HomeMy WebLinkAboutPacket SWWS Jun 25 2019Whatcom County
Council Surface Water Work Session
COUNTY COURTHOUSE
311 Grand Avenue, Ste #105
Bellingham, WA 98225-4038
(360) 778-5010
Meeting Agenda
Tuesday, June 25, 2019
10:30 AM
Civic Center Building Garden Room
COUNCILMEMBERS
Barbara Brenner
Rud Browne
Barry Buchanan
Tyler Byrd
Todd Donovan
Carol Frazey
Satpal Sidhu
CLERK OF THE COUNCIL
Dana Brown -Davis, C.M.C.
Council Surface Water Work Session Meeting Agenda June 25, 2019
Call To Order
Roll Call
Discussion
1. Watershed planning update
2. Homeowners incentive program update
Other Business
Adiournment
Whatcom County Pure 2 Printed on 113012024
j, I4IP
Lake Whatcom
Homeowner Incentive Program
June 25, 2019
Surface Water Work Session
Today's Discussion
• Brief overview of HIP
• HIP 2.0 Update
• Interlocal Agreement with City of Bellingham
• Answer questions
HIP Overview & History
• Program Goals:
—Reduce phosphorus from areas that
cannot be treated with capital projects
—Promote watershed stewardship
• No mechanism to make homeowners
retrofit properties; therefore, an incentive
program
• Public benefit; NOT a homeowner benefit
HIP 1.0 "Pilot"
• Ecology grant funded 2011-2015
• City of Bellingham led, interlocal agreement with
Whatcom County for grant reimbursement
• Significantly different than HIP 2.0
— Program area = city limits + Silver Beach Creek
subwatershed
— Majority of projects within city limits
— Staff design and permitting
— 153 projects completed
— More information in final grant report
HIP 2.0 Development
• 2015-2016
• City of Bellingham -led program evaluation
— Focus groups: homeowners, businesses, staff
—Survey of HIP 1 participants
—Survey of target property owners (e.g., shoreline)
— BMP design stakeholder input
• Information used to develop HIP 2.0
HIP 2.0 Overview
• Rolled out June 2017
• Significant program changes
— Doubled program area: 2,700 eligible properties (70%
Whatcom County/30% City of Bellingham)
— Transition to Whatcom County lead
— Neutral third party "face of HIP" = Whatcom
Conservation District
— Professional certification program (Utilize private
sector services)
— Cookie cutter engineered designs to simplify design &
permitting and allow calculation of P reductions
HIP 2.0 Overview
• Two-tier program
• Target: most phosphorus benefit
—Shoreline, creekside, large lawn
—Maintenance agreement with easement
— $1.30/square foot treated with no limit
—Materials +design &labor reimbursable
— 5 best management practices (BMPs)
— Step 1=site visit
HIP 2.0 Overview
• Do -It -Yourself Native Landscaping
—All other properties
—Maintenance agreement without easement
— $1.30/square foot treated with $6,000 limit
—Materials only reimbursable; homeowner
responsible for all labor
—Native landscaping only
— Step 1= attend a workshop
HIP 2.0 Update
• Two full years of implementation
• Whatcom Conservation District support:
— 1 FTE HIP Project Coordinator for target program
—Native plant expert for DIY program support
—Critical areas expert for target program support
— Program administration/outreach support
HIP 2.0 Update
• 2017-2018 focus on establishing program and
engaging homeowners
— Professional trainings
— DIY native landscaping workshops
— Website
— Outreach/advertising
— Developing processes
— Troubleshooting BMP designs
• 2019 focus building on work completed in 2017-18
Join your
neighbors. .'
9
Protect - d4.,
Lake
Whatcom.
Find out more!
www.lakewhatcomHIP.org
This propertyis
Find out more!
www.hkewhatcom
HIP.org
�4• ,f„ a -- -._ .., �� ®,IE � to
_ ! a Allf
�.: s-sett,,"•re,y �' mac- ; s �;y
HIP 2.0 Stats June 2017-May 2019
DIY
Target
eligible properties (approximate)
2,000
700
# workshops held
9
n/a
# households attending a workshop
115
n/a
# households requesting initial site visit
n/a
52
# projects in process
(permit review, permitted, construction)
10
3
# projects in the ground (closed out or phased)
8
3
area treated to date (square feet)
261682
341111
reimbursement to date ($)
$201815
$441344
P removed to date (pounds/year)
0.655
0.838
Program Changes
• Cooperative program between City and
County
• Any changes need to done through ILA
• Ecology approval necessary if we want credit
underTMDL
• Lake Whatcom Policy Group
— Part of Lake Whatcom Management Program
— Currently working on next 5-year work plan
Current COB Interlocal Agreement
• 2017-2019 (December 2016)
• Linked to 2017-2018 budget
• Purpose
—Spells out each jurisdiction's responsibilities
—Outlines agreed to program rules &structure
— Whatcom County pays first $100,000/year (Flood
Fund)
—City of Bellingham pays remainder (Lake Whatcom
Watershed Acquisition Program)
New COB Interlocal Agreement
• Continue with same terms with minor
administrative updates
— Extend through 2020 to synch with 2019-2020
approved budgets
—Update to reference 2019-2020 funding
—Minor edits to match current implementation
2018 Expenses
2019-2020
Budget
WCPW
$100;000
$100;000
City of Bellingham
$100;000
$320,000
TOTAL
$200;000
$420;000
Questions
WHATCOM COUNTY
PUBLIC WORKS DEPARTMENT
JON HUTCHINGS
Director
[Lei
THROUGH
FROM:
DATE:
RE:
MEMORANDUM
The Honorable Jack Louws, Whatcom County Executive, and
Honorable Members of the Whatcom County Council
Jon Hutchings, Director
Gary S. Stoyka, Natural Resources Program Manager
June 18, 2019
June 25, 2019 Council Surface Water Work Session
NATURAL RESOURCES
322 N. Commercial Street, Suite 110
Bellingham, WA 98225
Telephone: (360) 778-6230
FAX: (360) 778-6231
www, whatcomcoun ty. us
Please refer to the proposed agenda below for the next Surface Water Work Session. Additional
supporting documents may be distributed at or before the meeting.
AGENDA
Date:
Tuesday, June 25, 2019
Time:
10:30 a.m. to 12:00 p.m.
Place:
Civic Center Garden Level Conference Room
Time
Topic
Council Action
Background Information
Requested
Attached
10:30 AM —
Watershed Planning Update
Discussion
June 12, 2019 WRIA 1
11:00 AM
Management Team Brief
Sheet No. 7
11:00 AM —
Homeowners Incentive Program Update
Discussion
None
12:00 PM
If you have questions, please feel free to call me at (360) 778-6218.
cc: Mike McFarlane Joe Rutan Paula Harris
Beth Bushaw Jeff Hegedus John Thompson
Tyler Schroeder Josh Fleischmann Karen Frakes
Sue Blake Roland Middleton Dana Brown -Davis
George Boggs Ryan Ericson Lonni Cummings
John Wolpers
Kraig Olason
Jennifer Schneider
Atina Casas
Kristi Felbinger
Mike Donahue
Erika Douglas
Jill Nixon
Cathy Craver
Mark Personius
BRIEF SHEET AGENDA ITEM #7
MEETING: WRIA 1 Management Team
MEETING DATE: June 12, 2019
AGENDA ITEM: Agenda Item #7 Regional (WRIA1-Wide) Water Supply Plan, Strategy 3 in WRIA 1
Watershed Management Board Work Plan
OUTCOMES: Information; Discussion; Feedback
The purpose of this agenda brief sheet is to provide background information about the topic,
recommendations, if applicable, and desired outcome.
Agenda Outcome:
Approval _ Agreement_ Direction Feedback X Information/Discussion X
Background:
• The Regional (WRIA1-Wide) Water Supply Plan is Strategy 3 in the WRIA 1 Watershed Management
Board's Five Year Work Plan approved in August 2018 (attached pages from work plan).
• Consistent with the approach described on page 6 of the WRIA 1 Watershed Management Board's
Work Plan (WRIA 1 Watershed Management Board 2018-2023, August 1) for initiating the
implementation of strategies, a more detailed scope of work and timeline for Strategy 3 has been
drafted (attached).
• The draft scope of work builds on the information in the WRIA 1 Watershed Management Board
Work Plan and provides additional information about the coordination of the work under the WRIA 1
structure, the work to be completed, and the timeline.
. As a Near -Term Action (NTA) in the 2018-2022 Action Agenda for Puget Sound, the Regional (WRIA1-
Wide) Water Supply Plan has received partial funding through the National Estuary Program (NEP).
The draft scope of work attached will be used to develop the contract and project plan for that
funding source.
Discussion:
• Discuss coordination approach for initiating implementation.
Outcome:
. Discussion and feedback
Brief Sheet #7 June 12, 2019 Page 1 of 1
August 1, 2018
292 groundwater model include receiving and operating the model, which are
293 reflected in the tasks outlined below, and expanding it to other areas of
294 WRIA 1 such as the South Fork Nooksack Watershed where a groundwater
295 model has been proposed by Nooksack Tribe in partnership with USGS.
296 I Total Strategy 2 Planning Level Budget through 2020: $85,000
297 Work Products: Operation of WRIA 1 groundwater model; Options for
298 expanding groundwater model
299 Task 1: Coordinate technical review of groundwater model within the
300 WRIA 1 framework and identify additional groundwater monitoring
301 needs for long term model resolution, if any.
302 Timeline: December 2018-January 2019
303 Task 2: Identify options and select preferred option for managing the
304 coupled surface/groundwater model including operation of the
305 model and updating data sets as information becomes available
306 that will result in an increase in the resolution of the model output,
307 and after identifying how the model will be used and key
308 management questions for operating the model.
309 Timeline: August 2018-December 2018
310 Task 3: Identify needs and long term funding for managing the coupled
311 surface/groundwater model. Costs should include but is not limited
312 to staffing, updating data as needed, making information available
313 to the public and other entities, and calibrating the model when
314 appropriate.
315 Timeline: August 2018-January 2019
316 Task 4: Implement recommendation for managing the coupled model. This
317 task is dependent on Tasks 2 and 3 of this Strategy.
318 Timeline: Initiate implementation February 2019
319 Task 5: Expand groundwater modeling to other areas of WRIA 1 starting
320 with the South Fork Nooksack Watershed model proposed by
321 Nooksack Tribe in partnership with USGS.
322 Timeline: 2019-2022
323 Strategy 3: Regional (WRIA-Wide) Water Supply Plan
324 Description: This Strategy was originally identified in the 2010 Lower
325 Nooksack Strategy but not implemented due to lack of funding support.
326 Nonetheless, there remains a need for a WRIA 1-wide water supply plan
327 that establishes a framework to address water supply needs beyond the
328 WADOH regulatory framework of the Whatcom County Coordinated Water
329 System Plan (CWSP) and that is consistent with the geographic extent of
330 proposed approaches to settle water rights. Under this Strategy, the
Page 12 of 20
04-11-2019
Explanations of Changes
Line 296: Added "Planning
Level" for consistency with
other text in document.
August 1, 2018
331 regional water supply plan will integrate the 2017 updated CWSP with other
332 out -of -stream and instream water needs, in context with land use,
333 economic viability, and ecosystem recovery. Consider climate change
334 impacts on water quality and quantity as it relates to water supply.
335 Total Strategy 3 Planning Level Budget through 2020: $225,000
336 Work Product: Regional Water Supply Plan
337 I Task 1: Coordinate with technical work groups and staff teams—,-a4+d
338 drafting and providing feedback and review of
339 water supply plan components. Review of plan components will be
340 coordinated through the WRIA 1 framework.
341 I Timeline: 2019-2020 '^'�20
342 Task 2: Consolidate and quantify water availability, water use, and water
343 supply needs for out of stream needs (current and projected, which
344 will consider climate change) including evaluating water right data
345 base for opportunities. This task is anticipated to focus initially in
346 pilot areas for Strategy 4 (Drainage Based Management Planning).
347 I Timeline: 2019-2020
348 Task 3: Compile existing information on instream water needs and
349 identify monitoring priorities to incorporate in Strategy 7. This task
350 is anticipated to initially focus in pilot areas for Strategy 4 (Drainage
351 Based Management Planning).
352 I Timeline: 2019-2020
353 Task 4: Identify and support water supply and management research,
354 facilitate data collection, and close data gaps. This includes
355 I identifying priority needs for monitoring effectiveness of water
356 supply management approaches and solutions. This task will be
357 done in conjunction with Strategies 7 and 4, and related information
358 from the ESSB 6091 update (Strategy 6), as applicable.
359 I Timeline: 2019-2020 Deeemla^"'^14
360 Task 5: Identify, evaluate, and support solutions for meeting water supply
361 needs. This will be a collaborative and coordinated approach with
362 other efforts evaluating solutions in/for related plans and studies
363 (e.g., Drought Plan, grants addressing water supply, climate change
364 plans or studies, etc.), and in conjunction with Strategies 4 and 6
365 Drainage Based Management Planning and WRIA 1 Watershed
366 Management Plan (ESSB 6091 update), respectively. Gaps in
367 solutions will be identified, where applicable.
368 I Timeline: 2019-2020
Page 13 of 20
04-11-2019
Exolanations of Chanees
Line 333-334: reference to
climate change added
based on Nooksack Tribe
comments 2/21/19.
Line 335: Added "Planning
Level" for consistency with
other text in document.
Lines 337-338: Per
February 20 Management
Team meeting, removed
reference to Planning Unit
because lines 225-228
provide for receiving
feedback and input from
committees, public, and
Planning Unit as applicable
for each of the strategies.
The exception noted is
Strategy 6.
Lines 343-344: reference to
climate change added
based on Nooksack Tribe
comments 2/21/19.
Lines 363-364: reference to
climate change added
based on Nooksack Tribe
comments 2/21/19.
Task timelines added for
consistency
August 1, 2018
369 Task 6: Provide water supply information for connecting water availability
370 (e.g., forestry and agriculture) to land use and habitat. The
371 outcomes of Tasks 2-5 will be used to improve connections between
372 where water is available and existing land use. Information will be
373 coordinated with Strategies 4 through 6, and will be used to
374 integrate water supply needs into other planning efforts (e.g.,
375 Comprehensive Plans, Integrated Floodplain Planning, and other
376 watershed -scale plans).
377 I Timeline: 2020-2021
378 Task 7: Draft and Final WRIA 1 Water Supply Plan that consolidates
379 information from Tasks 2-6 into a WRIA 1 Water Supply Plan that
380 includes instream and out of stream water needs and identifies
381 ranges of solutions. Review and feedback on the draft plan will be
382 coordinated with tes#nical staffTwe,(gFO61ps, `"CIA —1 Planning
383 IJ,r , WRIA 1 Management Team, andn-tf}er imte.re,_#ed
384 paFtiesthrough the WRIA 1 framework prior to a final plan.
385 Partnerships with WWIN, WSU, WCD and others will be used for
386 sharing information and to support outreach related to water
387 supply planning.
388 I Timeline: 2020-2021
389 Strategy 4: Drainage Based Management Planning
390 Description: Drainage -based management planning (DBMP) is a
391 recommendation in the WRIA 1 Watershed Management Plan. The concept
392 is a planning approach scaled to the drainage level and that will consider
393 five elements — water quality, water supply, instream flow, fish habitat, and
394 accountability. Under this approach, targets for each of the elements will
395 be developed and agreed to among the affected parties. A pilot area will be
396 identified for implementing the DBMP approach. Based on effectiveness of
397 the approach in the pilot area, additional sub -basins will be identified to
398 continue the DBMP. This Strategy is inextricably linked to all of the
399 Strategies in this 2018-2023 work plan and is expected to involve identifying
400 and coordinating with a sub -lead for each sub -basin. The approach is similar
401 to an approach introduced and presented to stakeholders by Lummi Nation
402 and is envisioned as a mechanism to help facilitate the resolution of state
403 and federal/tribal water rights in WRIA 1 .
404 I Total Strategy 4 Planning Level Budget through 2020: $112,500
405 Work Products: Data synthesis and analysis technical memo; subbasin goals
406 for water supply, water quality, instream flows, and habitat;
407 Implementation Plan and Agreements for Drainage -Scale Water
408 Management
Page 14 of 20
04-11-2019
Explanations of Changes
Line 370: Nooksack Tribe
comments 2/21/19
Line 382-384: removed
references for consistency
and used same language as
in Task 1, Lines 339-340.
Line 404: Added "Planning
Level" for consistency with
other text in document.
Discussion DRAFT Scope of Work-Versionl
WRIA 1 Management Team Meeting, 06/12/19
WRIA 1 Watershed Management Board 2018-2023 Work Plan,
Strategy 3: Regional (WRIA-Wide) Water Supply Plan Scope of Work
This document is a working document for a "phase 1" scope of work for Strategy 3 of the WRIA 1
Watershed Management Board's 5-Year Work Plan. A "phase 1" is intended to scale the tasks from a
WRIA 1-wide effort to pilot areas using funds granted through the WDFW for implementing near term
actions included in the 2018-2022 Action Agenda for Puget Sound' and leveraging other grants and
efforts underway that are directly related to Strategy 3, Regional (WRIA-Wide) Water Supply Plan
(RWSP) This scope of work including tasks, subtasks, work products, and timelines are subject to
change to reflect WRIA 1 Management Team and technical staff input, feedback by entities,
organizations, Whatcom County Committees, and public.
A. Purpose
The purpose of the Regiona12 (WRIAl-Wide) Water Supply Plan (RWSP) is to establish a framework to
address water supply needs for instream and out of stream uses. The RWSP is not replacing the
Whatcom County Coordinated Water System Plan that is prepared under the Washington Department
of Health regulatory framework but is integrating it with other out -of -stream water uses and instream
water needs, and in context with land use, water quality, habitat, and stream flows.
B. Phase 1 Project Description
Scale tasks outlined in Strategy 3, Regional (WRIA1-Wide) Water Supply Plan, of the 2018-2022 WRIA 1
Watershed Management Board (WMB) Work Plan to two pilot areas, and implement tasks. The
proposed pilot areas should be selected based on one or more of the following reasons:
• Data availability
• Leverages other ongoing or proposed activities and funding
• Supports and/or advances other strategies in the WRIA 1 Watershed Management Board 5-year
Work Plan
Outcome of the Phase 1 Scope of Work is a water supply plan for the pilot areas that quantify current
and future out -of -stream water supplies and identifies management solutions that address those needs.
The pilot area plans will be rolled up into the regional, WRIA 1 Wide water supply plan, which will be a
separate, future scope of work.
Implementation of the tasks outlined in this scope of work will be completed under the framework of
the WRIA 1 WMB's multi -year work plan and structure. As identified in the work plan, the PUD No. 1 is
the administrative lead for advancing the RWSP strategy. Individual tasks or subtasks outlined below
may be undertaken by other entities or consultants with the PUD No. 1 responsible for coordinating the
overall management. Subcontracts, letters of commitment, Interlocal agreements, and/or
' The Regional (WRIA1-Wide) Water Supply Plan was submitted as a 2018 near term action (NTA) for inclusion in
the 2018-2022 Action Agenda for Puget Sound. Through the NTA review process, it was evaluated and included in
the referenced Action Agenda. Funding for NTAs is EPA, National Estuary Program funding administered through
Puget Sound Strategic Initiative Leads.
z Regional defined as Water Resource Area 1 (WRIA1) within Whatcom County boundaries.
Page 1 of 6
Discussion DRAFT Scope of Work-Versionl
WRIA 1 Management Team Meeting, 06/12/19
memorandum of understandings may be developed with other entities, organizations, and/or
consultants for individual tasks or subtasks. Tasks and/or subtasks may be implemented concurrently;
they are not necessarily sequential (e.g., feedback and communication tasks will be ongoing).
Implementing this Phase 1 scope of work will also support information needs for Strategy 4, Drainage
Based Management Planning, 2018-2022 WRIA 1 Watershed Management Board Work Plan, August 1,
2018).
C. Scope of Work Tasks and Deliverables
TASK 1: Process for Coordinating Tasks and Identifying Pilot Areas
1.1 The coordination process will be under the WRIA 1 Management Team as the administrative
team of the WRIA 1 Watershed Management Board. Technical staff of the entities represented
in the Local Government and Co -Manager Caucuses of the WRIA 1 Watershed Management
Board will provide technical input to the tasks with the WRIA 1 Management Team providing
the overall guidance for implementation. Other technical, planning, administrative, and/or
management staff will be invited to participate as identified for purposes of addressing unique
characteristics of the pilot areas. Staff involved in the coordination will have expertise in or be
involved with water supply, fisheries, flows, habitat, water quality, agricultural needs, and land
use (i.e., factors associated with instream and out of stream water uses/needs). Staff and
Management Team members will be responsible for communicating the process internally
within their organization, with their associated committees and boards, staff teams, and/or
work groups and with their councils and commissions. ILP
Timeline: June 30, 2019
Product/Outcome: Technical staff identified for coordinating process and reporting to WRIA 1
Management Team
1.2 Criteria proposed for selecting pilot areas include:
a. Available data
b. Ability to leverage existing funds
c. Ability to leverage efforts underway that relate directly to the tasks identified in this scope
of work
d. Competing water needs
e. Nexus with water quality and flood management
f. Nexus with issues identified in the Stream Restoration Act (ESSB 6091)
Based on the criteria, the proposed pilot areas include the Drayton and Bertrand Watersheds.
The proposed pilot areas will be confirmed by the Management Team as part of Task 1.
Timeline: June 30, 2019
Product/Outcome: Confirm Pilot Areas
1.3 Convene technical staff and establish responsibilities and confirm project plan, milestones, and
timeline.
Timeline: July 15, 2019
Page 2 of 6
Discussion DRAFT Scope of Work-Versionl
WRIA 1 Management Team Meeting, 06/12/19
Product/Outcome: Project Plan
TASK 2: Data Compilation and Synthesis3
2.1 Convene technical staff to identify type/categories of data for documenting existing and future
instream and out of stream water uses and needs and sources for the information including but
not limited to:
• Water right permits and sources (i.e., ground or surface water)
• Future water supply needs by type of use and source over next 50 years in 10 year
increments.
• Stream flows
• Fish presence
• Habitat conditions
• Land use
• Water service area boundaries and water use projections4
Timeline: July 30, 2019
Product/Outcome: List of publications and data sets relevant to existing and future instream
and out of stream water uses
2.2 Subcontract and/or Memorandums of Agreement for compiling and synthesizing data
identified in 2.1, and identifying data gaps, if any5. Anticipated consolidation and synthesis
tasks include but are not limited to:
• Inventorying existing water right permits by source of water to identify surplus water, if any,
and additional water supply needs
• Synthesizing future water supply needs in the pilot area(s) over next 50 years in 10 year
increments including seasonal impacts based on climate change projections for domestic,
industrial, commercial, municipal uses
• Projecting water use over next 50 years in 10 year increments for agriculture including
potential seasonal variations resulting from climate change projections.
• Summarizing stream flow information, identifying data gaps, and provide recommendations
for priority stream flow gage locations, if applicable.
• Summarizing current and historic fish presence in the pilot area(s).
• Summarizing current and historic habitat conditions in the pilot area(s).
Timeline: September 30, 2019
3This task also supports WRIA 1 Watershed Management Board 2018-2022 Work Plan, Strategy 4, Drainage Based
Management Planning.
4The source for this information will be the most recently approved Whatcom County Coordinated Water System
Plan.
5This subtask may be implemented by multiple entities and/or consultants through Memorandum of Agreements
and/or contracts, as applicable.
Page 3 of 6
Discussion DRAFT Scope of Work-Versionl
WRIA 1 Management Team Meeting, 06/12/19
Product/Outcome: Data synthesis technical memorandums) including identifying data gaps
and recommendations.
2.3 Synthesize and summarize data from 2.2 with land use and water service area boundaries (2.1)
to characterize current and projected water use for both instream and out of stream needs in
context with land use and water service boundaries. The intent is to identify where water is
available and where it is needed to inform water management solutions including
opportunities for improving habitat and stream flows.
Timeline: October 31, 2019
Product/Outcome: Technical Memorandum including synthesis of data, maps, data sets,
findings, and recommendations, if applicable.
TASK 3: Water Supply/Management Solutions
3.1 Identify and evaluate potential future water supply source alternatives that could be developed
to meet future water requirements. Although this subtask is not limited to approaches
identified through the 2018 WRIA 1 process to address ESSB 6091 (Stream Restoration Act), it is
expected that it is a significant source of information for alternatives to further evaluate to
address water needs identified through Task 2. The alternatives will be evaluated for technical,
economic, regulatory, and political feasibility.
Timeline: November 30, 2019
Product/Outcome: Technical memorandum of alternatives and evaluation outcomes
3.2 Identify early actions either for full implementation or as a pilot to further evaluate feasibility
at a broader scale. Actions identified as "early action" are ready to go and include
implementation plan that includes clear objectives, performance measures, budget to
implement, administer, and monitor, source of funding, implementing entity, and an
effectiveness monitoring plan.
Timeline: Ongoing as tasks identify and refine information in the pilot area(s)
Product/Outcome: Implementation plan for early actions
TASK 4: Support/Facilitate Data Collection
4.1 Facilitate development of monitoring plan to fill priority data gaps identified in Task 2, and
primarily 2.2. Design a monitoring plan surrounding the implementation of management tools
that provides baseline conditions and tracks effects of project implementation. The monitoring
plan(s) will include costs, locations, and implementing agency.
Timeline: December 31, 2019
Product/Outcome: Monitoring Plan
TASK 5: Phase 1 Scaled Water Supply Report
5.1 Consolidate information from Tasks 1-4 into a Phase 1 report for the pilot area(s) that includes
a characterization of instream and out of stream water uses, current and future water needs,
6This task also relates to WRIA 1 Watershed Management Board Work Plan, Strategy 7, Integrated Monitoring
Program.
Page 4 of 6
Discussion DRAFT Scope of Work-Versionl
WRIA 1 Management Team Meeting, 06/12/19
identifies ranges of solutions, costs to implement, and monitoring plan for effectiveness of
projects. This report will be rolled up into the Regional (WRIA 1-wide) Water Supply Plan (Task
6) that is the intended outcome for Strategy 3 in the WRIA 1 Watershed Management Board
2018-2022 Work Plan. While the "phase 1" focus on pilot areas will provide information on
water supply needs and management solutions, it is not intended to be a stand-alone water
supply plan and is part of the larger water supply framework.
Timeline: Draft Report January 31, 2020; Final Report February 28, 2020
Product/Outcome: Draft and Final Phase 1 Project Report
Task 6: Regional (WRIA1-Wide) Water Supply Plan
6.1 While tasks 2-4 are focused primarily in pilot areas, the process of implementing those tasks is
intended to inform the WRIA-wide water supply planning as outlined in Strategy 3 of the WRIA
1 Watershed Management Board 2018-2022 Work Plan. This means that as data is compiled
and synthesized, to the extent possible, databases will be setup and references documented
that are applicable to completing the WRIA 1 Wide Water Supply Plan.
6.2 Consider modifications, if any, from the Pilot Area processes (Tasks 1-4) for purposes of setting
the scope to coordinate the Regional (WRIA 1-Wide) Water Supply Plan process in the
remaining areas of WRIA 1, which would be completed in 2020-2021.
Timeline: a. January 30, 2020 Scope of Work for WRIA 1-Wide Framework and Tasks; b.
December 2021 for Regional (WRIA 1 Wide) Water Supply Plan
Product/Outcome: Scope of Work for WRIA1-Wide Framework and Tasks; Draft and Final
Regional (WRIA 1 Wide) Water Supply Plan
TASK 7: Outreach and Engagement
7.1 It is anticipated that the members of the WRIA 1 Management Team and technical staff and
others involved in Tasks 1-6 will be communicating internally with their legislative, policy,
management, committees, and/or other individuals or boards on an ongoing basis, and
receiving feedback and guidance on tasks and subtasks as they move forward. The
coordinating process and task approach outlined in subtask 1.1 is intended to ensure that the
Local Government Caucus, which includes the Ag Water Board as Ex-Officio, and the Co -
Manager Caucus of the WRIA 1 Watershed Management Board are informed as the project
advances, it is not creating a new process or new committees, and it is consistent with the
approved WRIA 1 Watershed Management Board 2018-2022 Work Plan.
7.2 The WRIA 1 Planning Unit will be updated on a regular basis with opportunities for feedback on
draft work products.
7.3 The WRIA 1 Staff Teams will be involved in providing input as tasks move forward. Technical
staff participating in the coordination of the tasks in the scope will be communicating with the
established staff teams as needed for input.
7.4 Draft work products will be posted to the WRIA 1 Project website with public opportunities for
feedback on draft products.
Page 5 of 6
Discussion DRAFT Scope of Work-Versionl
WRIA 1 Management Team Meeting, 06/12/19
7.5 Opportunities will be pursued with Whatcom Watersheds Information Network (WWIN) to
provide public outreach and engagement as appropriate such as through the WWIN/MRC
Speaker Series or other events.
Timeline: Ongoing throughout the Phase 1 Project
Page 6 of 6