HomeMy WebLinkAboutPacket Water Work Session Sep 19 2023Whatcom County
Council Water Work Session
COUNTY COURTHOUSE
311 Grand Avenue, Ste #105
Bellingham, WA 98225-4038
(360) 778-5010
Meeting Agenda
Tuesday, September 19, 2023
10:30 AM
Civic Center Building Conference Room / Hybrid Meeting
HYBRID MEETING - (PARTICIPATE IN -PERSON, SEE REMOTE JOIN
INSTRUCTIONS AT www.whatcomcounty.us/joinvirtualcouncil, OR CALL
360.778.5010)
COUNCILMEMBERS
Barry Buchanan
Tyler Byrd
Todd Donovan
Ben Elenbaas
Carol Frazey
Kaylee Galloway
Kathy Kershner
CLERK OF THE COUNCIL
Dana Brown -Davis, C.M.C.
Council Water Work Session Meeting Agenda September 19, 2023
Call To Order
Roll Call
Announcements
Individuals who require special assistance to participate in the Council's meetings are asked to contact
the Council Office at 360.778.5010 at least 96 hours in advance. This committee meeting is also noticed
as a meeting of the Whatcom County Council, with the agenda limited to committee business.
Meeting Materials
AB2023-491 Meeting Materials for the Water Work Session September 19, 2023
Watershed Planning Update
2024-2029 Water Resources Improvement Plan
Proposed Fish Barrier Removal Program
WRIA 1 Planning Unit update
Other Business
Adjournment
Whatcom County Page 2 Printed on 411412025
• Whatcom County COUNTY COURTHOUSE
311 Grand Avenue, Ste #105
Bellingham, WA 98225-4038
(360)778-5010
• Agenda Bill Master Report
File Number: AB2023-491
File ID: AB2023-491 Version: 1 Status: Received
File Created: 07/21/2023 Entered by:
Department: File Type: Receipt of Document(s)
Assigned to: Council Water Work Session Final Action: 09/19/2023
Agenda Date: 09/19/2023 Enactment #:
Primary Contact Email: kfelbing@co.whatcom.wa.us
TITLE FOR AGENDA ITEM:
Meeting Materials for the Water Work Session September 19, 2023
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE:
None
HISTORY OF LEGISLATIVE FILE
Date: Acting Body: Action: Sent To:
09/19/2023 Council Water Work Session RECEIVED
Attachments: Water Work Session Agenda and Packet for 9.19.2023, Presentation for Proposed Fish Barrier
Removal Program
Whatcom County Page 1 Printed on 4/14/2025
WHATCOM COUNTY
PUBLIC WORKS DEPARTMENT
ELIZABETH KOSA
Director
MEMORANDUM
NATURAL RESOURCES
322 N. Commercial Street, Suite 110
Bellingham, WA 98225
Telephone: (360) 778-6230
FAX: (360) 778-6231
www. whatcomcounty. us
TO: The Honorable Satpal Singh Sidhu, Whatcom County Executive, and
Honorable Members of the Whatcom County Council
THROUGH: Elizabeth Kosa, Director
FROM: Gary S. Stoyka, Natural Resources Program Manager
DATE: September 13, 2023
RE: September 19, 2023 Council Water Work Session
Please refer to the proposed agenda below for the next Water Work Session. Additional supporting
documents may be distributed at or before the meeting.
AGENDA
Date:
Tuesday, September 19, 2023
Time:
10:30 a.m. to 12:00 p.m.
Place:
Hybrid Meeting:
In Person: Civic Center Garden Level Conference Room (322 N. Commercial St., Street Level)
Virtual: For instructions on how to watch or participate in this meeting, please visit us at
www.whatcomcounty.us/ioinvirtualcouncil or contact the Council Office at 360.778.5010. View
meeting schedules, agendas, minutes, videos, and archives at www.whatcom.legistar.com.
Time
Topic
Council Action
Background Information
Requested
Attached
10:30 AM —
Watershed Planning Update
Informational
None
10:45 AM
10:45 AM —
2024-2029 Water
11:15 AM
2024-2029 Water Resources Improvement
Informational
Resources Improvement
Plan
Plan
11:15 AM —
Proposed Fish Barrier Removal Program
Informational
None
11:45 AM
11:45 AM —
WRIA 1 Planning Unit update
Informational
None
12:00 PM
If you have questions, please feel free to call me at (360) 778-6218.
cc:
Dana Brown -Davis
Kristi Felbinger
Jill Nixon
Jennifer Schneider
Karen Frakes
Erika Douglas
John Thompson
Paula Harris
Kraig Olason
Chris Elder
Cathy Craver
Doug Ranney
Melissa Donnelly
Roland Middleton
Erin Page
Josh Fleischmann
Mark Personius
Tyler Schroeder
Sue Sullivan
Brandy Reed
Bennett Knox
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2024-2029 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A
Item
No.
Project Description
Database ID
No.
I BES
Previous Expenditures
2024
i 2025
2026
2027
2028
2029
Total
Amount source Phas Amount sou Phase Amount source
$ 1,935,000 FEET/LWSU PE $ 25,000 LWSU PE
Phase Amount
PE
source
Phase Amount
PE
sou
Ph- AmounC
PE
sou Phase Amount
PE
1
SWP #SWLW23-04 Academy Road Stormwater Improvements:
Evaluate the water quality performance of the existing Academy
stormwater system and provide recommended retrofits.
20-005
2,030,000
63.9
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
CN
$ 70,000
LWSU
CN
CN
CN
CN
CN
2
SWP #SWLW23-03 Geneva Bioretention Pilot Project: Install new
water quality treatment media, evaluate the effectiveness and
constructability of new water quality treatment media
20-006
63.9
$ 1,000,000
REET/Grant/LWSU
PE
PE
PE
PE
PE
$ 1,112,000
RW
RW
RI
R
RW
RW
RW
RW
CN
$ 90,000
ECY Grant
CN
CN
CN
CN
CN
CN
$ 22,000
REET
CN
CN
CN
CN
CN
3
SWP#SWLW23-01 Silver Beach Creek Stormwater Improvements
Phase 2: Main channel restoration below Hillsdale using natural
vegetation
07-095
60.5
$ 250,000
FEET LWSU
PE
$ 40,000
LWSU
PE
PE
PE
PE
PE
$ 1,160,000
RW
$ 20,000
FEET
RW
RW
RW
RW
RWCN
$ 600,000
REET
CN
CN
CN
CN
CN
CN
$ 250,000
LWSU
CN
CN
CN
CN
CN
4
Eagleridge Stormwater Improvements: Install a water quality
system to treat stormwater from the Eagleridge development.
20-007
61.4
$ 15,000
LWSU
PE
$ 280,000
REET
PE
PE
PE
PE
PE
$ 810,000
RW
$ 15,000
LWSU
RW
RW
RW
RW
RW
CN
CN
$ 500,000
LWSU
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
5
aterImprovements: Install water quality
Austin Court discharge
system on the discharge from Austin Court.
20-008
58.8
PE
$ 200,000
LWSU
PE
PE
PE
PE
PE
$ 675,000
RW
$ 25,000
REET
RW
RW
RW
RW
RW
CN
CN
CN
$ 450,000
LWSU
CN
CN
CN
6
SWP #SWLW23-05 Cedar Hills Culvert Replacement: Replacement of
culvert damaged during the 2021 flooding event with FEMA funding
contribution.
23-001
44.2
$ 12,000
LWSU
PE
$ 60,000
FEMA
PE
PE
PE
PE
PE
$ 392,000
PE
$ 100,000
REET
PE
PE
PE
PE
PE
RW
$ 15,000
LWSU
RW
RW
RW
RW
RW
CN
CN
$ 180,000
FEMA
CN
CN
CN
CN
CN
CN
$ 25,000
REET
CN
CN
CN
CN
7
Strawberry Point/Lake Whatcom Blvd Stormwater Improvements:
System upgrades to improve water quality including vaults,
biofiltration swales, and channel restoration
17-001
62.2
PE
PE
$ 30,000
LWSU
PE
$ 300,000
REET
PE
$ 50,000
LWSU
PE
PE
$ 1,170,000
RW
RW
RW
$ 35,000
LWSU
RW
RW
RW
CN
CN
CN
CN
$ 455,000
REET
CN
CN
CN
CN
CN
CN
$ 300,000
LWSU
CN
CN
8
Geneva Street & Lake Louise Road Culvert Replacement: Replace
culverts along Geneva Street and Lake Louise Road to improve water
quality and conveyance
20-010
58.8
PE
PE
PE
PE
$ 70,000
REET
PE
PE
$ 270,000
PE
PE
PE
PE
PE
PE
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
$ 200,000
LWSU
CN
9
Lake Whatcom Boulevard Media Filter Drain (EG-1): Install media
filter drain or other water quality system along west side of Lake
Whatcom Blvd to improve water quality.
22-006
58.8
PE
PE
PE
PE
$ 180,000
LWSU
PE
PE
$ 835,000
RW
RW
RW
RW
$ 25,000
FEET
RW
RW
CN
CN
CN
CN
CN
$ 630,000
REET
CN
10
Sudden Valley Stormwater Improvements No. 2: Construct drainage
system upgrades and retrofits in the Sudden Valley area of the Lake
Whatcom watershed.
22-007
49.0
PE
PE
PE
$ 10,000
LWSU
PE
$ 200,000
LWSU
PE
$ 60,000
REET
PE
$ 1,260,000
PE
PE
PE
PE
PE
PE
RW
RW
RW
RW
$ 10,000
REET
RW
RW
CN
CN
CN
CN
CN
$ 500,000
REET
CN
CN
CN
CN
CN
CN
$ 480,000
LWSU
CN
11
Lake Whatcom Boulevard Water Quality Vault (EG-4):Install a water
quality system to remove phosphorus and other pollutants from
residential runoff prior to entering Lake Whatcom.
22-008
57.1
PE
PE
PE
PE
PE
$ 200,000
REET
PE
$ 225,000
PE
PE
PE
PE
PE
PE
RW
RW
RW
RW
RW
$ 25,000
LWSU
RW
CN
CN
CN
CN
CN
CN
12
Viewhaven Lane Water Quality & Conveyance Improvements:
Install water quality systems and improve conveyance near
Viewhaven Lane.
20-009
58.8
PE
PE
PE
PE
PE
PE
$ 100,000
LWSU
$ 115,000
RW
RW
RW
RW
RW
RW
$ 15,000
LWSU
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
13
WATERSHEDBIRCH BAY & AQUATIC• r
SWP#SWBB23-02 Charel Terrace Stormwater Outfall Repair:
Marine outfall stabilization to protect a bluff slope (emergency repair
2022) and permanent stabilization (2023)
20-011
29.8
$ 290,000
IBBWARM/FEMA
PE
$ 60,000
FEMA
PE
PE
PE
PE
PE
$ 750,000
RW
RW
RW
RW
RW
RW
CN
$ 350,000
FEMA
CN
$ 50,000
BBWARM
CN
CN
CN
CN
CN
14
SWP #SWBB23-03 Holeman Avenue Stormwater Improvements
(PW-1): Replace CBs, upsize culverts, re-establish ditch on Holeman
Ave near Birch Bay Dr
07-242
37.8
$ 140,000
BBWARM
PE
$ 65,000
BBWARM
PE
PE
PE
PE
PE
$ 905,000
RW
RW
RW
RW
RW
RW
CN
$ 300,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 400,000
FEET
CN
CN
CN
CN
CN
15
SWP #SWBB23.04 Semiahmoo Drive South & Outfall Improvements
(BP-2, BP-5): Upsize culverts and re-establish roadside ditch on east
p
side of Semiahmoo Drive.
18-00918-010
50.3
$ 320,000
BBWARM
PE
$ 35,000
BBWARM
PE
$ 50,000
BBWARM
PE
PE
PE
PE
$ 1,355,000
PE
PE
PE
PE
PE
PE
RW
$ 15,000
BBWARM
CN
$ 410,000
Road Funds
RW
RW
RW
RW
CN
CN
$ 525,000
BBWARM
CN
CN
CN
CN
16
SWP #SWBB23.05 Normar Place Stormwater Improvements (BP-1):
Upsize pipes, replace CBs and install energy dissipater at pipe outfall
on Normar Place
19-004
52.0
$ 280,000
BBWARM
PE
PE
$ 60,000
BBWARM
PE
PE
PE
PE
$ 1,160,000
PE
PE
RW
$ 20,000
BBWARM
CN
RW
RW
RW
RW
CN
CN
$ 500,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 300,000
FEET
CN
CN
CN
CN
17
SWP #SWBB23-06 Lora Lane Drainage & Tide Gate Modifications
(TCl-2): Replace tide gate structure and repair embankment; install
Type 2 CB and culvert under Birch Bay Dr
18-008
42.5
$ 6,500
BBWARM
PE
$ 280,000
BBWARM
PE
PE
$ 60,000
BBWARM
PE
PE
PE
$ 1,716,500
RW
RW
RW
RW
RW
RW
CN
CN
CN
$ 200,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 300,000
REET
CN
CN
CN
CN
CN
CN
$ 870,000
Road Funds
CN
CN
CN
18
SWP#SWBB23-07 Birch Point Road Stormwater & Outfall
Improvements (BP-3, BP-6): Upsize culverts and replace outfall to
the beach to reduce bluff erosion
21-001
33.3
PE
PE
$ 300,000
BBWARM
PE
PE
PE
PE
$ 970,000
RW
RW
$ 20,000
BBWARM
RW
RW
RW
RW
CN
CN
CN
CN
$ 100,000
Road Funds
CN
CN
CN
CN
CN
CN
$ 250,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 300,000
FEET
CN
CN
19
SWP#SWBB23-08 Richmond Park Stormwater Improvements(SH-
2): Address drainage concerns in Richmond Park by re-routing
stormwater down Shintaffer Road to a Birch Bay outfall
22-010
42.5
PE
PE
PE
$ 660,000
BBWARM
PE
PE
$ 140,000
BBWARM
PE
$ 2,600,000
RW
RW
RW
$ 40,000
BBWARM
RW
RW
RW
CN
CN
CN
CN
CN
$ 680,000
Road Funds
CN
CN
CN
CN
CN
CN
$ 780,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 300,000
REET
CN
20
Roger's Slough Drainage Improvements: Re -grade ditches, install
new culverts, and replace existing pipe with concrete box culvert
under Birch Point Road into Roger's Slough
23-002
70.2
PE
PE
PE
PE
$ 750,000
BBWARM
PE
PE
$ 150,000
BBWARM
$ 2,850,000
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
$ 1,950,000
BBWARM
CN
CN
CN
CN
CN
CN
21
Birch Bay Village Drainage Improvements: Upsize existing culverts
and install new pipe and catch basins in Birch Bay Village to reduce
flooding
23-003
52.9
PE
PE
PE
PE
PE
$ 350,000
BBWARM
PE
$ 350,000
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
22
Bay Ridge Estates Drainage Improvements: Upsize and install new
culverts and CBs on Birch Point Road and Selder Road to reduce
flooding
23-004
46.1
PE
PE
PE
IPE
IPE
PE
1 $ 220,000
1 BBWARM
$ 220,000
CN
CN
CN
IRW
IRW
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
CNI
I
ICNI
CN
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2024-2029 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A
Item
No.
Project Description
Database ID
No.
BES
Previous Expenditures
Amount sn��ee
2024
Pnase Amouno source
2025
Phase Amount source
2026
Pr,a,e Amount
Phase Amount
202
Phase Amount
Total
23
Everson Overflow Pipeline Bank Stabilization (720009): Stabilize
bank at erosion site from 2020 flood at pipeline crossing
20-002
FCZD
PE
PE
PE
PE
PE
Project Total:
66.3
$ 18,000
PE
$ 1,054,000
FEMA/State
PE
PE
PE
PE
PE
PE
$ 1,129,500
$ 37,500
Pipeline
PE
PE
PE
PE
PE
PE
CN
$ 1,000
FCZD
CN
CN
CN
CN
CN
FCZD Total:
CN
$ 19,000
FEMA/State
CN
CN
CN
CN
CN
$ 19,000
CN
CN
CN
CN
CN
CN
24
Jones Creek Debris Flow Risk Reduction (712004): Construct
deflection berms and realign roadway
07-105
70.6
$ 6,131,000
FCZD
PE
$
FCZD
PE
PE
PE
PE
PE
$ 350,000
FEMA/State grant
PE
$
Roads
PE
PE
PE
PE
PE
Project Total:
$ 3,879,000
1 FbD grant
RW
$
FCZD
RW
I
RW
I
IRW
RW
RW
1
$ 10,383,000
RW
$ -
FbD grant
CN
CN
CN
CN
CN
CN
$ 5,000
FCZD
CN
CN
CN
CN
CN
FCZD Total:
CN
$ 18,000
FbD grant
CN
CN
CN
CN
CN
$ 6,136,000
CN
$ -
Roads
CN
CN
CN
CN
CN
CN
$
Utilities
CN
CN
CN
CN
CN
25
Marine Drive Emergency Levee Repair (720004): Repair crest and
backslope flood damage
20-001
61.4
$ 121,000
FCZD
PE
PE
PE
PE
PE
PE
Project Total:
$ 2,181,000
FEMA
PE
PE
PE
PE
PE
PE
$ 2,463,000
$ 121,000
State
CN
$ 2,000
FCZD
CN
CN
CN
CN
CN
FCZD Total:
CN
$ 38,000
FEMA/State
CN
CN
I
jCN
CN
CN
1
$ 123,000
26
Truck Road Bank Stabilization (720008): Phase 1 emergency
construction in 2022 and Phase 2 road rehab and environmental
mitigation in 2023
20-003
59.4
$ 37,000
FCZD
PE
$ 1,400
FCZD
PE
PE
PE
PE
PE
Project Total
$ 1,345,000
FEMA
PE
$ 54,600
FEMA/State
PE
PE
PE
PE
PE
$ 3,951,000
$ 75,000
State
PE
$ 1,400
Roads
PE
PE
PE
PE
PE
$ 37,000
Roads
CN
$ 58,600
FCZD
CN
$ 1,400
FCZD
CN
CN
CN
CN
FCZD Total
CN
$ 2,224,900
FEMA/State
CN
$ 54,600
FEMA/State
CN
CN
CN
CN
$ 98,000
CN
$ 58,600
Roads
CN
$ 1,400
Roads
CN
CN
CN
CN
27
Hudson Rd Bridge No. 132 Repair (722006): Repair Nov 2021
damages to bridge approaches
22-001
38.9
$ 375
FCZD
PE
$ 375
FCZD
PE
PE
PE
PE
PE
Project Total:
$ 7,125
FEMA/State
PE
$ 7,125
FEMA/State
PE
PE
PE
PE
PE
$ 127,500
CN
$ 5,500
FCZD
CN
$ 125
FCZD
CN
CN
CN
CN
FCZD Total
CN
$ 104,500
FEMA/State
CN
$ 2,375
FEMA/State
CN
CN
CN
CN
$ 6,375
28
Timon Levee USACE Rehabilitation (722001): USACE to repair Nov
2021 flood damages.
22-002
64.5
$ 12,000
FCZD
PE
PE
PE
PE
PE
PE
Project Total:
$ 2,064,000
(See Note 1)
CN
CN
CN
CN
CN
CN
CN
$ 1,621,000
USACE
CN
CN
CN
CN
CN
CN
$ 406,000
FCZD
CN
CN
CN
CN
CN
FCZD Total
CN
$ 25,000
LE Subzone
CN
CN
CN
CN
CN
$ 418,000
29
Upper Hampton USACE Levee Rehabilitation (722008): USACE to
repair Nov 2021 flood damages.
22-004
58.7
$ 5,000
FCZD
PE
PE
PE
PE
PE
PE
Project Total:
$ 1,504,750
(See Note 1)
CN
CN
CN
CN
CN
CN
CN
$ 1,109,000
USACE
CN
CN
CN
CN
CN
CN
$ 222,000
FCZD
CN
CN
CN
CN
CN
FCZD Total
CN
$ 25,000
LE Subzone
CN
CN
I
CN
I
CN
jCN
1
$ 227,000
30
Cougar Creek and Neevel Levee Improvement (720010): Stabilize
oversteepened section of levee (SWIF project) with new flood gate
and restoration (FLIP project)
16-008
59.4
$ 109,000
FCZD
PE
$ 32,500
FCZD
PE
PE
PE
PE
PE
Project Total:
$ 117,000
NOAA grant
PE
PE
PE
PE
PE
PE
$ 2,375,000
$ 77,000
FbD grant
PE
RW
RW
RW
RW
RW
RW
CN
$ 1,608,235
FCZD
CN
PE
PE
PE
CN
$ 45,000
FCZD
CN
$ 386,235
EQUIP
CN
CN
CN
CN
FCZD Total:
CN
CN
CN
CN
CN
CN
$ 1,795,000
31
Abbott Levee Protection and Improvement (718010): Interim
erosion protection measures for levee & road (Ph. 1); Extend and
realign upstream end of levee (Ph. 2 - SWIF project)
16-007
70.4
$ 655,000
FCZD
PE
$ 138,300
FCZD
PE
$ 25,000
FCZD
PE
PE
PE
PE
Project Total:
$ 443,000
Roads
PE
$ 138,300
Roads
PE
$ 25,000
Roads
PE
PE
PE
PE
$ 3,740,000
RW
CN
$ 1,000,000
FCZD
CN
$ 7,500
FCZD
CN
CN
CN
FCZD Total:
RW
CN
$ 1,300,000
Roads
CN
$ 7,500
Roads
CN
CN
CN
$ 1,964,000
32
Acme Woody Revetment Repair (723008): FEMA funded repair to
Acme Early Chinook Restoration Project
23-005
67.7
PE
$ 14,225
FCZD
PE
FCZD
Project Total:
PE
$ 270,275
FEMA/State
PE
FEMA/State
$ 1,285,000
CN
$ 50,000
FCZD
FCZD Total:
CN
$ 950,000
FEMA/State
$ 78,000
33
Bertrand Creek Levee Stabilization (721002): Restore right and left
levee prisms and install bank protection (SWIF project)
16-005
54.4
$ 7,000
FCZD
PE
$ 30,000
PE
$ 5,000
FCZD
PE
PE
PE
PE
Project Total:
CN
CN
$ 225,000
FCZD
CN
CN
CN
CN
$ 292,000
CN
CN
$ 25,000
DDft4?
CN
CN
CN
CN
34
Devries Levee Improvements: Widen and establish full crest width
and backslope levee (SWIF project)
19-001
49.3
PE
$ 10,000
PE
$ 25,000
PE
PE
PE
PE
Project Total:
CN
CN
$ 200,000
CN
CN
CN
CN
$ 225,000
35
Ferndale Levee Improvement (719008): Reconstruct and realign
Ferndale and Treatment Plant Levees to improve level of protection
and address deficiencies
07-104
68.9
$ 171,000
FCZD
PE
$ 96,000
FCZD
PE
$ 20,000
FCZD
PE
$ 50,000
PE
1 $ 50,000
IPE
$ 50,000
1
PE
I
Construction
$ 805,000
FbD grant
PE
$ 384,000
FbD grant
PE
$ 80,000
FbD grant
RW
RW
RW
RW
Expected
RW
RW
$ 100,000
FCZD
CN
$ 380,000
FCZD
CN
CN
CN
in 2026-27
CN
RW
$ 400,000
FbD grant
CN
$ 1,520,000
FbD grant
CN
$ 5,000,000
CN
$ 1,000,000
CN
36
Glacier -Gallup Alluvial Fan Restoration (718007): Remove all or part
of Glacier Creek levee and construct setback levee along Gallup
Creek. Interim revetment fix in 2023
18-006
88.9
$ 413,000
FCZD
PE
$ 116,600
FCZD
PE
$ 40,000
FCZD
PE
$ 40,000
FCZD
PE
FCZD
PE
PE
Construction
$ 1,079,000
FbD grant
PE
$ 466,400
FbD grant
PE
$ 160,000
FbD grant
PE
$ 160,000
FbD grant
PE
FbD grant
PE
PE
Expected
RW
$ 120,000
FCZD
RW
$ 200,000
FCZD
RW
FCZD
RW
FCZD
RW
RW
in
RW
$ 480,000
FbD grant
RW
$ 800,000
FbD grant
RW
FbD grant
RW
FbD grant
RW
RW
2027-2028
CN
CN
FCZD
CN
I FCZD
CN
$ 1,000,000
FCZD
CN
$ 1,000,000
FCZD
CN
CN
CN
FbD grant
CN
FbD grant
CN
$ 4,000,000
FbD grant
CN
$ 4,000,000
FbD grant
CN
37
Dahlberg Wetland Mitigation Site (719006): Develop advanced
mitigation site for future impacts from Flood and Road projects
(likely phased implementation as projects are permitted)
20-004
66.3
$ 873,000
FCZD
PE
$ 15,000
FCZD
PE
$ 240,000
FCZD
PE
$ 100,000
PE
PE
$ 100,000
PE
Project Total:
CN
CN
CN
CN
$ 1,000,000
CN
CN
$ 500,000
$ 2,828,000
CN
CN
CN
CN
CN
CN
38
Upper Hampton Levee Improvements: Widen levee crest and flatten
backslope at two sites and seepage at retaining wall deficienies (SWIF
project)
16-006
70.4
$ 6,000
LE Subzone
PE
PE
$ 5,000
PE
PE
PE
PE
Project Total:
Under Lynden project
RW
RW
RW
RW
RW
RW
$ 36,000
CN
CN
$ 25,000
FCZD/LE Subzone
CN
CN
CN
CN
39
Floodplain Acquisition: Acquire key properties for future levee
reconfiguration to reduce risk and improve habitat
07-002
79.6
$ 236,000
FCZD
RW
$ 1,100,000
FCZD
RW
$ 5,000,000
RW
$ 5,000,000
RW
RW
RW
$ 943,000
FbD grant
RW
$ 4,400,000
FbD grant
RW
$ 9,600,000
FEMA/CBDG
$ 843,000
Commerce grant
RW
$ 866,000
Commerce grant
RW
RW
RW
RW
I
RW
40
Marietta Acquisition: Acquire properties in repetitive flood loss area
and remove structures
07-002
79.6
$ 663,000
FCZD
RW
RW
RW
RW
RW
RW
Total through'21
$ 1,044,000
FEMA/State
RW
$ 55,000
RW
$ 100,000
RW
$ 100,000
RW
$ 100,000
RW
$ 100,000
RW
$ 1,852,000
$ 145,000
ESRP grant
CN
CN
$ 25,000
CN
$ 25,000
CN
$ 25,000
CN
$ 25,000
CN
FCZD Total:
CN
CN
CN
CN
CN
CN
$ 663,000
41
High Creek Sediment Trap (720005): Annual clean out of sediment
traps
22-005
58.8
$ 137,000
FCZD
CN
CN
CN
CN
CN
CN
FCZD Total thru '24
$ 105,000
FEMA/State
CN
$ 115,000
FCZD
CN
$ 120,000
FCZD
CN
$ 125,000
FCZD
CN
$ 130,000
FCZD
CN
$ 135,000
FCZD
ICN
1 $ 140,000
FCZD
$ 252,000
42
Emergency/New Projects: Typically repair projects that result from
new damage, as needed
OS-003
Varies
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
RW
RW
RW
RW
RW
RW
Total/year:
CN
$ 50,000
Local sponsor
ICN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
$ 425,000
CN
$ 350,000
FCZD
CN
$ 350,000
FCZD
CIN
$ 350,000
FCZD
CN
$ 350,000
FCZD
ICN
1 $ 350,000
1 FCZD
CN
$ 350,000
FCZD
Numbers in italics are placeholders far projects still being conceived.
Previous expenditures includes work contracted in 2022 that will continually appropriate into 2023.
Note 1: Estimated total pro ect cost includes work done by U.S. Army Corps of En ineers USACE and funded directly by USACE.
Whatcom County Public Works — Stormwater Division
Project Narrative
Academy Road Stormwater Improvements
Database ID No. 20-005
Construction Funding Years : 2024
Project Narrative:
2024-2029 Six -Year WRIP
Item No. 1
Whatcom County and the City of Bellingham jointly developed this project to improve water quality from the
approximate 80-acre Academy sub -basin of the Lake Whatcom Watershed. This stormwater treatment facility project
was originally constructed in 2015 and will be retrofitted to improve phosphorus removal based upon recently
completed evaluations of stormwater treatment performance. City of Bellingham will adopt the facility for future
operation and maintenance after the retrofit improvements are completed by Whatcom County in 2024.
Project Status:
Design and permitting is being completed in 2023 and construction scheduled to take place in the summer of 2024.
Initial 2015 completed project cost: $ 1,204,000
2024 retrofit project cost: $ 826,000
Total Estimated Project Cost: $ 2,030,000
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 2
Geneva Bioretention Pilot Project
Database ID No. 20-006
Construction Funding Years : 2023
Project Narrative:
This project will utilize a Washington State Department of Ecology grant to install and monitor the performance of new
bioretention soil media. The existing swales are approaching the end of the media's effective life. New media will be
required to replace the existing depleted media in the near future.
A portion of the existing swales will be used to test the new media, which is designed to reduce the amount of phosphorus
and other pollutants entering the lake. Preliminary testing has shown the new media is much more effective in removal of
phosphorus than more traditional media. If tests show significant improvement over the original media, the media will be
adopted as a Best Management Practice (BMP) and be included in the updated WDOE Stormwater Manual.
Project Status:
Design is occurring in 2021-2022, construction in 2023, and monitoring performance in 2024-2026.
Total Estimated Project Cost: $1,112,000 (without monitoring costs)
fW
...:-
Fe.
-�t
gA
•`:' ;:
JV
2
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 3
Silver Beach Creek Stormwater Improvements Phase 2
Database ID No. 07-095
Construction Funding Years : 2024
Project Narrative:
This project will address the stream bank erosion found on Silver Beach Creek and other tributaries. The project will
reduce the amount of erosion and bank material that has been generally associated with the sediment -laden phosphorus
loading to Lake Whatcom. The project will reconfigure approximately 950 linear feet of stream channels with a more
stable cross-section to reduce erosion and the export of sediment.
Project Status:
Design is underway and construction scheduled to take place in 2024.
Total Estimated Project Cost: $1,160,000
F R'
tTrl0
3
Whatcom County Public Works — Stormwater Division
Project Narrative
Eagleridge Stormwater Improvements
Database ID No. 20-007
Construction Funding Years : 2025
2024-2029 Six -Year WRIP
Item No. 4
Project Narrative:
This project includes the installation of a water quality treatment facility associated with the Eagleridge neighborhood in
the Lake Whatcom watershed. The Eagleridge development is approximately 34 acres and runoff from this
development will be routed through a water quality facility to help remove sediments and phosphorus before entering
Lake Whatcom.
Project Status:
Design is anticipated in 2023-2024 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $810,000
... ABLE_ST._
0
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 5
Austin Court Stormwater Improvements
Database ID No. 20-008
Construction Funding Years : 2026
Project Narrative:
This project includes the installation of a large filter vault to improve water quality in the existing Austin Court stormwater
system. The tributary area is approximately three acres and the water quality system will remove sediments and
phosphorus prior to entering Lake Whatcom.
Project Status:
Design is anticipated in 2023-2024 and construction scheduled to take place in 2026.
Total Estimated Project Cost: $675,000
5
Whatcom County Public Works — Stormwater Division
Project Narrative
Cedar Hills Culvert Replacement
Database ID No. 23-001
Construction Funding Years : 2025
Project Narrative:
2024-2029 Six -Year WRIP
Item No. 6
This project includes the replacement of a culvert that was damaged during the 2021 flooding event with a new upsized
100-linear feet long 36-inch diameter culvert. The work shall also include the modification of the culvert inlet to enhance
erosion and sediment control, along with re -grading and armoring the downstream channel to provide improved
conveyance capacity. This will be funded by FEMA, REET and the Lake Whatcom utility.
Project Status:
Design is anticipated in 2024-2025 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $392,000
M
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 7
Strawberry Point/ Lake Whatcom Blvd Stormwater Improvements
Database ID No. 17-001
Construction Funding Years : 2027
Project Narrative:
This project will involve the installation of a water quality facility to treat approximately three acres of residential area.
Project elements may include: bio-infiltration swales, filter vaults, media filter drains, and rain gardens in order to improve
water quality.
Project Status:
Design is anticipated in 2025-2026 and construction scheduled to take place in 2027.
Total Estimated Project Cost: $1,170,000
U Y,
�ti*:v.
r i t IX
11 E 4AI if= S7
0_2 0 AMP
7
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 8
Geneva Street & Lake Louise Road Culvert Replacement
Database ID No. 20-010
Construction Funding Years : 2028
Project Narrative:
Project will improve conveyance of roadside ditches and culverts along Geneva Street and Lake Louise Road. This will
improve water quality. The project will replace approximately 200 linear feet of undersized or damaged culverts.
Project Status:
Design is anticipated in 2027 and construction scheduled to take place in 2028.
Total Estimated Project Cost: $270,000
93
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 9
Lake Whatcom Boulevard Media Filter Drain (EG-1)
Database ID No. 22-006
Construction Funding Years : 2028
Project Narrative:
The project would install Media Filter Drain (MFD), or other appropriate water quality system, along approximately 300
linear feet of roadway on the west side of Lake Whatcom Blvd. Stormwater runoff from approximately 8.5 acres on the
west side of Lake Whatcom Blvd. is collected in a shallow roadside ditch, this project would treat this water prior to
discharging to Lake Whatcom.
Project Status:
Design is anticipated in 2027 and construction scheduled to take place in 2028.
Total Estimated Project Cost: $835,000
M�RGAN ST
a�
r -t.
'WJ
_4
4
[_-ir.� .
Legend
Media Filter drain
Existing Condition Infrastructure
Storm Pipe
Culver
— DitCh
Catch Basin ! Vanhole
-,sue. •, � � � , ,; � x+ ; • _il" � -
A F
x
LMedlia Filter Drain
.. Lf)
r
SPRINGIST
- Jlf
::At
Z'' =�
rr I
0
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 10
Sudden Valley Stormwater Improvements No. 2
Database ID No. 22-007
Construction Funding Years : 2028
Project Narrative:
A project, to be determined, will be constructed within the Sudden Valley area as the second water quality improvement
project focused on removing sediment and treating phosphorus in a continued collaboration with the Sudden Valley
community. The project will include drainage system upgrades and retrofits to the existing stormwater infrastructure.
Details will be forthcoming as Whatcom County works with representatives of the Sudden Valley Community
Association.
Project Status:
Design is anticipated in 2026-2027 and construction scheduled to take place in 2028.
10
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 11
Lake Whatcom Boulevard Water Quality Vault (EG-4)
Database ID No. 22-008
Construction Funding Years : 2030
Project Narrative:
This project includes the installation of a filter vault to improve water quality in the existing Lake Whatcom Blvd
stormwater system. The water quality system will remove sediments and phosphorus from approximately 3 acres of
residential runoff prior to entering Lake Whatcom.
Project Status:
Design is anticipated in 2028-2029 and construction scheduled to take place in 2030.
Total Estimated Project Cost: $650,000
q:.
` � 1
W
f Storm
a,
' =rrL
V
11
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 12
Viewhaven Lane Water Quality & Conveyance Improvements
Database ID No. 20-009
Construction Funding Years : 2030
Project Narrative:
This project will improve conveyance and water quality near Viewhaven Lane and Lake Whatcom Blvd intersection.
Project will include approximately 100 linear feet of conveyance improvements by replacing two undersized culverts and
regrading a ditch. The project will also install approximately 135 linear feet of water quality facility. Project elements may
include: bioinfiltration swales, filter vaults, media filter drains, and rain gardens.
Project Status:
Design is anticipated in 2029-2030 and construction scheduled to take place in 2030.
Total Estimated Project Cost: $475,000
12
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 13
Charel Terrace Stormwater Outfall Repair
Database ID No. 20-011
Construction Funding Years : 2024
Project Narrative:
The December 20, 2018 "Solstice Eve" windstorm caused damage to the stormwater outfall on Birch Point installed as
part of the Charel Terrace project in 2011. In March 2019 a "Major Disaster Declaration" that covered Whatcom County
for the December storm was granted. In December 2019, the Consolidated Resource Center approved the Washington
State Emergency Management Division's $110,887 request for Architectural & Engineering Services to assess the site
and develop conceptual design options. An RFP was advertised by Whatcom County in March 2020 and Herrera
Environmental Consultants completed a preliminary study that assessed the outfall stabilization approaches to maintain a
functional outfall. From this study, a temporary repair was constructed in fall 2022 to secure the catch basin to the bluff
and reposition the outfall tee. The permanent repair will be constructed in the summer of 2024.
Project Status:
Design occurring in 2021-2023 and construction is scheduled to take place in 2024.
Total Estimated Project Cost: $750,000
13
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 14
Holeman Avenue Stormwater Improvements (PW-1)
Database ID No. 07-242
Construction Funding Years : 2024
Project Narrative:
The project goal is to reduce roadway flooding on Holeman Avenue by replacing undersized pipe and catch basins and
re-establish existing ditch to match pipe invert elevations. This area is particularly sensitive due to the steep, unstable bluff
along the shoreline and the concern is that flooding could lead to bluff failure and property damage. This is a critical public
safety issue.
Project Status:
Design is occuring in 2022-23 and construction is scheduled to take place in 2024.
otal Estimated Project Cost: $905,000
:3rrt Ir}r
1
14
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 15
Semiahmoo Drive South & Outfall Improvements (BP-2, BP-5)
Database ID No. 18-009 & 18-010
Construction Funding Years : 2025
Project Narrative:
This project will improve the stormwater conveyance system at the south end of Semiahmoo Drive by upsizing the
cross culvert to reduce flooding and increase traffic safety, and reconstruct the outfall conveyance system to the Strait
of Georgia damaged during the November 2021 extreme rainfall event.
Project Status:
Design and permitting is occurring 2021 to 2024 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $1,355,000
15
Whatcom County Public Works — Stormwater Division
Project Narrative
Normar Place Stormwater Improvements (BP-1)
Database ID No. 19-004
Construction Funding Years : 2025
2024-2029 Six -Year WRIP
Item No. 16
Project Narrative:
This project involves upsizing pipes, replacing catch basins and installing an outfall pipe over the bluff with an energy
dissipater at Normar Place to reduce roadway flooding, scour and sediment transport.
Project Status:
Design is anticipated in 2023-2024 and construction in 2025.
Total Estimated Project Cost: $1,160,000
. A. r
4
i
-1 i ti
w €
+
4
16
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 17
Lora Lane Drainage & Tide Gate Modifications (TC1-2)
Database ID No. 18-008
Construction Funding Years : 2026
Project Narrative:
The purpose of this project is to replace the existing 48" corrugated metal culvert under Birch Bay Drive with an 8-ft wide
fish passable box culvert, replace the existing tide gate on the water side of Birch Bay Drive with a new side hinge tide
gate, and install shoreline armoring at the outfall area. This project will collaborate with the Design and Construction
Division of Whatcom County Public Works.
Project Status:
Preliminary engineering design concluded in 2021. Permanent repair design will begin 2024 and construction is
anticipated for 2026.
Total Estimated Project Cost: $1,716,500
17
Whatcom County Public Works — Stormwater Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 18
Birch Point Road Stormwater & Outfall Improvements (BP-3 & BP-6)
Database ID No. 21-001
Construction Funding Years : 2027
Project Narrative:
A corrugated metal outfall pipe over a steep bluff on Birch Point collapsed due to erosional undermining. The driveway
culverts, ditches and upstream storm drain system leading to the outfall are undersized and cause flooding and erosion
during storm events. This project will involve upsizing culverts, reestablishing ditches and replacing and anchoring the
outfall pipe and construction of pipe -end energy dissipater.
Project Status:
Design will be completed in 2025-26. Construction is scheduled to take place in 2027.
Total Estimated Project Cost: $970,000
m
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 19
Richmond Park Stormwater Improvements (SH-2)
Database ID No. 22-010
Construction Funding Years : 2028
Project Narrative:
This project will address drainage concerns in Richmond Park by re-routing the large volume of water that currently
moves through the development down Shintaffer Road to an outfall in Birch Bay. It would involve replacing 1,640 feet of
ditch/culvert on Shintaffer Road with 36" diameter HDPE pipe, installing 13 type 2 catch basins and building a new
outfall into Birch Bay.
Project Status:
Design will occur in 2026-2027 and construction is scheduled to take place in 2028.
Total Estimated Project Cost: $2,600,000
19
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 20
Roger's Slough Drainage Improvements
Database ID No. 23-002
Construction Funding Years : 2029
Project Narrative:
This project will address drainage and flooding issues in Birch Bay Village, Birch Bay Drive and Birch Point Loop Road.
It will involve replacing twin 30" diameter culverts that direct water under Birch Bay Drive into Roger's Slough with a
fish -passable concrete box culvert, installing 285 feet of pipe, regrading 500 feet of ditch, and installing a new type 2
catch basin and overflow pipe near the mouth of Roger's Slough.
Project Status:
Design will occur in 2027-2028 and construction is scheduled to take place in 2029.
Total Estimated Project Cost: $2,850,000
20
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 21
Birch Bay Village Drainage Improvements
Database ID No. 23-003
Construction Funding Years : 2030
Project Narrative:
This project will address drainage and flooding issues in Birch Bay Village in the vicinity of Salish Road and Kwan Lake.
It will involve installing or replacing 1,400 lineal feet of pipe, installing four new catch basins along Nootka Loop and
Salish Road and installing a new 36" diameter flap gate near Nootka Loop to reduce tidal backwatering.
Project Status:
Design will occur in 2028-2029 and construction is scheduled to take place in 2030.
Total Estimated Project Cost: $1,185,000
.IN T kA
a
3.1
a
i
PROPOSED
Sbwm brain
GB Type 2
EXISTING
Mpte,'C uNerl
y Dech
^iap Gate
f -
Birch Bay
1
Whatcom County Public Works — Stormwater Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 22
Bay Ridge Estates Drainage Improvements
Database ID No. 23-004
Construction Funding Years : 2031
Project Narrative:
This project will address drainage and flooding issues in Bay Ridge Estates and along Selder Road. It will involve
installing or replacing 500 lineal feet of pipe, regrading 1,000-feet of ditch, and installing two new catch basins on
Selder Road and Birch Point Road.
Project Status:
Design will occur in 2029-2030 and construction is scheduled to take place in 2031.
Total Estimated Project Cost: $770,000
I { 4
!,ROPOSEO
CUVeFS
Rdcn Regrade
Storm DFain
in ORType- 9
• Ca Type 2
EkiSnNd
Or
Pipe;Ctdverl M Jr
Dfth p�
pool
• - Deepen, Widen Ditch
Rep -ace D:Ich
ri r ��
6r_T {
22
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 23
Everson Overflow Pipeline Bank Stabilization
Database ID No. 20-002
Construction Funding Years : 2023
Project Narrative:
A portion of the bank within the Everson overflow corridor was damaged during the 2020 flood season, this erosion was
further exacerbated during the November 2021 flood events. The damage site is located near a petroleum pipe crossing
the Nooksack River. The FCZD `s project will stabilize the bank and protect the high ground divide that controls how much
overflow occurs at Everson.
Project Status:
The project is designed and construction is anticipated to be complete in 2023. The FCZD anticipates that FEMA and the
State will fund 95% of the project through the Public Disaster Assistance Program.
Total Estimated Cost: $1,129,500
Expenditures to Date: $1,109,500
23
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 24
Jones Creek Debris Flow Risk Reduction
Database ID No. 07-105
Construction Funding Years : 2023
Project Narrative:
This project includes acquisition of residential properties in the high hazard area of the Jones Creek alluvial fan and
-onstruction of setback deflection berms to reduce the risk of debris flow damage to the town of Acme. The project
ncludes realignment of Turkington Road at the location where it crosses the proposed berm.
Project Status:
All property acquisition, design and construction for the project is complete. A Department of Ecology Floodplains by
Design Grant provided 80% funding for the acquisition of two properties and construction. The Road Fund and Acme
VVater District No. 18 is also providing funding towards construction of the project. Planting will take place in 2024.
Total Estimated Cost: $10,383,000
Expenditures to Date: $10,360,000
{
i ti4 d L
tY -
L'
A '"AF
24
6
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 25
Marine Drive Emergency Levee Repair
Database ID No. 20-001
Construction Funding Years : 2023
Project Narrative:
The Marine Drive Levee provides flood protection during smaller, more frequent floods to the Marietta area and Slater
Road. The levee is located on property owned by the Washington Department of Wildlife who is managing the property for
wildlife. The levee was damaged in several locations during flooding in 2020, 2021, and 2022. The project involves
restoring the levee crest and backslope.
Project Status:
The project is designed and construction is anticipated to be complete in 2023. An interim project was completed to
temporarily stabilize the damage areas prior to the repair. The FCZD is utilizing FEMA funds to partially fund the project.
Total Estimated Cost: $2,463,000
Expenditures to Date: $2,423,000
25
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 26
Truck Road Bank Stabilization
Database ID No. 20-003
Construction Funding Years : 2022 and 2024
Project Narrative:
The project is located along Truck Road about 0.3 miles easterly from Mt. Baker Highway (SR 542). During high-water
events of the 2017/2018 winter, the North Fork Nooksack River eroded the unprotected bank of Truck Road to within 13
feet of the roadway surface. This prompted an emergency project to construct a passive riprap revetment underneath a
section of the roadway to provide immediate protection. Flooding during 2020 eroded the remaining bank exposing the
recently constructed riprap revetment and destabilizing a portion of the north bound lane. Jersey barriers were placed by
county crews to block off this lane to traffic. Additional erosion sustained the November 2021 floods, threatened the road
downstream of the previous damage area. The FCZD undertook an emergency project to address the immediate threat to
truck road. Additional work is needed to provide environmental mitigation for that action and to repair and realign the
damaged section of road.
Project Status:
The FCZD has completed the emergency repair and is currently designing and permitting the associated Phase 2 project
that will provide environmental mitigation and road repair. Construction of the Phase 2 project is anticipated to occur in
2024. The FCZD anticipates that FEMA and the State will fund 95% of the project through the Public Disaster Assistance
program
Total Estimated Cost: $3,951,000
Expenditures to Date: $1,494,000
26
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 27
Hudson Road Bridge No. 132 Repair
Database ID No. 22-001
Construction Funding Years : 2024
Project Narrative:
The project is located along near the dead end of Hudson Rd in Acme, WA. The FCZD recently purchased the property at
the end of this road as a part of the Jones Creek Debris Flow Risk Reduction Project. The approaches to the bridge that
serves the property were damaged during the November 2021 flood events. The project will provide for repair to the
bridge approaches.
Project Status:
The FCZD has provided FEMA with the damages and cost estimate to repair the project. Design and permitting for the
project will be conducted in the winter of 2023/2024. Construction is anticipated to occur in 2024. The FCZD anticipates
that FEMA and the State will fund 95% of the project through the Public Disaster Assistance program.
Total Estimated Cost: $125,000
Expenditures to Date: $7,500
27
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 28
Timon Levee USACE Levee Rehabilitation
Database ID No. 22-002
Construction Funding Years : 2024
Project Narrative:
The Timon Levee is located near Northwood Rd, southeast of Lynden WA. The levee is eligible for the Public Law (PL)
84-99 Levee Rehabilitation program with the US Army Corps of Engineers (USACE). This program allows for the USACE
to repair damages to the levee and requires a 20% local cost -share. The Timon Levee was damaged during the
November 2021 flood events. The FCZD worked with the USACE to flood fight the damage during the event, this
emergency flood fight was funded 100% by the USACE. This project provides for the USACE to conduct permanent
repairs at the site.
Project Status:
USACE anticipates construction of the project in 2024. The FCZD local share of costs is 20%. Total project cost includes
USACE construction as a direct contribution.
Total Estimated Cost: -
Expenditures to Date: --
28
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 29
Upper Hampton USACE Levee Rehabilitation
Database ID No. 22-004
Construction Funding Years : 2024
Project Narrative:
The Upper Hampton Levee is located near Northwood Rd, southeast of Lynden WA. The levee is eligible for the Public
Law (PL) 84-99 Levee Rehabilitation program with the US Army Corps of Engineers (USACE). This program allows for
the USACE to repair damages to the levee and requires a 20% local cost -share. The Upper Hampton Levee was
damaged during the November 2021 flood events. This project provides for the USACE to conduct permanent repairs at
the site.
Project Status:
USACE anticipates construction of the project in 2024. The FCZD local share of costs is 20%. Total project cost includes
USACE construction as a direct contribution.
Total Estimated Cost: -
Expenditures to Date: --
29
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 30
Cougar Creek Early Action / Neevel Levee Bank Stabilization
Database ID No. 16-008
Construction Funding Years : 2025
Project Narrative:
The Neevel Levee provides varying levels of protection to a significant amount of agricultural land. Approximately 250 feet
of the levee running along Cougar Creek is over -steepened and experiencing sloughing of the riverward face. A
stabilization project incorporating large woody debris at the toe and reducing the slope of the riverward face is proposed
in the System -wide Improvement Framework (SWIF) to resolve the deficiency identified by the US Army Corps of
Engineers and keep the levee eligible for repair under the Public Law (PL) 84-99 Program. An early action project
developed through the Floodplain Integrated Planning (FLIP) process includes replacement of the Cougar Creek flood
gate and installation of large woody debris in the channel downstream.
Project Status:
Design of the project has been finalized. Construction is anticipated for 2025 with funding through NRCS's EQIP program,
additional outside funding for construction has not yet been identified.
Total Estimated Cost: $2,375,000
Expenditures to Date: $303,000
30
Whatcom County Public Works — River and Flood Division
Project Narrative
2024-2029 Six -Year WRIP
Item No. 31
Abbott Levee Protection and Improvement Project
Database ID No. 16-007
Construction Funding Years: 2021 and 2025
Project Narrative:
The project is located along Abbott Road about 1.7 miles east of Hannegan Road. Recent erosion along the Nooksack
River has removed a section of riprap that previously protected the land adjacent to the Abbott Levee and Abbott Road.
Phase1 of this project addressed the ongoing erosion in this location. The FCZD is also investigating possible road and
levee setback options to improve the upstream tie-in of the levee and address a deficiency identified by the US Army
Corps of Engineers to maintain the levee's eligibility in the PL 84-99 Levee Rehabilitation Program. This work will be
implemented as a second phase of the project.
Project Status:
Construction of Phase 1 was completed during Summer or 2021. The FZCD is working with the project consultant on
Phase 2. Phase 2 will include a reach assessment to provide the technical basis for developing alternatives for upstream
improvements. The FZCD will utilize this reach scale analysis to develop a capital project for Phase 2. Phase 2
construction is anticipated during 2025.
Total Estimated Cost: $3,740,000
Expenditures to Date: $1,098,000
31
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 32
Acme Woody Revetment Repair
Database ID No. 23-005
Construction Funding Years : 2025
Project Narrative:
The project site is an approximately 1/4-mile long section of eroding bank located along the left bank of the South Fork
Nooksack River in the unincorporated community of Acme in Whatcom County. In 2009 and 2010 the Flood Control
Zone District constructed multiple log jams and woody revetments to discourage lateral erosion and stabilize the lower
reach of Landingstrip Creek for the purpose of enhancing critical habitat for ESA listed species and providing flood
protection to the Acme community and the SR 9 bridge. Flooding in November 2021 eroded the lower portion of the
project, destabilized the wood structures, and eroded the streambank. The proposed project will repair the woody
revetment along the new stream alignment.
Project Status:
Design is anticipated to start in 2024 and construction is anticipated in the Summer of 2025 with funding through FEMA
and FCZD.
Total Estimated Cost: $1,285,000
Expenditures to Date: $0
32
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 33
Bertrand Creek Levee Stabilization
Database ID No. 16-005
Construction Funding Years : 2025
Project Narrative:
The Bertrand Creek right and left bank Levees are designed to overtop during larger floods, but provide protection to
agricultural land during the growing season. The left bank levee has a 250 foot long section where erosion is threatening
the levee prism. The right bank levee face is sloughing at three locations with a total length of approximately 250 feet. The
levees will have to be repaired to remain eligible for rehabilitation through the US Army Corps of Engineers Public Law
(PL) 84-99 Levee Rehabilitation Program.
Project Status:
A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process.
The project will be designed by the FCZD. Construction is anticipated in the Summer of 2025.
Total Estimated Cost: $292,000
Expenditures to Date: $7,000
33
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 34
Devries Levee Improvements
Database ID No. 19-001
Construction Funding Years : 2025
Project Narrative:
This project involves widening the levee crest and backsloping the levee to meet the US Army Corps of Engineers's levee
geometry standards for levees in the Public Law (PL) 84-99 Levee Rehabilitation Program (SWIF project).
Project Status:
A conceptual design has been developed as part of the SWIF planning process. Detailed design has not been initiated
yet.
Total Estimated Cost: $225,000
Expenditures to Date: $0
34
Whatcom County Public Works — River and Flood Division
Project Narrative
Ferndale Levee Improvement Project
Database ID No. 07-104
Construction Funding Years : 2026 - 2028
Project Narrative:
2024-2029 Six -Year WRIP
Item No. 35
Two levee segments, one sponsored by the City of Ferndale and one by the FCZD and Diking District #1 in the US Army
Corps of Engineer's Public Law (PL) 84-99 Levee Rehabilitation Program, provide protection to the three treatment
facilities along Ferndale Road. The US Army Corps of Engineers has identified several deficiencies along these two levee
segments, including a gap in which super sacks filled with sand have been placed. The 1999 Comprehensive Flood
Hazard Management Plan recommended improving these levees to provide 100-year protection to the City and the
treatment facilities. The System -wide Improvement Framework (SWIF) also includes this project to address the identified
levee deficiencies.
Project Status:
This project is currently in the design phase. A preferred alternative for the levee and road alignment has been selected. A
60 percent design level plan of the proposed levee configuration is anticipated Fall of 2023. A 100 Percent design level
plan is anticipated in 2024. Grant funding through the State's Floodplain's by Design program has been secured to
complete the design. Construction is anticipated to be phased with construction beginning in 2026 and lasting through
2028.
Total Estimated Construction Cost: TBD
Expenditures to Date: $976,000
35
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 36
Glacier -Gallup Creeks Alluvial Fan Restoration
Database ID No. 18-006
Construction Funding Years : 2023 and 2027
Project Narrative:
The Glacier Creek Levee on the left (west) bank of the creek was constructed in the 1960s to prevent overflows into
Gallup Creek and damage to State Route (SR) 542. Since construction, the levee has been subject to ongoing damage.
Constriction of the Glacier -Gallup channel migration zone (CMZ) has exacerbated aggradation upstream of SR 542 and
severely degraded fish habitat. WSDOT replaced the Gallup Creek bridge in 2010 and is working to construct a new
bridge over Glacier Creek and the alluvial fan between the two creeks. The FCZD is developing a project in coordination
with WSDOT and is evaluating the feasibility of full or partial removal of levees blocking natural channel migration on the
Glacier and Gallup Creeks alluvial fan and construction of a setback levee on Gallup Creek to protect the Community of
Glacier.
Project Status:
A feasibility study and alternatives analysis for evaluating levee removal and setback alternatives was initiated in late
2018. Preliminary design of the preferred alternative will be initiated once the preferred alternative is selected.
Construction of an interim project to address levee damage was completed in 2023. Construction of the levee removal
and setback is anticipated to occur concurrently with the Glacier Creek bridge replacement in 2027 and 2028.
Total Estimated Project Cost: TBD
Expenditures to Date: $1,492,000
36
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 37
Dahlberg Wetland Mitigation Site
Database ID No. 20-004
Construction Funding Years : 2026 - 2028
Project Narrative:
The FCZD purchased a property northeast of Ferndale as a mitigation site for future projects having wetland or riparian
impacts. The property contained a dilapidated farm house.
Project Status:
FCZD purchased the subject property and demolished the farm house in Fall of 2020. The FCZD has installed a
groundwater monitoring network on the site to support developing a long-term restoration plan for the site.
Total Estimated Cost: TBD
Expenditures to Date: $873,000
37
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 38
Upper Hampton Levee Improvements
Database ID No. 16-006
Construction Funding Years : 2027
Project Narrative:
Several deficiencies were identified by the US Army Corps of Engineers on the Upper Hampton Levee. Improvements to
the levee geometry are proposed in two locations and improvement to address seepage is proposed at a third location.
Project Status:
A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process.
Detailed design has not been initiated yet. However, we were able to complete a portion of the levee backsloping work at
one site using excess material generated at the 2021 Abbott and Lynden Levee Improvement projects.
Total Estimated Cost: TBD
Expenditures to Date: $6,000
38
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 39
Floodplain Acquisition
Database ID No. 07-002
Acquisition Funding Years : 2017- TBD
Project Narrative:
Reach -scale projects to reconfigure flood infrastructure are being evaluated through the integrated planning processes
that started with the System -wide Improvement Framework (SWIF) and has transitioned into the Floodplain Integrated
Planning (FLIP) process. The goal of this work is to reduce flood risk and expenditures and restore habitat and the
processes that form it.
Voluntary acquisition of lands is proposed to enable future levee reconfigurations to reduce flood risk and future levee
repairs, while improving habitat.
Project Status:
Acquisition of one property in Reach 4 was completed in 2020. Discussions with additional property owners will occur in
2021 and 2022.
Total Estimated Cost: TBD
Expenditures to Date: $1,128,000
39
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 40
Marietta Acquisition
Database ID No. 07-002
Construction Funding Years : 2001 - Present
Project Narrative:
Acquisition of residential properties in the frequently -flooded repetitive flood loss area of Marietta, removal of existing
structures and restoration of properties with native vegetation.
Project Status:
Property acquisition began in 2001 and is ongoing. As properties are acquired, structures are removed and native
vegetation is planted. All acquisitions are voluntary and the project is ongoing as current property owners decide to sell
their properties. Total project cost will need to include funding for cleanup of up to four former gas stations, though the
exact nature of the work is still undefined.
Total Estimated Project Cost: TBD
Expenditures to Date: $1,852,000
.N
Whatcom County Public Works — River and Flood Division
Project Narrative
High Creek Sediment Trap
Database ID No. 22-005
Construction Funding Years : Annually
Project Narrative:
2024-2029 Six -Year WRIP
Item No. 41
High Creek flooding damaged nearby homes and closed Mount Baker Highway in the mid-1990's. A legal settlement
resulting from that event directs Whatcom County to prepare a creek management plan. Sediment management in the
watershed including the 3400 feet of County owned right of way east of Kendall Creek is an important plan element along
with fish habitat mitigation. State permits for future maintenance dredging are dependent on consistency with the final
management plan. A management plan was developed and recommended the construction of two sediment traps, one
sited upstream of Mount Baker Highway to trap coarser material and one by the confluence with Kendall Creek to trap
finer material. The sediment traps were constructed in 2018. The project provides for the annual clean out of those
sediment traps.
Project Status:
The 2023 clean out is anticipated to be complete in September 2023 for a cost of $80,000. Total Estimated Cost is for
annual estimated cleanout costs funded by the FCZD.
Total Estimated Cost: $135,000
Expenditures to Date: --
41
Whatcom County Public Works — River and Flood Division 2024-2029 Six -Year WRIP
Project Narrative Item No. 42
Emergency/New Projects
Database ID No. 08-003
Construction Funding Years : 2024 - 2029
Project Narrative:
This item provides funding to address unanticipated projects resulting from new damage to flood control facilities.
Project Status:
Design and construction to occur as necessary.
Total Estimated Project Cost: $425,000/year
Expenditures to Date: $425,000/year
Due to the nature of this item, no map exists. Board of Supervisors review and prioritization will be sought at the
appropriate time.
42
Whatcom County
Fish Passage Barrier Removal
Public Works Culvert Work Group
Surface Water Work Session
September 19, 2023
Culvert Remediation MOA
Parties
• Whatcom County
• Nooksack Indian Tribe
• Lummi Nation
• Washington Department of
Fish and Wildlife
4 _ 1
Im
.t h
2
�r
- Y
Johnson's Creek, Mosquito Lake Road
Major Components
J ' Culvert Inventory Updates
• Reassess Culverts with Changed
Stream Conditions
'Collaborate on Pre -Application
Field Measurements
-- ' 1k
3av •'-' �• � , '�
� Win' ��; � ' 'e��_ -
�. � 'r ..}�'#•
Johnson's Creek, Mosquito Lake Road
• Collaborate on Prioritization Plan
• Agree on Proposed Schedule for
Implementation
• Collaborate on Technical Support
and Funding
• Annual Check In with Policy Group
Whatcom County Culverts
- County Ownership —
• Approximately 195 County
culverts are barriers that block
>200m of historic habitat
• Sub -set of —80 culverts have the
most significant habitat gains
• Program Efficiencies
• Less complex projects can
move forward while larger,
more complex, projects are
designed & funded
• Bundling Projects
• Projects will be developed and
sequenced across PW divisions
Grant Funding
Kenney Creek -Brian Abbott Fish Barrier Removal Board (2 Grants for State
Culvert Funding through the Recreation and Conservation Office)
o Status- Design Grant Awarded/Completed
o Status- Construction Grant Awarded/In-progress with 2024 or 2025 construction
o Design Budget- $523,000
o ($443,000 grant/$80,000 local match)
o Construction Budget- $3,500,000
o ($2,975,000 grant/$525,000 local match)
o Total Budget- $4, 023, 000
o Components
o Alternatives analysis through final bridge and stream restoration design
o Landowner outreach and easements
o Culvert, fill, obsolete fishway removal, bridge construction and site restoration
Grant Funding
Habitat Strategic Initiative Lead Grant (EPA National Estuary Program Funding)
o Status- Awarded/ Agreement Under Development
o Estimated Budget- $790,000
o Components
o Staff Capacity — 2 FTEs (1 Natural Resource Specialist; 1 Engineering Supervisor)
o Contractor for Design
o Support for Tribes and Small Cities
o WRIA 1 Coordination and 4-Year Work Plan Updates
o Habitat and Fish Passage Barrier Training
o Preliminary Design Black Slough Projects
o Community Outreach
Grant Funding
Aquatic Organism Passage Grant (US Department of Transportation)
o Status- Awarded/Agreement Under Development
o Estimated Budget- $1,100,039
o ($880,031 federal grant/ $220,008 local match)
o Components
o Alternatives Analysis, Preliminary Design and Construction Cost Estimates for 11
Culverts
Building Staff Capacity
• Cross -Division Program
• Natural Resources
• Bridge and Hydraulics
• Maintenance and Operations
Natural Resources (1 FTE)
• Coordinate, Identify, Prioritize,
Monitor, Grants & Contracts
Bridge and Hydraulics (3 FTE)
• Cost Estimates, Design,
Construction, Grants & Contracts
Maintenance &Operations (TBD)
0 Inspect, repair, replace
Next Steps
o Budget Supplementals (2023
and 2024)
o Grant Agreements
o Staff Recruitment
o Implement the MOA
o Continue Seeking Outside
Funds
o Updates to Council