HomeMy WebLinkAboutPacket Water Work Session Nov 16 2021Whatcom County Council Water Work Session COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 Bellingham, WA 98225-4038 (360) 778-5010 Meeting Agenda Tuesday, November 16, 2021 10:30 AM Virtual Meeting VIRTUAL MEETING COUNCILMEMBERS Rud Browne Barry Buchanan Tyler Byrd Todd Donovan Ben Elenbaas Carol Frazey Kathy Kershner CLERK OF THE COUNCIL Dana Brown -Davis, C.M.C. Council Water Work Session Meeting Agenda November 16, 2021 Call To Order Roll Call Water Resources Update Discussion with WRIA 1 Planning Unit (Part 1) Overview of Flood Control Zone District Budget Overview of WRIA 1 Data Hub Other Business Adjournment Whatcom County Page 2 Printed on 21812024 WHATCOM COUNTY PUBLIC WORKS DEPARTMENT JON HUTCHINGS Director MEMORANDUM NATURAL RESOURCES 322 N. Commercial Street, Suite 110 Bellingham, WA 98225 Telephone: (360) 778-6230 FAX: (360) 778-6231 www. whatcomcounty. us TO: The Honorable Satpal Singh Sidhu, Whatcom County Executive, and Honorable Members of the Whatcom County Council THROUGH: Jon Hutchings, Director FROM: Gary S. Stoyka, Natural Resources Program Manager DATE: November 9, 2021 RE: November 16, 2021 Council Water Work Session Please refer to the proposed agenda below for the next Water Work Session. Additional supporting documents may be distributed at or before the meeting. AGENDA Date: Tuesday, November 16, 2021 Time: 10:30 a.m. to 12:00 p.m. Place: Virtual Meeting. For instructions on how to watch or participate in this meeting, please visit us at www.whatcomcounty.us/ioinvirtualcouncil or contact the Council Office at 360.778.5010. View meeting schedules, agendas, minutes, videos, and archives at www.whatcom.Iegistar.com. Time Topic Council Action Background Information Requested Attached 10:30 AM — Water Resources Update Informational None 10:45 AM 10:45 AM — Discussion with WRIA 1 Planning Unit Discussion None 11:15 AM 11:15 AM — Overview of Flood Control Zone District Informational Proposed 2022 Budget 11:45 AM Budget 11:45 AM — Overview of WRIA 1 Data Hub Informational None 12:00 PM If you have questions, please feel free to call me at (360) 778-6218. cc: Dana Brown -Davis Erika Douglas Cathy Craver Roland Middleton Mike McFarlane Kristi Felbinger John Thompson Beth Bushaw Mark Personius Aneka Sweeney Jill Nixon Paula Harris Jim Karcher Josh Fleischmann Chris Elder Jennifer Schneider Lonni Cummings Atina Casas Tyler Schroeder Karen Frakes Kraig Olason Doug Ranney Sue Sullivan OVERALL BUDGET SUMMARY Budget Program Code 169100 Adminstration 169100 Transfers - To Stormwater 169102 Flood Response 169104 Flood Planning 169106 Technical Assistance 169108 NFIP and CRS 169110 Early Warning 169112 Repair and Maintenance 169114 Flood Hazard Reduction 169119 Natural Resources 169120 Aquatic Invasive Species 169121 Water Planning 169700 NPDES TOTAL (DECREASE)/INCREASE IN FUND BALANCE Flood Control Zone District 2022 Budget Approved 2021 Budget Supplemented 2021 Budget 2021 Year End Projection Proposed 2022 Budget Revenues Expenditures Revenues Expenditures Revenues Expenditures Revenues Expenditures $ 5,043,000 $ 777,107 $ 5,043,000 $ 784,093 $ 5,020,258 $ 902,333 $ 5,210,000 $ 859,831 $ 1,459,512 $ 1,598,954 $ 1,279,163 $ 1,202,339 $ - $ 110,000 $ - $ 110,000 $ - $ 55,000 $ - $ 110,000 $ 258,000 $ 885,000 $ 258,000 $ 927,575 $ 115,000 $ 283,025 $ 70,000 $ 940,000 $ - $ 75,000 $ - $ 75,000 $ - $ 75,000 $ - $ 75,000 $ 16,000 $ 177,000 $ 16,000 $ 177,000 $ 10,000 $ 165,000 $ 12,000 $ 127,000 $ 4,500 $ 138,100 $ 4,500 $ 138,100 $ 4,413 $ 109,000 $ 4,413 $ 133,000 $ 535,000 $ 977,439 $ 385,000 $ 827,439 $ 264,115 $ 623,039 $ 715,000 $ 1,692,439 $ 2,632,540 $ 4,517,535 $ 4,157,143 $ 6,451,950 $ 2,957,851 $ 4,196,439 $ 3,169,846 $ 4,437,456 $ 557,361 $ 2,015,894 $ 563,639 $ 2,040,950 $ 499,278 $ 2,115,916 $ 744,139 $ 2,227,659 $ - $ 152,217 $ - $ 152,217 $ - $ 152,217 $ - $ 164,944 $ 175,000 $ 728,546 $ 175,000 $ 832,246 $ 225,000 $ 801,436 $ 175,000 $ 548,914 $ - $ 160,320 $ - $ 160,320 $ - $ 80,000 $ - $ 160,320 $ 9,221,401 $ 12,173,670 $ 10,602,282 $ 14,275,844 $ 9,095,915 $ 10,837,568 $ 10,100,398 $ 12,678,902 $ (2,952,269) $ (3,673,563) $ (1,741,653) $ (2,578,504) Notes: 14% Rev Lapse 24% Exp Lapse Assumes no fall flood in 2021; 2022 budget includes funding for flood response and new repair 2021 Txfr to Stormwater Projection includes a 20% budget lapse. Starting Balance 8,084,364 Projected Net Annual Activity -1,741,653 Projected Balance 6,342,711 Budgeted Net Annual Activity -2,578,504 Add back expense lapse of 20% (with related grant income reduction) 1,901,811 Projected Balance 5,666,018 Rev Exp ASR's 6426 Collaborative Water Solutions Process $ 125,000 $ 375,000 $ (250,000) 6427 WSU Extension $ - $ 25,000 $ (25,000) 6430 Auditor Fee Increases $ $ 12,500 $ (12,500) 6431 AIS Enforcement Funding $ $ 28,000 $ (28,000) 6432 Software Maint Contracts $ $ 5,000 $ (5,000) 6436 PIC Livestock Technical Ass't Frog. $ $ 50,000 $ (50,000) Balance after ASR's 5,295,518 BOY 2021 BOY 2022 BOY 2023 169121 169119 169100 169120 169100 169119 BOY 2023 (after ASRs) 2022 ASR's Revenues Expenditures $ 17,500 $ 125,000 $ 75,000 $ 28,000 $ 375,000 $ 125,000 $ 495,500 $ (370,500) FLOOD MAINTENANCE AND OPERATIONS Flood Response (169102) Wage and Benefits Sand and sandbags Preparedness training Sector observers during response Construction contracts TOTAL NET IMPACT TO FUND BALANCE Flood Planning (169104) Lower Nooksack Wage and Benefits CFHMP refinement/update Facilitation Hydraulic modeling/alternatives analyses FLIP process support/Engineering design/Plan Sediment management Reach 1 Sediment FLIP support for ag (AWB, farmer stipends) High water mark survey TOTAL NET IMPACT TO FUND BALANCE Technical Assistance (169106) Wage and Benefits Postage for Special District reassessments TOTAL NET IMPACT TO FUND BALANCE National Flood Insurance Prgm (169108) Wage and Benefits FEMA Floodplain mapping Permit reviews Original 2021 Budget Revenues Expenditures $ 10,000 $ 35,000 $ 5,000 $ 40,000 $ 20,000 $ - $ 110,000 $ (110,000) Original 2021 Budget Revenues Expenditures $ 150,000 $ 50,000 $ 50,000 $ 200,000 $ 300,000 $ 200,000 $ - $ 50,000 $ 58,000 $ 60,000 $ 25,000 $ 258,000 $ 885,000 $ (627,000) Original 2021 Budget Revenues Expenditures $ 75,000 $ - $ 75,000 $ (75,000) Original 2021 Budget Revenues Expenditures $ 150,000 $ 12,000 $ 16,000 Flood Control Zone District 2020 Budget Work Plan and Supporting Documentation DETAIL FOR FCZD PROGRAM AREAS Supplemented 2021 Budget 2021 Year End Projection Proposed 2022 Budget Revenues Expenditures Revenues Expenditures Revenues Expenditures $ 10,000 $ 10,000 $ 10,000 $ 35,000 $ 10,000 $ 35,000 $ 5,000 $ 5,000 $ 5,000 $ 40,000 $ 20,000 $ 40,000 $ 20,000 $ 10,000 $ 20,000 $ - $ 110,000 $ - $ 55,000 $ - $ 110,000 $ (110,000) $ (55,000) $ (110,000) Supplemented 2021 Budget Revenues Expenditures $ 150,000 $ 87,550 $ 50,000 $ 200,000 $ 305,025 $ 200,000 $ 50,000 $ 58,000 $ 60,000 $ 25,000 $ 258,000 $ 927,575 $ (6699575) Supplemented 2021 Budget Revenues Expenditures $ 75,000 $ - $ 75,000 $ (75,000) Supplemented 2021 Budget Revenues Expenditures $ 150,000 $ 12,000 $ 16,000 2021 Year End Projection Revenues Expenditures $ 150,000 $ 3,000 $ 10,000 $ 100,000 $ 105,025 $ 15,000 $ 15,000 $ 115,000 $ 283,025 $ (168,025) 2021 Year End Projection Revenues Expenditures $ 75,000 $ - $ 75,000 $ (75,000) 2021 Year End Projection Revenues Expenditures $ 150,000 $ 10,000 Proposed 2022 Budget Revenues Expenditures $ 130,000 $ 70,000 $ $ 70,000 $ $ (870,000) ns/Notes Includes pre -deployed and sand bags for training Road and M&O employees and equipment Road employees wages and benefits for 1 significant flood event During and immediately following response Budget based on 2009 flood with cost & wage increases 2021 YE projection assumes small fall flood ns/Notes 75,000 2021 BA inc 37,550 CA for CollinsW; need 2022 BA to cover est balance (35000) and amendment 60,000 2021 PO will CA (est bal is 10k) 2022 for FEQ model support 300,000 2021 BA inc 5025 CA for NWIC; Herrera balance will CA into 2022 (2021 PO): NEP grant ends in 2021 200,000 likely to get under contract in 2022 75,000 2020 PO for $85.7 balance + amendment for updated survey; 2021 BA for follow-up work with reach team 75,000 Pass through funding for ag consultant, farmers stipends and tribes- revenues from FbD 25,000 940,000 Proposed 2022 Budget Revenues Expenditures $ 75,000 $ - $ 75,000 $ (75,000) ns/Notes CDID#5 was updated in 2020 with improved parcel coverage Proposed 2022 Budget Revenues Expenditures Assumptions/Notes $ 100,000 $ - $ 12,000 Assumes LNR mapping in 2022 - expenditures for public meeting notice $ 12,000 $ - Flood permit fees Public education/CRS activities TOTAL NET IMPACT TO FUND BALANCE Early Warning System (169110) Wage and Benefits Nooksack River gages - USGS Everson MainSt stage gage _ USGS Emergency access to SNOTEL Equipment for gage upgrades/repairs Repairs and maintenance TOTAL NET IMPACT TO FUND BALANCE FLOOD CONSTRUCTION AND IMPROVEMENTS Repair and Maintenance (169112) Wage and Benefits Misc Construction Projects Emergency/new projects as needed Miscellaneous repair projects Marine Drive Levee Repair 2020 damage (720004) Truck Road 2018 Emergency Bank Protection (718001) Truck Road 2020 Damage (720008) Everson Overflow Pipeline Bank Stabilization (720009) Sande -Williams Levee Rehab (USACE/DD2-719004) Bertrand Creek Levee Stabilization (721002) Mitigation Planning/Implementation Jail crew Reveg planning/coordination Reveg/misc supplies TOTAL NET IMPACT TO FUND BALANCE $ 15,000 $ 16,000 $ 177,000 $ (161,000) Original 2021 Budget Revenues Expenditures $ 5,000 $ - $ 106,100 $ 4,500 $ - $ - $ 5,000 $ $ 12,000 $ $ 10,000 $ 4,500 $ 138,100 $ (133,600) Original 2021 Budget Revenues Expenditures $ 120,000 $ 50,000 $ 50,000 $ - $ 50,000 $ 225,000 $ 300,000 $ 140,000 $ 150,000 $ 120,000 $ 150,000 $ 117,439 $ 30,000 $ 10,000 $ 535,000 $ 977,439 $ (442,439) $ 16,000 $ $ (161,000) Flood Control Zone District 2020 Budget Work Plan and Supporting Documentation 15,000 $ 15,000 $ $ 177,000 $ 10,000 $ 165,000 $ 12,000 $ $ (155,000) $ (115,000) Supplemented 2021 Budget Revenues Expenditures $ 5,000 $ - $ 106,100 $ 4,500 $ - $ - $ 5,000 $ $ 12,000 $ $ 10,000 $ 4,500 $ 138,100 $ (133,600) Supplemented 2021 Budget Revenues Expenditures $ 120,000 $ 50,000 $ 50,000 $ - $ 50,000 $ 75,000 $ 150,000 $ 140,000 $ 150,000 $ 120,000 $ 150,000 $ 117,439 $ 30,000 $ 10,000 $ 385,000 $ 827,439 $ (442,439) Flood Hazard Reduction (169114) 1 Original 2021 Budget I Supplemented 2021 Budget 2021 Year End Projection Revenues Expenditures $ 5,000 $ 104,000 $ 4,413 $ 4,413 $ 109,000 $ (104,587) 2021 Year End Projection Revenues Expenditures $ 120,000 $ 5,000 $ 40,000 $ 80,000 $ 123,025 $ 140,600 $ 93,750 $ 125,000 $ 7,340 $ - $ 117,439 $ 30,000 $ 5,000 $ 264,115 $ 623,039 $ (358,924) 2021 Year End Projection 15,000 127,000 Proposed 2022 Budget Revenues Expenditures $ 1,000 $ - $ 105,000 $ 4,413 $ - $ - $ 5,000 $ $ 12,000 $ $ 10,000 $ 4,413 $ 133,000 $ (128,587) Proposed 2022 Budget Revenues Expenditures $ 185,000 $ 50,000 $ 350,000 $ - $ 50,000 $ 251,250 $ 300,000 $ 253,750 $ 250,000 $ 135,000 $ 150,000 $ 25,000 $ 250,000 $ $ 117,439 $ $ 30,000 $ $ 10,000 $ 715,000 $ 1,692,439 $ (977,439) Proposed 2022 Budget CRS mailings ns/Notes Canadians reimburse cost to maintain gage; AVZ pays for Jones gage directly Equip at NF gage may need replacing ns/Notes Assumed costs for responding to flood/new repairs (assumes no fall 2021 flood) Placeholder for small projects; fall 2019 flood assumed Surveyed in 2020, construction in 2022 (FEMA) 50/50 cost -share with Roads; land ac d/s of site will provide final mitigation for past emergency work 2021 contract for alt analysis; 2021 amendment for design: rev are 75% FEMA and 12.5% Roads Alt anal in 2021; design in 2022; FEMA reimburses 75% 2021 revenues from DD#2 for 80/20 split on USACE cost -share Start design in 2021 and construct in 2022; potential cost -share from DD#4 Jail crew labor for FCZD and SWIF projects; available to diking or subzones New 2-year contract in 2021 Increased to cover plant replacement costs for Deming and other past projects as needed Wage and Benefits _ Misc Swift Creek Bank stabilzation/channel excavation Marietta property acquisition & demo New properties Leases for agriculture Walton Property Management Floodplain acquisition Ferndale Levee Improvement Project (719008) Lynden Levee Improvement Project (in conjunction with USACE rehab project) (718005) USACE Lynden Levee Rehab and Culvert Replacement (718005) Abbott Levee Improvement (SWIF) (718010) Duffner Ditch Flood Gate Replacement Early Action (720007) Cougar Creek Early Action Project Design (720010) Other FbD Early Action Projects (TBD) South Fork Fish Camp Project (72100x) Phase 1 design/construction Dahlberg Wetland Mitigation Site (719006) Wetland plan development Jones Creek Deflection Berm (712004) Berm and bridge design Land/easement acquisition Pre -closing costs (appraisals, hazmat, etc.) Construction High Creek Sediment Management Sediment trap maintenance (720005) Glacier -Gallup Creek Alluvial Fan Restoration (718007) Feasibility study/concept design (BGC) Outreach Preliminary design TOTAL NET IMPACT TO FUND BALANCE Revenues Expenditures $ 375,000 $ - $ 107,835 1 $ - $ 50,000 $ 3,780 $ - $ 831,760 $ 1,039,700 $ 524,000 $ 655,000 $ - $ 220,000 $ 325,000 $ 650,000 $ 90,000 $ 90,000 $ 100,000 $ 54,000 $ 180,000 $ 520,000 $ 650,000 $ $ 45,000 $ 48,000 $ 60,000 $ 36,000 $ 45,000 $ 200,000 $ 250,000 $ 2,632,540 $ 4,517,535 $ (1,884,995) Flood Control Zone District 2020 Budget Work Plan and Supporting Documentation Revenues Expenditures Revenues Expenditures Revenues Expenditures $ 375,000 $ 315,000 $ - $ 107,835 1 $ - $ 50,000 $ 3,780 $ - 1 $ 671,760 $ 839,700 $ 356,988 $ 446,235 $ 524,000 $ 655,000 $ - $ 220,000 $ 413,215 $ 826,430 $ 150,000 $ 150,000 $ 90,000 $ 90,000 $ 100,000 $ 54,000 $ 180,000 $ 1,409,600 $ 1,762,000 $ 75,800 $ 94,750 $ 124,000 $ 155,000 1 $ - $ 45,000 $ 48,000 $ 60,000 $ 36,000 $ 45,000 $ 200,000 $ 250,000 $ 4,157,143 $ 6,451,950 $ (2,294,807) $ 3,780 $ 16,800 $ 42,000 we may spend more this year if GG goes through $ 174,588 $ 218,235 $ 421,600 $ 527,000 $ 45,000 $ 210,600 $ 786,000 $ 150,000 $ 150,000 $ 105,000 $ 120,000 $ 10,000 1 7$ 100,000 $ 1,409,600 $ 1,762,000 $ 75,800 $ 94,750 $ 10,000 $ 57,994 $ 72,492 $ 42,690 $ 53,362 $ 32,000 $ 40,000 $ 2,957,851 $ 4,196,439 $ (1,238,588) $ $ 114,624 $ - $ 50,000 $ 3,780 $ - $ 16,800 $ - $ 847,866 $ 1,059,832 $ 422,400 $ 528,000 $ 36,000 $ 45,000 $ 155,000 $ 60,000 $ 75,000 $ 300,000 $ 375,000 $ 880,000 $ 880,000 ns/Notes 300k commitment per year; 150k Roads; remainder cost -shared 70/30 b/w FCZD and SNE Subzone Subject to CPI-W Increases New owner interested in selling River Rd and Emmerson Rd properties Revenues are from lease; 2021 expenses to deal with barn fire (demo, electric and well house) Revenues from FbD grant; 2021 BA reduced by 200k for transfer to Jones Crk; 2022 is remaining grant task balance if not used for GG 2021 BA from R&E CA; 2022 BA cover contract balance + amendment for 60% design; rev from FbD Chanel construction and USACE cost -share in 2021; planting and O&M plan in 2022 20% cost -share for USACE project; rev are from Lynden and LE subzone Assumes Roads pays 50%; design and contruct bank repair in 2021; 2022 BA is for Phase 2 design; 2021 BA inc NHC CA 2021 rev are EQIP funding (loaned to WID in 2020) and 150k FbD grant early action funds 2021 rev is NOAA funding through TNC; complete design and permit in 2022 as early action project for FbD? Balance of task budget in 2019-21 FbD grant; projects TBD Pass -through FbD funding to Nooksack Tribe for integrated fish - flood project: Tribe to provide grant match (not included in WRIP) $ 130,000 ?021 costs for BLA to settle claim; 2022 BA for work to start on site $ $ 50,000 $ $ 124,000 $ 2021 BA inc CA for Swift appraisals; 2021 PO for PSE contract 130,000 lance; Permitting assistance from Roads (30k/yr) design cost- Derus and Swift properties plus two easements in 2021; revenues from FbD; 2022 revenues is from road for new ROW 2021 BA for CA for Swift appraisal + supplement for add'tal properties 155,000 Demo and cleanup of Derus- likely to slip to 2022 due to movers $ $ 45,000 $ 20,000 $ 25,000 $ 200,000 $ 250,000 $ 3,169,846 $ 4,437,456 $ (1,267,610) Cleaning only one trap in 2021 Risk assessment and alternatives anlaysis in 2021; 2021 exp is contract balance to select alternative 2021 YE exp is contract balance - 2021 PO interim repair alt analysis in 2021; 60% design in 2022 Flood Control Zone District Proposed 2022 Budget Natural Resources (169119) NATURAL RESOURCES ADMINISTRATION Staff Office and operating TOTAL NET IMPACT TO FUND BALANCE NATURAL RESOURCES OPERATIONS Salmon Recovery Staff Restoration effectiveness monitoring, adaptive management, and stewardship Maintaining existing restoration projects* New restoration projects" Marine Resources Committee Staff MRC restoration projects Water Quality/Pollution Identification & Correction Program Coordination Water Quality Monitoring Data Management Technical Assistance Community Outreach Incentives Compliance Coordination and Planning Lake Whatcom Homeowner Incentive Program Cosmos WSU Extension outreach services TOTAL NET IMPACT TO FUND BALANCE TOTAL FOR COST CENTER 'Integrated Salmon Recovery/Flood Hazard Reduction Aquatic Invasive Species (169120) AIS ADMINISTRATION Staff Office and operating TOTAL NET IMPACT TO FUND BALANCE AIS OPERATIONS Coordination and Planning Interlocal Agreement (COB) Enforcement AIS online education program website maintenance TOTAL NET IMPACT TO FUND BALANCE TOTAL FOR COST CENTER Water Planning (169121) WATER PLANNING ADMINISTRATION Staff Office and operating TOTAL NET IMPACT TO FUND BALANCE Original 2021 Budget Revenues Expenditures $ 327,441 $ 293,439 $ $ 620,880 $ (620,880) $ 135,926 $ 61,408 $ 92,112 $ 30,000 $ 93,000 $ 105,100 $ 4,000 $ 3,365 $ 139,291 $ 247,035 $ 90,240 $ 90,240 $ 114,240 $ 114,240 $ 134,100 $ 173,100 $ 35,000 $ 59,000 $ 87,416 $ 87,416 $ 61,086 $ 25,000 $ 557,361 $ 1.424.954 $ (867,593) $ 557,361 $ 2,045,833 $ 1,488,472 capital and planning projects appear ur Original 2021 Budget Revenues Expenditures $ $ 143,467 $ $ 8,750 $ $ 152,217 $ (152.2171 $ - $ 152,217 $ 152,217 Original 2021 Budget Revenues Expenditures $ 123,354 $ 550 $ - $ 123,904 $ (123,904) Supplemented 2021 Budget Revenues Expenditures $ 327,441 $ 293,439 $ $ 620,880 $ (620,880) $ 135,926 $ 61,408 $ 92,112 $ 30,000 $ 93,000 $ 105,100 $ 10,278 $ 3,365 $ 139,291 $ 258,165 $ 90,240 $ 90,240 $ 114,240 $ 114,240 $ 134,100 $ 173,100 $ 35,000 $ 59,000 $ 87,416 $ 87,416 $ 61,086 $ 115,000 $ 25,000 $ 557,361 $ 1.424.954 $ (867,593) $ 557,361 $ 2,045,833 $ 1,488,472 der Cost Center 169114 and 169104. Supplemented 2021 Budget Revenues Expenditures $ $ 143,467 $ $ 8,750 $ $ 152,217 $ (152.2171 $ $ 152,217 $ 152,217 Supplemented 2021 Budget Revenues Expenditures $ 123,354 $ 550 $ - $ 123,904 $ (123,904) Year End 2021 Projection Revenues Expenditures $ 327,441 $ 293,439 $ $ 620,880 $ (620,880) $ 134,959 $ 59,440 $ 89,160 $ 30,000 $ 93,000 $ 105,100 $ - $ 10,278 $ 139,291 $ 258,165 $ 88,676 $ 90,240 $ 96,066 $ 96,066 $ 104,082 $ 173,100 $ 22,500 $ 42,500 $ 88,676 $ 87,416 $ 60,646 $ 115,000 $ 25,000 $ 493.000 $ 1.516.361 $ (1,023,361) $ 493,000 $ 2,137,241 $ 1,644,241 Year End 2021 Projection Revenues Expenditures $ $ 143,467 $ $ 3,700 $ $ 5,050 $ $ 152,217 $ (152.217) $ $ 152,217 $ 152,217 Year End 2021 Projection Revenues Expenditures $ 110,886 $ 550 $ - $ 111,436 $ (111,436) Proposed 2022 Budget Revenues Expenditures $ 324,595 $ 344,040 $ - $ 668,635 $ (668,635) $ 169,257 $ 61,408 $ 92,112 $ 30,000 $ 102,000 $ 102,900 $ 4,000 $ 123,866 $ 6,000 $ 267,227 $ 100,000 $ 100,000 $ 170,000 $ 170,000 $ 189,055 $ 238,055 $ 58,000 $ 79,000 $ 87,416 $ 87,416 $ 58,998 $ 25,000 $ 712.471 $ 1.609.239 $ (896,768) $ 712,471 $ 2,277,874 $ 1,565,403 Proposed 2022 Budget Revenues Expenditures $ $ 154,944 $ $ 10,000 $ $ 164,944 $ (164.9441 $ - $ 164,944 $ 164,944 Proposed 2022 Budget Revenues Expenditures $ 141,284 $ 550 $ - $ 141,834 $ (141,834) Assumptions/Notes Includes salary for 2.5 FTEs and overtime. 1 FTE WCC crew restoration activities WCC crew contract for maintaining previously planted projects Contracted services for activities supporting planting, fencing, culvert replacement, etc 0.95 FTE + $1,100 for intern MRC projects Program Coordinator (1 FTE) Sampling personnel, lab contract, one vehicle, equipment (1 FTE + extra help) WCD Data Manager WCD Farm Planners Outreach staff, WCD staff, supplies OSS and small farm cost share PDS Staff Staff time only (0.5 FTE); contracted services under Stormwater budget CosMos Project $125 with funding (RD 40%, BB 10%, GF 30%) Assumptions/Notes Misc. Expenses Contribution to City for AIS Program; includes COB program cost increase Interdepartmental Agreement with WCSO Contracted services for online course/website support Assumptions/Notes Watershed Planner ASRs $ 50,000 $ 25,000 $ 28,000 Flood Control Zone District Proposed 2022 Budget WATER PLANNING OPERATIONS Coordination and Planning Drainage -Based Management Watershed Planning Administrative Support LENS Groundwater Model LIO administration Stream Gauging Water Settlement Initiative TOTAL NET IMPACT TO FUND BALANCE TOTAL FOR COST CENTER $ 50,000 $ 50,0 $ 25,0 $ 50,0 $ 125,000 $ 125,0 $ 110,0 $ 250,0 $ 175,000 $ 610,0 $ (435,000) $ 175,000 $ 733,9 $ 558,9 $ 50,000 $ 50,0 $ 25,0 $ 153,7 $ 125,000 $ 125,0 $ 110,0 $ 250,0 $ 175,000 $ 610,0 $ (435,000) $ 175,000 $ 733,9 $ 558,9 $ 100,000 $ 50,0( $ 25,0( $ - $ 162,71 $ 125,000 $ 125,0( $ 105,0( $ 222,3( $ 225,000 $ 690,01 $ (465,000) $ 225,000 $ 801,4: $ 576,4: $ 50,000 $ 50,0 $ 25,0 $ 100,0 $ 125,000 $ 125,0 $ 125,0 $ 125,000 $ 375,0 $ 300,000 $ 800,0 $ (500,000) $ 300,000 $ 941,8 $ 641,8 Drainage -Based Management Watershed Planning Administrative Support Peer Review and Modification of Groundwater Model Administration of LIO process USGS Stream Monitoring/AESI GW Monitoring Contracts Collaborative Process to Resolve Water Issues $ 375,000 $ 478,000 September 26, 2021 Whatcom County Council 311 Grand Avenue, Suite 105 Bellingham, WA 98225 Sent Via Email Dear Councilmembers, This letter is written on behalf of and has been unanimously approved by the Planning Unit. The Planning Unit has previously responded to Executive Sidhu's May 21, 2021 letter asking the question: "What would be an ideal water resource plan backed by legally binding mechanisms?" The provided response was; "The ideal water resources plan is to update the salmon recovery plan, the watershed management plan, and then incorporate both into the County Comprehensive Plan." Given the Councils responsibility for Comprehensive Planning, this letter is intended to provide additional information related to the Planning Unit's recommendation of an ideal water resources plan. The Planning Unit supports updates to the WRIA 12005 Watershed Management Plan and the Salmon Recovery Plan (already underway). These plans, along with the Whatcom County Climate Action Plan, need to be incorporated into the Whatcom County Comprehensive Plan and associated codes (Critical Areas Ordinance, Shoreline Master Program, and relevant sections of Title 20 Zoning). These updates and incorporations must include planning for climate change mitigation and adaptation and incorporating best available science associated with climate change and biodiversity. County Legal Responsibility to Protect Surface and Ground Water Resources The County must address water resource issues as part of its land use planning responsibilities. This message came from the Washington Supreme Court even before its Hirst decision: The GMA includes requirements that counties consider and address water resource issues in land use planning. See, e.g. RCW 36.70A.020(100)(GMA goal to protect the environment, including "water quality and the availability of water"), .070(1) (requiring that land use elements "shall provide for protection of the quality and quantity of groundwater used for public water supplies"), (5)(c)(iv) (requiring that rural elements include measures "[p]rotecting ... surface water and groundwater resources"). Kittitas County et al., v. Eastern Washington Growth Management Hearings Board et al., 172 Wn.2d 144, 175, 256 P.3rd 1193 (2011). Moreover, the Washington Supreme Court in Kittitas also pointed out: Several relevant statutes indicate that the County must regulate to some extent to assure that land use is not inconsistent with available water resources. The GMA directs that the rural and 2 1 P a g e September 26, 2021 land use elements of a county's plan include measures that protect groundwater [and surface water] resources. RCW 36.70A.070(1), (5)(c)(iv). The County clearly has a legal obligation to protect surface and ground water resources as part of its land use planning responsibilities. II. County Comprehensive Plan and Development Regulations A. Under the Growth Management Act, water resource issues are a component of county comprehensive plans. Local public processes for water resource and climate change planning must be further developed and integrated with land use planning. The County's Comprehensive Plan is the vision for what Whatcom County looks like in 20 years and compiles all of the use designations, water use, habitats, flood plains, buildable lands, critical areas, etc. together in one place. This vision must include water resources and fish and wildlife protection. B. Revisions to the Whatcom County Comprehensive Plan should emphasize knowledge- and solution based decision making as necessary to achieve meaningful water resources protection and water availability. County commitments and activities taken pursuant to the above identified water resources statutes must be clearly identified as "measures," within the meaning of that term under GMA and should be based on the best available information. Id. C. Comprehensive plans are implemented through development regulations. Upon approval of a Comprehensive Plan establishing water resource goals, policies, and objectives, the next step is County adoption of enforceable water resource -related development regulations to implement its Comprehensive Plan. GMA development regulations are the legally binding mechanisms available to Whatcom County for water resources. III. Process Good governance requires a water resource plan backed by legally binding mechanisms to be developed in a public process. Only with constant and timely input by the citizens of Whatcom County will we get the public buy -in to make such a plan understandable, meaningful, and garner support for the public investments that will be required to see the plan to completion/implementation. The County's Comprehensive Plan has an already existing public input process that culminates in approval from County Council. IV. Schedule The Planning Unit recognizes the timing challenges associated with incorporating an updated Salmon Recovery Plan and Watershed Management Plan (WMP) into a new County Comprehensive Plan. While the Salmon Recovery Plan is in process of being updated, a WMP update has not yet been started. We understand that the County Comprehensive Plan update has a state mandated completion schedule which must be met. However, updates to the Comprehensive Plan can be initiated once per year by the Council and Executive. Aside from ensuring that changes to the Comprehensive Plan are docketed by 3 1 P a g e September 26, 2021 March of any year there is little standing in the way of incorporating as much watershed and climate change planning work as possible into the Comprehensive Plan. V. WMP update Water resource and habitat information developed in the WMP update is vital to development of the Comprehensive Plan and the County in discharging its GMA responsibilities. The County should view WMP updates as a necessary component of the land use planning process. Accordingly, County staff must take the lead on the Watershed Management Plan. There is no other way to make this work. The Planning Unit caucuses volunteer their time to provide comment and feedback. Specific priorities and proposals must be developed by County staff and brought to the Planning Unit for discussion and perspective, similar to the role staff takes on with the Planning Commission. VI. Conclusion The time has come for Whatcom County to fully integrate water resource planning with land use planning as required by the GMA. Development of a new Comprehensive Plan over the next few years affords the County with the opportunity to incorporate elements of an updated Watershed Management Plan and Salmon Recovery Plan into its own Comprehensive Plan. By fully complying with its legal obligations under GMA for water resource planning, Whatcom County has within its authority the ability to develop "legally binding mechanisms' to implement water resource policies. These policies and subsequent regulations should be developed, reviewed, and approved pursuant to the robust "public participation" requirements mandated by the GMA. Sincerely, WRIA 1 Planning Unit Cc: Whatcom County Executive Satpal Sidhu WRIA 1 Planning Unit Caucuses