Loading...
HomeMy WebLinkAboutres2024-040Whatcom County COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 Bellingham, WA 98225-4038 (360) 778-5010 Agenda Bill Master Report File Number: AB2024-579 File ID: AB2024-579 Version: 1 Status: Approved File Created: 08/29/2024 Entered by: LCumming@co.whatcom.wa.us Department: Public Works File Type: Resolution Requiring a Public Hearing Department Assigned to: Council Agenda Date: 09/24/2024 Related Files: Primary Contact Email: sdraper@co.whatcom.wa.us TITLE FOR AGENDA ITEM: Final Action: 09/24/2024 Enactment #: RES 2024-040 Resolution approving the 2025-2030 Six -year Transportation Improvement Program (STIP) SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE: The resolution includes the 2025-2030 Six -year Transportation Improvement Program (STIP) Exhibit A, and capital elements of the first 7 years of the Fourteen -year Ferry Capital Porgram, which is attached hereto to Exhibit B HISTORY OF LEGISLATIVE FILE Date: Acting Body: Action: Sent To: 09/10/2024 Council INTRODUCED FOR PUBLIC Council HEARING Aye: 7 Buchanan, Byrd, Donovan, Elenbaas, Galloway, Scanlon, and Stremler Nay: 0 09/24/2024 Council DISCUSSED AND MOTION(S) APPROVED 09/24/2024 Council APPROVED Aye: 7 Buchanan, Byrd, Donovan, Elenbaas, Galloway, Scanlon, and Stremler Nay: 0 Whatcom County Page 1 Printed on 101212024 Agenda Bill Master Report Continued (AB2024-579) Attachments: Memo, Resolution, Attachment A - Changes, Attachment B - Capital Project List, Attachment C - Cash Flow, Attachment D - Rating Program, Attachment E - Bridge Report, Attachment F - Narratives Whatcom County Page 2 Printed on 101212024 PROPOSED BY: INTRODUCED: 9i1 n /2024 RESOLUTION NO. 2024-040 SIX -YEAR TRANSPORTATION IMPROVEMENT PROGRAM FOR THE YEARS 2025 THROUGH 2O30 WHEREAS, pursuant to RCW 36.81.121, Whatcom County is required to prepare and approve a Six -Year Transportation Improvement Program each year; and WHEREAS, pursuant to RCW 36.54.015, Whatcom County is required to prepare a Fourteen -Year Ferry Capital Program each year; and WHEREAS, the Road Priority Array and the Annual Bridge Report were made available to the legislative authority during the preparation of this program; and WHEREAS, following approval of the Six -Year Transportation Improvement Program, the law requires an annual review of the work accomplished under the program and a determination of current transportation needs; and WHEREAS, based upon the findings of the annual review, and after a public hearing, a Six -Year Transportation Improvement Program shall be approved; and WHEREAS, pursuant to RCW 36.81.121, the Six -Year Transportation Improvement Program and Fourteen -Year Ferry Capital Program must be consistent with the County comprehensive plan pursuant to RCW 36.70A; and WHEREAS, the Six -Year Transportation Improvement Program attached hereto as Exhibit "A" has been reviewed and determined to be consistent with the County's comprehensive plan; and WHEREAS, the Fourteen -Year Ferry Capital Program attached hereto as Exhibit "B" has been reviewed and determined to be consistent with the County's comprehensive plan; Page 1 NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Council as follows: 1. That the Whatcom County Six -Year Transportation Improvement Program for the years 2025 through 2030, which is attached hereto as Exhibit "A", including the capital elements of the first six -years of the Fourteen -Year Ferry Capital Program, which is attached hereto as Exhibit "B", is hereby approved. 2. That the County Engineer is directed to file a copy of the same with the County Road Administration Board and the State Secretary of Transportation. ���`�tis+.1YiBBtlf/1111I APPR99\ I�- th of September, 2024. �' GO WHATCOM COUNTY COUNCIL ATTEST.::;a ro C�.. COM COU , WA INGTON Cathy Halka,'Cterk of the Council Barr u ana air of the Council APPROVED AS TO FORM: Approved by Chris Quinn/9.12.2024/LB Christopher Quinn, Chief Civil Deputy Prosecuting Attorney Page 2 MEMOMMEMEMEM. a 1 oil ME WIN soon . . . . . ................. ................. .............. .............. !I i!I II lIII o � ,MEMEMEMEME �� idlllll 11i� �!i! III .I ail e � i ��r mmn MOMMEMEMEMEMEMIN ��Ivl � �■■� 1 I i■1111 li ������ II I IIII � I I��� i III i ON �i I t° L IEEE =ME IIII I' lil Ili IIII i �� u u r� � EXHIBIT "B" Photo by Dan Ohms WHATCOM COUNTY 2025-2038 F FERRY CAM Overview The Fourteen -Year Ferry Capital Improvement Plan (the "Plan") is a general guide for the effective, efficient, and continuing operation of the Whatcom County ferry system. The Plan was prepared with the assistance and advice of the County Engineer and supports the Public Works Ferry and Engineering Divisions in long-range capital project planning for the replacement and improvement of the Whatcom County ferry transportation system. Whatcom County has evaluated major elements of its ferry system, providing specific data on its estimated current value, replacement costs, and amortization periods. The county identifies future capital needs and investments and reviews this report annually to adapt to changing fiscal and operational conditions and circumstances. Strict adherence is not expected. The Whatcom County Council has the authority to determine, prioritize, and authorize expenditures on capital improvement projects. They collaborate with the Public Works Department and the County Engineer to incorporate their recommendations. The capital projects listed in the Plan are the result of determinations from the Public Works Engineering division, Maintenance division, the County Council's ferry advisory committee, regulators, governmental agencies, residents, and citizen groups. In order to comply with state and federal rules and laws and maintain eligibility for grant funding, capital improvement projects must be listed and updated annually in the county's Six -Year Transportation Improvement Plan and on a Fourteen -Year Ferry Capital Facilities Plan. GOVERNING LAWS AND CODES The Revis d Cod of Washingt n("RCW") an t a ngton A m r v o (" A ") c I w a t yp r tot F u -Y F y aptallm m P an t SxY a T an po tat on I p o nt P og a ("TIP"), a follow : 1. (RCW) 36.54.015 Ferries —Fourteen -year long a g imp v m t pla —C S. The legislativ authori y of v ry c un op ng f rr s s all pr par , w ad c a d ass s a of o y r, a fo r -y ar to ra ap al m m pla mb all m jor elements of the f rry syst . Such P n s a i s ud a isti g of a ajor t of t syst s, ow g its sti at d rr t v , its sti at d r p ost, a d its a ortiz p riod. 2. RCW 36.811 1 Perpetual adv nced six-y r plans fo coo dinat d t anspo tation p og m, xp nditu s—Nonmotorized transportation—Railroa righ -of-w y. (1) A a y ti b adoptio of t b d t, t is ativ a t ority of a o ty, aft r o or or p b i ari s t r o, s a pr par a d adopt a o pr siv tra sportatio pro ra for t s i six a dar y ars. I t o ty as adopt d a o pr siv p a p rs a t to apt r 35 63 or 36 70 RCW t i r t a t ority of a art r o ty d riv d fro its art r, or apt r 36.70A RCW t pro ra s a b o sist t wit t is o pr siv P a. T pro ra s a i d propos d road a d brid o str do work a d of r tra sportatio fa i iti s a d pro ra s d d appropriat , a d for t os o ti s op rati f rri s s a a so i d a s parat s do s owi propos d apita x for f rri s, do k a d r at d fa i iti s. T pro ra s a i d a y w or a d bi y or p d stria fa i iti s id tifi d p rs a t to RC -2- 36.70 07 ( ) or of r app i ab a s t at pro of o otoriz d tra sit. opi s oft pro ra s a b fi d wit t o ty road ad i istratio board a d wit t stat s r tary of tra sportatio of or t a t irty days aft r its adoptio by t is ativ a t ority. T p rpos of t is s do is to ass r t at a o ty s a p rp t a y av avai ab adva d p a s ooki to t f t r for of ss t a six y ars as a id i arryi o t a oordi at d tra sportatio pro ra . T pro ra ay at a y ti b r vis d by a ajority of t is ativ a t ority b to y aft rap b i ari t r o (2) E six-y ar tra sportatio pro ra forward d tot s r tary i o pia wit s bs do (1 oft is s do s a o tai i for atio as to ow a o ty wi xt d its o ys, i di f ds ad avai ab p rs a t to apt r 47 R , for o otoriz d tra sportatio p rpos s. (3 Ea six-y ar tra sportatio pro ra forward d to t s r tary i o pia wit s bs do (1 oft is s do s a o tai i for atio as to ow a o ty s a a t to pr s ry rai road ri t-of-way i t v t t rai road as s to op rat i t o ty' j risdi do . (4 T six-y ar P a for a o ty s a sp ifi a y s t fort t os proj is a d pro ra s of r io a si ifi a for i sio i t tra sportatio i prov t pro ra wit i t at r io . 3 RCW 47 56 725 C u f rri s—D c rim impro m nt f n s (4 T o ty road ad i istratio board ay va at r q by Pi r , S a kiak , a d at o o ti s for o ty f rry apita i prov t f ds. T boards a va at t r q sts a d, if approv d by a ajority of t board, s b it t r q sts to t is at r for f di o f of t a o is avai ab d r R 46.68 9 2 y o ty aki a r q st d r t is s bs do s a first s k f di t ro t p b i works tr st f d, or a y of r avai ab r v so r, w r appropriat . 4 WA 13-400-040 S x- ar transportation program an f rr s st m fo rt n- ar plans b (1 Ea o ty's six-y ar tra sportatio pro ra a d f rry syst fo rt -y ar o ra apita i prov t p a s a b pr par d a d adopt d i a orda wit R 36.81.1 1 a d 36.54. 15, r sp tiv y, a do opy s a b forward d to t o ty road ad i istratio board o at r t a D 31 of a y ar. ( y propos d o ty f rry apita i prov t proj t st b i d d i bot t o ty's six- y ar tra sportatio pro ra a d f rry syst fo rt -y ar apita i prov t p a a d st r ai o bot d ri a oft p as soft proj t i . di : (a t t ti a o ty r q sts a s for proj ts; (b t t ti t o ty s b its a proj t f di app i atio ;a d ( U t proj t is o p t d or t proj t is of rwis t r i at d. (3 T o ty f rry apita i prov t proj t ost sti at s t at ar i d di t o ty's six- y ar tra sportatio pro ra s a d f rry syst fo rt -y ar p a s s a b o sid r d pr i i ary a d ar of bi di o a t a o ty f rry apita i prov t proj t app i atio s. -3- CAPITAL PLAN ELEMENTS Table 1: Ferry Syst m Curr nt and R pl c m V u s: This table meets h a r quir m n , by nclud g h c rr n v , r p co and a or z p rod f b y and fac . Th c rr n va of h M/V W C is the insured valu , th clo approx m n f t w T faci iti ' c t va i b k va ig c t d p ciati p d p ciat d imp v m t Table 2: Project d R v nu s: L y t th k w a ticipat d p ati g a d capita p j f di g c f th 14-Y P Tabl 3 Proj ct d Exp n i u s Thi tab i s d a th xp dit f th y t m that m t S (2) q O expenditures ar delin at b w b y ss I d o- ve a co . U.S C Gu eg c e y eq he f bed y-d ck eve y w ye ; h weve , ex e d he fe, mp e b y, d ec c ve me W C y ched e d y-d ck g - f- e v ce m e ce e d eve y ye f ve e T e m c e e ec ed eg y, eq ed by he N B I S d d dm a ed h gh he W h g S e D f T The ec a he de fy d ched e m j m e ce d e ceme f he e f c e S!e Table 1 IFERRY SYSTEM CURR NT AND PLAC M V LU S - 2024 M/V Whatcom rnrrant rta is irc rhivf LENGTH f 94 BEAM f 44 DISPLA M NT ons 78 Y R BUI 1962 C P C Y -- Pa e g r 100 C P C Y -- Ca 20 CURR UR DV -2024 $8 ESTIMATED CURRENT VALU -2024 Renlarpm nt S a is ira fnr 34 rar alar rir h YEAR 202 LENGTH f 18 BEAM f 5 DISPLACEMENT o s 100 CAPACITY -- Passe gers 150 CAPACITY -- Cars 3 ESTI MATED REPLACEMENT VALUE(') $3 700000 Lumm Isla d Ter i al Tra sfer Sp a d Dock Dolph /W w kw U la d Facili ies Subtotal - ummi Island erminal Izl Gooseberry Poi Ter i al Tra sfer Spa a d Doc Dol hi s Wi gwalll3 U la d Facili ies Subtotal - Gooseberry Point erminal I2I Design ethnical a d Ma a eme t Support Re ul or O F C V UE TOTAL VESSEL & FACI I IES V U $840,000 SCHEDULED REPLACEMENT ESTI MATED YEARBUILTOR AMORTIZ / F CURRENT BOOK REPLACEMENT REBUILT PERIOD END YEAR VALUE (4) COSTIzI 2013.201 2053 205 202 6 200 II $ 00 I S 672 511 56 1 C t b ed 7/ 3/ 4 ep t t C ty C I Fe y Repl eme t d Sy tem M z C t. Ex e I ted t the ye they e ed. IZI P 2018 LOS Alte t ve A ly b KPFF C (C t h ve bee e I ted 3% pe ye d ep e e t 2024 epl eme t t f the f 11 t t e, t et f t f ew b t.) (3) R eq el t . A ph ed pp h t el t w I de m d f t t ex f I t e p t mplet f the ew f I ty. (4) Reported from 2023 yea end using a 20-y ar lif for mp ov m is d t gh -1 a dep ec ( c u dep a ted mp veme t ) �7E Table 2 L Is F y 14-Y Cap P A $ in R 5- 31 Category 2025 2026 2027 2028 2029 2030 2031 Fares no growth in ride ship included $ 1,662 $ 1,745 $ 1,332 $ 1,924 $ 2,020 $ 2,121 $ 2,227 CPI Suppi m nt to fa s a b v p vi us y r t s 83 87 92 96 101 106 111 M m 55% of Ad' us T I Op i ng Ex ns s l 1,745 1,832 1,424 ,0 0 7 338 MVFT Sub y&F rr D f c R 36 36 37 38 395 407 419 C un Ro F 0 r t gSubsidy 1,962 2,058 2,154 2,254 2,360 2,34 2,4 3 Other Misc Fund ng 1 17 18 19 19 2 Ferry R pIac m ntF 15 15 15 15 15 15 15 CRAB Cap al Ferry F 9 5 5 5 5 5 5 5 Fe era a e G - - 5, 2 , S a e Mov Ahea W o f 1,237 1,237 1,237 Fe era Ferry B a P m F 9 825 8 9 9 3 T eve e 79 7, 2 11,7 3 25,3 1 5,545 5, 49 5,89 T al Ex 5,78 17, 11 5 ,74 1 , 93 5,453 1 Net Funded Unfu d d C rr t F i g Sources 3 117 1,234 5,848 25 86 30 9 196 725 Cum lative N t F nd d Unf d d- C rr F i g So rc s 117 1 51 97 29 882 0 1 02 5 0 961 Bond/ Other fundi source 4 30,000 Fa increases need d to m t55%Ad'us To al Op. r g Exp 321 419 444 47 500 530 56 N Fu U f n e hy h c I b i e 438 6 24,59 27,258 2,392 7 2,507 Cumulative Net Fund d Unfu ded 5 438 2,091 26,687 570 12,962 14, 9 1 ,08 L mmi I an F y 14-Y a Capita P g am A$ in R n 3- 3 Cat gory 2 3 33 34 3 36 3 38 F e n g w h in i e i in e $ 2,339 $ 2,45 $ 2,578 $ 2,707 $ 2,843 $ 2,985 $ 3, 34 CPI S m f e b y evi ye e 7 23 29 35 42 49 57 M 55% f A i T O C 2,45 2,579 2,707 2,842 2,985 3, 34 3,29 MV S b i y&Fe yD R 444 458 472 48 500 5 5 C n y R F n O e ing S b i y 2,58 2,7 5 2,85 2,994 3, 44 3,32 3,492 O e MI F n ing 2 23 24 25 2 27 29 Fe y Re e en F n 50 50 50 50 50 50 50 CRAB C i Fe yF n ing 500 500 500 500 500 500 500 T Reven e 45 4 90 983 7,29 7, 37 7,977 T Ex 2 9,0 2 3 3 28 9 0 7,308 7, 73 8,057 NtFn Unfn Crr Fning Sores3 1 917 9 61 3 17 36 C m 1 v N t F n Unf n -C nt F n ing So c s 53 779 53 71 53 695 53 71 53 74 53 F ein e e nee e ee 55%A ' e T O e in E en e 595 30 7 70 747 790 83 Ne F n e Unf n e n e y e i b n i e 4, 5 5 5 4 3 589 587 C m ati N t F n Unfn 31 751 33 366 34 9 1 36 595 3 39 797 41 3 4 N e: F a even e i e n en i e i (n g w e i ne) n en e wi CPI in e ee ye .1 e n e e en o f a even e eq ee e 55% eq i e by W 0.34 N e2:A S wnOnT be3,in ing i e en i e. N e 3: Ne Fe y g f n ing ing en even e e N e4:13 f $30 4.5%wi 20ye yb k A n i b e n v o f e b N e5:T i n e e en a i i o f e' nee a ieve e55%f eb g o f in WCC 0.34. N e: T i i e i ve fe y g n of of n e f e y e i b n w i e ve i M Table 3 Lummi Island Ferry 14-Year Capital Program All in 00O's Table 2 Expenditures 2025-2031 Page 1 Cat g y 5 6 7 9 3 31 O Ex v Op ati n P 794 884 978 2,077 2, 8 2,290 F e & 0 e in S ie 57 290 357 43 5 3 00 95 In n e 79 8 90 95 99 04 0 O e 0 e in E en e 207 2 7 228 238 248 259 2 9 T Ve e 0 e i n 3, 02 3,387 3,559 3,742 3,937 4, 44 4,3 4 Oth Op ati n A ini i n 572 0 29 58 8 7 5 744 P kin L L i 1 n 2 3 3 4 4 5 G P. 8 8 9 9 0 0 0 S ging A e L it n 27 28 30 3 32 34 35 G ebe yP. 9 9 0 0 2 D k L it n 34 3 37 39 4 43 44 G ebe y P. 385 404 424 443 4 2 48 50 T Op ating Ex 4 149 44 6 4 711 4 946 5 193 5 453 57 6 Capita E p n it Re e en f W C ief F 730 450 500 27,500 500 - - Te in M ifi i n F 750 300 5500 500 3,000 U n I ve en F 350 50 550 ,800 400 E e ifi i n F) 550 350 350 890 Re i n f G ebe y Te in F2 50 50 Te in H Sy e Re e en F3 00 T to Capita P g am C t 53 13 1 9 45 1 9 9 T to C t 6 679 57 6 17 611 5 746 16 93 5 453 6 616 H e i Deb Se vi e 2,343 2,343 2,343 2,343 H h T to C t w D b S i 6 679 5 7 6 17 611 53 9 1 436 7 796 959 N e: Deb Se vi e w o f 2028 n bey n g i n ye been e e i ne w f n i ng a ni wi be e. T i e y en i b e n $30 b n 4.5%f 20 ye -7- Table 3 (continued) Lummi Island Ferry 14-Year Capital Program A in Tab E p n it 3 3 Pag Cat g y 3 33 34 35 36 37 3 Op ating E p n v Op ati n Pe nne 2,404 2,524 2, 50 2,783 2,922 3,0 8 3,222 F e & 0 e in S ie 80 ,9 2,034 2, 2,30 2,453 2, In n e 5 2 27 33 40 47 54 0 e 0 e in E en e 279 290 300 3 32 33 342 T Ve e 0 e i n 4,599 4,84 5, 5,388 5, 84 5,999 329 Ot Op ati n A ini i n 772 80 829 858 887 9 5 944 P king L L it n 7 7 8 9 9 20 G ebe y P. 2 2 2 3 3 S ging A e L it n 3 38 39 4 42 43 45 G ebe y P. 2 3 3 4 4 4 5 D k L it n 4 48 49 5 53 54 5 G ebe y P. 520 539 558 578 597 35 T to Op ating E p n 6 1 6 313 66 696 73 7 673 57 Capita E p n it Re e en f W C ief F - - Te in M ifi i n F U n I ve en F E e ifi i n F) 3,050 Re i n fG ebe y Te in F2 Te in Hy i Sy e Re e en F3 - T to Capita P garnC t 13 5 T to C t 19 6 6313 66 696 73 7673 57 Hy e i Deb Se vi e 2,343 2,343 2,343 2,343 2,343 2,343 2,343 Hyp t ti a T to C twit D b 5 i 14 5 656 971 93 3 9 651 1 16 1 4 N e: Deb Se vi e w o f 2028 n bey n g i n ye been e e i ne w f n i ng a ni wi be e. T i e y en i b e n $30 b n 4.5%f 20 ye -8- Lummi Island Ferry System Modernization & Preservation Project (F1) CRP # 919008 (Project Based Budget 399100) Construction Funding Years : 2027, 2028 and 2029 Project Narrative: This project includes replacement of the Whatcom Chief with a 34 car vessel, modifications of the existing ferry terminals to accommodate the new vessel, upland improvements and electrification work. This work will be accomplished as outlined in the Lummi Island Ferry Service Level of Service Action Plan approved by the Whatcom County Council via Resolution 2018-026. This project is listed #F1 on the 2025-2030 Six Year Transportation Improvement Program. Project Status: Design, real estate and environmental permitting work is underway for the new vessel and terminal modifications. In 2022 Whatcom County received $25 million in federal funds via the RAISE grant program, $5.3 million in state funds via the Move Ahead Washington (MAW) capital projects program. In 2023, through the County Ferry Capital Improvement Program (CFCIP) administered by the County Road Administration Board (CRAB), the Washington State Legislation approved an annual commitment of $500,000 over the next twenty years for a total of $10 million in state funds for this project. Total Estimated Project Cost: $87,395,000 Expenditures to Date: $2,150,000 Funding Sources: Federal $ 25,000,000 (RAISE) State $ 15,300 000 (CFCIP & MAW) Other (TBD) $ 47 9 NEP (federal H Shorelin s mit CO S ct on 4 4 DO Environmental Permitting Sc 41 cap m s Right -of -Way Acquisition (Estimate) N R qu d County Forces (Estimate) N/ MN Whatcom Chief �l� Relocation of Gooseberry Terminal (F2) CRP # 919009 Construction Funding Years : TBD Project Narrative: This project involves relocating the Gooseberry Point Ferry Terminal. This work will be accomplished as outlined in the Lummi Island Ferry Service Level of Service Action Plan approved by the Whatcom County Council via Resolution 2018-026. This project is listed #F2 on the 2025-2030 Six Year Transportation Improvement Program. Project Status: Early action items will likely include an EIS and real estate work. Total Estimated Project Cost: TBD Expenditures to Date: $ 0 Funding Sources: Federal $ State $ Local $1 Environmental Permitting TBD Right -of -Way Acquisition (Estimate) TB County Forces (Estimate) TB it 0 -10- Terminal Hydraulic System Replacement CRP #TBD Construction Funding Years : TBD Project Narrative: This project is located at the Whatcom County ferry terminals in Section 3, T37N, R01 E. This project will include replacing the existing, aging hydraulic systems that operate the live load hanger pins and aprons at both ferry terminals. This project is listed #F3 on the 2025-2030 Six Year Transportation Improvement Program. Project Status: Design and permitting work to begin in 2025. Total Estimated Project Cost: TBD Expenditures to Date: $ 0 Funding Sources: Federal $ State $ Local $1 Environmental Permitting TB Right -of -Way Acquisition (Estimate) N R qu County Forces (Estimate) TB -11-