Loading...
HomeMy WebLinkAboutPacket Water Work Session Sep 19 2023Whatcom County Council Water Work Session COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 Bellingham, WA 98225-4038 (360) 778-5010 Meeting Agenda Tuesday, September 19, 2023 10:30 AM Civic Center Building Conference Room / Hybrid Meeting HYBRID MEETING - (PARTICIPATE IN -PERSON, SEE REMOTE JOIN INSTRUCTIONS AT www.whatcomcounty.us/joinvirtualcouncil, OR CALL 360.778.5010) COUNCILMEMBERS Barry Buchanan Tyler Byrd Todd Donovan Ben Elenbaas Carol Frazey Kaylee Galloway Kathy Kershner CLERK OF THE COUNCIL Dana Brown -Davis, C.M.C. Council Water Work Session Meeting Agenda September 19, 2023 Call To Order Roll Call Announcements Individuals who require special assistance to participate in the Council's meetings are asked to contact the Council Office at 360.778.5010 at least 96 hours in advance. This committee meeting is also noticed as a meeting of the Whatcom County Council, with the agenda limited to committee business. Meeting Materials AB2023-491 Meeting Materials for the Water Work Session September 19, 2023 Watershed Planning Update 2024-2029 Water Resources Improvement Plan Proposed Fish Barrier Removal Program WRIA 1 Planning Unit update Other Business Adjournment Whatcom County Page 2 Printed on 411412025 • Whatcom County COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 Bellingham, WA 98225-4038 (360)778-5010 • Agenda Bill Master Report File Number: AB2023-491 File ID: AB2023-491 Version: 1 Status: Received File Created: 07/21/2023 Entered by: Department: File Type: Receipt of Document(s) Assigned to: Council Water Work Session Final Action: 09/19/2023 Agenda Date: 09/19/2023 Enactment #: Primary Contact Email: kfelbing@co.whatcom.wa.us TITLE FOR AGENDA ITEM: Meeting Materials for the Water Work Session September 19, 2023 SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE: None HISTORY OF LEGISLATIVE FILE Date: Acting Body: Action: Sent To: 09/19/2023 Council Water Work Session RECEIVED Attachments: Water Work Session Agenda and Packet for 9.19.2023, Presentation for Proposed Fish Barrier Removal Program Whatcom County Page 1 Printed on 4/14/2025 WHATCOM COUNTY PUBLIC WORKS DEPARTMENT ELIZABETH KOSA Director MEMORANDUM NATURAL RESOURCES 322 N. Commercial Street, Suite 110 Bellingham, WA 98225 Telephone: (360) 778-6230 FAX: (360) 778-6231 www. whatcomcounty. us TO: The Honorable Satpal Singh Sidhu, Whatcom County Executive, and Honorable Members of the Whatcom County Council THROUGH: Elizabeth Kosa, Director FROM: Gary S. Stoyka, Natural Resources Program Manager DATE: September 13, 2023 RE: September 19, 2023 Council Water Work Session Please refer to the proposed agenda below for the next Water Work Session. Additional supporting documents may be distributed at or before the meeting. AGENDA Date: Tuesday, September 19, 2023 Time: 10:30 a.m. to 12:00 p.m. Place: Hybrid Meeting: In Person: Civic Center Garden Level Conference Room (322 N. Commercial St., Street Level) Virtual: For instructions on how to watch or participate in this meeting, please visit us at www.whatcomcounty.us/ioinvirtualcouncil or contact the Council Office at 360.778.5010. View meeting schedules, agendas, minutes, videos, and archives at www.whatcom.legistar.com. Time Topic Council Action Background Information Requested Attached 10:30 AM — Watershed Planning Update Informational None 10:45 AM 10:45 AM — 2024-2029 Water 11:15 AM 2024-2029 Water Resources Improvement Informational Resources Improvement Plan Plan 11:15 AM — Proposed Fish Barrier Removal Program Informational None 11:45 AM 11:45 AM — WRIA 1 Planning Unit update Informational None 12:00 PM If you have questions, please feel free to call me at (360) 778-6218. cc: Dana Brown -Davis Kristi Felbinger Jill Nixon Jennifer Schneider Karen Frakes Erika Douglas John Thompson Paula Harris Kraig Olason Chris Elder Cathy Craver Doug Ranney Melissa Donnelly Roland Middleton Erin Page Josh Fleischmann Mark Personius Tyler Schroeder Sue Sullivan Brandy Reed Bennett Knox WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2024-2029 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A Item No. Project Description Database ID No. I BES Previous Expenditures 2024 i 2025 2026 2027 2028 2029 Total Amount source Phas Amount sou Phase Amount source $ 1,935,000 FEET/LWSU PE $ 25,000 LWSU PE Phase Amount PE source Phase Amount PE sou Ph- AmounC PE sou Phase Amount PE 1 SWP #SWLW23-04 Academy Road Stormwater Improvements: Evaluate the water quality performance of the existing Academy stormwater system and provide recommended retrofits. 20-005 2,030,000 63.9 RW RW RW RW RW RW CN CN CN CN CN CN CN $ 70,000 LWSU CN CN CN CN CN 2 SWP #SWLW23-03 Geneva Bioretention Pilot Project: Install new water quality treatment media, evaluate the effectiveness and constructability of new water quality treatment media 20-006 63.9 $ 1,000,000 REET/Grant/LWSU PE PE PE PE PE $ 1,112,000 RW RW RI R RW RW RW RW CN $ 90,000 ECY Grant CN CN CN CN CN CN $ 22,000 REET CN CN CN CN CN 3 SWP#SWLW23-01 Silver Beach Creek Stormwater Improvements Phase 2: Main channel restoration below Hillsdale using natural vegetation 07-095 60.5 $ 250,000 FEET LWSU PE $ 40,000 LWSU PE PE PE PE PE $ 1,160,000 RW $ 20,000 FEET RW RW RW RW RWCN $ 600,000 REET CN CN CN CN CN CN $ 250,000 LWSU CN CN CN CN CN 4 Eagleridge Stormwater Improvements: Install a water quality system to treat stormwater from the Eagleridge development. 20-007 61.4 $ 15,000 LWSU PE $ 280,000 REET PE PE PE PE PE $ 810,000 RW $ 15,000 LWSU RW RW RW RW RW CN CN $ 500,000 LWSU CN CN CN CN CN CN CN CN CN CN 5 aterImprovements: Install water quality Austin Court discharge system on the discharge from Austin Court. 20-008 58.8 PE $ 200,000 LWSU PE PE PE PE PE $ 675,000 RW $ 25,000 REET RW RW RW RW RW CN CN CN $ 450,000 LWSU CN CN CN 6 SWP #SWLW23-05 Cedar Hills Culvert Replacement: Replacement of culvert damaged during the 2021 flooding event with FEMA funding contribution. 23-001 44.2 $ 12,000 LWSU PE $ 60,000 FEMA PE PE PE PE PE $ 392,000 PE $ 100,000 REET PE PE PE PE PE RW $ 15,000 LWSU RW RW RW RW RW CN CN $ 180,000 FEMA CN CN CN CN CN CN $ 25,000 REET CN CN CN CN 7 Strawberry Point/Lake Whatcom Blvd Stormwater Improvements: System upgrades to improve water quality including vaults, biofiltration swales, and channel restoration 17-001 62.2 PE PE $ 30,000 LWSU PE $ 300,000 REET PE $ 50,000 LWSU PE PE $ 1,170,000 RW RW RW $ 35,000 LWSU RW RW RW CN CN CN CN $ 455,000 REET CN CN CN CN CN CN $ 300,000 LWSU CN CN 8 Geneva Street & Lake Louise Road Culvert Replacement: Replace culverts along Geneva Street and Lake Louise Road to improve water quality and conveyance 20-010 58.8 PE PE PE PE $ 70,000 REET PE PE $ 270,000 PE PE PE PE PE PE RW RW RW RW RW RW CN CN CN CN CN $ 200,000 LWSU CN 9 Lake Whatcom Boulevard Media Filter Drain (EG-1): Install media filter drain or other water quality system along west side of Lake Whatcom Blvd to improve water quality. 22-006 58.8 PE PE PE PE $ 180,000 LWSU PE PE $ 835,000 RW RW RW RW $ 25,000 FEET RW RW CN CN CN CN CN $ 630,000 REET CN 10 Sudden Valley Stormwater Improvements No. 2: Construct drainage system upgrades and retrofits in the Sudden Valley area of the Lake Whatcom watershed. 22-007 49.0 PE PE PE $ 10,000 LWSU PE $ 200,000 LWSU PE $ 60,000 REET PE $ 1,260,000 PE PE PE PE PE PE RW RW RW RW $ 10,000 REET RW RW CN CN CN CN CN $ 500,000 REET CN CN CN CN CN CN $ 480,000 LWSU CN 11 Lake Whatcom Boulevard Water Quality Vault (EG-4):Install a water quality system to remove phosphorus and other pollutants from residential runoff prior to entering Lake Whatcom. 22-008 57.1 PE PE PE PE PE $ 200,000 REET PE $ 225,000 PE PE PE PE PE PE RW RW RW RW RW $ 25,000 LWSU RW CN CN CN CN CN CN 12 Viewhaven Lane Water Quality & Conveyance Improvements: Install water quality systems and improve conveyance near Viewhaven Lane. 20-009 58.8 PE PE PE PE PE PE $ 100,000 LWSU $ 115,000 RW RW RW RW RW RW $ 15,000 LWSU CN CN CN CN CN CN CN CN CN CN CN CN 13 WATERSHEDBIRCH BAY & AQUATIC• r SWP#SWBB23-02 Charel Terrace Stormwater Outfall Repair: Marine outfall stabilization to protect a bluff slope (emergency repair 2022) and permanent stabilization (2023) 20-011 29.8 $ 290,000 IBBWARM/FEMA PE $ 60,000 FEMA PE PE PE PE PE $ 750,000 RW RW RW RW RW RW CN $ 350,000 FEMA CN $ 50,000 BBWARM CN CN CN CN CN 14 SWP #SWBB23-03 Holeman Avenue Stormwater Improvements (PW-1): Replace CBs, upsize culverts, re-establish ditch on Holeman Ave near Birch Bay Dr 07-242 37.8 $ 140,000 BBWARM PE $ 65,000 BBWARM PE PE PE PE PE $ 905,000 RW RW RW RW RW RW CN $ 300,000 BBWARM CN CN CN CN CN CN $ 400,000 FEET CN CN CN CN CN 15 SWP #SWBB23.04 Semiahmoo Drive South & Outfall Improvements (BP-2, BP-5): Upsize culverts and re-establish roadside ditch on east p side of Semiahmoo Drive. 18-00918-010 50.3 $ 320,000 BBWARM PE $ 35,000 BBWARM PE $ 50,000 BBWARM PE PE PE PE $ 1,355,000 PE PE PE PE PE PE RW $ 15,000 BBWARM CN $ 410,000 Road Funds RW RW RW RW CN CN $ 525,000 BBWARM CN CN CN CN 16 SWP #SWBB23.05 Normar Place Stormwater Improvements (BP-1): Upsize pipes, replace CBs and install energy dissipater at pipe outfall on Normar Place 19-004 52.0 $ 280,000 BBWARM PE PE $ 60,000 BBWARM PE PE PE PE $ 1,160,000 PE PE RW $ 20,000 BBWARM CN RW RW RW RW CN CN $ 500,000 BBWARM CN CN CN CN CN CN $ 300,000 FEET CN CN CN CN 17 SWP #SWBB23-06 Lora Lane Drainage & Tide Gate Modifications (TCl-2): Replace tide gate structure and repair embankment; install Type 2 CB and culvert under Birch Bay Dr 18-008 42.5 $ 6,500 BBWARM PE $ 280,000 BBWARM PE PE $ 60,000 BBWARM PE PE PE $ 1,716,500 RW RW RW RW RW RW CN CN CN $ 200,000 BBWARM CN CN CN CN CN CN $ 300,000 REET CN CN CN CN CN CN $ 870,000 Road Funds CN CN CN 18 SWP#SWBB23-07 Birch Point Road Stormwater & Outfall Improvements (BP-3, BP-6): Upsize culverts and replace outfall to the beach to reduce bluff erosion 21-001 33.3 PE PE $ 300,000 BBWARM PE PE PE PE $ 970,000 RW RW $ 20,000 BBWARM RW RW RW RW CN CN CN CN $ 100,000 Road Funds CN CN CN CN CN CN $ 250,000 BBWARM CN CN CN CN CN CN $ 300,000 FEET CN CN 19 SWP#SWBB23-08 Richmond Park Stormwater Improvements(SH- 2): Address drainage concerns in Richmond Park by re-routing stormwater down Shintaffer Road to a Birch Bay outfall 22-010 42.5 PE PE PE $ 660,000 BBWARM PE PE $ 140,000 BBWARM PE $ 2,600,000 RW RW RW $ 40,000 BBWARM RW RW RW CN CN CN CN CN $ 680,000 Road Funds CN CN CN CN CN CN $ 780,000 BBWARM CN CN CN CN CN CN $ 300,000 REET CN 20 Roger's Slough Drainage Improvements: Re -grade ditches, install new culverts, and replace existing pipe with concrete box culvert under Birch Point Road into Roger's Slough 23-002 70.2 PE PE PE PE $ 750,000 BBWARM PE PE $ 150,000 BBWARM $ 2,850,000 RW RW RW RW RW RW CN CN CN CN CN CN $ 1,950,000 BBWARM CN CN CN CN CN CN 21 Birch Bay Village Drainage Improvements: Upsize existing culverts and install new pipe and catch basins in Birch Bay Village to reduce flooding 23-003 52.9 PE PE PE PE PE $ 350,000 BBWARM PE $ 350,000 RW CN CN CN CN CN CN CN CN CN CN CN CN CN CN CN CN CN 22 Bay Ridge Estates Drainage Improvements: Upsize and install new culverts and CBs on Birch Point Road and Selder Road to reduce flooding 23-004 46.1 PE PE PE IPE IPE PE 1 $ 220,000 1 BBWARM $ 220,000 CN CN CN IRW IRW RW CN CN CN CN CN CN CN CN CN CNI I ICNI CN WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2024-2029 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A Item No. Project Description Database ID No. BES Previous Expenditures Amount sn��ee 2024 Pnase Amouno source 2025 Phase Amount source 2026 Pr,a,e Amount Phase Amount 202 Phase Amount Total 23 Everson Overflow Pipeline Bank Stabilization (720009): Stabilize bank at erosion site from 2020 flood at pipeline crossing 20-002 FCZD PE PE PE PE PE Project Total: 66.3 $ 18,000 PE $ 1,054,000 FEMA/State PE PE PE PE PE PE $ 1,129,500 $ 37,500 Pipeline PE PE PE PE PE PE CN $ 1,000 FCZD CN CN CN CN CN FCZD Total: CN $ 19,000 FEMA/State CN CN CN CN CN $ 19,000 CN CN CN CN CN CN 24 Jones Creek Debris Flow Risk Reduction (712004): Construct deflection berms and realign roadway 07-105 70.6 $ 6,131,000 FCZD PE $ FCZD PE PE PE PE PE $ 350,000 FEMA/State grant PE $ Roads PE PE PE PE PE Project Total: $ 3,879,000 1 FbD grant RW $ FCZD RW I RW I IRW RW RW 1 $ 10,383,000 RW $ - FbD grant CN CN CN CN CN CN $ 5,000 FCZD CN CN CN CN CN FCZD Total: CN $ 18,000 FbD grant CN CN CN CN CN $ 6,136,000 CN $ - Roads CN CN CN CN CN CN $ Utilities CN CN CN CN CN 25 Marine Drive Emergency Levee Repair (720004): Repair crest and backslope flood damage 20-001 61.4 $ 121,000 FCZD PE PE PE PE PE PE Project Total: $ 2,181,000 FEMA PE PE PE PE PE PE $ 2,463,000 $ 121,000 State CN $ 2,000 FCZD CN CN CN CN CN FCZD Total: CN $ 38,000 FEMA/State CN CN I jCN CN CN 1 $ 123,000 26 Truck Road Bank Stabilization (720008): Phase 1 emergency construction in 2022 and Phase 2 road rehab and environmental mitigation in 2023 20-003 59.4 $ 37,000 FCZD PE $ 1,400 FCZD PE PE PE PE PE Project Total $ 1,345,000 FEMA PE $ 54,600 FEMA/State PE PE PE PE PE $ 3,951,000 $ 75,000 State PE $ 1,400 Roads PE PE PE PE PE $ 37,000 Roads CN $ 58,600 FCZD CN $ 1,400 FCZD CN CN CN CN FCZD Total CN $ 2,224,900 FEMA/State CN $ 54,600 FEMA/State CN CN CN CN $ 98,000 CN $ 58,600 Roads CN $ 1,400 Roads CN CN CN CN 27 Hudson Rd Bridge No. 132 Repair (722006): Repair Nov 2021 damages to bridge approaches 22-001 38.9 $ 375 FCZD PE $ 375 FCZD PE PE PE PE PE Project Total: $ 7,125 FEMA/State PE $ 7,125 FEMA/State PE PE PE PE PE $ 127,500 CN $ 5,500 FCZD CN $ 125 FCZD CN CN CN CN FCZD Total CN $ 104,500 FEMA/State CN $ 2,375 FEMA/State CN CN CN CN $ 6,375 28 Timon Levee USACE Rehabilitation (722001): USACE to repair Nov 2021 flood damages. 22-002 64.5 $ 12,000 FCZD PE PE PE PE PE PE Project Total: $ 2,064,000 (See Note 1) CN CN CN CN CN CN CN $ 1,621,000 USACE CN CN CN CN CN CN $ 406,000 FCZD CN CN CN CN CN FCZD Total CN $ 25,000 LE Subzone CN CN CN CN CN $ 418,000 29 Upper Hampton USACE Levee Rehabilitation (722008): USACE to repair Nov 2021 flood damages. 22-004 58.7 $ 5,000 FCZD PE PE PE PE PE PE Project Total: $ 1,504,750 (See Note 1) CN CN CN CN CN CN CN $ 1,109,000 USACE CN CN CN CN CN CN $ 222,000 FCZD CN CN CN CN CN FCZD Total CN $ 25,000 LE Subzone CN CN I CN I CN jCN 1 $ 227,000 30 Cougar Creek and Neevel Levee Improvement (720010): Stabilize oversteepened section of levee (SWIF project) with new flood gate and restoration (FLIP project) 16-008 59.4 $ 109,000 FCZD PE $ 32,500 FCZD PE PE PE PE PE Project Total: $ 117,000 NOAA grant PE PE PE PE PE PE $ 2,375,000 $ 77,000 FbD grant PE RW RW RW RW RW RW CN $ 1,608,235 FCZD CN PE PE PE CN $ 45,000 FCZD CN $ 386,235 EQUIP CN CN CN CN FCZD Total: CN CN CN CN CN CN $ 1,795,000 31 Abbott Levee Protection and Improvement (718010): Interim erosion protection measures for levee & road (Ph. 1); Extend and realign upstream end of levee (Ph. 2 - SWIF project) 16-007 70.4 $ 655,000 FCZD PE $ 138,300 FCZD PE $ 25,000 FCZD PE PE PE PE Project Total: $ 443,000 Roads PE $ 138,300 Roads PE $ 25,000 Roads PE PE PE PE $ 3,740,000 RW CN $ 1,000,000 FCZD CN $ 7,500 FCZD CN CN CN FCZD Total: RW CN $ 1,300,000 Roads CN $ 7,500 Roads CN CN CN $ 1,964,000 32 Acme Woody Revetment Repair (723008): FEMA funded repair to Acme Early Chinook Restoration Project 23-005 67.7 PE $ 14,225 FCZD PE FCZD Project Total: PE $ 270,275 FEMA/State PE FEMA/State $ 1,285,000 CN $ 50,000 FCZD FCZD Total: CN $ 950,000 FEMA/State $ 78,000 33 Bertrand Creek Levee Stabilization (721002): Restore right and left levee prisms and install bank protection (SWIF project) 16-005 54.4 $ 7,000 FCZD PE $ 30,000 PE $ 5,000 FCZD PE PE PE PE Project Total: CN CN $ 225,000 FCZD CN CN CN CN $ 292,000 CN CN $ 25,000 DDft4? CN CN CN CN 34 Devries Levee Improvements: Widen and establish full crest width and backslope levee (SWIF project) 19-001 49.3 PE $ 10,000 PE $ 25,000 PE PE PE PE Project Total: CN CN $ 200,000 CN CN CN CN $ 225,000 35 Ferndale Levee Improvement (719008): Reconstruct and realign Ferndale and Treatment Plant Levees to improve level of protection and address deficiencies 07-104 68.9 $ 171,000 FCZD PE $ 96,000 FCZD PE $ 20,000 FCZD PE $ 50,000 PE 1 $ 50,000 IPE $ 50,000 1 PE I Construction $ 805,000 FbD grant PE $ 384,000 FbD grant PE $ 80,000 FbD grant RW RW RW RW Expected RW RW $ 100,000 FCZD CN $ 380,000 FCZD CN CN CN in 2026-27 CN RW $ 400,000 FbD grant CN $ 1,520,000 FbD grant CN $ 5,000,000 CN $ 1,000,000 CN 36 Glacier -Gallup Alluvial Fan Restoration (718007): Remove all or part of Glacier Creek levee and construct setback levee along Gallup Creek. Interim revetment fix in 2023 18-006 88.9 $ 413,000 FCZD PE $ 116,600 FCZD PE $ 40,000 FCZD PE $ 40,000 FCZD PE FCZD PE PE Construction $ 1,079,000 FbD grant PE $ 466,400 FbD grant PE $ 160,000 FbD grant PE $ 160,000 FbD grant PE FbD grant PE PE Expected RW $ 120,000 FCZD RW $ 200,000 FCZD RW FCZD RW FCZD RW RW in RW $ 480,000 FbD grant RW $ 800,000 FbD grant RW FbD grant RW FbD grant RW RW 2027-2028 CN CN FCZD CN I FCZD CN $ 1,000,000 FCZD CN $ 1,000,000 FCZD CN CN CN FbD grant CN FbD grant CN $ 4,000,000 FbD grant CN $ 4,000,000 FbD grant CN 37 Dahlberg Wetland Mitigation Site (719006): Develop advanced mitigation site for future impacts from Flood and Road projects (likely phased implementation as projects are permitted) 20-004 66.3 $ 873,000 FCZD PE $ 15,000 FCZD PE $ 240,000 FCZD PE $ 100,000 PE PE $ 100,000 PE Project Total: CN CN CN CN $ 1,000,000 CN CN $ 500,000 $ 2,828,000 CN CN CN CN CN CN 38 Upper Hampton Levee Improvements: Widen levee crest and flatten backslope at two sites and seepage at retaining wall deficienies (SWIF project) 16-006 70.4 $ 6,000 LE Subzone PE PE $ 5,000 PE PE PE PE Project Total: Under Lynden project RW RW RW RW RW RW $ 36,000 CN CN $ 25,000 FCZD/LE Subzone CN CN CN CN 39 Floodplain Acquisition: Acquire key properties for future levee reconfiguration to reduce risk and improve habitat 07-002 79.6 $ 236,000 FCZD RW $ 1,100,000 FCZD RW $ 5,000,000 RW $ 5,000,000 RW RW RW $ 943,000 FbD grant RW $ 4,400,000 FbD grant RW $ 9,600,000 FEMA/CBDG $ 843,000 Commerce grant RW $ 866,000 Commerce grant RW RW RW RW I RW 40 Marietta Acquisition: Acquire properties in repetitive flood loss area and remove structures 07-002 79.6 $ 663,000 FCZD RW RW RW RW RW RW Total through'21 $ 1,044,000 FEMA/State RW $ 55,000 RW $ 100,000 RW $ 100,000 RW $ 100,000 RW $ 100,000 RW $ 1,852,000 $ 145,000 ESRP grant CN CN $ 25,000 CN $ 25,000 CN $ 25,000 CN $ 25,000 CN FCZD Total: CN CN CN CN CN CN $ 663,000 41 High Creek Sediment Trap (720005): Annual clean out of sediment traps 22-005 58.8 $ 137,000 FCZD CN CN CN CN CN CN FCZD Total thru '24 $ 105,000 FEMA/State CN $ 115,000 FCZD CN $ 120,000 FCZD CN $ 125,000 FCZD CN $ 130,000 FCZD CN $ 135,000 FCZD ICN 1 $ 140,000 FCZD $ 252,000 42 Emergency/New Projects: Typically repair projects that result from new damage, as needed OS-003 Varies PE $ 25,000 FCZD PE $ 25,000 FCZD PE $ 25,000 FCZD PE $ 25,000 FCZD PE $ 25,000 FCZD PE $ 25,000 FCZD RW RW RW RW RW RW Total/year: CN $ 50,000 Local sponsor ICN $ 50,000 Local sponsor CN $ 50,000 Local sponsor CN $ 50,000 Local sponsor CN $ 50,000 Local sponsor CN $ 50,000 Local sponsor $ 425,000 CN $ 350,000 FCZD CN $ 350,000 FCZD CIN $ 350,000 FCZD CN $ 350,000 FCZD ICN 1 $ 350,000 1 FCZD CN $ 350,000 FCZD Numbers in italics are placeholders far projects still being conceived. Previous expenditures includes work contracted in 2022 that will continually appropriate into 2023. Note 1: Estimated total pro ect cost includes work done by U.S. Army Corps of En ineers USACE and funded directly by USACE. Whatcom County Public Works — Stormwater Division Project Narrative Academy Road Stormwater Improvements Database ID No. 20-005 Construction Funding Years : 2024 Project Narrative: 2024-2029 Six -Year WRIP Item No. 1 Whatcom County and the City of Bellingham jointly developed this project to improve water quality from the approximate 80-acre Academy sub -basin of the Lake Whatcom Watershed. This stormwater treatment facility project was originally constructed in 2015 and will be retrofitted to improve phosphorus removal based upon recently completed evaluations of stormwater treatment performance. City of Bellingham will adopt the facility for future operation and maintenance after the retrofit improvements are completed by Whatcom County in 2024. Project Status: Design and permitting is being completed in 2023 and construction scheduled to take place in the summer of 2024. Initial 2015 completed project cost: $ 1,204,000 2024 retrofit project cost: $ 826,000 Total Estimated Project Cost: $ 2,030,000 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 2 Geneva Bioretention Pilot Project Database ID No. 20-006 Construction Funding Years : 2023 Project Narrative: This project will utilize a Washington State Department of Ecology grant to install and monitor the performance of new bioretention soil media. The existing swales are approaching the end of the media's effective life. New media will be required to replace the existing depleted media in the near future. A portion of the existing swales will be used to test the new media, which is designed to reduce the amount of phosphorus and other pollutants entering the lake. Preliminary testing has shown the new media is much more effective in removal of phosphorus than more traditional media. If tests show significant improvement over the original media, the media will be adopted as a Best Management Practice (BMP) and be included in the updated WDOE Stormwater Manual. Project Status: Design is occurring in 2021-2022, construction in 2023, and monitoring performance in 2024-2026. Total Estimated Project Cost: $1,112,000 (without monitoring costs) fW ...:- Fe. -�t gA •`:' ;: JV 2 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 3 Silver Beach Creek Stormwater Improvements Phase 2 Database ID No. 07-095 Construction Funding Years : 2024 Project Narrative: This project will address the stream bank erosion found on Silver Beach Creek and other tributaries. The project will reduce the amount of erosion and bank material that has been generally associated with the sediment -laden phosphorus loading to Lake Whatcom. The project will reconfigure approximately 950 linear feet of stream channels with a more stable cross-section to reduce erosion and the export of sediment. Project Status: Design is underway and construction scheduled to take place in 2024. Total Estimated Project Cost: $1,160,000 F R' tTrl0 3 Whatcom County Public Works — Stormwater Division Project Narrative Eagleridge Stormwater Improvements Database ID No. 20-007 Construction Funding Years : 2025 2024-2029 Six -Year WRIP Item No. 4 Project Narrative: This project includes the installation of a water quality treatment facility associated with the Eagleridge neighborhood in the Lake Whatcom watershed. The Eagleridge development is approximately 34 acres and runoff from this development will be routed through a water quality facility to help remove sediments and phosphorus before entering Lake Whatcom. Project Status: Design is anticipated in 2023-2024 and construction scheduled to take place in 2025. Total Estimated Project Cost: $810,000 ... ABLE_ST._ 0 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 5 Austin Court Stormwater Improvements Database ID No. 20-008 Construction Funding Years : 2026 Project Narrative: This project includes the installation of a large filter vault to improve water quality in the existing Austin Court stormwater system. The tributary area is approximately three acres and the water quality system will remove sediments and phosphorus prior to entering Lake Whatcom. Project Status: Design is anticipated in 2023-2024 and construction scheduled to take place in 2026. Total Estimated Project Cost: $675,000 5 Whatcom County Public Works — Stormwater Division Project Narrative Cedar Hills Culvert Replacement Database ID No. 23-001 Construction Funding Years : 2025 Project Narrative: 2024-2029 Six -Year WRIP Item No. 6 This project includes the replacement of a culvert that was damaged during the 2021 flooding event with a new upsized 100-linear feet long 36-inch diameter culvert. The work shall also include the modification of the culvert inlet to enhance erosion and sediment control, along with re -grading and armoring the downstream channel to provide improved conveyance capacity. This will be funded by FEMA, REET and the Lake Whatcom utility. Project Status: Design is anticipated in 2024-2025 and construction scheduled to take place in 2025. Total Estimated Project Cost: $392,000 M Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 7 Strawberry Point/ Lake Whatcom Blvd Stormwater Improvements Database ID No. 17-001 Construction Funding Years : 2027 Project Narrative: This project will involve the installation of a water quality facility to treat approximately three acres of residential area. Project elements may include: bio-infiltration swales, filter vaults, media filter drains, and rain gardens in order to improve water quality. Project Status: Design is anticipated in 2025-2026 and construction scheduled to take place in 2027. Total Estimated Project Cost: $1,170,000 U Y, �ti*:v. r i t IX 11 E 4AI if= S7 0_2 0 AMP 7 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 8 Geneva Street & Lake Louise Road Culvert Replacement Database ID No. 20-010 Construction Funding Years : 2028 Project Narrative: Project will improve conveyance of roadside ditches and culverts along Geneva Street and Lake Louise Road. This will improve water quality. The project will replace approximately 200 linear feet of undersized or damaged culverts. Project Status: Design is anticipated in 2027 and construction scheduled to take place in 2028. Total Estimated Project Cost: $270,000 93 Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 9 Lake Whatcom Boulevard Media Filter Drain (EG-1) Database ID No. 22-006 Construction Funding Years : 2028 Project Narrative: The project would install Media Filter Drain (MFD), or other appropriate water quality system, along approximately 300 linear feet of roadway on the west side of Lake Whatcom Blvd. Stormwater runoff from approximately 8.5 acres on the west side of Lake Whatcom Blvd. is collected in a shallow roadside ditch, this project would treat this water prior to discharging to Lake Whatcom. Project Status: Design is anticipated in 2027 and construction scheduled to take place in 2028. Total Estimated Project Cost: $835,000 M�RGAN ST a� r -t. 'WJ _4 4 [_-ir.� . Legend Media Filter drain Existing Condition Infrastructure Storm Pipe Culver — DitCh Catch Basin ! Vanhole -,sue. •, � � � , ,; � x+ ; • _il" � - A F x LMedlia Filter Drain .. Lf) r SPRINGIST - Jlf ::At Z'' =� rr I 0 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 10 Sudden Valley Stormwater Improvements No. 2 Database ID No. 22-007 Construction Funding Years : 2028 Project Narrative: A project, to be determined, will be constructed within the Sudden Valley area as the second water quality improvement project focused on removing sediment and treating phosphorus in a continued collaboration with the Sudden Valley community. The project will include drainage system upgrades and retrofits to the existing stormwater infrastructure. Details will be forthcoming as Whatcom County works with representatives of the Sudden Valley Community Association. Project Status: Design is anticipated in 2026-2027 and construction scheduled to take place in 2028. 10 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 11 Lake Whatcom Boulevard Water Quality Vault (EG-4) Database ID No. 22-008 Construction Funding Years : 2030 Project Narrative: This project includes the installation of a filter vault to improve water quality in the existing Lake Whatcom Blvd stormwater system. The water quality system will remove sediments and phosphorus from approximately 3 acres of residential runoff prior to entering Lake Whatcom. Project Status: Design is anticipated in 2028-2029 and construction scheduled to take place in 2030. Total Estimated Project Cost: $650,000 q:. ` � 1 W f Storm a, ' =rrL V 11 Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 12 Viewhaven Lane Water Quality & Conveyance Improvements Database ID No. 20-009 Construction Funding Years : 2030 Project Narrative: This project will improve conveyance and water quality near Viewhaven Lane and Lake Whatcom Blvd intersection. Project will include approximately 100 linear feet of conveyance improvements by replacing two undersized culverts and regrading a ditch. The project will also install approximately 135 linear feet of water quality facility. Project elements may include: bioinfiltration swales, filter vaults, media filter drains, and rain gardens. Project Status: Design is anticipated in 2029-2030 and construction scheduled to take place in 2030. Total Estimated Project Cost: $475,000 12 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 13 Charel Terrace Stormwater Outfall Repair Database ID No. 20-011 Construction Funding Years : 2024 Project Narrative: The December 20, 2018 "Solstice Eve" windstorm caused damage to the stormwater outfall on Birch Point installed as part of the Charel Terrace project in 2011. In March 2019 a "Major Disaster Declaration" that covered Whatcom County for the December storm was granted. In December 2019, the Consolidated Resource Center approved the Washington State Emergency Management Division's $110,887 request for Architectural & Engineering Services to assess the site and develop conceptual design options. An RFP was advertised by Whatcom County in March 2020 and Herrera Environmental Consultants completed a preliminary study that assessed the outfall stabilization approaches to maintain a functional outfall. From this study, a temporary repair was constructed in fall 2022 to secure the catch basin to the bluff and reposition the outfall tee. The permanent repair will be constructed in the summer of 2024. Project Status: Design occurring in 2021-2023 and construction is scheduled to take place in 2024. Total Estimated Project Cost: $750,000 13 Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 14 Holeman Avenue Stormwater Improvements (PW-1) Database ID No. 07-242 Construction Funding Years : 2024 Project Narrative: The project goal is to reduce roadway flooding on Holeman Avenue by replacing undersized pipe and catch basins and re-establish existing ditch to match pipe invert elevations. This area is particularly sensitive due to the steep, unstable bluff along the shoreline and the concern is that flooding could lead to bluff failure and property damage. This is a critical public safety issue. Project Status: Design is occuring in 2022-23 and construction is scheduled to take place in 2024. otal Estimated Project Cost: $905,000 :3rrt Ir}r 1 14 Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 15 Semiahmoo Drive South & Outfall Improvements (BP-2, BP-5) Database ID No. 18-009 & 18-010 Construction Funding Years : 2025 Project Narrative: This project will improve the stormwater conveyance system at the south end of Semiahmoo Drive by upsizing the cross culvert to reduce flooding and increase traffic safety, and reconstruct the outfall conveyance system to the Strait of Georgia damaged during the November 2021 extreme rainfall event. Project Status: Design and permitting is occurring 2021 to 2024 and construction scheduled to take place in 2025. Total Estimated Project Cost: $1,355,000 15 Whatcom County Public Works — Stormwater Division Project Narrative Normar Place Stormwater Improvements (BP-1) Database ID No. 19-004 Construction Funding Years : 2025 2024-2029 Six -Year WRIP Item No. 16 Project Narrative: This project involves upsizing pipes, replacing catch basins and installing an outfall pipe over the bluff with an energy dissipater at Normar Place to reduce roadway flooding, scour and sediment transport. Project Status: Design is anticipated in 2023-2024 and construction in 2025. Total Estimated Project Cost: $1,160,000 . A. r 4 i -1 i ti w € + 4 16 Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 17 Lora Lane Drainage & Tide Gate Modifications (TC1-2) Database ID No. 18-008 Construction Funding Years : 2026 Project Narrative: The purpose of this project is to replace the existing 48" corrugated metal culvert under Birch Bay Drive with an 8-ft wide fish passable box culvert, replace the existing tide gate on the water side of Birch Bay Drive with a new side hinge tide gate, and install shoreline armoring at the outfall area. This project will collaborate with the Design and Construction Division of Whatcom County Public Works. Project Status: Preliminary engineering design concluded in 2021. Permanent repair design will begin 2024 and construction is anticipated for 2026. Total Estimated Project Cost: $1,716,500 17 Whatcom County Public Works — Stormwater Division Project Narrative 2024-2029 Six -Year WRIP Item No. 18 Birch Point Road Stormwater & Outfall Improvements (BP-3 & BP-6) Database ID No. 21-001 Construction Funding Years : 2027 Project Narrative: A corrugated metal outfall pipe over a steep bluff on Birch Point collapsed due to erosional undermining. The driveway culverts, ditches and upstream storm drain system leading to the outfall are undersized and cause flooding and erosion during storm events. This project will involve upsizing culverts, reestablishing ditches and replacing and anchoring the outfall pipe and construction of pipe -end energy dissipater. Project Status: Design will be completed in 2025-26. Construction is scheduled to take place in 2027. Total Estimated Project Cost: $970,000 m Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 19 Richmond Park Stormwater Improvements (SH-2) Database ID No. 22-010 Construction Funding Years : 2028 Project Narrative: This project will address drainage concerns in Richmond Park by re-routing the large volume of water that currently moves through the development down Shintaffer Road to an outfall in Birch Bay. It would involve replacing 1,640 feet of ditch/culvert on Shintaffer Road with 36" diameter HDPE pipe, installing 13 type 2 catch basins and building a new outfall into Birch Bay. Project Status: Design will occur in 2026-2027 and construction is scheduled to take place in 2028. Total Estimated Project Cost: $2,600,000 19 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 20 Roger's Slough Drainage Improvements Database ID No. 23-002 Construction Funding Years : 2029 Project Narrative: This project will address drainage and flooding issues in Birch Bay Village, Birch Bay Drive and Birch Point Loop Road. It will involve replacing twin 30" diameter culverts that direct water under Birch Bay Drive into Roger's Slough with a fish -passable concrete box culvert, installing 285 feet of pipe, regrading 500 feet of ditch, and installing a new type 2 catch basin and overflow pipe near the mouth of Roger's Slough. Project Status: Design will occur in 2027-2028 and construction is scheduled to take place in 2029. Total Estimated Project Cost: $2,850,000 20 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 21 Birch Bay Village Drainage Improvements Database ID No. 23-003 Construction Funding Years : 2030 Project Narrative: This project will address drainage and flooding issues in Birch Bay Village in the vicinity of Salish Road and Kwan Lake. It will involve installing or replacing 1,400 lineal feet of pipe, installing four new catch basins along Nootka Loop and Salish Road and installing a new 36" diameter flap gate near Nootka Loop to reduce tidal backwatering. Project Status: Design will occur in 2028-2029 and construction is scheduled to take place in 2030. Total Estimated Project Cost: $1,185,000 .IN T kA a 3.1 a i PROPOSED Sbwm brain GB Type 2 EXISTING Mpte,'C uNerl y Dech ^iap Gate f - Birch Bay 1 Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP Project Narrative Item No. 22 Bay Ridge Estates Drainage Improvements Database ID No. 23-004 Construction Funding Years : 2031 Project Narrative: This project will address drainage and flooding issues in Bay Ridge Estates and along Selder Road. It will involve installing or replacing 500 lineal feet of pipe, regrading 1,000-feet of ditch, and installing two new catch basins on Selder Road and Birch Point Road. Project Status: Design will occur in 2029-2030 and construction is scheduled to take place in 2031. Total Estimated Project Cost: $770,000 I { 4 !,ROPOSEO CUVeFS Rdcn Regrade Storm DFain in ORType- 9 • Ca Type 2 EkiSnNd Or Pipe;Ctdverl M Jr Dfth p� pool • - Deepen, Widen Ditch Rep -ace D:Ich ri r �� 6r_T { 22 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 23 Everson Overflow Pipeline Bank Stabilization Database ID No. 20-002 Construction Funding Years : 2023 Project Narrative: A portion of the bank within the Everson overflow corridor was damaged during the 2020 flood season, this erosion was further exacerbated during the November 2021 flood events. The damage site is located near a petroleum pipe crossing the Nooksack River. The FCZD `s project will stabilize the bank and protect the high ground divide that controls how much overflow occurs at Everson. Project Status: The project is designed and construction is anticipated to be complete in 2023. The FCZD anticipates that FEMA and the State will fund 95% of the project through the Public Disaster Assistance Program. Total Estimated Cost: $1,129,500 Expenditures to Date: $1,109,500 23 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 24 Jones Creek Debris Flow Risk Reduction Database ID No. 07-105 Construction Funding Years : 2023 Project Narrative: This project includes acquisition of residential properties in the high hazard area of the Jones Creek alluvial fan and -onstruction of setback deflection berms to reduce the risk of debris flow damage to the town of Acme. The project ncludes realignment of Turkington Road at the location where it crosses the proposed berm. Project Status: All property acquisition, design and construction for the project is complete. A Department of Ecology Floodplains by Design Grant provided 80% funding for the acquisition of two properties and construction. The Road Fund and Acme VVater District No. 18 is also providing funding towards construction of the project. Planting will take place in 2024. Total Estimated Cost: $10,383,000 Expenditures to Date: $10,360,000 { i ti4 d L tY - L' A '"AF 24 6 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 25 Marine Drive Emergency Levee Repair Database ID No. 20-001 Construction Funding Years : 2023 Project Narrative: The Marine Drive Levee provides flood protection during smaller, more frequent floods to the Marietta area and Slater Road. The levee is located on property owned by the Washington Department of Wildlife who is managing the property for wildlife. The levee was damaged in several locations during flooding in 2020, 2021, and 2022. The project involves restoring the levee crest and backslope. Project Status: The project is designed and construction is anticipated to be complete in 2023. An interim project was completed to temporarily stabilize the damage areas prior to the repair. The FCZD is utilizing FEMA funds to partially fund the project. Total Estimated Cost: $2,463,000 Expenditures to Date: $2,423,000 25 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 26 Truck Road Bank Stabilization Database ID No. 20-003 Construction Funding Years : 2022 and 2024 Project Narrative: The project is located along Truck Road about 0.3 miles easterly from Mt. Baker Highway (SR 542). During high-water events of the 2017/2018 winter, the North Fork Nooksack River eroded the unprotected bank of Truck Road to within 13 feet of the roadway surface. This prompted an emergency project to construct a passive riprap revetment underneath a section of the roadway to provide immediate protection. Flooding during 2020 eroded the remaining bank exposing the recently constructed riprap revetment and destabilizing a portion of the north bound lane. Jersey barriers were placed by county crews to block off this lane to traffic. Additional erosion sustained the November 2021 floods, threatened the road downstream of the previous damage area. The FCZD undertook an emergency project to address the immediate threat to truck road. Additional work is needed to provide environmental mitigation for that action and to repair and realign the damaged section of road. Project Status: The FCZD has completed the emergency repair and is currently designing and permitting the associated Phase 2 project that will provide environmental mitigation and road repair. Construction of the Phase 2 project is anticipated to occur in 2024. The FCZD anticipates that FEMA and the State will fund 95% of the project through the Public Disaster Assistance program Total Estimated Cost: $3,951,000 Expenditures to Date: $1,494,000 26 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 27 Hudson Road Bridge No. 132 Repair Database ID No. 22-001 Construction Funding Years : 2024 Project Narrative: The project is located along near the dead end of Hudson Rd in Acme, WA. The FCZD recently purchased the property at the end of this road as a part of the Jones Creek Debris Flow Risk Reduction Project. The approaches to the bridge that serves the property were damaged during the November 2021 flood events. The project will provide for repair to the bridge approaches. Project Status: The FCZD has provided FEMA with the damages and cost estimate to repair the project. Design and permitting for the project will be conducted in the winter of 2023/2024. Construction is anticipated to occur in 2024. The FCZD anticipates that FEMA and the State will fund 95% of the project through the Public Disaster Assistance program. Total Estimated Cost: $125,000 Expenditures to Date: $7,500 27 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 28 Timon Levee USACE Levee Rehabilitation Database ID No. 22-002 Construction Funding Years : 2024 Project Narrative: The Timon Levee is located near Northwood Rd, southeast of Lynden WA. The levee is eligible for the Public Law (PL) 84-99 Levee Rehabilitation program with the US Army Corps of Engineers (USACE). This program allows for the USACE to repair damages to the levee and requires a 20% local cost -share. The Timon Levee was damaged during the November 2021 flood events. The FCZD worked with the USACE to flood fight the damage during the event, this emergency flood fight was funded 100% by the USACE. This project provides for the USACE to conduct permanent repairs at the site. Project Status: USACE anticipates construction of the project in 2024. The FCZD local share of costs is 20%. Total project cost includes USACE construction as a direct contribution. Total Estimated Cost: - Expenditures to Date: -- 28 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 29 Upper Hampton USACE Levee Rehabilitation Database ID No. 22-004 Construction Funding Years : 2024 Project Narrative: The Upper Hampton Levee is located near Northwood Rd, southeast of Lynden WA. The levee is eligible for the Public Law (PL) 84-99 Levee Rehabilitation program with the US Army Corps of Engineers (USACE). This program allows for the USACE to repair damages to the levee and requires a 20% local cost -share. The Upper Hampton Levee was damaged during the November 2021 flood events. This project provides for the USACE to conduct permanent repairs at the site. Project Status: USACE anticipates construction of the project in 2024. The FCZD local share of costs is 20%. Total project cost includes USACE construction as a direct contribution. Total Estimated Cost: - Expenditures to Date: -- 29 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 30 Cougar Creek Early Action / Neevel Levee Bank Stabilization Database ID No. 16-008 Construction Funding Years : 2025 Project Narrative: The Neevel Levee provides varying levels of protection to a significant amount of agricultural land. Approximately 250 feet of the levee running along Cougar Creek is over -steepened and experiencing sloughing of the riverward face. A stabilization project incorporating large woody debris at the toe and reducing the slope of the riverward face is proposed in the System -wide Improvement Framework (SWIF) to resolve the deficiency identified by the US Army Corps of Engineers and keep the levee eligible for repair under the Public Law (PL) 84-99 Program. An early action project developed through the Floodplain Integrated Planning (FLIP) process includes replacement of the Cougar Creek flood gate and installation of large woody debris in the channel downstream. Project Status: Design of the project has been finalized. Construction is anticipated for 2025 with funding through NRCS's EQIP program, additional outside funding for construction has not yet been identified. Total Estimated Cost: $2,375,000 Expenditures to Date: $303,000 30 Whatcom County Public Works — River and Flood Division Project Narrative 2024-2029 Six -Year WRIP Item No. 31 Abbott Levee Protection and Improvement Project Database ID No. 16-007 Construction Funding Years: 2021 and 2025 Project Narrative: The project is located along Abbott Road about 1.7 miles east of Hannegan Road. Recent erosion along the Nooksack River has removed a section of riprap that previously protected the land adjacent to the Abbott Levee and Abbott Road. Phase1 of this project addressed the ongoing erosion in this location. The FCZD is also investigating possible road and levee setback options to improve the upstream tie-in of the levee and address a deficiency identified by the US Army Corps of Engineers to maintain the levee's eligibility in the PL 84-99 Levee Rehabilitation Program. This work will be implemented as a second phase of the project. Project Status: Construction of Phase 1 was completed during Summer or 2021. The FZCD is working with the project consultant on Phase 2. Phase 2 will include a reach assessment to provide the technical basis for developing alternatives for upstream improvements. The FZCD will utilize this reach scale analysis to develop a capital project for Phase 2. Phase 2 construction is anticipated during 2025. Total Estimated Cost: $3,740,000 Expenditures to Date: $1,098,000 31 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 32 Acme Woody Revetment Repair Database ID No. 23-005 Construction Funding Years : 2025 Project Narrative: The project site is an approximately 1/4-mile long section of eroding bank located along the left bank of the South Fork Nooksack River in the unincorporated community of Acme in Whatcom County. In 2009 and 2010 the Flood Control Zone District constructed multiple log jams and woody revetments to discourage lateral erosion and stabilize the lower reach of Landingstrip Creek for the purpose of enhancing critical habitat for ESA listed species and providing flood protection to the Acme community and the SR 9 bridge. Flooding in November 2021 eroded the lower portion of the project, destabilized the wood structures, and eroded the streambank. The proposed project will repair the woody revetment along the new stream alignment. Project Status: Design is anticipated to start in 2024 and construction is anticipated in the Summer of 2025 with funding through FEMA and FCZD. Total Estimated Cost: $1,285,000 Expenditures to Date: $0 32 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 33 Bertrand Creek Levee Stabilization Database ID No. 16-005 Construction Funding Years : 2025 Project Narrative: The Bertrand Creek right and left bank Levees are designed to overtop during larger floods, but provide protection to agricultural land during the growing season. The left bank levee has a 250 foot long section where erosion is threatening the levee prism. The right bank levee face is sloughing at three locations with a total length of approximately 250 feet. The levees will have to be repaired to remain eligible for rehabilitation through the US Army Corps of Engineers Public Law (PL) 84-99 Levee Rehabilitation Program. Project Status: A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process. The project will be designed by the FCZD. Construction is anticipated in the Summer of 2025. Total Estimated Cost: $292,000 Expenditures to Date: $7,000 33 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 34 Devries Levee Improvements Database ID No. 19-001 Construction Funding Years : 2025 Project Narrative: This project involves widening the levee crest and backsloping the levee to meet the US Army Corps of Engineers's levee geometry standards for levees in the Public Law (PL) 84-99 Levee Rehabilitation Program (SWIF project). Project Status: A conceptual design has been developed as part of the SWIF planning process. Detailed design has not been initiated yet. Total Estimated Cost: $225,000 Expenditures to Date: $0 34 Whatcom County Public Works — River and Flood Division Project Narrative Ferndale Levee Improvement Project Database ID No. 07-104 Construction Funding Years : 2026 - 2028 Project Narrative: 2024-2029 Six -Year WRIP Item No. 35 Two levee segments, one sponsored by the City of Ferndale and one by the FCZD and Diking District #1 in the US Army Corps of Engineer's Public Law (PL) 84-99 Levee Rehabilitation Program, provide protection to the three treatment facilities along Ferndale Road. The US Army Corps of Engineers has identified several deficiencies along these two levee segments, including a gap in which super sacks filled with sand have been placed. The 1999 Comprehensive Flood Hazard Management Plan recommended improving these levees to provide 100-year protection to the City and the treatment facilities. The System -wide Improvement Framework (SWIF) also includes this project to address the identified levee deficiencies. Project Status: This project is currently in the design phase. A preferred alternative for the levee and road alignment has been selected. A 60 percent design level plan of the proposed levee configuration is anticipated Fall of 2023. A 100 Percent design level plan is anticipated in 2024. Grant funding through the State's Floodplain's by Design program has been secured to complete the design. Construction is anticipated to be phased with construction beginning in 2026 and lasting through 2028. Total Estimated Construction Cost: TBD Expenditures to Date: $976,000 35 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 36 Glacier -Gallup Creeks Alluvial Fan Restoration Database ID No. 18-006 Construction Funding Years : 2023 and 2027 Project Narrative: The Glacier Creek Levee on the left (west) bank of the creek was constructed in the 1960s to prevent overflows into Gallup Creek and damage to State Route (SR) 542. Since construction, the levee has been subject to ongoing damage. Constriction of the Glacier -Gallup channel migration zone (CMZ) has exacerbated aggradation upstream of SR 542 and severely degraded fish habitat. WSDOT replaced the Gallup Creek bridge in 2010 and is working to construct a new bridge over Glacier Creek and the alluvial fan between the two creeks. The FCZD is developing a project in coordination with WSDOT and is evaluating the feasibility of full or partial removal of levees blocking natural channel migration on the Glacier and Gallup Creeks alluvial fan and construction of a setback levee on Gallup Creek to protect the Community of Glacier. Project Status: A feasibility study and alternatives analysis for evaluating levee removal and setback alternatives was initiated in late 2018. Preliminary design of the preferred alternative will be initiated once the preferred alternative is selected. Construction of an interim project to address levee damage was completed in 2023. Construction of the levee removal and setback is anticipated to occur concurrently with the Glacier Creek bridge replacement in 2027 and 2028. Total Estimated Project Cost: TBD Expenditures to Date: $1,492,000 36 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 37 Dahlberg Wetland Mitigation Site Database ID No. 20-004 Construction Funding Years : 2026 - 2028 Project Narrative: The FCZD purchased a property northeast of Ferndale as a mitigation site for future projects having wetland or riparian impacts. The property contained a dilapidated farm house. Project Status: FCZD purchased the subject property and demolished the farm house in Fall of 2020. The FCZD has installed a groundwater monitoring network on the site to support developing a long-term restoration plan for the site. Total Estimated Cost: TBD Expenditures to Date: $873,000 37 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 38 Upper Hampton Levee Improvements Database ID No. 16-006 Construction Funding Years : 2027 Project Narrative: Several deficiencies were identified by the US Army Corps of Engineers on the Upper Hampton Levee. Improvements to the levee geometry are proposed in two locations and improvement to address seepage is proposed at a third location. Project Status: A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process. Detailed design has not been initiated yet. However, we were able to complete a portion of the levee backsloping work at one site using excess material generated at the 2021 Abbott and Lynden Levee Improvement projects. Total Estimated Cost: TBD Expenditures to Date: $6,000 38 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 39 Floodplain Acquisition Database ID No. 07-002 Acquisition Funding Years : 2017- TBD Project Narrative: Reach -scale projects to reconfigure flood infrastructure are being evaluated through the integrated planning processes that started with the System -wide Improvement Framework (SWIF) and has transitioned into the Floodplain Integrated Planning (FLIP) process. The goal of this work is to reduce flood risk and expenditures and restore habitat and the processes that form it. Voluntary acquisition of lands is proposed to enable future levee reconfigurations to reduce flood risk and future levee repairs, while improving habitat. Project Status: Acquisition of one property in Reach 4 was completed in 2020. Discussions with additional property owners will occur in 2021 and 2022. Total Estimated Cost: TBD Expenditures to Date: $1,128,000 39 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 40 Marietta Acquisition Database ID No. 07-002 Construction Funding Years : 2001 - Present Project Narrative: Acquisition of residential properties in the frequently -flooded repetitive flood loss area of Marietta, removal of existing structures and restoration of properties with native vegetation. Project Status: Property acquisition began in 2001 and is ongoing. As properties are acquired, structures are removed and native vegetation is planted. All acquisitions are voluntary and the project is ongoing as current property owners decide to sell their properties. Total project cost will need to include funding for cleanup of up to four former gas stations, though the exact nature of the work is still undefined. Total Estimated Project Cost: TBD Expenditures to Date: $1,852,000 .N Whatcom County Public Works — River and Flood Division Project Narrative High Creek Sediment Trap Database ID No. 22-005 Construction Funding Years : Annually Project Narrative: 2024-2029 Six -Year WRIP Item No. 41 High Creek flooding damaged nearby homes and closed Mount Baker Highway in the mid-1990's. A legal settlement resulting from that event directs Whatcom County to prepare a creek management plan. Sediment management in the watershed including the 3400 feet of County owned right of way east of Kendall Creek is an important plan element along with fish habitat mitigation. State permits for future maintenance dredging are dependent on consistency with the final management plan. A management plan was developed and recommended the construction of two sediment traps, one sited upstream of Mount Baker Highway to trap coarser material and one by the confluence with Kendall Creek to trap finer material. The sediment traps were constructed in 2018. The project provides for the annual clean out of those sediment traps. Project Status: The 2023 clean out is anticipated to be complete in September 2023 for a cost of $80,000. Total Estimated Cost is for annual estimated cleanout costs funded by the FCZD. Total Estimated Cost: $135,000 Expenditures to Date: -- 41 Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP Project Narrative Item No. 42 Emergency/New Projects Database ID No. 08-003 Construction Funding Years : 2024 - 2029 Project Narrative: This item provides funding to address unanticipated projects resulting from new damage to flood control facilities. Project Status: Design and construction to occur as necessary. Total Estimated Project Cost: $425,000/year Expenditures to Date: $425,000/year Due to the nature of this item, no map exists. Board of Supervisors review and prioritization will be sought at the appropriate time. 42 Whatcom County Fish Passage Barrier Removal Public Works Culvert Work Group Surface Water Work Session September 19, 2023 Culvert Remediation MOA Parties • Whatcom County • Nooksack Indian Tribe • Lummi Nation • Washington Department of Fish and Wildlife 4 _ 1 Im .t h 2 �r - Y Johnson's Creek, Mosquito Lake Road Major Components J ' Culvert Inventory Updates • Reassess Culverts with Changed Stream Conditions 'Collaborate on Pre -Application Field Measurements -- ' 1k 3av •'-' �• � , '� � Win' ��; � ' 'e��_ - �. � 'r ..}�'#• Johnson's Creek, Mosquito Lake Road • Collaborate on Prioritization Plan • Agree on Proposed Schedule for Implementation • Collaborate on Technical Support and Funding • Annual Check In with Policy Group Whatcom County Culverts - County Ownership — • Approximately 195 County culverts are barriers that block >200m of historic habitat • Sub -set of —80 culverts have the most significant habitat gains • Program Efficiencies • Less complex projects can move forward while larger, more complex, projects are designed & funded • Bundling Projects • Projects will be developed and sequenced across PW divisions Grant Funding Kenney Creek -Brian Abbott Fish Barrier Removal Board (2 Grants for State Culvert Funding through the Recreation and Conservation Office) o Status- Design Grant Awarded/Completed o Status- Construction Grant Awarded/In-progress with 2024 or 2025 construction o Design Budget- $523,000 o ($443,000 grant/$80,000 local match) o Construction Budget- $3,500,000 o ($2,975,000 grant/$525,000 local match) o Total Budget- $4, 023, 000 o Components o Alternatives analysis through final bridge and stream restoration design o Landowner outreach and easements o Culvert, fill, obsolete fishway removal, bridge construction and site restoration Grant Funding Habitat Strategic Initiative Lead Grant (EPA National Estuary Program Funding) o Status- Awarded/ Agreement Under Development o Estimated Budget- $790,000 o Components o Staff Capacity — 2 FTEs (1 Natural Resource Specialist; 1 Engineering Supervisor) o Contractor for Design o Support for Tribes and Small Cities o WRIA 1 Coordination and 4-Year Work Plan Updates o Habitat and Fish Passage Barrier Training o Preliminary Design Black Slough Projects o Community Outreach Grant Funding Aquatic Organism Passage Grant (US Department of Transportation) o Status- Awarded/Agreement Under Development o Estimated Budget- $1,100,039 o ($880,031 federal grant/ $220,008 local match) o Components o Alternatives Analysis, Preliminary Design and Construction Cost Estimates for 11 Culverts Building Staff Capacity • Cross -Division Program • Natural Resources • Bridge and Hydraulics • Maintenance and Operations Natural Resources (1 FTE) • Coordinate, Identify, Prioritize, Monitor, Grants & Contracts Bridge and Hydraulics (3 FTE) • Cost Estimates, Design, Construction, Grants & Contracts Maintenance &Operations (TBD) 0 Inspect, repair, replace Next Steps o Budget Supplementals (2023 and 2024) o Grant Agreements o Staff Recruitment o Implement the MOA o Continue Seeking Outside Funds o Updates to Council