HomeMy WebLinkAboutPacket Water Work Session Sep 17 2024Whatcom County
Council Water Work Session
COUNTY COURTHOUSE
311 Grand Avenue, Ste #105
Bellingham, WA 98225-4038
(360) 778-5010
Meeting Agenda
Tuesday, September 17, 2024
10:30 AM
Civic Center Building Conference Room / Hybrid Meeting (322 N.
Commercial St., Street Level)
HYBRID MEETING - (PARTICIPATE IN -PERSON, SEE REMOTE JOIN
INSTRUCTIONS AT www.whatcomcounty.us/joinvirtualcouncil, OR CALL
360.778.5010)
COUNCILMEMBERS
Barry Buchanan
Tyler Byrd
Todd Donovan
Ben Elenbaas
Kaylee Galloway
Jon Scanlon
Mark Stremler
CLERK OF THE COUNCIL
Cathy Halka, AICP, CMC
Council Water Work Session Meeting Agenda September 17, 2024
Call To Order
Roll Call
Announcements
Individuals who require special assistance to participate in the Council's meetings are asked to contact
the Council Office at 360.778.5010 at least 96 hours in advance. This committee meeting is also noticed
as a meeting of the Whatcom County Council, with the agenda limited to committee business.
Meeting Materials
AB2024-019 Meeting Materials for Water Work Session September 17, 2024
Water Issues Update
Portage Bay Shellfish Growing Area Upgrade
2025-2030 Water Resources Improvement
Program
WRIA 1 Planning Unit update
Lummi Island Ferry
Other Business
Adjournment
Whatcom County Page 2 Printed on 412812025
• Whatcom County COUNTY COURTHOUSE
311 Grand Avenue, Ste #105
Bellingham, WA 98225-4038
(360)778-5010
• Agenda Bill Master Report
File Number: AB2024-019
File ID: AB2024-019 Version: 1 Status: Received
File Created: 12/12/2023 Entered by: KFelbing@co.whatcom.wa.us
Department: Council Office File Type: Receipt of Document(s)
Assigned to: Council Water Work Session Final Action: 09/17/2024
Agenda Date: 09/17/2024 Enactment #:
Primary Contact Email: kfelbing@co.whatcom.wa.us
TITLE FOR AGENDA ITEM:
Meeting Materials for Water Work Session September 17, 2024
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE:
None
HISTORY OF LEGISLATIVE FILE
Date: Acting Body: Action: Sent To:
09/17/2024 Council Water Work Session RECEIVED
Attachments: Packet for 9.17.2024, Portage Bay Shellfish Growing Area Timeline, Ferry Presentation 9.17.2024,
Jones Act Article (Ferry)
Whatcom County Page 1 Printed on 4/28/2025
WHATCOM COUNTY
PUBLIC WORKS DEPARTMENT
ELIZABETH KOSA
Director
MEMORANDUM
NATURAL RESOURCES
322 N. Commercial Street, Suite 110
Bellingham, WA 98225
Telephone: (360) 778-6230
FAX: (360) 778-6231
www. whatcomcounty. us
TO: The Honorable Satpal Singh Sidhu, Whatcom County Executive, and
Honorable Members of the Whatcom County Council
THROUGH: Elizabeth Kosa, Director
FROM: Gary S. Stoyka, Natural Resources Program Manager
DATE: September 10, 2024
RE: September 17, 2024 Council Water Work Session
Please refer to the proposed agenda below for the next Water Work Session. Additional supporting
documents may be distributed at or before the meeting.
AGENDA
Date:
Tuesday, September 17, 2024
Time:
10:30 a.m. to 12:30 p.m.
Place:
Hybrid Meeting:
In Person: Civic Center Garden Level Conference Room (322 N. Commercial St., Street Level)
Virtual: For instructions on how to watch or participate in this meeting, please visit us at
www.whatcomcounty.us/ioinvirtualcouncil or contact the Council Office at 360.778.5010. View
meeting schedules, agendas, minutes, videos, and archives at www.whatcom.legistar.com.
Time
Topic
Council Action
Background Information
Requested
Attached
10:30 AM —
Water Issues Update
Informational
None
10:45 AM
10:45 AM —
Portage Bay Shellfish Growing Area Upgrade
Informational
None
10:50 AM
10:50 AM —
2025-2030 Water Resources Improvement
Informational
2025-2030 Water
11:20 AM
Program
Resources Improvement
Program
11:20 AM —
WRIA 1 Planning Unit update
Informational
None
11:30 AM
11:30 AM —
Lummi Island Ferry
Discussion
None
12:30 PM
If you have questions, please feel free to call me at (360) 778-6218.
cc:
Cathy Halka
Kristi Felbinger
Jill Nixon
Jennifer Schneider
Bennett Knox
Erika Douglas
John Thompson
Paula Harris
Kraig Olason
Chris Elder
Cathy Craver
Doug Ranney
Melissa Donnelly
Roland Middleton
Erin Page
Josh Fleischmann
Mark Personius
Kayla Schott-Bresler
Sue Sullivan
Julie Anderson
Aly Pennucci
Brandy Reed
PROPOSED BY:
INTRODUCED: 9.110.124
RESOLUTION NO
(A Resolution of the Whatcom County Flood Control Zone District
Board of Supervisors)
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT
SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM
FOR THE YEARS 2025 THROUGH 2O30
WHEREAS, pursuant to RCW 86.15.110, flood control or storm water control
improvements may be extended, enlarged, acquired, or constructed by a flood control zone
pursuant to a resolution adopted by its Board of Supervisors; and
WHEREAS, Whatcom County Public Works Department on behalf of the Whatcom
County Flood Control Zone District has prepared a Six -Year Water Resources Improvement
Program for adoption; and
WHEREAS, pursuant to RCW 86.15.120, the Supervisors shall hold a public hearing
prior to adopting the resolution; and
WHEREAS, the Six -Year Water Resources Improvement Program attached hereto as
Exhibit "A" has been reviewed and determined to be consistent with Whatcom County's
comprehensive plan and is consistent with the following plans:
• Lower Nooksack River Comprehensive Flood Hazard Management Plan, October
1999
• Jones Creek Debris Flow Study, March 2004
• WRIA 1 Salmon Recovery Plan, October 2005
• Birch Bay Comprehensive Stormwater Plan, July 2006
• Lake Whatcom Comprehensive Stormwater Plan, March 2008
• Lake Samish Basin Comprehensive Stormwater Plan, July 2012
• Birch Bay Central North Sub -Watershed Master Plan, December 2013
• Birch Bay Central South Sub -Watershed Master Plan, January 2015
• Nooksack River System -Wide Improvement Framework, June 2016
Page 1
• Birch Point, Terrell Creek Urban Area, and Point Whitehorn Sub -watershed
Master Plan, November 2016
• Lake Whatcom Comprehensive Plan: Stormwater Capital Program Update,
September 2017
• Lake Whatcom East Geneva Sub -watershed Master Plan, January 2021
• Birch Point Sub -watershed Drainage Study Report, September 2023; and
• Lake Whatcom Management Program 2025-2029 Work Plan, in preparation.
WHEREAS, pursuant to RCW 86.15.110, the preliminary engineering studies for
constructed improvements are on file with the Whatcom County Public Works Department;
and
WHEREAS, pursuant to RCW 86.15.110, the estimated cost of the acquisition or
construction of the improvement, together with supporting data, is included in the Six -Year
Water Resources Improvement Program; and
WHEREAS, the improvements will benefit one or more flood control zones, subzones
and the county as a whole;
Page 2
NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Flood Control Zone
District Board of Supervisors as follows:
That the Whatcom County Flood Control Zone District Six -Year Water Resources
Improvement Program for the years 2025 through 2030, which is attached hereto as
Exhibit "A", is hereby adopted.
APPROVED this day of , 2024.
ATTEST:
Flood Control Zone District Board of
Supervisors
WHATCOM COUNTY, WASHINGTON
Cathy Halka, Clerk of the Council Barry Buchanan, Chair
APPROVED AS TO FORM:
11 M uj gym. I v 6, trck� bw J 8- M. 2,14
hristopher Quinn, Chief Deputy Prosecuting Attorney — Civil Division
Page 3
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2025-2030 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A
Item
No.
Project Description
Database ID
No.
BES
Previous Expenditures
2025
2026
2027
2028
2029
2030
Total
Amount Source
Phase Amount some
Phase Amount Source
Phase
Amount Source
Phase Amount
Phase Amount Source
Phase Amount Source
1
SWP #SWLW24-01 Eagleridge Stormwater Improvements: Install a water quality
system to treat stormwater from the Eagleridge development.
20-007
61.4
$ 150,000
REET/LWSU
PE
$ 175,000
LWSU
PE
PE
Pt
PE
$ 825,000
PE
RW
RW
RW
KW
RW
RW
CN
$ 500,000
LWSU
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
2
SWP #SWLW23-06 Austin Court Stormwater Improvements: Install water quality
system on the discharge from Austin Court.
20-008
58.5
$ 70,000
REET/LWSU
PE
$ 217,375
LWSU
PE
PE
PE
PE
PE
$ 737,375
RW
RW
RW
RW
RW
RW
CN
CN
$ 450,000
LWSU
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
3
SWP #SWLW23-OS Cedar Hills Culvert Replacement: Replacement of culvert
damaged during the 2021 flooding event with FEMcontribution.
23-001
44.2
$ 145,000
FEMA/REET/LWSU
PE
$ 30,000
FEMA
PE
PE
PE
PE
PE
$ 380,000Afunding
PE
PE
PE
PE
PE
PE
RW
RW
RW
RW
RW
RW
CN
$ 180,000
FEMA
CN
CN
CN
CN
CN
CN
$ 25,000
REET
CN
CN
CN
CN
CN
4
Strawberry Point/Lake Whatcom Blvd Stormwater Improvements: System upgrades
to improve water quality including vaults, biofiltration swales, and channel
restoration
17-001
62.2
PE
$ 30,000
LWSU
PE
$ 300,000
REET
PE
$ 50,000
LWSU
PE
PE
PE
1,170,000
RW
RW
$ 35,000
LWSU
RW
RW
RW
RW$
CN
CN
CN
$ 455,000
REET
CN
CN
CN
CN
CN
CN
$ 300,000
LWSU
CN
CN
CN
5
Geneva Street & Lake Louise Road Culvert Replacement: Replace culverts along
Geneva Street and Lake Louise Road to improve water quality and conveyance
20-010
58.8
PE
PE
PE
$ 70,000
REET
PE
PE
PE
$ 270,000
PE
PE
PE
PE
PE
PE
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
$ 200,000
LWSU
CN
CN
6
Lake Whatcom Boulevard Media Filter Drain (EG-1): Install media filter drain or
other water quality system along west side of Lake Whatcom Blvd to improve water
quality.
22-006
58.8
PE
PE
PE
$ 180,000
LWSU
PE
PE
PE
$ 835,000
RW
RW
RW
$ 25,000
REET
RW
RW
RW
CN
CN
CN
CN
CN
630,000
REET
CN
7
Sudden Valley Stormwater Improvements No. 2: Construct drainage system
upgrades and retrofits in the Sudden Valley area of the Lake Whatcom watershed.
22-007
49.0
PE
PE
$ 10,000
LWSU
PE
PE
$ 200,000
LWSU
PE
PE
$ 60,000
REET
$ 1,260,000
PE
PE
PE
PE
PE
PE
RW
RW
RW
RW
$ 10,000
REET
RW
RW
CN
CN
CN
CN
CN
CN
$ 500,000
REET
CN
CN
CN
CN
CN
CN
$ 480,000
LWSU
8
Lake Whatcom Boulevard Water Quality Vault (EG-4):Install a water quality system
to remove phosphorus and other pollutants from residential runoff prior to entering
Lake Whatcom.
22-008
57.1
PE
PE
PE
PE
$ 200,000
REET
PE
PE
$ 40,000
LWSU
$ 650,000
PE
PE
PE
PE
PE
RW
RW
RW
$ 25,000
LWSU
RW
RWCN
CN
CN
CN
CN
$ 385,000
LWSUPE
Viewhaven Lane Water Quality &Conveyance Improvements: Install water quality
systemsand improve conveyance near Viewhaven Lane.
20-009
58.8
PE
PE
JRW
PE
$ 215,000
LWSU
PE
$ 215,000
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
10
BIRCH BAY WATERSHED & AQUATIC RESOURCES MNGT. DIST. (BBWARM)
SWPBSWBB23-02 Charel Terrace Stormwater Outfall Repair: Marineoutfall
stabilization to protect a bluff slope (emergency repair 2022) and permanent
stabilization (2023)
20-011
29.8
$ 280,000
BBWARM FEMA
PE
$ 55,000
BBWARM
PE
PE
PE
PE
PE
$ 797,000
PE
$ 52,000
FEMA
PE
PE
PE
PE
PE
RW
$ 10,000
BBWARM
RW
RW
RW
RW
RW
CN
$ 400,000
FEMA
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
11
SWP ri5WBB23-04 Semiahmoo Drive South & Outfall Improvements (BP-2, BP-S):
Upsize culverts and re-establish roadside ditch on east side of Semiahmoo Drive.
18-009
18-010
50.3
$ 395,000
BBWARM
PE
$ 50,000
BBWARM
PE
PE
PE
PE
PE
$ 1,380,000
PE
PE
PE
PE
PE
PE
RW
CN
RW
RW
RW
RW
CN
$ 935,000
BBWARM
CN
CN
CN
CN
CN
12
SWP ri5WBB23-06 Lora Lane Drainage & Tide Gate Modifications (TC3-2): Replace
tide gate structure and repair embankment; install Type 2 CB and culvert under Birch
Bay Dr
18-008
42.5
$ 140,000
BBWARM
PE
$ 200,000
BBWARM
PE
PE
PE
PE
PE
$ 1,710,000
RW
RW
RW
RW
RW
RW
CN
$ 570,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 200,000
REET
CN
CN
CN
CN
CN
CN
$ 600,000
ROAD FUNDS
CN
CN
CN
CN
CN
13
SWP ri5WBB23-05 Normar Place Stormwater Improvements (BP-1): Upsize pipes,
replace CBs and install energy dissipater at pipe outfall on Normar Place
19-004
52.0
$ 160,000
BBWARM
PE
$ 256,000
BBWARM
PE
PE
PE
PE
PE
$ 1,336,000
PE
PE
PE
PE
PE
PE
RW
$ 40,000
BBWARM
CN
RW
RW
RW
RW
CN
CN
$ 680,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 200,000
FEET
CN
CN
CN
CN
14
SWP ri5WBB23-07 Birch Point Road Stormwater & Outfall Improvements (BP-3, BP-
6): Upsize culverts and replace outfall to the beach to reduce bluff erosion
21-001
33.3
PE
$ 300,000
BBWARM
PE
PE
PE
PE
PE
$ 970,000
RW
$ 20,000
BBWARM
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
$ 450,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 200,000
FEET
CN
CN
CN
15
SWP#SWBB23-08 Richmond Park Stormwater Improvements(SH-2): Address
drainage concerns in Richmond Park by re-routing stormwater down Shintaffer Road
to a Birch Bay outfall
22-010
42.5
PE
PE
$ 660,000
BBWARM
PE
PE
$ 140,000
BBWARM
PE
PE
$ 2,600,000
RW
RW
$ 40,000
BBWARM
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
$ 1,560,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 200,000
REET
CN
CN
16
Roger's Slough Drainage Improvements: Re -grade ditches, install new culverts, and
replace existing pipe with concrete box culvert under Birch Point Road into Roger's
Slough
23-002
70.2
PE
PE
PE
$ 750,000
BBWARM
PE
PE
$ 150,000
BBWARM
PE
$ 2,850,000
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
$ 1,750,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 200,000
FEET
CN
17
Birch Bay Village Drainage Improvements: Upsize existing culverts and install new
pipe and catch basins in Birch Bay Village to reduce flooding
23-003
52.9
PE
PE
PE
PE
$ 350,000
BBWARM
PE
PE
$ 50,000
BBWARM
$ 1,310,000
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
$ 710,000
BBWARM
CN
CN
CN
CN
CN
CN
$ 200,000
FEET
18
Bay Ridge Estates Drainage Improvements: Upsize and install new culverts and CBs
on Birch Point Road and Selder Road to reduce flooding
23-004
46.1
PE
PE
PE
PE
PE
$ 220,000
BBWARM
PE
$ 220,000
RW
RW
RW
RW
RW
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
CN
19
Wooldridge Ave and Sunset Drive Stormwater Improvments (TC-2): Improve
drainage system to reduce local flooding and incorporate water quality treatment.
13-007
52.2
PE
PE
PE
PE
PE
PE
$ 180,000
BBWARM
$ 180,000
CN
CN
CN
CN
CN
RW
CN
CN
CN
CN
CN
CN
CN
CN
CN
I
CN
CN
I
CN
Page 1
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2025-2030 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A
Item
No.
Database ID
Project Description
No.
•rr
BES
�
Previous Expenditures
2025
2026
2027
2028
2029
2030
Total
I Phase Amount Source
Amount
Source
Phase
I Amount
6 Source
I Phase
I Amount I Source
I Phase
I Amount
I Source I Phase I Amount
I Source
I Phase
I Amount
I Source
20
Truck Road Bank Stabilization (720008): Phase 1 emergency construction in 2022
and Phase 2 road rehab and environmental mitigation in 2024. Final Planting 2025
20-003
59.4
$ 72,000
FCZD
PE
$ -
FCZD
Project Total:
$ 2,600,000
FEMA
PE
$ -
FEMA/State
$ 2,945,000
$ 144,000
State
PE
$ -
Roads
$ 72,000
Roads
CN
$ 1,400
FCZD
FCZD Total:
CN
$ 54,600
FEMA/State
$ 73,000
CN
$ 1,400
Roads
21
Devries Levee Improvements: Widen and establish full crest width and backslope
levee (SWIF project). All staff time; Diking District to construct.
19-001
49.3
PE
$ 10,000
FCZD
Project Total:
CN
$
22
Cougar Creek and Neevel Levee Improvement (720010): Stabilize oversteepened
section of levee (SWIF project) with new flood gate and restoration (FLIP project)
16-008
59.4
$ 166,000
FCZD
PE
$ 30,000
FCZD
PE
Project Total:
$ 117,000
NOAA grant
PE
$ 2,711,000
$ 100,000
FbD grant
RW
CN
$ 1,324,000
FbD grant
CN
$ 50,000
FCZD
CN
$ 386,235
EQUIP
CN
$
FCZD Total:
CN
$ 537,369
FCZD
CN
$ 632,000
23
Acme Woody Revetment Repair (723008): FEMA funded repair to Acme Early
Chinook Restoration Project
23-005
67.7
$ 59,080
FEMA
PE
$ 1,250
FCZD
PE
FCZD
Project Total:
$ 3,282
State
PE
$ 23,750
FEMA/State
PE
FEMA/State
$ 1,096,000
$ 3,282
FCZD
CN
$ 96,750
FCZD
CN
$ 20,000
FCZD
FCZD Total:
CN
$ 888,250
FEMA/State
CN
FEMA/State
$ 82,000
24
Bertrand Creek Levee Stabilization (721002): Restore right and left levee prisms and
install bank protection (SWIF project)
16-005
54.4
$ 34,000
FCZD
PE
$ 17,500
FCZD
Project Total:
$ 91000
DK4
PE
$ 7,500
DK4
$ 213,000
CN
$ 101,500
FCZD
FCZD Total:
CN
$ 43,500
DK4
$ 153,000
25
Upper Hampton Levee Improvements: Widen levee crest and flatten backslope at
two sites and seepage at retaining wall deficiencies (SWIF project)
16-006
70.4
$ 6,000
LE Subzone
PE
PE
$ 5,000
PE
Project Total:
Under Lynden project
RW
RW
RW
$ 61,000
CN
CN
$ 50,000
FCZD/LE
Subzone
CN
26
Abbott Levee Protection and Improvement (718010): Interim erosion protection
measures for levee & road (Ph. 1); Extend and realign upstream end of levee (Ph. 2 -
SWIF project)
16-007
70.4
$ 654,000
FCZD
PE
$ 275,500
FCZD
PE
$ 60,000
FCZD
PE
PE
Project Total:
$ 445,000
Roads
PE
$ -
Roads
PE
$ -
Roads
PE
IPE
$ 3,019,500
RW
RW
$ 75,000
FCZD
CN
$ 1,500,000
FCZD
CN
$ 10,000
FCZD
FCZD Total:
RW
RW
TBD
Roads
CN
TBD
Roads
CN
TBD
Roads
$ 2,850,000
27
Dahlberg Wetland Mitigation Site (719006): Develop advanced mitigation site for
future impacts from Flood and Road projects
20-004
66.3
$ 882,000
FCZD
PE
$ 195,000
FCZD
PE
$ 115,000
FCZD
PE
$ 12,500
FCZD
Project Total:
CN
CN
$ 2,854,500CN
CN
CN
$ 1,650,000
FCZD
28
Hudson Rd Bridge No. 132 Bridge Replacement (722006): Alternatives analysis for
bridge replacement as requried by WDFW permit condition
22-001
64.5
$ 50,000
FEMA/State
PE
$ 323,000
FEMA/State
PE
$ 475,000
FEMA/State
PE
$ 95,000
FEMA/State
PE
FEMA/State
Project Total
$ 2,500
FCZD
PE
$ 8,500
FCZD
PE
$ 12,500
FCZD
PE
$ 2,500
FCZD
PE
FCZD
$ 5,993,000
PE
$ 8,500
Roads
PE
$ 12,500
Roads
PE
$ 2,500
Roads
PE
Roads
CN
$ 4,750,000
FEMA/State
FCZD Total
CN
$ 125,000
FCZD
$ 151,000
CN
$ 125,000
Roads
29
Glacier -Gallup Alluvial Fan Restoration (718007): Remove all or part of Glacier Creek
levee and construct setback levee along Gallup Creek. Interim revetment fix in 2023
18-006
88.9
$ 438,000
FCZD
PE
$ 100,000
FCZD
PE
FCZD
PE
$ 40,000
FCZD
PE
FCZD
PE
$ 937,000
FbD grant
PE
$ 400,000
FbD grant
PE
FbD grant
PE
$ 160,000
FbD grant
PE
FbD grant
PE
Construction
RW
$ 120,000
FCZD
RW
$ 400,000
FCZD
RW
FCZD
RW
$ 100,000
FCZD
RW
expected in
RW
$ 480,000
FbD grant
RW
$ 1,600,000
FbD grant
RW
FbD grant
RW
$ 400,000
FbD grant
RW
2029-2030
CN
CN
FCZD
CN
FCZD
CN
FCZD
CN
$ 1,000,000
FCZD
CN
$ 1,000,000
FCZD
CN
CN
FbDgrant
CN
FbDgrant
CN
FbDgrant
CN
$ 4,000,000
FbDgrant
CN
$ 4,000,000
FbDgrant
30
Ferndale Levee Improvement (719008): Reconstruct and realign Ferndale and
Treatment Plant Levees to improve level of protection and address deficiencies
07-104
68.9
$ 229,000
FCZD
PE
$ 69,500
FCZD
PE
$ 8,500
FCZD
PE
$ 19,500
FCZD
PE
$ 5,000
FCZD
PE
$ 5,000
FCZD
PE
$ 1,000
FCZD
Project Total:
$ 779,000
FbD grant
PE
$ 556,000
FbD grant
PE
$ 68,000
FbD grant
PE
$ 156,000
FbD grant
PE
$ 40,000
FbD grant
PE
$ 40,000
FbD grant
PE
$ 8,000
FbD grant
$ 20,203,000
PE
$ 69,500
Ferndale ILA
PE
$ 8,500
Ferndale ILA
PE
$ 19,500
Ferndale ILA
PE
$ 5,000
Ferndale ILA
PE
$ 5,000
Ferndale ILA
PE
$ 1,000
Ferndale ILA
FCZD Total:
RW
$ 25,000
FCZD
RW
$ 25,000
FCZD
RW
RW
RW
RW
$ 2,256,500
RW
$ 200,000
FbDgrant
RW
$ 200,000
FbDgrant
RW
RW
RW
RW
FbD Grant
RW
$ 25,000
Ferndale ILA
RW
$ 25,000
Ferndale ILA
RW
RW
RW
RW
$ 16,135,000
CN
CN
$ -
FCZD
CN
FCZD
CN
FCZD
CN
$ 550,000
FCZD
CN
$ 1,320,000
FCZD
Ferndale ILA
CN
CN
$ 24,000
FbDgrant
CN
$ 2,976,000
FbDgrant
CN
$ 1,408,000
FbDgrant
CN
$ 4,400,000
FbDgrant
CN
$ 5,280,000
FbDgrant
$ 1,810,500
CN
CN
$ 6,000
Ferndale ILA
CN
$ 744,000
Ferndale ILA
CN
$ 352,000
Ferndale ILA
CN
$ 550,000
Ferndale ILA
CN
Ferndale ILA
31
Fish Camp (723005): Design and log procurement in 2025, Phase 1 Construction in
2026, Phase 2 (incl berms) Construction in 2027.
24-001
71.9
$ 11,000
FCZD
PE
$ 15,000
FCZD
PE
$ 5,000
FCZD
PE
Project Total:
PE
RW
RW
$ 3,341,000
RW
CN
$ 15,000
FCZD
CN
$ 15,000
FCZD
FCZD Total:
CN
$ 880,000
21/23 FbD grant
CN
$ 800,000
23/25 FbD Grant
CN
$ 1,600,000
25/27 FbD Grant
$ 61,000
32
Floodplain Acquisition: Acquire key properties for future levee reconfiguration to
reduce risk and improve habitat
07-002
79.6
RW/CN
$ 1,409,000
FCZD
RW
$ 5,000,000
RW
$ 5,000,000
RW
$ 5,000,000
RW/CN
$ 5,636,000
FbD grant
RW/CN
$ 2,700,000
FEMA/CBDG
RW/CN
$ 630,000
Commerce grant
RW
RW
33
Marietta Acquisition: Acquire properties in repetitive flood loss area and remove
structures
07-002
79.6
RW
RW
RW
RW
RW
RW
RW
$ 55,000
RW
$ 100,000
RW
$ 100,000
RW
$ 100,000
RW
$ 100,000
RW
CN
CN
$ 25,000
CN
$ 25,000
CN
$ 25,000
CN
$ 25,000
CN
CN
CN
CN
CN
CN
CN
34
High Creek Sediment Trap (720005): Annual clean out of sediment traps
22-005
58.8
CN
CN
CN
CN
CN
CN
CN
$ 115,000
FCZD
CN
$ 120,000
FCZD
CN
$ 125,000
FCZD
CN
$ 130,000
FCZD
CN
$ 135,000
FCZD
CN
$ 140,000
FCZD
35
Emergency/New Projects: Typically repair projects that result from new damage, as
needed
08-003
Varies
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
PE
$ 25,000
FCZD
RW
RW
RW
RW
RW
RW
Total/year:
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
CN
$ 50,000
Local sponsor
$ 425,000
CN
$ 350,000
FCZD
CN
$ 350,000
FCZD
CN
$ 350,000
FCZD
CN
$ 350,000
FCZD
CN
$ 350,000
FCZD
CN
$ 350,000
FCZD
rs In italics are placeholders for projects still being conceived.
us expenditures includes work contracted in 2024 that will continually appropriate into 2025.
rNole'�1":
Estimated total project cost includes work done by U.S. Army Corps of Engineers (USACE) and funded directly by USACE.
Page 2
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 1
Eagleridge Stormwater Improvements
Database ID No. 20-007
Construction Funding Years : 2025
Project Narrative:
This project includes the installation of a water quality treatment facility associated with the Eagleridge neighborhood in
the Lake Whatcom watershed. The Eagleridge development is approximately 34 acres and runoff from this
development will be routed through a water quality facility to help remove sediments and phosphorus before entering
Lake Whatcom.
Project Status:
Design work has been initiated in 2024 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $825,000
■l 1:40111 a Ike
�. ,- 1
.70 0-7 0A.rii
je
•�r
t� �y
ze- jQy
rJ
1
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 2
Austin Court Stormwater Improvements
Database ID No. 20-008
Construction Funding Years : 2026
Project Narrative:
This project includes the installation of a large filter vault to improve water quality in the existing Austin Court
stormwater system. The tributary area is approximately three acres and the water quality system will remove sediments
and phosphorus prior to entering Lake Whatcom.
Project Status:
Design contract is anticipated to be executed Summer 2024 and construction scheduled to take place in 2026.
Total Estimated Project Cost: $737,375
2
Whatcom County Public Works — Stormwater Division
Project Narrative
Cedar Hills Culvert Replacement
Database ID No. 23-001
Construction Funding Years : 2025
Project Narrative:
2025-2030 Six -Year WRIP
Item No. 3
This project includes the replacement of a culvert that was damaged during the 2021 flooding event with a new upsized
100-linear feet long 36-inch diameter culvert. The work shall also include the modification of the culvert inlet to enhance
erosion and sediment control, along with re -grading and armoring the downstream channel to provide improved
conveyance capacity. This will be funded by FEMA, REET and the Lake Whatcom utility.
Project Status:
Design is anticipated in 2024-2025 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $380,000
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 4
Strawberry Point/ Lake Whatcom Blvd Stormwater Improvements
Database ID No. 17-001
Construction Funding Years : 2027
Project Narrative:
This project will involve the installation of a water quality facility to treat approximately three acres of residential area.
Project elements may include: bio-infiltration swales, filter vaults, media filter drains, and rain gardens in order to improve
water quality.
Project Status:
Design is anticipated in 2025-2026 and construction scheduled to take place in 2027.
Total Estimated Project Cost: $1,170,000
4
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 5
Geneva Street & Lake Louise Road Culvert Replacement
Database ID No. 20-010
Construction Funding Years : 2028
Project Narrative:
Project will improve conveyance of roadside ditches and culverts along Geneva Street and Lake Louise Road. This will
improve water quality. The project will replace approximately 200 linear feet of undersized or damaged culverts.
Project Status:
Design is anticipated in 2027 and construction scheduled to take place in 2028.
Total Estimated Project Cost: $270,000
x. T
Ag
IA._C BALE 5T ■
Vff
sY. w
f.+e , sCyfx�`-�� r/ r�f��S• 7p, •,�L...'r?f.... _ '`' 'Q . fy��:� •.
'•a !� �!. ��E •fir'. 14•�.C" Y-Y ~ I i C� �Yi i.�.}•. .
• } ,+i,•� :"� a �� ... ". .
5
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 6
Lake Whatcom Boulevard Media Filter Drain (EG-1)
Database ID No. 22-006
Construction Funding Years : 2029
Project Narrative:
The project would install Media Filter Drain (MFD), or other appropriate water quality system, along approximately 300
linear feet of roadway on the west side of Lake Whatcom Blvd. Stormwater runoff from approximately 8.5 acres on the
west side of Lake Whatcom Blvd. is collected in a shallow roadside ditch, this project would treat this water prior to
discharging to Lake Whatcom.
Project Status:
Design is anticipated to begin in 2027 and construction scheduled to take place in 2029.
Total Estimated Project Cost: $835,000
MORGAN ST
:r
k >'
4
Legend
Media Filter drain
Existing Condition Infrastructun
Storm Pipu
Culvert
Ditch
Catch Basin ; Manhole
47:. t r'3L
,a OE
1 r
a :Med()oia Filler Drain
LF)''
SPRING'ST:
4
s
4 6
I
200
=i Feet
0
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 7
Sudden Valley Stormwater Improvements No. 2
Database ID No. 22-007
Construction Funding Years : 2030
Project Narrative:
A project, to be determined, will be constructed within the Sudden Valley area as the second water quality improvement
project focused on removing sediment and treating phosphorus in a continued collaboration with the Sudden Valley
community. The project will include drainage system upgrades and retrofits to the existing stormwater infrastructure.
Details will be forthcoming as Whatcom County works with representatives of the Sudden Valley Community
Association.
Project Status:
Design is anticipated in 2028-2029 and construction scheduled to take place in 2030.
7
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 8
Lake Whatcom Boulevard Water Quality Vault (EG-4)
Database ID No. 22-008
Construction Funding Years : 2030
Project Narrative:
This project includes the installation of a filter vault to improve water quality in the existing Lake Whatcom Blvd
stormwater system. The water quality system will remove sediments and phosphorus from approximately 3 acres of
residential runoff prior to entering Lake Whatcom.
Project Status:
Design is anticipated in 2028-2029 and construction scheduled to take place in 2030.
Total Estimated Project Cost: $650,000
vroposea invastructure
■ Proposed Storm Filter
Existing Condition Irfrastruch
Storm Pipe
Culvert
L I— Ditch
'N
4
M
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 9
Viewhaven Lane Water Quality & Conveyance Improvements
Database ID No. 20-009
Construction Funding Years : 2031
Project Narrative:
This project will improve conveyance and water quality near Viewhaven Lane and Lake Whatcom Blvd intersection.
Project will include approximately 100 linear feet of conveyance improvements by replacing two undersized culverts
and regrading a ditch. The project will also install approximately 135 linear feet of water quality facility. Project elements
may include: bioinfiltration swales, filter vaults, media filter drains, and rain gardens.
Project Status:
Design is anticipated in 2029-2030 and construction scheduled to take place in 2031.
Total Estimated Project Cost: $475,000
0
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 10
Charel Terrace Stormwater Outfall Repair
Database ID No. 20-011
Construction Funding Years : 2025
Project Narrative:
The December 20, 2018 "Solstice Eve" windstorm caused damage to the stormwater outfall on Birch Point installed as
part of the Charel Terrace project in 2011. In March 2019 a "Major Disaster Declaration" that covered Whatcom County
for the December storm was granted. In December 2019, the Consolidated Resource Center approved the Washington
State Emergency Management Division's $110,887 request for Architectural & Engineering Services to assess the site
and develop conceptual design options. An RFP was advertised by Whatcom County in March 2020 and Herrera
Environmental Consultants completed a preliminary study that assessed the outfall stabilization approaches to maintain
a functional outfall. From this study, a temporary repair was constructed in fall 2022 to secure the catch basin to the
bluff and reposition the outfall tee. The permanent repair will be constructed in the summer of 2025.
Project Status:
Design occurring in 2021-2024 and construction is scheduled to take place in 2025.
Total Estimated Project Cost: $797,000
10
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 11
Semiahmoo Drive South & Outfall Improvements (BP-2, BP-5)
Database ID No. 18-009 & 18-010
Construction Funding Years : 2025
Project Narrative:
This project will improve the stormwater conveyance system at the south end of Semiahmoo Drive by upsizing the
cross culvert to reduce flooding and increase traffic safety, and reconstruct the outfall conveyance system to the Strait
of Georgia damaged during the November 2021 extreme rainfall event.
Project Status:
Design and permitting was initiated in 2021 and will continue into 2025. Construction is scheduled for 2025.
Total Estimated Project Cost: $1,380,000
11
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 12
Lora Lane Drainage & Tide Gate Modifications (TC1-2)
Database ID No. 18-008
Construction Funding Years : 2025
Project Narrative:
The purpose of this project is to replace the existing 48" corrugated metal culvert under Birch Bay Drive with an 8-ft wide
fish passable box culvert, replace the existing tide gate on the waterward side of Birch Bay Drive with a new side hinge
tide gate, and install shoreline armoring at the outfall area. This project will be a collaboration with the Design and
Construction Division of Whatcom County Public Works and the Leisure Park Community.
Project Status:
Preliminary engineering design occurred in 2021. Permanent repair design will begin 2024 and construction is anticipated
for 2025.
Total Estimated Project Cost: $1,710,000
tG BEEN LNi]- 7A.:
R ESE LN'( '-`T e 1 f ��. - f' 'lt R 7.
- s
rR
• � `.� +{�- �e��_. � �.:;xi � -.
r -yam i
1k �.
IERLN" rl,k � .a
Ly�RA HIV
12
Whatcom County Public Works — Stormwater Division
Project Narrative
Normar Place Stormwater Improvements (BP-1)
Database ID No. 19-004
Construction Funding Years : 2026
2025-2030 Six -Year WRIP
Item No. 13
Project Narrative:
This project involves upsizing pipes, replacing catch basins and installing an outfall pipe over the bluff with an energy
dissipater at Normar Place to reduce roadway flooding, scour and sediment transport.
Project Status:
Design is anticipated in 2024-2025 and construction in 2026.
Total Estimated Project Cost: $1,336,000
• I sp •• Y daHY'!"
13
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 14
Birch Point Road Stormwater & Outfall Improvements (BP-3 & BP-6)
Database ID No. 21-001
Construction Funding Years : 2027
Project Narrative:
A corrugated metal outfall pipe over a steep bluff on Birch Point collapsed due to erosional undermining. The driveway
culverts, ditches and upstream storm drain system leading to the outfall are undersized and cause flooding and erosion
during storm events. This project will involve upsizing culverts, reestablishing ditches and replacing and anchoring the
outfall pipe and construction of pipe -end energy dissipater.
Project Status:
Design will be completed in 2025-26. Construction is scheduled to take place in 2027.
Total Estimated Project Cost: $970,000
14
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 15
Richmond Park Stormwater Improvements (SH-2)
Database ID No. 22-010
Construction Funding Years : 2028
Project Narrative:
This project will address drainage concerns in Richmond Park by re-routing the large volume of water that currently
moves through the development down Shintaffer Road to an outfall in Birch Bay. It would involve replacing 1,640 feet of
ditch/culvert on Shintaffer Road with 36" diameter HDPE pipe, installing 13 Type 2 catch basins and building a new
outfall into Birch Bay.
Project Status:
Design will occur in 2026-2027 and construction is scheduled to take place in 2028.
Total Estimated Project Cost: $2,600,000
0 ,,
15
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 16
Roger's Slough Drainage Improvements
Database ID No. 23-002
Construction Funding Years : 2029
Project Narrative:
This project will address drainage and flooding issues in Birch Bay Village, Birch Bay Drive and Birch Point Loop Road.
It will involve replacing twin 30" diameter culverts that direct water under Birch Bay Drive into Roger's Slough with a
fish -passable concrete box culvert, installing 285 feet of pipe, regrading 500 feet of ditch, and installing a new Type 2
catch basin and overflow pipe near the mouth of Roger's Slough.
Project Status:
Design will occur in 2027-2028 and construction is scheduled to take place in 2029.
Total Estimated Project Cost: $2,850,000
N
0 250 50F ` 1
Feet tiQp�
w +_ WN
`❑
Cn
i -
O
Qor
Kwan Lake
Deeper Under
Future Conditions
•r.
PROPOSED
Block Culvert
= Culvert
» Ditch Regrade
N-- Remove Culvert
Storm Drain
® CB Type 2
EXISTING
= Pipe/Culvert
= Ditch
5' x 8` Structure
16
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 17
Birch Bay Village Drainage Improvements
Database ID No. 23-003
Construction Funding Years : 2030
Project Narrative:
This project will address drainage and flooding issues in Birch Bay Village in the vicinity of Salish Road and Kwan Lake.
It will involve installing or replacing 1,400 lineal feet of pipe, installing four new catch basins along Nootka Loop and
Salish Road and installing a new 36" diameter flap gate near Nootka Loop to reduce tidal backwatering.
Project Status:
Design will occur in 2028-2029 and construction is scheduled to take place in 2030.
Total Estimated Project Cost: $1,310,000
q`. PROPOSED
w R�� �!!
�y LU 'r ' S Storm Drain '
-A C8 Type 2
A 04 EXISTING
BIRCH'PpINT �� BIRCFI P01N7 LQQP = PipelCulvert
Ditch
Flap Gate
t SALISN,gb � ..
Project Locat on
}
:.-
111111111111p—
x t
-f r
N
o :_0 500
=zet
n Lake
Birch Bay
17
Whatcom County Public Works — Stormwater Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 18
Bay Ridge Estates Drainage Improvements
Database ID No. 23-004
Construction Funding Years : 2031
Project Narrative:
This project will address drainage and flooding issues in Bay Ridge Estates and along Selder Road. It will involve
installing or replacing 500 lineal feet of pipe, regrading 1,000-feet of ditch, and installing two new catch basins on
Selder Road and Birch Point Road.
Project Status:
Design will occur in 2029-2030 and construction is scheduled to take place in 2031.
Total Estimated Project Cost: $770,000
PROPOSED
CUIVert
I� Ditch Regrade
J Storm Drain
p CB Type 1
Q GB Type 2
4 EXISTING
C Pipe.!Culvera
Ditch
t• r
JD�eepen,
Widen Ditch
+ 01
AP
Replace Ditch
30"
BIRCH P INT',Rb
N
;, Ar
zoo aoo
Feet
rdaern� I �
18
Whatcom County Public Works — Stormwater Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 19
Wooldridge Avenue & Sunset Drive Stormwater Improvements (TC-2)
Database ID No. 13-007
Construction Funding Years : 2032
Project Narrative:
This project will improve the conveyance system along Wooldridge Avenue, Jackson Road and Sunset Drive by upsizing
pipes, installing or replacing catch basins and culverts, reestablishing roadside ditches, and installing a water quality filter
vault and treatment swale.
Project Status:
Design is anticipated in 2030-2031 and construction is scheduled to take place in 2032.
Total Estimated Project Cost: 1,220,000
7
•` -7,
�f
jp
KEY
i z
2 44-E
J �7 � � F � • � r �'�`^ t
Iwv
• - r a.
j• ^*�
`
L r
LJJ
*
J t r
v
LJ
} %
r �[
� 4*
:^
i
ABALOIJE 4VAY' '
19
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 20
Truck Road Bank Stabilization
Database ID No. 20-003
Construction Funding Years : 2022 and 2024
Project Narrative:
The project is located along Truck Road about 0.3 miles easterly from Mt. Baker Highway (SR 542). During high-water
events of the 2017/2018 winter, the North Fork Nooksack River eroded the unprotected bank of Truck Road to within 13
feet of the roadway surface. This prompted an emergency project to construct a passive riprap revetment underneath a
section of the roadway to provide immediate protection. Flooding during 2020 eroded the remaining bank exposing the
recently constructed riprap revetment and destabilizing a portion of the north bound lane. Jersey barriers were placed by
county crews to block off this lane to traffic. Additional erosion sustained the November 2021 floods, threatened the road
downstream of the previous damage area. The FCZD undertook an emergency project to address the immediate threat to
truck road. In 2024, additional work provided environmental mitigation for that action and to repair and realign the
damaged section of road.
Project Status:
The FCZD has completed the emergency repair and is currently designing and permitting the associated Phase 2 project
that will provide environmental mitigation and road repair. Construction of the Phase 2 project is anticipated to occur in
2024, with planting and restoration scheduled for 2025. The FCZD anticipates that FEMA and the State will fund 95% of
the project through the Public Disaster Assistance program
Total Estimated Cost: $2,945,000
Expenditures to Date: $2,888,000
20
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 21
Devries Levee Improvements
Database ID No. 19-001
Construction Funding Years : 2025
Project Narrative:
This project involves widening the levee crest and backsloping the levee to meet the US Army Corps of Engineers's levee
geometry standards for levees in the Public Law (PL) 84-99 Levee Rehabilitation Program (SWIF project).
Project Status:
The Diking District is proposing to utilize the excess fill generated from the Cougar Creek project to complete the
backsloping work.
Total Estimated Cost: $10,000
Expenditures to Date: $0
21
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 22
Cougar Creek Early Action / Neevel Levee Bank Stabilization
Database ID No. 16-008
Construction Funding Years : 2025
Project Narrative:
The Neevel Levee provides varying levels of protection to a significant amount of agricultural land. Approximately 250 feet
of the levee running along Cougar Creek is over -steepened and experiencing sloughing of the riverward face. A
stabilization project incorporating large woody debris at the toe and reducing the slope of the riverward face is proposed
in the System -wide Improvement Framework (SWIF) to resolve the deficiency identified by the US Army Corps of
Engineers and keep the levee eligible for repair under the Public Law (PL) 84-99 Program. An early action project
developed through the Floodplain Integrated Planning (FLIP) process includes replacement of the Cougar Creek flood
gate and installation of large woody debris in the channel downstream.
Project Status:
Design of the project has been finalized. Construction is anticipated for 2025 with funding through NRCS's EQIP program,
and Floodplains by Design (FbD).
Total Estimated Cost: $2,711,000
Expenditures to Date: $383,000
22
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 23
Acme Woody Revetment Repair
Database ID No. 23-005
Construction Funding Years : 2025
Project Narrative:
The project site is an approximately 1/4-mile long section of eroding bank located along the left bank of the South Fork
Nooksack River in the unincorporated community of Acme in Whatcom County. In 2009 and 2010 the Flood Control Zone
District constructed multiple log jams and woody revetments to discourage lateral erosion and stabilize the lower reach
of Landingstrip Creek for the purpose of enhancing critical habitat for ESA listed species and providing flood protection
to the Acme community and the SR 9 bridge. Flooding in November 2021 damaged the lower portion of the project,
destabilized the wood structures, and eroded the streambank. The proposed project will repair the woody revetment
along the new stream alignment.
Project Status:
Design is anticipated to start in 2024 and construction is anticipated in the Summer of 2025 with funding through FEMA
and FCZD.
Total Estimated Cost: $1,146,000
Expenditures to Date: $65,650
23
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 24
Bertrand Creek Levee Stabilization
Database ID No. 16-005
Construction Funding Years : 2025
Project Narrative:
The Bertrand Creek right and left bank Levees are designed to overtop during larger floods, but provide protection to
agricultural land during the growing season. The left bank levee has a 250 foot long section where erosion is threatening
the levee prism. The levee will have to be repaired to remain eligible for rehabilitation through the US Army Corps of
Engineers Public Law (PL) 84-99 Levee Rehabilitation Program.
Project Status:
The project has been designed by the FCZD. Construction is anticipated in the Summer of 2025.
Total Estimated Cost: $213,000
Expenditures to Date: $21,500
24
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 25
Upper Hampton Levee Improvements
Database ID No. 16-006
Construction Funding Years : 2026
Project Narrative:
Several deficiencies were identified by the US Army Corps of Engineers on the Upper Hampton Levee. Improvements to
the levee geometry are proposed in two locations and improvement to address seepage is proposed at a third location.
Project Status:
A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process.
Detailed design has not been initiated yet. However, we were able to complete a portion of the levee backsloping work at
one site using excess material generated at the 2021 Abbott and Lynden Levee Improvement projects.
Total Estimated Cost: $61,000
Expenditures to Date: $6,000
25
Whatcom County Public Works — River and Flood Division
Project Narrative
2025-2030 Six -Year WRIP
Item No. 26
Abbott Levee Protection and Improvement Project
Database ID No. 16-007
Construction Funding Years: 2021 and 2028
Project Narrative:
The project is located along Abbott Road about 1.7 miles east of Hannegan Road. Erosion along the Nooksack River
removed a section of riprap that previously protected the land adjacent to the Abbott Levee and Abbott Road. Phase 1 of
this project addressed the ongoing erosion in this location. The FCZD is also investigating possible road and levee
setback options to improve the upstream tie-in of the levee and address a deficiency identified by the US Army Corps of
Engineers to maintain the levee's eligibility in the PL 84-99 Levee Rehabilitation Program. This work will be implemented
as a second phase of the project.
Project Status:
Construction of Phase 1 was completed during Summer or 2021. The FZCD is working with the project consultant on
Phase 2. Phase 2 will include a reach assessment to provide the technical basis for developing alternatives for upstream
improvements. The FZCD will utilize this reach scale analysis to develop a capital project for Phase 2. Phase 2
construction is anticipated in 2027.
Total Estimated Cost: $3,020,000
Expenditures to Date: $1,099,000
26
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 27
Dahlberg Wetland Mitigation Site
Database ID No. 20-004
Construction Funding Years : 2027 - 2028
Project Narrative:
The FCZD purchased a property northeast of Ferndale as a mitigation site for future projects having wetland or riparian
impacts. The property contained a dilapidated farm house.
Project Status:
FCZD purchased the subject property and demolished the farm house in Fall of 2020. The FCZD has installed a
groundwater monitoring network on the site to support developing a long-term restoration plan for the site.
Total Estimated Cost: $2,800,000
Expenditures to Date: $882,000
27
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 28
Hudson Road Bridge No. 132 Repair
Database ID No. 22-001
Construction Funding Years : 2024 and 2028
Project Narrative:
The project is located near the dead end of Hudson Rd in Acme, WA. The FCZD purchased the property at the end of this
road as a part of the Jones Creek Debris Flow Risk Reduction Project. The approaches to the bridge that serves the
property were damaged during the November 2021 flood events. The flood damaged was repaired in 2024 to restore
access. However, as a part of the Hydraulic Project Approval permit, the Department of Fish and Wildlife has required that
the crossing be replaced with a new bridge that is consistent with WDFW Water Crossing Design Guidelines within five
years. In 2025 the FCZD will commence an bridge replacement alternatives analysis that will evaluate the challenges
associated with Jones Creek debris flow hazards and neighboring habitat restoration efforts.
Project Status:
FCZD completed the design, permitting, and construction of the temporary repair in 2024. The FCZD has provided FEMA
with the damages and cost estimate to perform the temporary repair, and will continue to coordinate the full bridge
replacement. An alternatives analysis for the bridge replacement and fish -passage study will start in 2025. The
construction for the bridge replacement is expected in 2028. The FCZD anticipates that FEMA and the State will fund 95%
of the project through the Public Disaster Assistance program.
Total Estimated Cost: $5,993,000
Expenditures to Date: $52,500
28
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 29
Glacier -Gallup Creeks Alluvial Fan Restoration
Database ID No. 18-006
Construction Funding Years : 2023, 2029 and 2030
Project Narrative:
The Glacier Creek Levee on the left (west) bank of the creek was constructed in the 1960s to prevent overflows into
Gallup Creek and damage to State Route (SR) 542. Since construction, the levee has been subject to ongoing damage.
Constriction of the Glacier -Gallup channel migration zone (CMZ) has exacerbated aggradation upstream of SR 542 and
severely degraded fish habitat. WSDOT replaced the Gallup Creek bridge in 2010 and is working to construct a new
bridge over Glacier Creek and the alluvial fan between the two creeks. The FCZD is developing a project in coordination
with WSDOT and is evaluating the feasibility of full or partial removal of levees blocking natural channel migration on the
Glacier and Gallup Creeks alluvial fan and construction of a setback levee on Gallup Creek to protect the Community of
Glacier.
Project Status:
A feasibility study and alternatives analysis for evaluating levee removal and setback alternatives was initiated in late
2018. Preliminary design of the preferred alternative will be initiated once the preferred alternative is selected.
Construction of an interim project to address levee damage was completed in 2023. Construction of the levee removal
and setback is anticipated will be coordinated with Glacier Creek bridge replacement. Construction is anticipated in 2029
and 2030.
Total Estimated Project Cost: $15,000,000
Expenditures to Date: $1,375,000
29
Whatcom County Public Works — River and Flood Division
Project Narrative
Ferndale Levee Improvement Project
Database ID No. 07-104
Construction Funding Years : 2027 - 2030
Project Narrative:
2025-2030 Six -Year WRIP
Item No. 30
Two levee segments, one sponsored by the City of Ferndale and one by the FCZD and Diking District #1 in the US Army
Corps of Engineer's Public Law (PL) 84-99 Levee Rehabilitation Program, provide protection to the three treatment
facilities along Ferndale Road. The US Army Corps of Engineers has identified several deficiencies along these two levee
segments, including a gap in which super sacks filled with sand have been placed. The 1999 Comprehensive Flood
Hazard Management Plan recommended improving these levees to provide 100-year protection to the City and the
treatment facilities. The System -wide Improvement Framework (SWIF) also includes this project to address the identified
levee deficiencies.
Project Status:
This project is currently in the design phase. A preferred alternative for the levee and road alignment has been selected. A
60 percent design level plan of the proposed levee configuration is anticipated at the end of 2024, a 90 percent design
level plan is anticipated in 2025, and final design for each phase will be in 2026 and 2027. Grant funding through the
State's Floodplain's by Design program has been secured to complete the design. Construction is anticipated to be
phased with construction beginning in 2027 and lasting through 2030.
Total Estimated Construction Cost: $20,203,000
Expenditures to Date: $1,008,000
30
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 31
South Fork Nooksack Fish Camp (Ts'eq) Integrated Project
Database ID No. 24-001
Construction Funding Years : 2025 - 2027
Project Narrative:
The South Fork Nooksack River Fish Camp (Ts'eq) Integrated Flood and Fish Project (Fish Camp Project) is a
collaboration of the Nooksack Indian Tribe Natural Resources Department (Tribe) and the FCZD to develop broadly -
supported, multi -beneficial solutions to reduce flood risk to the Acme community and restore habitat for ESA -listed early -
timed Chinook salmon and other salmonid species. The Fish Camp Project Area is located in the lower South Fork
Nooksack River valley downstream and upstream of the town of Acme between river mile (RM) 7.3 and RM 9.7,
respectively. The Project Area includes the SFNR mainstem channel and floodplain habitats and extends from the end
of Rothenbuhler Rd. in the south to just downstream of the BNSF railway bridge in the north. The State Route (SR) 9
bridge crosses over the SFNR near RM 8.6 and conveniently separates the project area into upstream (Phase 2) and
downstream (Phase 1) sections.
Project Status:
Design and log Procurement in 2025, Phase 1 Construction in 2026, Phase 2 Construction (incl Berms) in 2027
Total Estimated Cost: $3,340,000 Expenditures to Date: $11,000
31
Whatcom County Public Works — River and Flood Division
Project Narrative
Floodplain Acquisition
Database ID No. 07-002
Acquisition Funding Years : 2017- TBD
Project Narrative:
2025-2030 Six -Year WRIP
Item No. 32
Reach -scale projects to reconfigure flood infrastructure are being evaluated through the integrated planning processes
that started with the System -wide Improvement Framework (SWIF) and has transitioned into the Floodplain Integrated
Planning (FLIP) process. The goal of this work is to reduce flood risk and expenditures and restore habitat and the
processes that form it.
Voluntary acquisition of lands is proposed to enable future levee reconfigurations to reduce flood risk and future levee
repairs, while improving habitat.
Project Status:
Acquisition of 12 properties and demolition of associated structures occurred in 2024 and additional acquisitions and
demolitions are anticipated in 2025. Acquisitions are targeted in areas that sustained significant damage in 2021, in areas
mapped as FEMA floodways and areas that will enable future flood hazard reduction projects
Total Estimated Cost: N/A
Expenditures to Date: N/A
32
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 33
Marietta Acquisition
Database ID No. 07-002
Construction Funding Years : 2001 - Present
Project Narrative:
Acquisition of residential properties in the frequently -flooded repetitive flood loss area of Marietta, removal of existing
structures and restoration of properties with native vegetation.
Project Status:
Property acquisition began in 2001 and is ongoing. As properties are acquired, structures are removed and native
vegetation is planted. All acquisitions are voluntary and the project is ongoing as current property owners decide to sell
their properties. Total project cost will need to include funding for cleanup of up to four former gas stations, though the
exact nature of the work is still undefined.
Total Estimated Project Cost: N/A
Expenditures to Date: N/A
33
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 34
High Creek Sediment Trap
Database ID No. 22-005
Construction Funding Years : Annually
Project Narrative:
High Creek flooding damaged nearby homes and closed Mount Baker Highway in the mid-1990's. A legal settlement
resulting from that event directs Whatcom County to prepare a creek management plan. Sediment management in the
watershed including the 3400 feet of County owned right of way east of Kendall Creek is an important plan element along
with fish habitat mitigation. State permits for future maintenance dredging are dependent on consistency with the final
management plan. A management plan was developed and recommended the construction of two sediment traps, one
sited upstream of Mount Baker Highway to trap coarser material and one by the confluence with Kendall Creek to trap
finer material. The sediment traps were constructed in 2018. The project provides for the annual clean out of those
sediment traps.
Project Status:
The 2025 clean out is anticipated to be complete in September 2025 for a cost of $100,000. Total Estimated Cost is for
annual estimated cleanout costs funded by the FCZD.
Total Estimated Cost: approximately $120,000 annually
Expenditures to Date: --
34
Whatcom County Public Works — River and Flood Division 2025-2030 Six -Year WRIP
Project Narrative Item No. 35
Emergency/New Projects
Database ID No. 08-003
Construction Funding Years : 2025 - 2030
Project Narrative:
This item provides funding to address unanticipated projects resulting from new damage to flood control facilities.
Project Status:
Design and construction to occur as necessary.
Total Estimated Project Cost: $425,000/year
Expenditures to Date:
Due to the nature of this item, no map exists. Board of Supervisors review and prioritization will be sought at the
appropriate time.
35
Portage Bad Shellfish Growing Area C
2006
assif ication
2024 *
115 acres (stations 52 and 271) � Two marine stations (49 and 272)
upgraded to Approved. � meet Adverse Pollution Condition 0
standards in 2023 and are
2019 recommended for evaluation for
potential upgrade. Evaluation will
Spring harvest restrictions � ■
2003 were removed. 800 acres be completed in 2024.
remain closed to harvest in
625 acres were upgraded to the fall (October -December).
Approved. ■
Upgrades
10 10 is go 10 0 is 10 10 0 is 10 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 is 0 0 0 0 0 0 W 0 0 0 0 0 0 0 0 *9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 *,be 0 0 0 0 0
Downgrades
o
U 2016 •
■ 115 acres (stations 52 and •
1999 271) upgraded to Approved.
The Restricted area was expanded
by approximately 90 acres. �
O •
2022
1997 Elevated fecal bacteria results in
A portion of the Portage Bay shellfish
growing area was downgraded to
Restricted due to declining
water quality. This area was
voluntarily closed by Lummi Nation in
late 1996.
2015
Following declines in water quality in freshwater
and at marine sites, approximately 500 acres
were downgraded to Conditional Approval. These
areas were closed to shellfish harvest in the
September result in expanded period
of fall closure (September -
December).
_____9___.& ,,.____! I ,_____. ____, r-,L October -December)
Whatcorn County Council Water Works
September 17, 2024
Ferry System: Capital Planning
Elizabeth Kosa, Director
Laura Frolich, Assistant Director
Whatcom County Public Works
■ Project History
■ Review current capital project alternatives
■ Update on current project status
■ Review project factors
■ Jones Act video recording (9 minutes)
■ Options and Next Steps
■ Public Works Commitments
Project History
2007 —New 35 car ferry project deferred
Estimated cost $16M
CRAB award for $8M declined
Lummi Island terminal work deferred pending vessel replacement
Inaction
2018 — County Council adopts LOS Recommendation
2021 — Financial plan adopted, and work began on grant applications
2024 — Project budget cost estimate $89M
Cost Escalation Rates
2018
2019
2020
2021
2022
2023
Vessels (BLS PPI Shipbuilding)
2.37%
2.03%
0.90%
10.23%
21.19%
13.34%
Terminals (Seattle Area CPI)
3.15%
2.50%
1.64%
5.00%
8.95%
5.68%
2024
4.76%
3.32%
Ferry System- Capital Project Alternatives
A. Single Phase with Electrification
$86M project value
B. Deferred Electrification
$92M project value
C. In -Kind Replacement
$43M project value
Current Project Status
• Since award in 2022, the county has spend $1.12M on the Lummi Island Ferry
Replacement and System Modernization Project
• Efforts Include: design, analysis, technical reports & studies for the 34-car
electric vessel, in water structures, docks and terminal upgrades
• To sign RAISE grant agreement actions needed:
1. Finalize design (60%)
2 Start NEPA process (Step 2 level analysis required) 1 year long
process
Develop funding plan (Due July 2025)
9/17/2024 I 5
Project Factors for Consideration
1. RAISE grant triggers federal regulations
2. Electrification Infrastructure Issue
3. Gooseberry terminal location
4. Jones Act Compliance
1. Federal Requirements
• RAISE is administered by USDOT, it was adopted in US code(Federal law): 2022 awarded the county $25M
for the Lummi Island Ferry Replacement and System Modernization Project
• USDOT expects all RAISE funding be obligated by September 30, 2026 and funds to be completely expended
by September 30, 2031.
• Accepting federal funds requires NEPA process:
Proposed project triggered the Step 2 level analysis:
Requires an Environmental Assessment AND a Finding of No Significant Impact (EA/FONSI)
No FONSI4 A Step 3 level analysis is triggered- Environmental Impact Statement (EIS)
NEPA process typically takes one year minimum, planned start date no later than January 2025 in order to meet 9/2026
9/17/2024 I 7
2. Electrification Issues
• Lack of existing PSE infrastructure- project requires shore
power (substation) and marine cable connections (rv8M)
• PSE is a private, for -profit company, typically does not absorb
new infrastructure costs
0 No indication PSE will install needed power connections,
burden is on developer
• PSE will not provide assurances for future capital investments
9/17/2024 I 8
3. Gooseberry Point Terminal
• GP Terminal is located within the Lummi Nation, not on county -
owned land
• Ferry route and current dock locations impact usual and
accustomed fishing grounds
• Relocation of docks is required to renew lease
• Lummi Nation controls the land and sets the lease price and
terms
• GP Terminal lease expires in 2046
4. Merchant Marine Act of 1920 aka the Jones Act
• Requires new vessels to be built in the US
• Requires used vessels to be purchased in the US
• Video highlight the impacts of the Jones Acton the
Washington State Ferry System
https://www.cato.org/blot/iones-act-exacerbates-us-ferry-system-struggles
What are our options?
• Continue on current plan
• Pivot to a new project alternative
• Lobby the state legislature for significant funding
Next Steps
By October 31st 4 Executive's Recommendation
on best course of action including scope, schedule,
budget, funding, and revenue.
Public Works Department's Commitments
• Help solve a 20 year problem
• Complete necessary dock repairs on Lummi Island side regardless (-12M)
• Provide leadership
until the
project
is executed
to remedy
past inactions
• Prioritize the Ferry
system -
Public Works relies
on it to transport crews and
equipment in order to service Lummi Island road system
• Consider a dedicated Ferry district fund to ensure a sustainable system,
affording both capital and operating costs
• Recognize that a bridge could be a long term solution (100 year lifespan) but
we're still reliant on a new vessel in the shorter term
9/17/2024 I 13
Discussion
`'-..�
Merits ? Questions?
;om County Public Works
9/17/2024 I 14
9/17/24, 12:21 PM Jones Act Exacerbates US Ferry System Struggles I Cato at Liberty Blog
CNfO BLOG
INSTITUTEe
MAY 7, 2024 2:25PM
Jones Act Exacerbates US Ferry
System Struggles
By Colin Grabow
Washington State Ferries (WSF) has certainly seen better days. With over
3,500 canceled sailings last year and just 15 of its 21 vessels reliably
https://www.cato.org/blog/Jones-act-exacerbates-us-ferry-system-struggles 1 /5
9/17/24, 12:21 PM Jones Act Exacerbates US Ferry System Struggles I Cato at Liberty Blog
operating, a recent Seattle Times editorial described the ferry system as
"in crisis" and characterized its fleet as "antiquated" and "depleted." Such
language is apt. With 11 of the system's ferries at least 40 years old and
WSF five short of the 26 vessels it considers ideal, new vessels are badly
needed. Unfortunately, none are projected to arrive until 2028 at the
earliest.
The ferry system's troubles have become a topic of this year's governor's
race, including criticism of the state's decision to procure ferries powered
by hybrid electric engines —a move some observers allege has
complicated the acquisition process. At most, however, this is only a
proximate cause of WSF's ferry woes. Far more deserving of blame are
protectionist maritime laws that prohibit the purchase of vessels from the
international market. Such restrictions mean that WSF—in fact, all US ferry
systems —must provide service with one hand tied behind their backs.
That Washington urgently needs to revamp its ferry fleet isn't news. Five
years ago, the state passed legislation allowing a contract extension with
Seattle shipyard Vigor —which has built WSF's last ten vessels —to build up
to five more large ferries using hybrid electric technology. But negotiations
with the shipyard then hit a snag. While Washington had pegged the cost
of new ferries at $188 million each in 2018—an estimate that rose to $249
million in 2022—the price quoted by Vigor for the first such ferry was over
$400 million.
Ouch.
Washington responded by rebidding the contract and changing its law so
shipyards outside the state could compete to build the vessels. That,
however, has meant delays in the acquisition process, mounting
frustration among ferry users, and the ongoing exchange of barbs over
the new propulsion system.
But this controversy misses the bigger picture. Washington's chief obstacle
to cost-effectively acquiring new ferries isn't rooted in technology but
protectionism. One only needs to look across Washington's international
border to see why.
In late 2019, only two months after Washington announced its plan to
purchase new hybrid electric ferries, Canadian ferry operator BC Ferries
ordered four vessels with the same technology from a European
https://www.cato.org/blog/Jones-act-exacerbates-us-ferry-system-struggles 2/5
9/17/24, 12:21 PM Jones Act Exacerbates US Ferry System Struggles I Cato at Liberty Blog
shipbuilder. All four were delivered before the end of 2021. Featuring a
capacity approximately one-third that of the vessels sought by WSF (450
passengers and crew and 47 vehicles versus 1,500 passengers and 144
vehicles), the ferries cost about $38 million each —less than a sixth of the
new WSF ferries' estimated price.
WSF and BC Ferries' contrasting experiences are largely (if not entirely)
due to the latter's ability to buy vessels from international shipbuilders.
When BC Ferries announced its desire to purchase four new hybrid electric
ferries, 18 shipyards from around the world indicated their interest (of
which 9 were selected to compete). Notably, not a single Canadian
shipyard bid on the project.
In contrast, WSF must contend with the 1920 Jones Act, which applies to
the domestic waterborne transportation of merchandise (e.g. vehicles),
and the Passenger Vessel Services Act of 1886, which restricts the
domestic waterborne transportation of people. Both laws require vessels to
be constructed in US shipyards that are far less numerous and far less
competitive than their international counterparts. Significantly higher prices
for WSF's new ferries are a foregone conclusion.
And the protectionist headaches don't stop there.
https://www.cato.org/blog/Jones-act-exacerbates-us-ferry-system-struggles 3/5
9/17/24, 12:21 PM Jones Act Exacerbates US Ferry System Struggles I Cato at Liberty Blog
After the vessels are delivered, WSF still faces the task of finding mariners
to crew them. That's unlikely to be easy, with a January report from
Washington's Department of Transportation pointing out that the ferry
system faces "severe staff shortages that are unprecedented in its 70-year
history." Maritime protectionism figures here too. While BC Ferries and
other international ferry systems can hire skilled foreign mariners to help
mitigate such crew shortages, the report points out that WSF is "precluded
from doing [so] by the 1920 Jones Act" (US -flagged vessels are restricted
in the employment of foreign nationals to green card holders).
Unfortunately, Jones Act -induced complications to US ferry systems go
beyond Washington.
Like WSF, the Alaska Marine Highway System (AMHS) also needs new
vessels, including a hybrid electric replacement for its 1964-built ferry
Tustumena. Described by the system's director as thirty years past its
prime, the ferry has a history of structural issues and saw its return to
service from an annual overhaul recently delayed by the discovery of
wasted steel. Just maintaining the vessel costs $2 million per year. As the
Anchorage Daily News has pointed out, however, finding the money and a
shipyard willing to build the new ferry is proving a challenge:
The replacement vessel is expected to cost around $350 million.
Sam Dapcevich, a marine highway spokesperson, said the state has
so far secured nearly $243 million, counting around $60 million in
expected federal formula funds. That leaves more than $107 million
needed to fund the project. The state is hoping most — if not all — of
the balance can be covered through a federal grant.
As of March, amid months of delays, the Tustumena replacement
vessel has yet to go out to bid. The design was changed to include
batteries, reflecting a federal requirement for reduced emissions. A
bid attempt in 2022 yielded no takers [emphasis and hyperlink
added]. Last summer, [AMHS Director Craig] Tornga said he wanted
to select a shipyard by the end of the year. In December, Tornga
said he wanted to put out a request for proposals in January. Delays
have piled on as Tornga held meetings with several shipyard officials
to ensure that unlike in 2022, shipyards would, in fact, bid on the
project.
On the East Coast, meanwhile, Massachusetts' Steamship Authority hasn't
even bothered constructing new purpose-built vessels to replace three of
https://www.cato.org/blog/Jones-act-exacerbates-us-ferry-system-struggles 4/5
9/17/24, 12:21 PM Jones Act Exacerbates US Ferry System Struggles I Cato at Liberty Blog
its aging (and deteriorating) ferries. Instead, it purchased three offshore
service vessels —all at least fifteen years of age —used to support Gulf of
Mexico offshore oil and gas operations and is converting them into ferries.
The project has already experienced hiccups, with the conversions' cost
increasing from a projected $9 million per vessel to $13.6 million.
Transporting over 131 million passengers in 2019, ferries form an important
part of the US transportation system. They are particularly vital for parts of
the country, including Alaska and the greater Puget Sound region, for
which land -based transport alternatives are either less direct and more
time-consuming or non-existent. For these communities, ferry service is a
lifeline and their difficulties demand an effective response from
policymakers. Taking aim at costly and ineffective maritime protectionism
that impedes US ferry systems' ability to obtain the vessels and mariners
they need would be an excellent start.
RELATED TAGS
Trade Policy, Project on Jones Act Reform
This work is licensed under a Creative Commons Attribution- NonCommercial-
ShareAlike 4.0 International License.
https://www.cato.org/blog/Jones-act-exacerbates-us-ferry-system-struggles 5/5