Loading...
HomeMy WebLinkAboutord2024-016Whatcom County COUNTY COURTHOUSE 311 Grand Avenue, Ste #105 ut Bellingham, WA 98225-4038 (360) 778-5010 Agenda Bill Report File Number: AB2024-160 File ID: AB2024-160 Version: 1 Status: Adopted File Created: 02/21/2024 Entered by: KGallach@co.whatcom.wa.us Department: Public Works File Type: Ordinance Requiring a Public Hearing Department Assigned to: Council Final Action: 03/19/2024 Agenda Date: 03/19/2024 Enactment #: ORD 2024-016 Related Files: Primary Contact Email: sdraper i co.whatcom.wa.us TITLE FOR AGENDA ITEM: Ordinance establishing a temporary closure of Truck Road SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE: Public Works respectfully requests that the County Council adopt the proposed ordinance to temporarily close Truck Road, fi-om Deal Road to Mosquito Lake Road HISTORY OF LEGISLATIVE FILE Date: Acting Body: Action: Sent To: 03/05/2024 Council INTRODUCED FOR PUBLIC Council HEARING Aye: 7 Buchanan, Byrd, Donovan, Elenbaas, Galloway, Scanlon, and Stremler Nay: 0 03/19/2024 Council ADOPTED Aye: 7 Buchanan, Byrd, Donovan, Elenbaas, Galloway, Scanlon, and Stremler Nay: 0 Attachments: Memo, Proposed Ordinance, Detour Plan, Vicinity Map Whatcom County Page 1 Printed on 312012024 Agenda Bill Report Continued (AB2024-160) Whatcom County Page 2 Printed on 312012024 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 PROPOSED BY: Public Works - Engineering INTRODUCTION DATE: ORDINANCE NO. 2024-016 ESTABLISHING A TEMPORARY CLOSURE OF TRUCK ROAD WHEREAS, the Whatcom County Council is authorized to close roads under the provisions of RCW 36.32.120; and WHEREAS, Truck Rd was damaged during the Superbowl 2020 flood and the November 2021 flooding exacerbated erosion at this site; and WHEREAS, in 2021 an emergency project was then constructed; and WHEREAS, a second phase of work is necessary to realign and repair the road, and provide required environmental mitigation; and WHEREAS, the project is anticipated to last from June through the end of November 2024;and WHEREAS, a detour will be in place during this project; and WHEREAS, the County Engineer has agreed that it is necessary to close Truck Road for this project; and NOW, THEREFORE, BE IT ORDAINED by the Whatcom County Council that the Public Works Department of Whatcom County is hereby directed to temporarily close Truck Road, from Deal Road to Mosquito Lake Road; and BE IT FURTHER ORDAINED, that the County Engineer is hereby directed to install the appropriate signs and close the road at a suitable time to be coordinated with the contractor, once the project commences; and BE IT FURTHER ORDAINED, that the Whatcom County Sheriff and Washington State Patrol be notified by a copy of this ordinance; and BE IT FURTHER ORDAINED, that once the project is complete, the temporary closure shall expire; and 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 BE IT FURTHER ORDAINED, that once the project is complete, the County Engineer is hereby directed to remove all road closure signs and reopen the roadway. ADOPTED this 19th day of March 2024 ATTEST: a®a®o C ,a Dina BPpwn-D;.6 i eCl� °of thee Council l- APPROVEb�AS TO, FORM: Electronically Approved by C. Quinn/33A 2-20-2024 Christopher Quinn, Sr. Deputy Prosecuting Attorney, Civil Division WHATCOM COUNTY COUNCIL WHATCOM COUNTY, WASHINGTON (2 It Barr B Aanan', rouncill Chair WHATCOM COUNTY EXECUTIVE WHATCOM COUNTY, WASHINGTON J/S 9 y a. oil • �- Approved ( ) Denied Date Signed: 61