Agenda Bill Master Report
File Number: AB2022-545
File ID:
AB2022-545
Version: 1
Status: Approved
File Created:
09/26/2022
Entered by: Bthompso@co.whatcom.wa.us
Department:
Council Office
File Type: Resolution (FCZDBS) Requiring a Public Hearing
Assigned to:
Council
Final Action: 10/25/2022
Agenda Date:
10/25/2022
Enactment #: RES 2022-043
Primary Contact Email: SDraper@co.whatcom.wa.us
TITLE FOR AGENDA ITEM:
Resolution adopting the 2023-2028 Six -Year Water Resources Improvement Program (WRIP) by the
Whatcom County Council (Council acting as the Whatcom County Flood Control Zone District Board
of Supervisors)
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE:
Whatcom County Public Works Department on behalf of the Whatcom County Flood Control Zone
District has prepared a Six -Year Water Resources Improvement Program (WRIP) for adoption. The
Supervisors shall hold a public hearing prior to adoption of the resolution
HISTORY OF LEGISLATIVE FILE
Date: Acting Body:
Action:
Sent To:
10/11/2022 Council INTRODUCED FOR PUBLIC Council
HEARING
Aye: 7 Buchanan, Byrd, Donovan, Elenbaas, Frazey, Galloway, and Kershner
Nay: 0
Absent: 0
10/25/2022 Council APPROVED
Aye: 7 Buchanan, Byrd, Donovan, Elenbaas, Frazey, Galloway, and Kershner
Nay: 0
Absent: 0
Whatcom County Page 1 Printed on 1012712022
Agenda Bill Master Report Continued (AB2022-545)
Attachments: Memo, Proposed Resolution
Whatcom County Page 2 Printed on 1012712022
PROPOSED BY: Public Works
INTRODUCED: 10�11 1/22
RESOLUTION NO. 2022-043
(A Resolution of the Whatcom County Flood Control Zone District
Board of Supervisors)
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT
SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM
FOR THE YEARS 2023 THROUGH 2O28
WHEREAS, pursuant to RCW 86.15.110, flood control or storm water control
improvements may be extended, enlarged, acquired, or constructed by a flood control zone
pursuant to a resolution adopted by its Board of Supervisors; and
WHEREAS, Whatcom County Public Works Department on behalf of the Whatcom
County Flood Control Zone District has prepared a Six -Year Water Resources Improvement
Program for adoption; and
WHEREAS, pursuant to RCW 86.15.120, the Supervisors shall hold a public hearing
prior to adopting the resolution; and
WHEREAS, the Six -Year Water Resources Improvement Program attached hereto as
Exhibit "A" has been reviewed and determined to be consistent with Whatcom County's
comprehensive plan and is consistent with the following plans:
• Lower Nooksack River Comprehensive Flood Hazard Management Plan, October
1999
• Jones Creek Debris Flow Study, March 2004
• WRIA 1 Salmon Recovery Plan, October 2005
• Birch Bay Comprehensive Stormwater Plan, July 2006
• Lake Whatcom Comprehensive Stormwater Plan, March 2008
• Lake Samish Basin Comprehensive Stormwater Plan, July 2012
• Birch Bay Central North Subwatershed Master Plan, December 2013
• Birch Bay Central South Subwatershed Master Plan, January 2015
• Nooksack River System -Wide Improvement Framework, June 2016
Page 1
• Birch Point, Terrell Creek Urban Area, and Point Whitehorn Sub -watershed
Master Plan, November 2016
• Lake Whatcom Comprehensive Plan: Stormwater Capital Program Update,
September 2017
• Lake Whatcom Management Program 2020-2024 Work Plan, July 2020; and
• Lake Whatcom East Geneva Sub -watershed Master Plan, January 2021
WHEREAS, pursuant to RCW 86.15.110, the preliminary engineering studies for
constructed improvements are on file with the Whatcom County Public Works Department;
and
WHEREAS, pursuant to RCW 86.15.110, the estimated cost of the acquisition or
construction of the improvement, together with supporting data, is included in the Six -Year
Water Resources Improvement Program; and
WHEREAS, the improvements will benefit one or more flood control zones, subzones
and the county as a whole;
Page 2
NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Flood Control Zone
District Board of Supervisors as follows:
That the Whatcom County Flood Control Zone District Six -Year Water Resources
Improvement Program for the years 2023 through 2028, which is attached hereto as
Exhibit "A", is hereby adopted.
APPROVED this 25th day of October , 2022.
Flood Control Zone District Board of
I C, 0�1r Supervisors
A3T T;�� y�bj WHATCON COUNTY, WASHINGTON
i
COO� s
Dana BPpavis; CIrk`'of the Council Todd Donovan, Cha —
fsF ( B
APPROVED'AS,TO F6RM:
Chri opher Quinn, Seni r Civil De uty Pros'cuting Attqrney
/61
Page 3
Q
H
m
Q
r
€
E
3
r
x � v
>
o
r o
V
�
o
�3
..... . . . .
. . .
11
Millie
IN
mail
I
IIIIIIIIIIII
......... ........
............
...
W.
..-a
.......
. . . .
.
..........
.......
..... .....
MEN
mom
mulililiniii
III
I
Mile
1
.11
MR
MEN
Nos
mom
Whatcom County Public Works — Stormwater Division
Project Narrative
Academy Road Stormwater Improvements
Database ID No. 20-005
Construction Funding Years : 2023
Project Narrative:
2023-2028 Six -Year WRIP
Item No. 1
Whatcom County and the City of Bellingham jointly developed this project to improve water quality from the Academy sub -
basin of the Lake Whatcom Watershed. This project, originally constructed during the summer of 2015, will undergo an
evaluation and perform recommended modifications to improve phosphorus removal. City of Bellingham will adopt the
facility after the evaluation and improvements.
Project Status:
Design is occuring in 2021-2022 and construction scheduled to take place in the summer of 2023.
Total Estimated Project Cost: $650,000
Whatcom County Public Works — Stormwater Division
Project Narrative
Geneva Bioretention Pilot Project
Database ID No. 20-006
Construction Funding Years : 2023
Project Narrative:
2023-2028 Six -Year WRIP
Item No. 2
This project will utilize a Washington State Department of Ecology grant to install and monitor the performance of new
bioretention soil media. The existing swales are approaching the end of the media's effective life. New media will be
required to replace the existing depleted media in the near future.
A portion of the existing swales will be used to test the new media, which is designed to reduce the amount of phosphorus
and other pollutants entering the lake. Preliminary testing has shown the new media is much more effective in removal of
phosphorus than more traditional media. If tests show significant improvement over the original media, the media will be
adopted as a Best Management Practice (BMP) and be included in the updated WDOE Stormwater Manual.
Project Status:
Design is occurring in 2021-2022, construction in 2023, and monitoring performance in 2024-2026.
Total Estimated Project Cost: $1,208,750 (without monitoring costs)
Whatcom County Public Works — Stormwater Division
Project Narrative
Silver Beach Creek Phase 2
Database ID No. 07-095
Construction Funding Years : 2024
Project Narrative:
2023-2028 Six -Year WRIP
Item No. 3
This project will address the stream bank erosion found on Silver Beach Creek and other tributaries. The project will
reduce the amount of erosion and bank material that has been generally associated with the sediment -laden phosphorus
loading to Lake Whatcom. The project will reconfigure approximately 950 linear feet of stream channels with a more
stable cross-section to reduce erosion and the export of sediment.
Project Status:
Design is anticipated to occur in 2022-23 and construction scheduled to take place in 2024.
Total Estimated Project Cost: $770,000
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 4
Eagleridge Stormwater Improvements
Database ID No. 20-007
Construction Funding Years : 2025
Project Narrative:
This project includes the installation of a water quality treatment facility associated with the Eagleridge neighborhood in
the Lake Whatcom watershed. The Eagleridge development is approximately 34 acres and runoff from this development
will be routed through a water quality facility to help remove sediments and phosphorus before entering Lake Whatcom.
Project Status:
Design is anticipated in 2023-2024 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $550,000
111
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 5
Austin Court Stormwater Improvements
Database ID No. 20-008
Construction Funding Years : 2025
Project Narrative:
This project includes the installation of a large filter vault to improve water quality in the existing Austin Court stormwater
system. The tributary area is approximately three acres and the water quality system will remove sediments and
phosphorus prior to entering Lake Whatcom.
Project Status:
Design is anticipated in 2022-2023 and construction scheduled to take place in 2025.
Total Estimated Project Cost: $425,000
Whatcom County Public Works — Stormwater Division
Project Narrative
2023-2028 Six -Year WRIP
Item No. 6
Viewhaven Lane Water Quality & Conveyance Improvements
Database ID No. 20-009
Construction Funding Year(s): 2026
Project Narrative:
This project will improve conveyance and water quality near Viewhaven Lane and Lake Whatcom Blvd intersection.
Project will include approximately 100 linear feet of conveyance improvements by replacing two undersized culverts and
regrading a ditch. The project will also install approximately 135 linear feet of water quality facility. Project elements may
include: bioinfiltration swales, filter vaults, media filter drains, and rain gardens.
Project Status:
Design is anticipated in 2023-2024 and construction scheduled to take place in 2026.
Total Estimated Project Cost: $475,000
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 7
Strawberry Point/ Lake Whatcom Blvd Stormwater Improvements
Database ID No. 17-001
Construction Funding Years : 2027
Project Narrative:
This project will involve the installation of a water quality facility to treat approximately three acres of residential area.
Project elements may include: bio-infiltration swales, filter vaults, media filter drains, and rain gardens in order to improve
water quality.
Project Status:
Design is anticipated in 2025-2026 and construction scheduled to take place in 2027.
Total Estimated Project Cost: $910,000
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 8
Geneva Street & Lake Louise Road Culvert Replacement
Database ID No. 20-010
Construction Funding Years : 2028
Project Narrative:
Project will improve conveyance of roadside ditches and culverts along Geneva Street and Lake Louise Road. The
project will replaced approximately 200 linear feet of undersized or damaged culverts.
Project Status:
Design is anticipated in 2026 and construction scheduled to take place in 2028.
Total Estimated Project Cost: $280,000
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 9
Lake Whatcom Boulevard Media Filter Drain (EG-1)
Database ID No. 22-006
Construction Funding Years : 2028
Project Narrative:
The project would install Media Filter Drain (MFD), or other appropriate water quality system, along approximately 300
linear feet of roadway on the west side of Lake Whatcom Blvd. Stormwater runoff from approximately 8.5 acres on the
west side of Lake Whatcom Blvd. is collected in a shallow roadside ditch, this project would treat this water prior to
discharging to Lake Whatcom.
Project Status:
Design is anticipated in 2026-27 and construction scheduled to take place in 2028.
Total Estimated Project Cost: $835,000
Whatcom County Public Works — Stormwater Division
Project Narrative
Sudden Valley Stormwater Improvements No. 2
Database ID No. 22-007
Construction Funding Years : 2029
Project Narrative:
2023-2028 Six -Year WRIP
Item No. 10
A project, to be determined, will be constructed within the Sudden Valley area as the second water quality improvement
project focused on removing sediment and treating phosphorus in a continued collaboration with the Sudden Valley
community. Details will be forthcoming as Whatcom County works with representatives of the Sudden Valley
Community Association.
Project Status:
Design is anticipated in 2026-2027 and construction scheduled to take place in 2029.
Total Estimated Project Cost: $600,000
10
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 11
Lake Whatcom Boulevard Water Quality Vault (EG-4)
Database ID No. 22-008
Construction Funding Years : 2030
Project Narrative:
This project includes the installation of a filter vault to improve water quality in the existing Lake Whatcom Blvd
stormwater system. The water quality system will remove sediments and phosphorus from approximately 3 acres of
residential runoff prior to entering Lake Whatcom.
Project Status:
Design is anticipated in 2028-2029 and construction scheduled to take place in 2030.
Total Estimated Project Cost: $500,000
11
Whatcom County Public Works — Stormwater Division
Project Narrative
Cottonwood Drive Stormwater Inlet Repair
Database ID No. 22-009
Construction Funding Years : 2023
Project Narrative:
2023-2028 Six -Year WRIP
Item No. 12
The Cottonwood neighborhood experienced significant flooding during the storms in November 2021. A plugged pipe
caused Cottonwood Creek to overflow and erode an existing earthen berm, which flooded the neighborhood and
damaged public and private property. This project will clean up the flood debris, repair the eroded berm, and place
some additional mitigation measures in the neighborhood to better direct flood water to a safer location during future
storm events occurs.
Project Status:
Design is occurring in 2022 and construction is scheduled to take place in 2023.
Total Estimated Project Cost: $330,000
12
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 13
Charel Terrace Stormwater Outfall Repair
Database ID No. 20-011
Construction Funding Years : 2023
Project Narrative:
The December 20, 2018 "Solstice Eve" windstorm caused damage to the stormwater outfall on Birch Point installed as
part of the Charel Terrace project in 2011. In March 2019 a "Major Disaster Declaration" that covered Whatcom County
for the December storm was granted. In December 2019, the Consolidated Resource Center approved the Washington
State Emergency Management Division's $110,887 request for Architectural & Engineering Services to assess the site
and develop conceptual design options. An RFP was advertised by Whatcom County in March 2020 and Herrera
Environmental Consultants completed a preliminary study that assessed the outfall stabilization approaches to maintain a
functional outfall. From this study, a temporary repair will be constructed in early fall 2022 to secure the catch basin to the
bluff and reposition the outfall tee. The permanent repair will be constructed in the summer of 2023, which may consist of
hard armoring of the slope to protect cultural resources.
Project Status:
Design is occurring in 2021-2022 and construction scheduled to take place in 2023.
Total Estimated Project Cost: $675,000
13
Whatcom County Public Works — Stormwater Division
Project Narrative
2023-2028 Six -Year WRIP
Item No. 14
Holeman Avenue Stormwater Improvements (PW-1)
Database ID No. 07-242
Construction Funding Years : 2024
Project Narrative:
The project goal is to reduce roadway flooding on Holeman Avenue by replacing undersized pipe and catch basins and
re-establish existing ditch to match pipe invert elevations. This area is particularly sensitive due to the steep, unstable bluff
along the shoreline and the concern is that flooding could lead to bluff failure and property damage. This is a critical public
safety issue.
Project Status:
Design is anticipated in 2022-23 and construction scheduled to take place in 2024.
Total Estimated Project Cost: $1,105,000
14
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 15
Semiahmoo Drive South & Outfall Improvements (BP-2, BP-5)
Database ID No. 18-009 & 18-010
Construction Funding Years : 2024
Project Narrative:
This project will improve the conveyance system along the east side of Semiahmoo Drive by upsizing pipes and re-
establishing/deepening ditches to reduce flooding and increase traffic safety.
Project Status:
Design is taking place in 2021-2023 and construction scheduled to take place in 2024.
Total Estimated Project Cost: $1,724,000
15
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 16
Normar Place Stormwater Improvements (BP-1)
Database ID No. 19-004
Construction Funding Years : 2025
Project Narrative:
This project involves upsizing pipes, replacing catch basins and installing an outfall pipe over the bluff with an energy
dissipater at Normar Place to reduce roadway flooding, scour and sediment transport.
Project Status:
Design is anticipated in 2023-24 and construction in 2025.
Total Estimated Project Cost: $690,000
16
Whatcom County Public Works — Stormwater Division
Project Narrative
2023-2028 Six -Year WRIP
Item No. 17
Lora Lane Drainage & Tide Gate Modifications (TC1-2)
Database ID No. 18-008
Construction Funding Years : 2026
Project Narrative:
The purpose of this project is to replace the existing 48" corrugated metal pipe culvert under Birch Bay Drive with a fish
passage culvert that is anticipated to be an 8-ft wide box culvert, remove the existing tide gate on the water side of Birch
Bay Drive, install a new side hinge tide gate on the east side of Birch Bay Drive on the new 8-ft wide culvert, and install
shoreline armoring at the outfall area.
Project Status:
Preliminary engineering design will begin in 2021 and be completed prior to construction in 2026.
Total Estimated Project Cost: $1,436,000*
*Road Fund contributions are tentative
17
Whatcom County Public Works — Stormwater Division
Project Narrative
2023-2028 Six -Year WRIP
Item No. 18
Birch Point Road Stormwater & Outfall Improvements (BP-3 & BP-6)
Database ID No. 21-001
Construction Funding Years : 2026
Project Narrative:
A corrugated metal outfall pipe over a steep bluff on Birch Point collapsed due to undermining. The driveway culverts,
ditches and upstream storm drain system leading to the outfall are undersized and cause flooding and erosion during
storm events. This project will involve upsizing culverts, reestablishing ditches and replacing the halfpipe outfall with an
HDPE tightline, anchor and energy dissipater.
Project Status:
Design will be completed in 2024-25. Construction is scheduled to take place in 2026.
Total Estimated Project Cost: $700,000
18
Whatcom County Public Works — Stormwater Division
Project Narrative
Richmond Park Stormwater Improvements (SH-2)
Database ID No. 22-010
Construction Funding Years : 2027-2028
Project Narrative:
2023-2028 Six -Year WRIP
Item No. 19
This project will address drainage concerns in Richmond Park by re-routing the large volume of water that currently
moves through the development down Shintaffer Road to an outfall in Birch Bay. It would involve replacing 2,000 feet of
ditch/culvert on Shintaffer Road with 24" diameter HDPE pipe, installing 15 type 2 catch basins and building a new
outfall into Birch Bay.
Project Status:
Design will occur in 2025-26 and construction is scheduled to take place in 2027-2028.
Total Estimated Project Cost: $2,430,000
19
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 20
Wooldridge Avenue & Sunset Drive Stormwater Improvements (TC-2)
Database ID No. 13-007
Construction Funding Years : 2029
Project Narrative:
This project will improve the conveyance system along Wooldridge Avenue, Jackson Road and Sunset Drive by upsizing
pipes, installing or replacing catch basins and culverts, reestablishing roadside ditches, installing a water quality filter vault
and 100 linear feet of water quality treatment swale.
Project Status:
Design is anticipated in 2027-2028 and construction is scheduled to take place in 2029.
Total Estimated Project Cost:
DOE Water Quality Grant: $750,000*
BBWARM: $470,000
Total: $1,220,000
*Unsecured grant fundin
20
Whatcom County Public Works — Stormwater Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 21
Hillsdale Stormwater Improvements, Phase 1 (HL-C-1)
Database ID No. 19-002
Construction Funding Years : 2030
Project Narrative:
This project involves upsizing pipes, replacing catch basins, installing new drain line, and replacing blind tee connections
on Morgan, Cottonwood and Birch Bay Drives to reduce flooding and allow for maintenance.
Project Status:
Pre -design was completed in 2014, final design will be completed in 2028-29 and construction of Phase 1 scheduled to
take place in 2030.
Total Estimated Project Cost: $750,000
21
Whatcom County Public Works — Stormwater Division
2023-2028 Six -Year WRIP
Project Narrative Item No 22
Shallow Shore Culvert Relocation
Database ID No. 18-007
Construction Funding Years : 2023
Project Narrative:
The existing cross -culvert located at 326 Shallow Shore Drive discharges onto the western edge of the lakefront parcel.
During heavy storm events, discharge from the cross -culvert overwhelms an existing private culvert which conveys
stormwater to the lake, resulting in regular flooding and inundation throughout the rainy season.
The County currently has an undeveloped right-of-way (Bass Street) to the lake approximately 300 feet north of the
existing outfall along Shallow Shore Drive which could serve as an alternate to the existing outfall. The project will
evaluate water quality alternatives that may be installed prior to discharging in Lake Samish.
Project Status:
Design is occurring in 2021-22 and construction scheduled to take place in 2023.
Total Estimated Project Cost: $570,000
22
Whatcom County Public Works —River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 23
Lynden Levee Improvement
Database ID No. 16-003
Construction Funding Year(s): 2021 - 2022
Project Narrative:
One 24" culvert and one 48" culvert are located less than 50 feet apart providing interior drainage through the Lynden
Levee. One of the pipes drains a channel that flows through the City of Lynden's wastewater treatment plant. The levee
has overtopped where the culverts are located, damaging the levee backslope and the small berm that separates the
drainage channel from a water treatment settling pond. The conceptual design developed as part of the System -wide
Improvement Framework (SWIF) planning process includes relocating the treatment plant drainage channel through a
forested area further away from the pond, connecting the two drainages, and replacing the two culverts with a single
larger fish -passable culvert with a side -hinge flood gate.
Project Status:
Primary construction of the project was completed during summer of 2021. This project was implemented collaboratively
by the FCZD and the USACE. FCZD finished planting and stabilization of the new channel in 2022. Minor project closeout
costs are anticipated in 2023. Total project cost includes USACE construction as a direct contribution.
Total Estimated Cost: $1,934,000
Expenditures to Date: $1,931,500
23
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 24
Everson Overflow Pipeline Stabilization
Database ID No. 20-002
Construction Funding Year(s): 2024
Project Narrative:
A portion of the bank within the Everson overflow corridor was damaged during the 2020 flood season, this erosion was
further exacerbated during the November 2021 flood events. The damage site is located near a petroleum pipe crossing
the Nooksack River. The FCZD is exploring options to stabilize the bank and protect the high ground divide that controls
how much overflow occurs at Everson.
Project Status:
The project is in the design phase. Construction is anticipated for summer of 2024. The FCZD anticipates that FEMA and
the State will fund 95% of the project through the Public Disaster Assistance Program.
Total Estimated Cost: $1,517,125
Expenditures to Date: $139,000
24
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 25
Marine Drive Levee Repair
Database ID No. 20-001
Construction Funding Years : 2024
Project Narrative:
The Marine Drive Levee provides flood protection during smaller, more frequent floods to the Marietta area and Slater
Road. The levee is located on property owned by the Washington Department of Wildlife who is managing the property for
wildlife. The levee backslope was damaged in several locations during flooding in 2020 and 2021. The project involves
restoring the levee crest and backslope to the original geometry while trying to minimize the impacts to existing
vegetation.
Project Status:
The project is in the design phase. Construction is anticipated for summer of 2024. An interim project was completed in
2023 to temporarily stabilize the damage areas prior to flood season. The FCZD is utilizing FEMA funds to partially fund
the project.
Total Estimated Cost: $1,201,000
Expenditures to Date: $103,000
25
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 26
Truck Road Bank Stabilization
Database ID No. 20-003
Construction Funding Years : 2023
Project Narrative:
The project is located along Truck Road about 0.3 miles easterly from Mt. Baker Highway (SR 542). During high-water
events of the 2017/2018 winter, the North Fork Nooksack River eroded the unprotected bank of Truck Road to within 13
feet of the roadway surface. This prompted an emergency project to construct a passive riprap revetment underneath a
section of the roadway to provide immediate protection. Flooding during 2020 eroded the remaining bank exposing the
recently constructed riprap revetment and destabilizing a portion of the north bound lane. Jersey barriers were placed by
county crews to block off this lane to traffic. Additional erosion sustained the November 2021 floods, threatened the road
downstream of the previous damage area. The FCZD undertook an emergency project to address the immediate threat to
truck road. Additional work is needed to provide environmental mitigation for that action and to repair and realign the
damaged section of road.
Project Status:
The FCZD has completed the emergency repair and is currently designing and permitting the associated Phase 2 project
that will provide environmental mitigation and road repair. Construction of the Phase 2 project is anticipated to occur in
2023. The FCZD anticipates that FEMA and the State will fund 95% of the project through the Public Disaster Assistance
program
Total Estimated Cost: $4,267,000
Expenditures to Date: $1,516,000
26
Whatcom County Public Works —River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 27
Jones Creek Debris Flow Risk Reduction
Database ID No. 07-105
Construction Funding Years : 2023
Project Narrative:
This project includes acquisition of residential properties in the high hazard area of the Jones Creek alluvial fan and
construction of setback deflection berms to reduce the risk of debris flow damage to the town of Acme. The project
includes realignment of Turkington Road at the location where it crosses the proposed berm.
Project Status:
Nearly all required property acquisition for the project is complete; one additional easement will be purchased in 2023.
Detailed design is near completion and construction is anticipated in spring 2023. A Department of Ecology Floodplains by
Design Grant provided 80% funding for the acquisition of two properties and will also partially fund the construction of the
project.
Total Estimated Cost: $10,675,000
Expenditures to Date: $5,235,000
27
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 28
Hudson Road Bridge No. 132 Repair
Database ID No. 22-001
Construction Funding Years : 2023
Project Narrative:
The project is located along near the dead end of Hudson Rd in Acme, WA. The FCZD recently purchased the property at
the end of this road as a part of the Jones Creek Debris Flow Risk Reduction Project. The approaches to the bridge that
serves the property were damaged during the November 2021 flood events. The project will provide for repair to the
bridge approaches.
Project Status:
The FCZD has provided FEMA with the damages and cost estimate to repair the project. Design and permitting for the
project will be conducted in the winter of 2022/23. Construction is anticipated to occur in 2023. The FCZD anticipates that
FEMA and the State will fund 95% of the project through the Public Disaster Assistance program.
Total Estimated Cost: $135,000
Expenditures to Date: --
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 29
Timon Levee USACE Levee Rehabilitation
Database ID No. 22-002
Construction Funding Years : 2023
Project Narrative:
The Timon Levee is located near Northwood Rd, southeast of Lynden WA. The levee is eligible for the Public Law (PL)
84-99 Levee Rehabilitation program with the US Army Corps of Engineers (USACE). This program allows for the USACE
to repair damages to the levee and requires a 20% local cost -share. The Timon Levee was damaged during the
November 2021 flood events. The FCZD worked with the USACE to flood fight the damage during the event, this
emergency flood fight was funded 100% by the USACE. This project provides for the USACE to conduct permanent
repairs at the site.
Project Status:
USACE anticipates construction of the project in 2023. The FCZD local share of costs is 20%. Total project cost includes
USACE construction as a direct contribution.
Total Estimated Cost: $607,500
Expenditures to Date: --
►e
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 30
Upper Hampton USACE Levee Rehabilitation
Database ID No. 22-004
Construction Funding Year(s): 2023
Project Narrative:
The Upper Hampton Levee is located near Northwood Rd, southeast of Lynden WA. The levee is eligible for the Public
Law (PL) 84-99 Levee Rehabilitation program with the US Army Corps of Engineers (USACE).. This program allows for
the USACE to repair damages to the levee and requires a 20% local cost -share. The Upper Hampton Levee was
damaged during the November 2021 flood events. This project provides for the USACE to conduct permanent repairs at
the site.
Project Status:
USACE anticipates construction of the project in 2023. The FCZD local share of costs is 20%. Total project cost includes
USACE construction as a direct contribution.
Total Estimated Cost: $258,750
Expenditures to Date: --
30
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 31
Jones Creek Revetment Repair
Database ID No. 22-003
Construction Funding Years : 2023
Project Narrative:
The project is located just upstream of the Turkington Rd Bridge over Jones Creek near Acme WA. The riprap revetment
that protects the bridge approaches was damaged during the November 2021 flood events. The project will provide for
repair to damaged revetment.
Project Status:
The FCZD has provided FEMA with the damages and cost estimate to repair the project. Design and permitting for the
project will be conducted in the winter of 2022/23. Construction is anticipated to occur in 2023. The FCZD anticipates that
FEMA and the State will fund 95% of the project through the Public Disaster Assistance program.
Total Estimated Cost: $120,800
Expenditures to Date: $10,300
31
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 32
Cougar Creek Early Action / Neevel Levee Bank Stabilization
Database ID No. 16-008
Construction Funding Years : 2024
Project Narrative:
The Neevel Levee provides varying levels of protection to a significant amount of agricultural land. Approximately 250 feet
of the levee running along Cougar Creek is over -steepened and experiencing sloughing of the riverward face. A
stabilization project incorporating large woody debris at the toe and reducing the slope of the riverward face is proposed
in the System -wide Improvement Framework (SWIF) to resolve the deficiency identified by the US Army Corps of
Engineers and keep the levee eligible for repair under the Public Law (PL) 84-99 Program. An early action project
developed through the Floodplain Integrated Planning (FLIP) process includes replacement of the Cougar Creek flood
gate and installation of large woody debris in the channel downstream.
Project Status:
Design of the project has been finalized. Construction is anticipated for 2024 with funding through NRCS's EQIP program
and the Department of Ecology Floodplains by Design grant.
Total Estimated Cost: $2,029,000
Expenditures to Date: $271,000
32
Whatcom County Public Works — River and Flood Division
Project Narrative
2023-2028 Six -Year WRIP
Item No. 33
Abbott Levee Protection and Improvement Project
Database ID No. 16-007
Construction Funding Years: 2021 and 2025
Project Narrative:
The project is located along Abbott Road about 1.7 miles east of Hannegan Road. Recent erosion along the Nooksack
River has removed a section of riprap that previously protected the land adjacent to the Abbott Levee and Abbott Road.
Phase1 of this project addressed the ongoing erosion in this location. The FCZD is also investigating possible road and
levee setback options to improve the upstream tie-in of the levee and address a deficiency identified by the US Army
Corps of Engineers to maintain the levee's eligibility in the PL 84-99 Levee Rehabilitation Program. This work will be
implemented as a second phase of the project.
Project Status:
Construction of Phase 1 was completed during Summer or 2021. The FZCD is developing a scope of work with the
project consultant for Phase 2. Phase 2 will include a reach assessment to provide the technical basis for developing
alternatives for upstream improvements. The FZCD will utilize this reach scale analysis to develop a capital project for
Phase 2. Phase 2 construction is anticipated during 2025.
Total Estimated Cost: $3,843,000
Expenditures to Date: $1,318,000
33
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 34
Bertrand Creek Levee Stabilization
Database ID No. 16-005
Construction Funding Years : 2025
Project Narrative:
The Bertrand Creek right and left bank Levees are designed to overtop during larger floods, but provide protection to
agricultural land during the growing season. The left bank levee has a 250 foot long section where erosion is threatening
the levee prism. The right bank levee face is sloughing at three locations with a total length of approximately 250 feet. The
levees will have to be repaired to remain eligible for rehabilitation through the US Army Corps of Engineers Public Law
(PL) 84-99 Levee Rehabilitation Program.
Project Status:
A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process.
The project will be designed by the FCZD. Construction is anticipated in the Summer of 2025.
Total Estimated Cost: $312,000
Expenditures to Date: $7,000
34
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 35
Devries Levee Improvements
Database ID No. 19-001
Construction Funding Years : 2025
Project Narrative:
This project involves widening the levee crest and backsloping the levee to meet the US Army Corps of Engineers's levee
geometry standards for levees in the Public Law (PL) 84-99 Levee Rehabilitation Program (SWIF project).
Project Status:
A conceptual design has been developed as part of the SWIF planning process. Detailed design has not been initiated
yet.
Total Estimated Cost: $235,000
Expenditures to Date: $0
35
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 36
Ferndale Levee Improvement Project
Database ID No. 07-104
Construction Funding Years : 2025 - 2027
Project Narrative:
Two levee segments, one sponsored by the City of Ferndale and one by the FCZD and Diking District #1 in the US Army
Corps of Engineer's Public Law (PL) 84-99 Levee Rehabilitation Program, provide protection to the three treatment
facilities along Ferndale Road. The US Army Corps of Engineers has identified several deficiencies along these two levee
segments, including a gap in which super sacks filled with sand have been placed. The 1999 Comprehensive Flood
Hazard Management Plan recommended improving these levees to provide 100-year protection to the City and the
treatment facilities. The System -wide Improvement Framework (SWIF) also includes this project to address the identified
levee deficiencies.
Project Status:
This project is currently in the design phase. An preferred alternative for the levee and road alignment has been selected.
A 60 percent design level plan of the proposed levee configuration is anticipated Fall of 2022. A 100 Percent design level
plan is anticipated in 2024. Grant funding through the State's Floodplain's by Design program has been secured to
complete the design. Construction is anticipated to be phased with construction beginning in 2025 and lasting through
2027.
Total Estimated Construction Cost: TBD
Expenditures to Date: $627,000
36
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 37
Glacier -Gallup Creeks Alluvial Fan Restoration
Database ID No. 18-006
Construction Funding Years : 2023, 2027
Project Narrative:
The Glacier Creek Levee on the left (west) bank of the creek was constructed in the 1960s to prevent
overflows into Gallup Creek and damage to State Route (SR) 542. Since construction, the levee has been
subject to ongoing damage. Constriction of the Glacier -Gallup channel migration zone (CMZ) has exacerbated
aggradation upstream of SR 542 and severely degraded fish habitat. WSDOT replaced the Gallup Creek
bridge and is working to construct a new bridge over Glacier Creek and the alluvial fan between the two
creeks. The FCZD is developing a project in coordination with WSDOT and is evaluating the feasibility of full or
partial removal of levees blocking natural channel migration on the Glacier and Gallup Creeks alluvial fan and
construction of a setback levee on Gallup Creek to protect the Community of Glacier.
Project Status:
A feasibility study and alternatives analysis for evaluating levee removal and setback alternatives was initiated
in late 2018. Preliminary design of the preferred alternative will be initiated once the preferred alternative is
selected. Construction of an interim project to address levee damage is anticipated in 2023. Construction of the
levee removal and setback is anticipated to occur concurrently with the Glacier Creek bridge replacement in
2027.
Total Estimated Project Cost: TBD
Expenditures to Date: $721,000
R
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 38
Dahlberg Wetland Mitigation Site
Database ID No. 20-004
Construction Funding Year(s): 2026 - 2028
Project Narrative:
The FCZD purchased a property northeast of Ferndale as a mitigation site for future projects having wetland or riparian
impacts. The property contained a dilapidated farm house.
Project Status:
FCZD purchased the subject property and demolished the farm house in Fall of 2020. The FCZD has installed a
groundwater monitoring network on the site to support developing a long-term restoration plan for the site.
Total Estimated Cost: TBD
Expenditures to Date: $885,000
38
Whatcom County Public Works —River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 39
Upper Hampton Levee Improvements
Database ID No. 16-006
Construction Funding Years : 2027
Project Narrative:
Several deficiencies were identified by the US Army Corps of Engineers on the Upper Hampton Levee. Improvements to
the levee geometry are proposed in two locations and improvement to address seepage is proposed at a third location.
Project Status:
A conceptual design has been developed as part of the System -wide Improvement Framework (SWIF) planning process.
Detailed design has not been initiated yet. However, we were able to complete a portion of the levee backsloping work at
one site using excess material generated at the 2021 Abbott and Lynden Levee Improvement projects.
Total Estimated Cost: TBD
Expenditures to Date: $6,000
39
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 40
Floodplain Acquisition
Database ID No. 07-002
Acquisition Funding Year(s): 2017- TBD
Project Narrative:
Reach -scale projects to reconfigure flood infrastructure are being evaluated through the integrated planning processes
that started with the System -wide Improvement Framework (SWIF) and has transitioned into the Floodplain Integrated
Planning (FLIP) process. The goal of this work is to reduce flood risk and expenditures and restore habitat and the
processes that form it.
Voluntary acquisition of lands is proposed to enable future levee reconfigurations to reduce flood risk and future levee
repairs, while improving habitat.
Project Status:
Acquisition of one property in Reach 4 was completed in 2020. Discussions with additional property owners will occur in
2021 and 2022.
Total Estimated Cost: TBD
Expenditures to Date: $1,128,000
40
Whatcom County Public Works —River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 41
Marietta Acquisition
Database ID No. 07-002
Construction Funding Years : 2001 - Present
Project Narrative:
Acquisition of residential properties in the frequently -flooded repetitive flood loss area of Marietta, removal of existing
structures and restoration of properties with native vegetation.
Project Status:
Property acquisition began in 2001 and is ongoing. As properties are acquired, structures are removed and native
vegetation is planted. All acquisitions are voluntary and the project is ongoing as current property owners decide to sell
their properties. Total project cost will need to include funding for cleanup of up to four former gas stations, though the
exact nature of the work is still undefined.
Total Estimated Project Cost: TBD
Expenditures to Date: $1,852,000
41
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 42
High Creek Sediment Trap
Database ID No. 22-005
Construction Funding Years : Annually
Project Narrative:
High Creek flooding damaged nearby homes and closed Mount Baker Highway in the mid-1990's. A legal settlement
resulting from that event directs Whatcom County to prepare a creek management plan. Sediment management in the
watershed including the 3400 feet of County owned right of way east of Kendall Creek is an important plan element along
with fish habitat mitigation. State permits for future maintenance dredging are dependent on consistency with the final
management plan. A management plan was developed and recommended the construction of two sediment traps, one
sited upstream of Mount Baker Highway to trap coarser material and one by the confluence with Kendall Creek to trap
finer material. The sediment traps were constructed in 2018. The project provides for the annual clean out of those
sediment traps.
Project Status:
The 2022 clean out was be funded at 95% through the FEMA Public Disaster Assistance grant. Future cleanouts are
anticipated to be funded by FCZD. Total Estimated Cost is for annual estimated cleanout costs.
Total Estimated Cost: $135,000
Expenditures to Date: --
42
Whatcom County Public Works — River and Flood Division 2023-2028 Six -Year WRIP
Project Narrative Item No. 43
Emergency/New Projects
Database ID No. 08-003
Construction Funding Years : 2023 - 2028
Project Narrative:
This item provides funding to address unanticipated projects resulting from new damage to flood control facilities.
Project Status:
Design and construction to occur as necessary.
Total Estimated Project Cost: $425,000/year
Expenditures to Date: $425,000/year
Due to the nature of this item, no map exists. Board of Supervisors review and prioritization will be sought at the
appropriate time.
43