Loading...
HomeMy WebLinkAboutPacket Water Work Session May 14 2024Whatcom County Council Water Work Session COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 Bellingham, WA 98225-4038 (360) 778-5010 Meeting Agenda Tuesday, May 14, 2024 10:30 AM Civic Center Building Conference Room / Hybrid Meeting HYBRID MEETING - (PARTICIPATE IN -PERSON, SEE REMOTE JOIN INSTRUCTIONS AT www.whatcomcounty.us/joinvirtualcouncil, OR CALL 360.778.5010) COUNCILMEMBERS Barry Buchanan Tyler Byrd Todd Donovan Ben Elenbaas Kaylee Galloway Jon Scanlon Mark Stremler CLERK OF THE COUNCIL Dana Brown -Davis, C.M.C. Council Water Work Session Meeting Agenda May 14, 2024 Call To Order Roll Call Announcements Individuals who require special assistance to participate in the Council's meetings are asked to contact the Council Office at 360.778.5010 at least 96 hours in advance. This committee meeting is also noticed as a meeting of the Whatcom County Council, with the agenda limited to committee business. Meeting Materials AB2024-015 Meeting Materials for Water Work Session May 14, 2024 Water Issues Update Birch Bay Watershed and Aquatic Resources Management District Rate Study - Revenue Requirements and Rate Design Alternatives Lake Whatcom Management Program 2025-2029 Work Plan Development WRIA 1 Planning Unit update Other Business Adiournment Whatcom County Page 2 Printed on 4/23/2025 • Whatcom County COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 Bellingham, WA 98225-4038 (360)778-5010 • Agenda Bill Master Report File Number: AB2024-015 File ID: AB2024-015 Version: 1 Status: Received File Created: 12/12/2023 Entered by: KFelbing@co.whatcom.wa.us Department: Council Office File Type: Receipt of Document(s) Assigned to: Council Water Work Session Final Action: 05/14/2024 Agenda Date: 05/14/2024 Enactment #: Primary Contact Email: kfelbing@co.whatcom.wa.us TITLE FOR AGENDA ITEM: Meeting Materials for Water Work Session May 14, 2024 SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE: None HISTORY OF LEGISLATIVE FILE Date: Acting Body: Action: Sent To: 05/14/2024 Council Water Work Session RECEIVED Attachments: 5.14.2024 Agenda, BBWARM Rate Study Presentation on 5.14.2024, Lake Whatcom Management Program Presentation on 5.14.2024 Whatcom County Page 1 Printed on 4/23/2025 WHATCOM COUNTY PUBLIC WORKS DEPARTMENT ELIZABETH KOSA Director MEMORANDUM NATURAL RESOURCES 322 N. Commercial Street, Suite 110 Bellingham, WA 98225 Telephone: (360) 778-6230 FAX: (360) 778-6231 www. wh a tco m c o un tV. us TO: The Honorable Satpal Singh Sidhu, Whatcom County Executive, and Honorable Members of the Whatcom County Council THROUGH: Elizabeth Kosa, Director FROM: Gary S. Stoyka, Natural Resources Program Manager DATE: May 7, 2024 RE: May 14, 2024 Council Water Work Session Please refer to the proposed agenda below for the next Water Work Session. Additional supporting documents may be distributed at or before the meeting. AGENDA Date: Tuesday, May 14, 2024 Time: 10:30 a.m. to 12:30 p.m. Place: Hybrid Meeting: In Person: Civic Center Garden Level Conference Room (322 N. Commercial St., Street Level) Virtual: For instructions on how to watch or participate in this meeting, please visit us at www.whatcomcounty.us/joinvirtualcouncil or contact the Council Office at 360.778.5010. View meeting schedules, agendas, minutes, videos, and archives at www.whatcom.legistar.com. Time Topic Council Action Background Information Requested Attached 10:30 AM — Water Issues Update Informational None 10:45 AM 10:45 AM — Birch Bay Watershed and Aquatic Resources Informational Rate Study Policy Paper 11:30 AM Management District Rate Study - Revenue Requirements and Rate Design Alternatives 11:30 AM — Lake Whatcom Management Program 2025- Feedback 2020-2024 Lake Whatcom 12:15 PM 2029 Work Plan Development Management Program Work Plan 12:15 PM — WRIA 1 Planning Unit update Informational None 12:30 PM If you have questions, please feel free to call me at (360) 778-6218. cc: Dana Brown -Davis Kristi Felbinger Jill Nixon Jennifer Schneider Bennett Knox Erika Douglas John Thompson Paula Harris Kraig Olason Chris Elder Cathy Craver Doug Ranney Melissa Donnelly Roland Middleton Erin Page Josh Fleischmann Mark Personius Kayla Schott-Bresler Sue Sullivan Julie Anderson Brandy Reed -1 BBWARIP County Council: Birch Bay Watershed and Aquatic Water Work Session Resources Management district 1w,w, 4XV-0, - IV 1-11- T _ 'w_` A J ow FIL . • J, y 44Ir► !% — �_tar_ —ilk AV Al •:;> FGS GROUP Solutions -Oriented Consulting •;:� Agenda Revenue requirements Existing rate structure Alternative rate structure Next steps FCS GROUP Slide 2 •;�� Study Process & Next Steps 0 B13WARM Birch Bay Watershed and Aquatic Resources Management District January 17 Public Meeting Rate study process & policies April 17 Advisory Committee Meeting Revenue requirement scenarios May 8 Public Meeting Alternative rate structure WHATCOM COUNTY W A S H I N G T 0 N May 14 Council Water Work Session Revenue requirement & rate structure June 4 County Council Meeting Resolution introduced June 18 County Council Meeting Public hearing FCS GROUP Slide 3 r , r N� s i A 00, P. i�" M.• r. fin. �•ti . y . 10 wo CSGROUP 1 -,7 ;� . ., . 4lide'4 _ Y.At:�. � _ ! � _ � Yr _ ram.• 1 i......�-�'?1•w1 ��� .�: .. � � �.� �� • •;�� Rate Study Overview Policy Framework Utility rates are set to recover the annual cost of providing service. Revenue Requirement & Rates FCS GROUP Slide 5 •;�� Costs Increasing; Rates Have Not Changed Cumulative Adjustments 70% 60% — ► 62% 50% • • /o 40% • 30% 40 0% • • 0% 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 =mBBWARM Rates (Adopted 2008) • • CPI-U - Sea-Tac-Bell m ENR CCI - 20 City Average FCS GROUP Note: CCI = construction cost index; CPI = consumer price index Slide 6 •;�� Many Capital Projects on the Horizon 2023-33 CIP contains $17 million in capital, $1.5 million per year (2023 $, before estimated inflation) $2,500,000 CD$2,000,000 N N o $1,500,000 U ca a $110001000 U `o $5001000 Q With inflation, $20.1 million total and $1.8 million per year 2023 2024 2025 2026 2027 2028 2029 ■ Design & Permitting ■ Construction 2030 2031 2032 2033 FCS GROUP Slide 7 Source: BBWARM Fund Balance Projection from County Staff, some projects budgeted for 2023 will roll over into 2024. •::� Scenario 1: With Road Funds Capital Funding % Increase Grants Annual single-family rate (medium density) $3,500,000 10i. Rate increase amount year over year $3,000,000 $2,500,000 $2,0001000 $1,500,000 $1,000,000 $75 $500,000 0 2.5% 2.5% 0 2.5% 2.5 /o $196 $201 16.0% 2.5 /o $187 $191 $5 20.0% $178 $182 $5 $5 $5 $ $25 $4 27.0% totoM- 34.0% $128 $��•� $27 $101 to. 0.0% 26 $75 $00 � � . . $0 00 2023 2024 Operating & Maintenance 2025 2026 New Debt Service 2027 2028 2029 2030 2031 2032 2033 Rate Funded Capital —Revenue @ 2023 Rates — —Revenue with Increases FCS GROUP Slide 8 �♦� Scenario 2: No Road Funds %Increase �♦ Annual single-family rate (medium density) Capital Funding Rate increase amount year over year $3,500,000 , . . $3,0001000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 $75 $500,000 2.5% 2.5% 0 2.5% 2.5% 2.5% $236 $242 21.0 /o $219 $224 $230 $6 $6 $214 $5 $6 23.0% $37 $5�����- 'rants $177 ots 32.0% $33 0 *o � $144 00 00 45.0% $35 0.0% $109 00 00 $34 • � $75 $0 2023 2024 Operating & Maintenance 2025 2026 New Debt Service 2027 2028 2029 2030 2031 2032 2033 Rate Funded Capital —Revenue @ 2023 Rates — —Revenue with Increases FCS GROUP Slide 9 El N $250 co ry $200 co J) $150 6n $100 co Updated BBWARM Rates in Survey Group (2025) Annual Stormwater Fee $101 $109 $75 Q $50 SzA & o V o 10"a\o 5��� ��o�� ���� `\ ►� ����o o�� �\o�� ��Go�` �``��� r��\ cow\ �oa�o Sze �a P Jo��o o\\,�o, � 41 FCS GROUP Slide 10 Note: Rate survey performed in fall/winter 2023. How Will Costs be Recovered? Revenue requirement How big is the pie? Rate structure How to slice the pie? FCS GROUP Slide 11 Existing Rate Structure ►1 !� r� . si • - �Z4 ' �. •'�` Current BBWARM Rate Structure Single-family residences & agricultural parcels* charged for 1.0 equivalent service unit (ESU) All other developed properties charged for 1.0 ESU per 4,000 square feet of measured impervious area Undeveloped parcels not charged development) (medium development) $104.52 (high development) FCS GROUP *"Agricultural parcel" means a developed parcel participating in the Whatcom County agricultural open space program, with less than one acre of impervious area. Slide 13 Drawbacks of Current Rate Structure Drawbacks for Residential Customers Parcels with less impervious area can pay more than parcels with more impervious area Drawbacks for Non -Residential Customers Similar amounts of impervious area charged differently (for density fee) Different amounts of impervious area charged similarly (for density fee) Examples provided in appendix FCS GROUP Slide 14 •;�� Annual Rate Adjustments Under Current Structure Scenario 1: With Road Funds % Incr. 34.0% 27.0% 20.0% 16.0% 2.5% 2.5% 2.5% 2.5% 2.5% Low $60.24 $80.72 $102.52 $123.02 $142.70 $146.27 $149.93 $153.68 $157.52 $161.46 Medium $75.00 $100.50 $127.64 $153.16 $177.67 $182.11 $186.66 $191.33 $196.11 $201.01 High $104.52 $140.06 $177.87 $213.45 $247.60 $253.79 $260.13 $266.64 $273.30 $280.13 Scenario 2: Without Road Funds % Incr. 45.0% 32.0% 23.0% 21.0% 2.5% 2.5% 2.5% 2.5% 2.5% Low $60.24 $87.35 $115.30 $141.82 $171.60 $175.89 $180.29 $184.79 $189.41 $194.15 Medium $75.00 $108.75 $143.55 $176.57 $213.65 $218.99 $224.46 $230.07 $235.82 $241.72 High $104.52 $151.55 $200.05 $246.06 $297.74 $305.18 $312.81 $320.63 $328.65 $336.86 FCS GROUP Slide 15 •;:� Rate Structure &Adjustment Recommendations Eliminate density tiers (Low, Medium, High) Round ESUs to nearest tenth Continue to... Assign single-family customers 1.0 equivalent service unit (ESU) per developed parcel Charge others based on measured impervious area, where 1.0 ESU = 4,000 impervious square feet Keep current adjustments and credits Exception: consider eliminating 27% and 10% capacity and maintenance credit (results in very little actual savings, high admin burden, no one even qualifies for 27% credit) All current adjustments listed in appendix slides FCS GROUP Slide 16 .MOL �. ►:_ ti 00 ,. • r , 3 � ��• •'ram •,•��'.' � � •r • �� ap, i . 'mac �/ ..4A 0- r4Z �" .�. a ,i .:,,. :_ , . ,�" �• - fig_ ' • , l �' ' • ` ' • �, if f , ••- ► 1 All, • �+ � /t - � ► ♦ � � I _ � JI �. _� ■ 1 � � ��j � � L♦��r���\ /ram �� .ii. _ •;�� Recommended Rate Design Low (1-10% impervious) $ Medium (11-50% impervious) $$ High (>50% impervious) $$$ All Customers o6 FCS GROUP Slide 18 iJx PI. Sir `u Imp's,xm is 2025 en H°gan a. 21113 •;�� Capital Project Locations 23 Past 1 Future Projects 2012-2033* Outside UGA 7 30% Inside UGA 16 70% UGA = urban growth area FCS GROUP TIP schedule for 2027-2033 subject to change Ch"Iif IY[i Z-,,, , Ik FEMA R°pa1 r 2M4 [%¢ Chaml Tmracu ZA1 Rohm JPak SOomwalar YTpnYiLfM1CM.'74 29� EIFtlI Pt Oran°pa pr GP Sy°Lam R°par 21116 R°garY Slough i N..h Chlpn .d pla 4. lnpra.wnurai a-L-1 Ln] Rio Mr 6-k 20i9 r [ran°g° Irrpr4N PIL 7933 / Ra}Ftlgp�Eslau paFYgf lmpmwrrn¢ � %%� 7L77d2023 R°pW Snmbh—mr' Bah 8D-fYll Imqu4YCYa 2a41 �� A C9110—Idmonbmnu°tl Hubs l°W Fd6 AFJS /�/� M3 dBlrch"0,MN y � uanaga Irrp�r°,K,- to 8—h- Dr 6 F..P.k B.h Pant Rd.Skrmlralor 6 ttirllyl Lrpraxomonls M3 2014 28YF Blrch bay 6r. Patlwhn Faclty CUImbuWn 2� 451 oldrl Jqe A— 6 Su— Dr Si—arur Imp—& ZA2 Elk.h Ray ❑r. a PL Vhwmna Rd. 7919 ,am H.l -an Cw ShT -b r Imbmunwra M24 BBwARM Capital Improvement Projects L.9—d I�:crxrartt :il, ur: a 626 �.5 1 Lao Ln. Dr.hW STM G210 2N6 Slide 19 Map P—L-d: Customer ESU Locations Roughly 9,500 ESUs in service area Roughly 1/3 outside of UGA Roughly 2/3 inside of UGA Estimated ESUs in 2025 Inside UGA 69% Outside UGA 31% FCS GROUP Slide 20 •;�� Reasons for Uniform Rate per ESU Uniform Rate per ESU Consistent with Industry Norms Projects generally align with .11L Wide benefit from better water 69 � customer population density quality of the Bay (inside/outside UGA) Wide benefit from water quantity p Some water quantity issues management (transportation, � from outside UGA move into erosion control, emergency access) UGA via Terrell Creek FCS GROUP Slide 21 •;�� Annual Rate Adju • Scenario 1: With Road Funds stments Under Alternative Structure % Incr. 34.0% 27.0% 20.0% 16.0% 2.5% 2.5% 2.5% 2.5% 2.5% Per E S U $107.55 $136.59 $163.90 $190.13 $194.88 $199.75 $204.75 $209.87 $215.11 • Scenario 2: Without Road Funds % Incr. 45.0% 32.0% 23.0% 21.0% 2.5% 2.5% 2.5% 2.5% 2.5% Per ESU $116.38 $153.62 $188.95 $228.63 $234.35 $240.20 $246.21 $252.37 $258.67 FCS GROUP Slide 22 2025 •;�� Sample Bills Scenario 1: With Road Funds Systemwide ♦ Average: 34 /o Category ,i MME" 11YI, "E"Nomm % Change Single-family (1 low ESU) $60.24 $107.55 79% Single-family (1 medium ESU) $75.00 $107.55 43% Single-family (1 high ESU) $104.52 $107.55 3% Customer & Category % Change Regional Park (32 low ESUs) $1,927.68 $31441.60 79% Condos (14 low ESUs) $843.36 $11505.70 79% Golf Course (24 medium ESUs) $1,800.00 $21581.20 43% Medical 6 medium ESUs $450$645.30 43% Nearly same ( ) .00 impervious; Eating Place (6 high ESUs) 1 $627.12 1 $645.30 3% previously charged diff. Mini Storage (77 high ESUs) $8,048.04 $81281.35 3% L Gas Station (10 high ESUs) $1,045.20 $11075.50 3% FCS GROUP Reminder: Cumulative operating/capital cost inflation since 2009 = 50-62% Slide 23 2025 •;�� Sample Bills Scenario 2: No Road Funds Systemwide ♦ Average: 45 /o Category.,i�'j-1 WErIjjgMrW Change Single-family (1 low ESU) $60.24 $116.38 93% Single-family (1 medium ESU) $75.00 $116.38 55% Single-family (1 high ESU) $104.52 $116.38 11% Customer & Category % Change Regional Park (32 low ESUs) $1,927.68 $31724.16 93% Condos (14 low ESUs) $843.36 $11629.32 93% Golf Course (24 medium ESUs) $1,800.00 $21793.12 55% Medical 6 medium ESUs $450$698.28 55% Nearly same ( ) .00 impervious; Eating Place (6 high ESUs) 1 $627.12 1 $698.28 11% previously charged diff. Mini Storage (77 high ESUs) $8,048.04 $81961.26 11% L Gas Station (10 high ESUs) $1,045.20 $11163.80 11% FCS GROUP Reminder: Cumulative operating/capital cost inflation since 2009 = 50-62% Slide 24 •;�� Updated BBWARM Rates in Survey Group (2025) cn $300 $250 $200 M d) $150 $100 $75 Q $50 $- Annual Stormwater Fee $108 $116 o���� a\��\ \a��o tea\ 5o�a oat ��1 oaf s��� o \5 P\\� ���� �G° o��` � �c' off' G° ce� ���'� �a�` ��5'�0 0�� \'` ago°� o`l.�5a� ate\ o�� �a�° oOa P oram � � .fir Q �a� �r �a�` �ago 5 J J .�� \rf \rf FCS GROUP Slide 25 Note: Rate survey performed in fall/winter 2023. ►-!m 1 r r • 1 4C ♦ 7 I • ,� f G OUP i ' �.� ode 26 ��IY.At'! _ 0 - ! _ Y\ r _ 1 tom.• 1 j......�-•?1•w1~'•• .': ., . �,-;A�•'� • (., •;:� Summary Revenue requirement: How big is the pie? Annual Increase in Revenue Needs 32% 23016 21% 34% 27% 20% 16% 2025 KIN 2027 KIM: - - Scenario 1: With Road Funds —Scenario 2: No Road Funds Rate structure: How to slice the pie? » Current density -based rate structure perpetuates issues » Alternative rate structure recommended: uniform rate per ESU Eliminate density designations FCS GROUP Slide 27 •;�� Study Process & Next Steps 0 B13WARM Birch Bay Watershed and Aquatic Resources Management District January 17 Public Meeting Rate study process & policies April 17 Advisory Committee Meeting Revenue requirement scenarios May 8 Public Meeting Alternative rate structure WHATCOM COUNTY W A S H I N G T 0 N May 14 Council Water Work Session Revenue requirement & rate structure June 4 County Council Meeting Resolution introduced June 18 County Council Meeting Public hearing FCS GROUP Slide 28 John Ghilarducci President 1 Principal (425) 867-1937 johng@fcsgroup.com Thank you! Questions? www.fcsgroup.com Tage Aaker Senior Project Manager (425) 615-6487 tagea@fcsgroup.com a: I S ► IL •:;> FGS GROUP Solutions -Oriented Consulting Grace Glahn Senior Analyst (425) 615-6236 graceg@fcsgroup.com Appendix FCS GROUP Slide 30 •;�� Fiscal Policies Examples Operating Reserve Capital Reserve Debt Service Coverage Cushion to accommodate cash flow fluctuations To meet emergency repairs, unanticipated capital, and project cost overruns Compliance with existing debt covenants and maintain credit worthiness for future debt Policy Targets 90 days of operating expenses (25%) Consistent with 2007 Study $300,000 Consistent with 2007 Study (roughly $200,000 plus inflation) If borrowing, minimum target: 1.25x annual debt service FCS GROUP Slide 31 •;:� Drawbacks for Single -Family Assumed impervious area used, actual density % may vary Parcels with less impervious area can pay more than parcels with more impervious area (see below) A. Medium 1.00 25% 30,000 7,500 4,000 13% (Med.) $2.46 B. High 1.00 55% 7,500 4,125 4,000 53% (High) $4.92 B — A (% change) Actual Percent Impervious = Actual Impervious Area (ft.) - Lot Size (ft.) Assumed Density = Assumed Impervious Area - Lot Size (ft.) FCS GROUP Slide 32 Drawbacks for.NonmSinglemFamily Similar Amounts of Impervious Area Charged Differently (for Density Fee) A. High 32,234 23,114 B. Medium 53,579 23,912 B=A (% change) 3% 72% (High) 6.0 $4.92 $29.52 45% (Med.) 6.0 $2.46 $14.76 * ESUs in BBWARM are rounded to nearest whole number. '50% FCS GROUP Slide 33 Drawbacks for.NonmSinglemFamily Different Amounts of Impervious Area Charged Similarly (for Density Fee) A. High 147375 8,146 B. Medium 40,511 16,842 B —A 107% (% change) 57% (High) 2.0 $4.92 $9.84 42% (Med.) 4.0 $2.46 $9.84 * ESUs in BBWARM are rounded to nearest whole number. (:D FCS GROUP Slide 34 Current BBWARM Exemptions & Adjustments Single-family: Low-income senior / disabled person Exempt Single-family: Less than 2,000 impervious square feet Contiguous lots Parcels with privately owned stormwater facilities (with excess capacity) Permissive rainwater harvesting system OR privately owned stormwater facilities (1992 standard) 0.5 ESU (instead of 1.0) Contiguous lots charged as one lot for rate calculation 27% discount 10% discount FCS GROUP Slide 35 Current BBWARM Exemptions & Adjustments (contd.) Undeveloped parcels Exempt State / County roads Agricultural parcels in open space program w/ <1 acre of impervious area Property owned by Birch Bay Water and Sewer District Exempt Charged for 1 ESU (like single family) Exempt per interlocal agreement (ILA) FCS GROUP Slide 36 OF BE<</4' � cy � y u 3 gSHING�O Lake Whatcom Management Program Five -Year Work Plan Preparation for 2025-2029 Lake Whatcom Work Plan "Co ' co �gSNI NG C0 May 14, 2024 2025-2029 Work Plan Development Timeline Spring 2024 Work Planning Direct Staff- May Leadership Council Input discussions 0 0 * April Joint Policy Group Initial Draft Outline Policymaker Input Questions/Directions Summer 2024 Draft for Public Comment Public Input + WRAB June Joint Policy Group 0 0 September Joint Policy Group Final Draft Summary of Public Input Winter 2024 Council(s) and Commission Adoption Final Publication 0 Lake Whatcorn Management Program: Ten Program Areas 1. Land Preservation 2. Stormwater 3. Land Use 4. Monitoring & Data 6. Recreation 7. Aquatic Invasive Species 8. Utilities & Transportation 9. Education & Engagement 5. Hazardous Materials 10. Administration +11. Climate Action +12. Forest Management EXAMPLE #Number. Program Area — Current Planning Outline Existing actions or programs in 2020-2024 Work Plan that staff propose to continue in 2025-2029 period (Ref. to Work Plan) New and Improved Action s New Work Plan items introduced by Staff or Policy Group Members for consideration to be included in 2025-2029 Work Plan #1. Land Preservation — Current Planning Outline • Pursue purchases of additional land through Property Acquisition Program (Obj. 1.1)(City) • Manage and restore purchased land by planting and invasive species removal (Obj. 1.2) (City) • Forest health assessments (Obj. 1.2) (City) • Wildfire preparedness — Public properties and adjacent lands (Obj. 1.2) (City) ImprovedENeew and • Lake Whatcom Forest Management Plan (City and County) • Wildfire preparedness expansion — Private forest and residential properties (City and County) • Reassign items to new Program Area for Forest Management (City and County) #2. Stormwater — Current Planning Outline • Capital facility construction and retrofit projects (Obj. 2.1) (City and County) • Residential assistance programs (Obj. 2.2) (City = HIP, County = NNLP) • System -wide Operations and Maintenance (O+M) (Obj. 2.3) (City and County) rLNew or Enhanced Activities • PBOOM Enhanced Maintenance Plan (EMP) for capital facilities (City) • PBOOM Standard Operating Procedures (SOPs) for public areas (City) • Next generation of HIP (City) • Develop and monitor advanced stormwater treatment technologies (Whatcom County w/King County and Department of Ecology) #3. Land Use — Current Planning Outline • Enforcement and application of land use regulations and mitigation requirements for single family lot development/ redevelopment (Obj. 3.1) (City and County) • Regulations for development/ redevelopment of multi -family properties (Obj. 3.1) (City) • Review and comment on private forest applications (Obj. 3.2) (City and County) LlNew or Enhanced Activities • Lake Whatcom Forest Management Plan (City and County) • Reassign items to New Program Area for Forest Management (City and County) #4. Monitoring and Data — Current Planning Outline • Lake Whatcom monitoring (Obj. 4.1) (City, County, LWWSD) • Tributary monitoring (Obj. 4.2) (County and LWWSD) • Stormwater monitoring (Obj. 4.3) including BMP Effectiveness (City and County) ENe:w or Enhanced Activities • Lake Whatcom Climate Vulnerability Assessment (NEW) (City and County) • TMDL Reassessment update (County) • New studies to understand long term Lake health (ex: internal loading, Nitrogen balance, groundwater, urbanized runoff) (City, County, LWWSD) • PBOOM BMP Effectiveness Monitoring (City) #5. Hazardous Materials — Current Planning Outline New or Enhanced Activities • Collect and dispose of hazardous materials and fertilizers through Disposal of Toxics Facility (Obj. 5.1) (County) • Maintain list of low-P materials for use in gardens and landscapes (Obj. 5.1) (City) • Respond to spills and track responses (Obj. 5.2) (City and County) #6. Recreation — Current Planning Outline • Stormwater treatment at recreation facilities (Obj. 6.1) (City and County) • Manage increasing demand for access to recreational lands while balancing water quality impacts (Obj. 6.1-6.3) (City and County) • Participate in regional land management partnerships to engage user groups (Obj. 6.4) (City and County) New or Enhanced Activities • Expansion of restrooms at high -use locations (County) #7. Aquatic Invasive Species — Current Planning Outline • Run Whatcom Boat Inspections (Obj. 7.1)* • Implement AIS monitoring (Obj. 7.2)* • Participate in regional AIS partnerships to maintain situational awareness in the field (Obj. 7.3)* • Continue to address known and suspected AIS populations in local waterways (Obj. 7.3)* *AIS Program Operated by City: Funded by City 60%, County 30%, LWWSD 10% ENe:w or Enhanced Activities • Lake Whatcom Rapid Response Plan (City) • Additional early detection and monitoring efforts to fill in State data gaps (City, County, LWWSD) #8 Utilities and Transportation — Current Planning Outline Manage infrastructure to protect water quality and provide public services (Obj. 8.1-8.3) (City, County, LWWSD) ENew or Enhanced Activities • Water System Plan update - includes improvements and upgrades across the system (City) • Updated Water Conservation Program (City) and consider policies that increase water conservation (City, County, LWWSD) • Direct install program for low -flow toilets for low-income residents (City) • Bikeway projects for multi -modal transportation options Northshore / Lakeside / Euclid Ave. (City — DRAFT Plan) #9. Education and Engagement — Current Planning Outline • New Homeowner packets, Newsletter,. and other materials regularly distributed (Obj. 9.1) (City and County) • Measure watershed residents' understanding of watershed issues through five-year repeat survey (Obj. 9.1) (City and County) • Continued support for homeowner - focused programs and behavior change efforts (Obj. 9.2) (City and County) ENe:w or Enhanced Activities • Increase awareness about wildfire preparedness and risk reduction (City and County) #10. Administration — Current Planning Outline • Coordinate efforts and budget among three jurisdictions (Obj. 10.1, 10.2, 10.4) (City, County, LWWSD) • Organize and publish annual reports (Obj. 10.3) (City, County, LWWSD) • Ensure that programs meet regulatory requirements (Obj. 10.5) (City and County) Work Plan Overall —Your Input 1. Land Preservation -Conduct evaluation to determine how County Conservation Futures Funds (or similar) can be utilized to accelerate land acquisitions -Revisit program to purchase undeveloped lots in Sudden Valley -Focus outreach efforts on increasing the number of willing sellers 2. Stormwater - No additional input 3. Land Use -Normalize P-reduction/land preservation metrics across jurisdictions -Convene work session with City and County electeds to explore "phosphorus -neutral" development regulations in City and how those could be applied in Whatcom County areas -Regulate and license short-term vacation rentals in the watershed in such a way as to ensure the protection of water quality 4. Monitoring and Data -Complete On -Site Sewage (OSS) assessment previously initiated. Submit results to Health Department for determination on impact to environmental health from both performing and underperforming OSS. -Review earlier work by consultant that identified OSS as source of phosphorus -Conduct detailed assessment of performance of all BMPs watershed -wide in addition to PBOOM assessment. 5. Hazardous Materials -Evaluate impacts of firefighting chemicals (flame retardants dropped on forest fires) on water quality. Work Plan Overall —Your Input 6. Recreation -Evaluate partnerships with tourism groups to collaborate on outreach for water quality best practices in recreation areas -Develop a standard of trail maintenance BMPs that is most protective of water quality for public and private trail building and maintenance -Determine if/how electric bikes may increase risk of erosion of trails and/or fire threat in recreation lands 7. Aquatic Invasive Species -Include provision forAIS inspection and compliance at short-term rentals as part of regulation of these uses -Conduct additional monitoring at WDFW and Sudden Valley boat launches to characterize risk of launches outside of inspections, off- season, and off -hours. Consider seasonal ramp closures based on the risk level identified. 8. Transportation and Utilities -Engage with Whatcom Transportation Authority or other public transit entities to explore a "Bus to Trailheads" option to reduce vehicle trips into the watershed and reduce parking pressure at recreation sites -Engage with Whatcom Council of Governments for an assessment of multi -modal transit options for watershed areas, to determine additional opportunities for transportation projects 9. Education and Engagement -Develop emergency outreach plan to reach residents in the event of a wildfire 10. Administration -Increase number of policymaker-to-policymaker meetings to encourage collaboration. Support technical policy questions/code development. 11. Climate Action - Support for new program area. No additional input