HomeMy WebLinkAboutres2021-051Whatcom County COUNTY COURTHOUSE
311 Grand Avenue, Ste #105
Bellingham, WA 98225-4038
(360) 778-5010
Agenda Bill Master Report
File Number: AB2021-622
File ID: AB2021-622 Version: 1 Status: Approved
File Created: 10/26/2021 Entered by: MCaldwel@co.whatcom.wa.us
Department: Finance Division File Type: Resolution (FCZDBS) Requiring a Public Hearing
Assigned to: Council Final Action: 11/23/2021
Agenda Date: 11/23/2021 Enactment#: RES 2021-051
Primary Contact Email: mcaldwel@comcast.net
TITLE FOR AGENDA ITEM:
Resolution adopting the 2022 budget for the Whatcom County Flood Control Zone District and
Subzones (Council acting as the Flood Control Zone District Board of Supervisors)
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE:
Consistent with RCW 86.15.140, the FCZD must adopt an annual budget that includes the
County -wide district and the subzones of the District. The attached resolution establishes
the overall budget consistent with the appropriation items outlined in the law.
Public Works respectfully requests that the FCZD Board of Supervisors adopt the attached
resolution to establish a 2022 budget for the County -wide District and the following
subzones:
• Acme/Van Zandt Subzone
• Lynden/Everson Subzone
• Sumas/Nooksack/Everson Subzone
• Samish Watershed Subzone
• Birch Bay Watershed and Aquatic Resources Management District
HISTORY OF LEGISLATIVE FILE
Date: Acting Body:
Action:
Sent To:
11/09/2021 Council INTRODUCED FOR PUBLIC Council
HEARING
Aye: 6 Browne, Buchanan, Byrd, Donovan, Elenbaas, and Frazey
Whatcom County Page 1 Printed on 1112412021
Agenda Bill Master Report Continued (AB2021-622)
Nay: 0
Absent: 1 Kershner
11/23/2021 Council APPROVED AS AMENDED
Aye: 6 Browne, Buchanan, Byrd, Donovan, Elenbaas, and Frazey
Nay: 0
Absent: 1 Kershner
Attachments: Staff Memo, Proposed Resolution
Whatcom County Page 2 Printed on 1112412021
PROPOSED BY: Public Works
INTRODUCTION DATE: 11/09/2021
RESOLUTION NO. 2021-051
(A Resolution of the Whatcom County Flood Control
Zone District Board of Supervisors)
ADOPTING THE 2022 BUDGET FOR THE
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT AND SUBZONES
WHEREAS, RCW 86.15.140 requires that the Board of Supervisors of each flood
control zone district and subzone adopt an annual budget for the zone; and
WHEREAS, the statute further requires that the zone or subzone budget be divided
into four appropriation items: overhead and administration; maintenance and operation;
construction and improvements; and bond retirement and interest; and
WHEREAS, under the appropriation item for construction and improvements, the
Board is required to list each flood control improvement or storm water control
improvement planned for the budget year and the estimated expenditure for each during
the next year; and
WHEREAS, the budget may only be adopted after a public hearing for which proper
notice has been given; and
WHEREAS, Fund No. 169 is managed by the County on behalf of the Whatcom
County Flood Control Zone District for purposes of funding flood control, storm water
management, and other water resources work by the County that are consistent with the
powers of the District under RCW 86.15 and RCW 39.34.190; and
WHEREAS, funds obtained by the County through grants or cooperative agreements
for flood control and other water resources work are also managed through Fund No. 169;
and
WHEREAS, the 2022 budget proposed by the County Executive for the Whatcom
County Flood Control Zone District includes proposed expenditures out of Fund 169 to pay
for flood control, storm water management, and other water resources work consistent with
the powers of the District under RCW 86.15 and RCW 39.34.190;
NOW, THEREFORE, BE IT RESOLVED by the Board of Supervisors as follows:
Section I. Approval of the Budget
The Board hereby adopts the 2022 budget for the Flood Control Zone District Fund No. 169
in the amounts presented below and further described Exhibit A of this resolution:
OVERALL BUDGET SUMMARY
Budget
2022 Budget
Code
Program
RCW Appropriation Item
Revenues
Expenditures
169100
Administration
Overhead & administration
$5,210,000
$877,331
169119
Natural Resources Administration
Overhead & administration
624,949
169120
AIS Administration
Overhead & administration
-
169121
Water Planning Administration
Overhead & administration
5,586
129,272
169100
Stormwater Administration (Transfer)
Overhead & administration
-
729,811
169102
Flood Response
Maintenance & operations
-
110,000
169104
Flood Planning
Maintenance & operations
70,000
940,000
169106
Technical Assistance
Maintenance & operations
-
75,000
169108
NFIP and CRS
Maintenance & operations
12,000
127,000
169110
Early Warning
Maintenance & operations
4,413
133,000
169119
Natural Resources Operations
Maintenance & operations
744,139
1,677,710
169120
AIS Operations
Maintenance & operations
-
192,944
169121
Water Planning Operations
Maintenance & operations
414,414
1,029,642
169100
Stormwater Lake Whatcom Operations (Transfer)
Maintenance & operations
-
346,000
169700
Stormwater NPDES Phase II
Maintenance & operations
160,320
169100
Stormwater Lake Whatcom Capital (Transfer)
Construction & improvements
-
-
169112
Repair and Maintenance
Construction & improvements
715,000
1,692,439
169114
Flood Hazard Reduction
Construction & improvements
3,169,846
4,437,456
Total 2022 FCZD Budget
Code Program
16923 Acme/VanZandtSubzone
16925 Birch Bay Subzone
16921 Lynden/EversonSubzone
16922 Sumas/Nooksack/Everson Subzone
16923 Acme/VanZandtSubzone
16924 Samish Watershed Subzone
16925 Birch Bay Subzone
16921 Lynden/EversonSubzone
16922 Sumas/Nooksack/Everson Subzone
16923 Acme/VanZandtSubzone
16925 Birch Bay Subzone
Total of 2022 FCZD Sub -Zone Budgets
Overhead & administration
Overhead & administration
Maintenance & operations
Maintenance & operations
Maintenance & operations
Maintenance & operations
Maintenance & operations
Construction & improvements
Construction & improvements
Construction & improvements
Construction & improvements
$10,345,398 $13,282,874
$ (2,937,476 )
Revenues Expenditures
$1, 500
872,200
387,921
45,460
32,500
135,210
11, 500
25,225
6,181
22,570
22,150
-
146,400
45,000
199,125
30,000
83,125
803,000
$1,183,790
$1,685,277
$(501,487)
Section II. Provisions Restricting Expenditures, Authorizing Actions, and Setting
Expectations.
For purposes of purchasing and award, projects listed in the attached exhibit (B) FCZD
Construction and Improvements Work Plan shall be administered pursuant to WCC Chapter
3.08.100 A.(2) and A.(3) using the process prescribed for capital budget appropriations.
Contracts for goods and services on individual items or projects listed in Exhibit (B) may be
exceeded by up to 10%, provided expenditures in total do not exceed the total
appropriation for the FCZD construction and improvement Work Plan.
APPROVED this 23rd day of November , 2021.
e�F, '�Y 9� ¢4 ud 59 p5Ag59e�
.��
ATTEST"
,..
FL �
Dana Brown-6� is, C[OrR of the Council
APPROVED, AS TO FORM:''
Approved by email/C Quinn/M Caldwell
Senior Civil Deputy Prosecuting Attorney
WHATCOM COUNTY FLOOD CONTROL ZONE
DISTRICT BOARD OF SUPERVISORS
WHATCOM COUNTY, WASHINGTON
Barry BVrian, Chair of Board of Supervisors
Exhibit A
OVERALL BUDGET SUMMARY
Budget Program
Code
169100
Adminstration $
169100
Transfers - To Stormwater
169102
Flood Response S
169104
Flood Planning S
169106
Technical Assistance S
169108
NFIP and CPS S
169110
Early Warning S
169112
Repair and Maintenance S
169114
Flood Hazard Reduction $
169119
Natural Resources S
169120
Aquatic Invasive Species $
169121
Water Planning S
169700
NPDES S
TOTAL $
DECREASE)/INCREASE
IN FUND BALANCE $
Approved
2021
Budget
Revenues
Expenditures
5,043,000
$
777,107
S
1,459,512
-
S
110,000
258.000
S
885.000
-
$
75,000
16,000
$
177,000
4,500
S
138,100
535.000
S
977,439
2,632.540
$
4,517,535
557,361
$
2,015, 894
-
S
152,217
175,000
S
978,546
-
S
160,320
9,221,401
$
12,423,670
(3,202,269)
Flood Control Zone District
2022 Budget
Supplemented
2021 Budget
2021 Year End
Projection
Proposed
2022 Budget
Revenues
Expenditures
Revenues
Expenditures
Revenues
Expenditures
S 5,043,000
S 784,093
$ 5,020,258
$ 902,333
$ 5,210,000
$ 859,8:
S 1,598,954
$ 1,279,163
$ 1,075,811
$ -
$ 110,000
$ -
S 55,000
S -
$ 110,000
$ 258,000
S 927,575
$ 115,000
$ 283,025
$ 70,000
$ 940,000
$ -
S 75,000
S -
$ 75.000
$ -
$ 75,000
$ 16,000
S 177,000
$ 10,000
$ 165,000
S 12,000
$ 127,000
S 4,500
$ 138,100
$ 4,413
$ 109,000
S 4,413
S 133,000
$ 385,000
$ 827,439
$ 264,115
S 623,039
$ 715,000
S 1,692,439
S 4.157,143
S 6,451,950
$ 2,957,851
S 4,196,439
$ 3,169,846
$ 4,437,456
S 563,639
S 2,040,950
$ 499,278
$ 2,115,916
$ 744,139
$ 2,227,659
S -
S 152,217
$ -
S 152,217
S -
$ 164,944
S 175,000
$ 1,082,246
$ 225,000
$ 1,023,736
$ 175,000
S 548,914
S -
$ 160,320
S -
$ 60,000
S -
$ 160,320
$ 10,602,282
$ 14,525,844
$ 9,095,915
$ 11,059,868
$ 10,100,398
$ 12,552,374
S (3,923,563)
$ (1,963,953)
$ (2,451,976)
Notes: 2021 Anticipated: 14 % Rev Lapse 24 % Exp Lapse
Assumes no fall flood in 2021; 2022 budget includes funding for flood response and new repair
2021 Txfr to Stormwater Projection includes a 20 % budget lapse.
Starting Balance
8,084,364
Projected Net Annual Activity
-1,963,953
Projected Balance
6,120,411
Budgeted Net Annual Activity
-2.451,976
Add back expense lapse of 20 %
(with related grant
income reduction)
1,876,506
Projected Balance
5,544,940
AS R's
Rev
Exp
6430 Auditor Fee Increases
$ -
$ 12,500 $
(12,500)
6432 Software Maint Contracts
S -
$ 5,000 S
(5,000)
6427 WSU Extension
S -
$ 25,000 S
(25,000)
6426 Collaborative Water Solutions Process 2022
S 125,000
$ 375,000 $
(250,000)
6431 AIS Enforcement Funding
S -
$ 28,000 $
(28,000)
6434 Domestic Water Use Efficiency Program
$ -
$ 40,000 $
(40,000)
6435 Climate Action Planner
S 120,000
S 120,000 $
-
6436 PIC Livestock Technical Assistance Program
$ -
S 50,000 S
(50,000)
6437 Technical Studies for WRIA I Planning Cps
S -
$ 75,000 S
(75,000)
Balance after ASR's
245,000
730,500
5,059,440
1/1/2021
1/112022
1/1/2023
169100
169100
169119
169121
169120
169121
169121
169119
169121
1/1/2023 (after ASRs)
2022 ASR's
Revenues I Expenditures
$ 17.500
$ 75,000
$ 28,000
245,000 S 610,000
245,000 $ 730,500
(485,500)
Exhibit A
Page 1 of 11
Exhibit A Flood Control Zone District
2022 Budget
Work Plan and Supporting Documentation
DETAIL FOR FCZD PROGRAM AREAS
FLOOD MAINTENANCE AND OPERATIONS
Flood Response (169102)
Proposed 2022 Budget
Revenues Expenditures
Assumptions/Notes
Wage and Benefits
$ - 10,000
Sand and sandbags
$ 3-5 000
Includes pre -deployed and sand bags for training
Preparedness training
$ 5,000
Road and M&O employees and equipment
Sector observers during response
$ 40,000
Road employees wages and benefits for 1 significant flood event
Construction contracts
$ 20,000
During and immediately following response
TOTAL
$ - $ 110,000
Budget based on 2009 flood with cost & wage increases
NET IMPACT TO FUND BALANCE
$ (110,000.0)
2021 YE projection assumes small fall flood
Proposed 2022 Budget
Revenues Expenditures
Wage and Benefits
$ : 130,000.
CFHMP refinement/update
Facilitation
$ 75,000
2021 BA inc 37.550 CAfor collmsw; need 2022 BAm cover est balance (35000) and
..andmenl
Hydraulic modeling/altematives analyses
$ 60,000
2021 PO will CA lest bal is 10k) 2022 for FEQ model support
FLIP process support/Engineedng design/Plan
$ 300, 000
2021 BA inc 5025 CA for NWIC: Herrera balance will CA into 2022 (2021 PO). NEP
grant ends in 2021
Sediment management
$ 200,000
likely to get under contract in 2022
$
-
$ 75,000
2020 PO for $85.7 balance t amendment for updated survey; 2021 BA for follow-up
Reach 1 Sediment
warkwith reach team
FLIP support for ag (AWB, fanner stipends)
$
70,000.0
$ 75,000
Pass through funding for ag consultant, farmers stipends and tribes- revenues from
FbD
High water mark survey
$ 25,000
TOTAL $
70,000.0
$ 940,000
NET IMPACT TO FUND BALANCE $
(870,000.0)
Technical Assistance (169106) '(
Proposed 2022
Budget
Revenues
Expenditures
Assumptions/Notes
Wage and Benefits '::
$ 75,000:
Postage for Special District reassessments
$ -
CDID#5 was updated in 2020 with improved parcel coverage
TOTAL $
-
$ 75,000
NET IMPACT TO FUND BALANCE
$
(75,000.0)
National Flood Insurance Prgm(169108)
Proposed 2022
Budget
Revenues
Expenditures
Assumptions/Notes
Wage and .Benefits ..
$ ` 100,000..
FEMA Floodplain mapping
S
-
$ 12,000
Assumes LNR mapping in 2022 - expenditures for public meeting
notice
Permit reviews
$
12,000.0
$ -
Flood permit fees
Public education/CRS activities
$
-
$ 15,000
CRS mailings
TOTAL $
12,000.0
$ 127,000
NET IMPACT TO FUND BALANCE
$
(115,000.0)
Early Warning System (169110)
Proposed 2022
Budget
Assumptions/Notes
Revenues
Expenditures
Wage and Benefits:-
S 1,000
Nooksack River gages - USGS
$
-
$ 105,000
Everson MainSt stage gage _ USGS
$
4,413.0
$ -
Canadians reimburse cost to maintain gage; AVZ pays for Jones
gage directly
Emergency access to SNOTEL
$
-
$ 5,000
Equipment for gage upgrades/repairs
$
-
$ 12,000
Equip at NF gage may need replacing
Repairs and maintenance
S
-
$ 10,000
TOTAL $
4,413.0
$ 133,000
NET IMPACT TO FUND BALANCE
$
(128,587.0)
Exhibit A
Page 2 of 11
Exhibit A
FLOOD CONSTRUCTION AND IMPROVEMENTS
Flood Control Zone District
2022 Budget
Work Plan and Supporting Documentation
epair and Maintenance 1169112) Proposed 2022 Budget
Revenues Expenditures Assumptions/Notes
Wage and Benefits $ 185,000'.
Mist
Assumed costs for responding to flood/new repairs (assumes no
Emergency/new projects as needed
$
50,000.0
$ 350,000
fall 2021 flood)
Miscellaneous repair projects
$
-
$ 50,000
Placeholder for small projects; fall 2019 flood assumed
Marine Drive Levee Repair 2020 damage (720004)
$
251,250.0
$ 300,000
Surveyed in 2020, construction in 2022 (FEMA)
2021 contract for alt analysis, 2021 amendment for design: rev are
Truck Road 2020 Damage (720008)
$
253,750.0
$ 250,000
75 % FEMA and 12.5% Roads
Everson Overflow Pipeline Bank Stabilization (720009)
$
135,000.0
$ 150,000
Alt anal in 2021; design in 2022; FEMA reimburses 75%
Bertrand Creek Levee Stabilization (721002)
$
25,000.0
$ 250,000
Start design in 2021 and construct in 2022, potential cost -share
from DD#4
ifigation Ptanning/lrnplementafion
Jail crew
$
-
$ 117,439
Jail crew labor for FCZD and SWIF projects; available to diking or
subzones
Reveg planning/coordination
$
-
$ 30,000
New 2-year contract in 2021
Reveg/mist supplies
$
-
$ 10,000
Increased to cover plant replacement costs for Deming and other
past projects as needed
TOTAL
$
716,000.0
$ 1,692,439
NET IMPACT TO FUND BALANCE
$
(977,439.0)
food Hazard Reduction (169114) Proposed 2022 Budget
Revenues Expenditures Assumptions/Notes
Wage and Benefits $ '; 315,000
Mist - $
300k commitment per year; 150k Roads, remainder cost -shared
Bank stabilzation/channel excavation
$ - $
114,624
70/30 b/w FCZD and SNE Subzone Subject to CPI-W Increases
)voer Nooksack River
Marietta property acquisition & demo New properties
$ - $
50,000
New owner interested in selling
Leases for agriculture
$ 3,780.0 $
-
River Rd and Emmerson Rd properties
Revenues are from lease; 2021 expenses to deal with barn fire
Walton Property Management
$ 16,800.0 $
-
(demo, electric and well house)
Revenues from FbD grant; 2021 BA reduced by 200k for transfer to
Floodplain acquisition
$ 847,866.0 $
1,059,832
Jones Crk; 2022 is remaining grant task balance if not used for GG
2021 BA from R&E CA; 2022 BA cover contract balance +
Ferndale Levee Improvement Project (719008)
$ 422,400.0 $
528,000
amendment for 60% design; rev from FbD
Lynden Levee Improvement Project (in conjunction with
$ 36,000.0 $
45,000
Chanel construction and USACE cost -share in 2021; planting and
USACE rehab project) (718005)
O&M plan in 2022
Abbott Levee Improvement (SWIF) (718010)
$ 155,000.0 $
260,000
Assumes Roads pays 50%; design and contract bank repair in
2021; 2022 BA is for Phase 2 design; 2021 BA inc NHC CA
2021 rev is NOAA funding through TNC; complete design and
Cougar Creek Early Action Project Design (720010)
$ 60,000.0 $
75,000
permit in 2022 as early action project for FbD?
Other FbD Early Action Projects (TBD)
$ 300,000.0 $
375,000
Balance of task budget in 2019-21 FbD grant, projects TBD
)uth Fork Fish Camp Project (72100x)
Phase 1 design/construction
$ 880,000.0 $
880,000
Pass -through FbD funding to Nooksack Tribe for integrated fish -
flood project: Tribe to provide grant match (not included in WRIP)
ahiberg Wetland Mitigation Site (710006)
2021 costs for BLA to settle claim; 2022 BA for work to start on site
Wetland plan development
$
130,000
nlan develnnme W—nitnrinn
2021 BA inc CA for Swift appraisals; 2021 PO for PSE contract
Berm and bridge design $ 54,000.0 $ 130, 000 balance, Permitting assistance from Roads (30k/yr) design cost -
shared 70/30 with Roads
Derus and Swift properties plus two easements in 2021; revenues
Land/easement acquisition $ 50,000.0 $ - from FbD; 2022 revenues is from road for new ROW
Construction $ 124,000.0 $ 155,000 Demo and cleanup of Derus- likely to slip to 2022 due to movers
Sediment trap maintenance (720005) $ - $ 45,000 Cleaning only one trap in 2021
lacier -Gallup Creek'Aliuvial Fan Restoration (718007)
Outreach $ 20,000.0 S 25,000 2021 YE exp is contract balance - 2021 PO
Preliminary design $ 200,000.0 $ 250,000 interim repair all analysis in 2021; 60% design in 2022
TOTAL $ 3,169,846.0 $ 4,437,456
NET IMPACT TO FUND BALANCE $ (1,267,610.0)
Exhibit A
Page 3 of 11
Exhibit A
NATURAL RESOURCES ADMINISTRATION
Staff
Office and operating
Flood Control Zone District
2022 Natural Resources Budget
Work Plan and Supporting Documentation
TOTAL $
NET IMPACT TO FUND BALANCE $
NATURAL RESOURCES OPERATIONS
Salmon Recovery
Staff
Restoration effectiveness monitoring, adaptive
management, and stewardship
Proposed 2022 Budget
Revenues Expenditures
$ 308,421
$ 316.528
- $ 624,949
(624,949)
$ 136,352
$ 61.408
Assumptions/Notes
Includes salary for 2.5 FTEs and overtime.
1 FTE
WCC crew restoration activities
Maintaining existing restoration projects*
$ 92,112
WCC crew contract for maintaining
New restoration projects*
$ 30,000
Contracted services for activities
supporting planting, fencing, culvert
replacement etc.
Marine Resources Committee
Staff
$
102,000
$ 107,225
0.95 FTE + $1,100 for intern
MRC restoration projects
$ 4,000
MRC projects
Water Quality/Pollution Identification & Correction
Program Coordination
$ 136,352
Program Coordinator (1 FTE)
Water Quality Monitoring
$
6,000
$ 267,597
Sampling personnel, lab contract, one
Data Management
$
100,000
$ 100,000
WCD Data Manager
Technical Assistance
$
170,000
$ 170.000
WCD Farm Planners
Community Outreach
$
220,723
$ 269,723
Outreach staff, WCD staff, supplies
Incentives
$
58,000
$ 79,000
OSS and small farm cost share
Compliance
$
87,416
$ 87,416
PDS Staff
Coordination and Planning
Lake Whatcom Homeowner Incentive Program
$ 61,525
Staff time only (0.5 FTE); contracted
Cosmos
CosMos Project $125 with funding (RD
40%, BB 10%, GF 30%)
WSU Extension outreach services
TOTAL $ 744,139 $ 1,602,710
NET IMPACT TO FUND BALANCE $ (858,571)
TOTAL FOR COST CENTER $ 744,139 $ 2,227,659
$ 1,483,520
*Integrated Salmon Recovery/Flood Hazard Reduction capital and planning projects appear
AIS ADMINISTRATION
Staff
Office and operating
TOTAL $
NET IMPACT TO FUND BALANCE $
AIS OPERATIONS
Coordination and Planning
Interlocal Agreement (COB)
Enforcement
AIS online education program website maintenance
TOTAL
NET IMPACT TO FUND BALANCE
under Cost Center 169114 and 169104.
Proposed 2022 Budget
Revenues Expenditures Assumptions/Notes
$ Misc. Expenses
ASRs
$ 50,000
$ 25,000
$ $ 154,944 Contribution to City for AIS Program;
includes COB program cost increase
$ Interdepartmental Agreement with WCSO $ 28,000
$ $ 10,000 Contracted services for online
$ $ 164,944
$ (164,944)
TOTAL FOR COST CENTER $ - $ 164,944
$ 164,944
Exhibit A
Page 4 of 11
Exhibit A
Flood Control Zone District
2022 Natural Resources Budget
Work Plan and Supporting Documentation
Water Planning;(169121) Proposed 2022 Budget
Revenues Expenditures
WATER PLANNING ADMINISTRATION
Staff $ 5,586 $ 128,722
Office and operating $ 550
TOTAL $ 5,586 $ 129,272
NET IMPACT TO FUND BALANCE $ (123,686)
WATER PLANNING OPERATIONS
Coordination and Planning
(Drainage -Based Management
$
50,000
$
Watershed Planning Administrative Support
$
LENS Groundwater Model
$
LIO administration
$
119,414
$
Stream Gauging
$
Climate Action Planner
Domestic Water Use Effeciency Program
Water Settlement Initiative
Technical Studies for WRIA I Planning Ops
TOTAL
$
169,414
$
NET IMPACT TO FUND BALANCE
$
(250,228)
TOTAL FOR COST CENTER
$
175,000
$
50,000
25,000
100,000
119,642
125,000
Assumptions/Notes
Watershed Planner+ LIO Labor
Drainage -Based Management
Watershed Planning Administrative Support
Peer Review and Modification of
Groundwater Model
Administration of LIO process
USGS Stream Monitoring/AESI GW
Monitoring Contracts
$ 40,000
Collaborative Process to Resolve Water
Issues
$ 250,000
Collaborative Process to Resolve Water
Issues
$ 75,000
419,642
548,914
373,914
TOTAL ASRs
$ 2,941,517
$ 919,139
$ (2,022,378)
$ 2,022,378 Total Budgeted Expenditure
$ 2,490,378 Total with ASRs
$ (199,230) 8% lapse on expenses with ASRs
$ 2,291,148 (Estimated 2022 Expenditures
$ 468,000
Exhibit A
Page 5 of 11
Exhibit A
Lynden/Everson Subzone
2022 Budget
and Fund Balance Projections
Fund balance as of December 31, 2020
2021 Estimated Revenues:
Assessment
Interest earnings/penalties
2021 Estimated Expenditures:
Levee vegetation maintenance
Mole control/misc
Alternative corrections crew labor
Address new ACOE deficiencies
Lynden Levee Rehabilitation (USACE) and Channel Work
Plant materials/maintenance supplies
Upper Hampton Backsloping
Abbott Levee Bank Stabilization & Habitat Project
Coordination, TA & Project Mgmt.
$177,705 N (-) Notes
Total
Projected December 2021 fund balance $123,165
2022 Revenues -Proposed Budget
Assessment
Interest earnings
2022 Expenditures - Proposed Budget
Levee vegetation maintenance
Mole control/misc
Alternative corrections crew labor
Address new ACOE deficiencies
ACOE Culvert Inspections
Cost-share/repairs as needed
Coordination
$43,060
$2,400
$25,000 brushing, spraying and
hydroseeding
$2,500 ACOE deficiency
$5,000 misc levee and mitigation
$5,000 Blankers levee & misc.
$25,000 local contribution
$2,500 for mitigation
$5,000 trucking and/or dozer time
$25,000 local contribution
$5,000 staff time
$45,460 $100,000
$43,060
$2,400
$25,000 brushing, spraying and
hydroseeding
$2,500 ACOE deficiency
$5,000 misc levee and mitigation
maintenance
$5,000 new problems placeholder
$5,000 video/photos
$30,000 New damage
$5,000 staff time
Total $45,460 $77,500
Projected December 2022 fund balance $91,125
Exhibit A
Page 6 of 11
Exhibit A
Sumas/Nooksack/Everson Subzone
2022 Budget
and Fund Balance Projections
Fund balance as of December 31, 2020
$1,474,948 N
(-) Notes
2021 Estimated Revenues:
Assessment
$121,210
Interest earnings
$14,000
2021 Estimated Expenditures:
Levee vegetation maintenance
$5,000 brushing and spraying
Mitigation monitoring and maintenance
$1,000 supplies
Alternative corrections crew labor
$2,500 misc maintenance
Transfer to Swift Creek project fund
$45,000 150k Road fund, 105K FCZD
fund also transferred for
$300k/yr
Coordination
$1,500 staff costs
Pump station electric charges
$2,000 PSE
Total
$135,210
$57,000
Projected December 2021 fund balance
$1,553,158
2022 Revenues - Proposed Budget
Assessment
$121,210
Interest earnings
$14,000
2022 Expenditures - Proposed Budget
Levee vegetation maintenance
$5,000 brushing, spraying and
hydroseed
Pump station electric charges
$2,000 PSE
Mitigation monitoring and maintenance
$1,000 supplies
Alternative corrections crew labor
$2,000 misc maintenance
Coordination, TA & Project Mgmt.
$1,500 staff costs
Transfer to Swift Creek project fund
$49,125 150k Road fund, 105K FCZD
fund also transferred for
$300k/yr subject to CPI -Urban
Cost-share/repairs as needed (new damage)
$150,000 30% of $500,000 project
Total
$135,210 $210,625
Projected December 2022 fund balance
$1,477,743
Exhibit A
Page 7 of 11
Exhibit A
Acme/Van Zandt Subzone
2022 Budget
and Fund Balance Projections
Fund balance as of December 31, 2020 $365,394 (+) (-) Notes
2021 Estimated Revenues:
Assessment $23,225
Interest earnings $2,000
2021 Estimated Expenditures:
Cost-share/repairs as needed $0
M&O for Jones Creek stage/prec gage (9 month $6,001 9 month operation with
operation) telemetry
Ad min support for meetings/minutes $1,000
Total $25,225 $7,001
Projected December 2021 fund balance $383,618
2022 Revenues - Proposed Budget
Assessment $23,225
Interest earnings $2,000
2022 Expenditures - Proposed Budget
Cost-share/repairs as needed $30,000 30% of 100k project
M&O for Jones Creek stage/prec gage (9 month $6,181 9 month operation with
operation) telemetry
Admin support for meetings/minutes $1,500
Total $25,225 $37,681
Projected December 2022 fund balance $371,162
Exhibit A
Page 8 of 11
Exhibit A
Fund balance as of December 31, 2020
2021 Estimated Revenues:
Assessment
Interest earnings
2021 Estimated Expenditures:
Natural resource staff salaries, wages, benefits
Office & operating supplies
Repair & maintain weir & channel - contract services
Repairs & Maintenance - interfund
Samish Watershed Subzone
2022 Proposed Budget
and Fund Balance Projections
$137,453 N H Subtotal Notes
$22,555
Permits
Tota I
Projected Fund Balance December 31, 2021 $144,555
2022 Revenues - Proposed Budget
Assessment
Interest earnings
2022 Expenditures - Proposed Budget
Natural resource staff salaries, wages, benefits
Office & operating supplies
Repair & maintain weir & channel - contract services
Repairs & Maintenance - interfund
Permits
Total
Projected December 2022 fund balance $144,975
$21,820
2X June actual
$735
2X June actual
$15,453
$6,455
YTD x 2.25 to account for more hours in fall
$337
$3,800
8 months of the 12 month LOA
$4,861
This is for M&O interfund and was assigned to "668-
Other services in 2021 budget but changes were
assigned to "705 -R&M" which is where this was
budgeted in the draft 2021 budget
$0
Permits current thru spring 2024
$22,555
$15,453
$22,570
$21,820
Assumes 2022 similar to 2021
$750
Assumes 2022 similar to 2021
$22,150
$6,750
$1,250
Weir timber replacement, new neoprene baffles,
etc.
$7,900
2021-2022 LOA amount plus 3.5% cost increase for
2022-2023 LOA + $2000 for beaver trapping
$6,250
Assumes M&O rental rates don't inflate appreciably
$0
Permits current thru spring 2024
$22,570
$22,150
Exhibit A
Page 9 of 11
Exhibit A
Birch Bay Subzone
2022 Budget
Administration/
Program
Capital
Maintenance,
Water Quality
Education &
Habitat
2022 Break Out
Personnel
Development &
Improvement
Small Works,
Monitoring
Outreach
Improvement
Total
Overhead/
Management
Projects
& Scoping
Admin M&O Construction
2022
2022
2022
2022
2022
2022
2022
2022
A O C
Revenue
FEMA - Fed
(71,250)
(71,250)
- (71,250)
FEMA - State
(11,875)
(11,875 )
- (11,875)
Assessment Penalties
(2,500)
(2,500)
(2,500)
Interest
(23,000)
(23,000)
(23,000) _
Assessments
(780,000)
(780,000)
(780,000) _
Stormwater transfer in
(66,700)
(66,700)
(66,700) -
REET II transfer in
Revenue Total
, (872,200)
-(83,125)i
((955,325)
f(872,200) (83,125)
Expense
Salaries & Wages
142,983
142,983
Extra Help
29,000
29,000
Overtime
2.000
2,000
Benefits
110,078
110,078
Total Salaries & Benefits
284,061
-
284,061
284,061
Unrealized Gain (Loss)
Office & Operating Supplies
1,000
6,000
15,000
22,000
7,000 15.000
Office & Oper. Supplies-Interfund
200
200
200
Printing
5,000
5,000
5,000
Books/Publications/Subscrip.
200
200
200
Tools & Equipment
100
100
100
Software
1,500
1,500
1,500
Other Services and Charges (Emergency)
50,000
50,000
50,000
Contractual Services
5,000
12,500
17,500
17.500
Professional Services
18,000
10,000
345,000
14.000
40,000
427,000
68,000 359,000
Building Maintenance
1,332
1,332
1,332
Other Service s-Interfund
60,000
12.000
72,000
- 72,000
Postaae/Shipping/Freight
500
3,000
3,500
3,500
Postage-Interfund
100
100
100
Telephone
965
965
965
Travel-Educ/Training
1,000
1,000
1,000
Travel -Other
1,500
1,500
1,500
Advertising
1,500
1,500
1,500
Equipment Rental
200
200
200
Space Rental
1.000
250
1,250
1,250
Space Rental-Interfund
1,500
1,500
1,500
Insurance Premium - Interfund
760
760
760
Repairs & Maintenance
40,000
40,000
40,000
Registration/Tuition
2,100
2,100
2,100
Meeting Refreshments
300
200
500
500
Administrative Cost Allocation
11,575
11,575
11,575
Other Miscellaneous-Interfund
2,000
2,000
2,000
Intergov. Professional Services
10,000
10,000
10,000
Capital Outlays - Other Improvements
355,000
355,000
355,000
Operating Transfer Out - Gen Fd
22,978
22 978
22 978
Total Expenditures
399,471 11,300
760,000
73,000
12,600
65,950 15,000
1,337,321
387,921 146,400 803,000 1,337,321
Net Fund Impact: 381,996
(484,279) 146,400 719,875 381,996
Projected 2022 Starting Balance: 1,800,000
Net 2022 Fund Impact: (381,996)
Lapse Add Back at 15% 200,598
Projected 2022 Ending Balance: 1,618,602
Exhibit A
Page 10 of 11
Exhibit A Birch Bay Subzone
2022
Capital Budget
Capital Improvement Projects
Object Code Project/Program 2022 Notes
9259017002 Harborview Road/Birch Bay Drive Stormwater Improvements, Ph 2
6630 PROFESSIONAL SERVICES Design, archaeology, bid support
7380 CAPITAL OUTLAYS - OTHER IMPROVEMENTS Construction contract, ROW
6699 OTHER SERVICES INTERFUND 10,000 Construction staking, as -built survey, permitting assitance, engineering oversight
7199 OTHER MISC INTERFUND Permit expense
9259020001 Semiahmoo Drive Stormwater Improvements
6630 PROFESSIONAL SERVICES 105,000 Design, archaeology, bid support
7380 CAPITAL OUTLAYS - OTHER IMPROVEMENTS 325.000 Construction contract, ROW
6699 OTHER SERVICES INTERFUND 10.000 Construction staking, as -built survey, permitting assitance, engineering oversight
7199 OTHER MISC INTERFUND Permit expense
9259019002 Charel Terrace Bank Stabilization Study
6630 PROFESSIONAL SERVICES
7380 CAPITAL OUTLAYS - OTHER IMPROVEMENTS
6699 OTHER SERVICES INTERFUND
7199 OTHER MISC INTERFUND
9259020002 Holeman Avenue Stormwater Improvements
6630 PROFESSIONAL SERVICES
7380 CAPITAL OUTLAYS - OTHER IMPROVEMENTS
6699 OTHER SERVICES INTERFUND
7199 OTHER MISC INTERFUND
9259021001 Normar Place Stormwater Improvements
6630 PROFESSIONAL SERVICES
7380 CAPITAL OUTLAYS - OTHER IMPROVEMENTS
6699 OTHER SERVICES INTERFUND
7199 OTHER MISC INTERFUND
55,000 Herrera design contract. Received $110k from FEMA, requires 12.5 % match
30,000 Construction contract, ROW
10,000 Construction staking, as -built survey, permitting assitance, engineering oversight
Permit expense
90,000 Design, archaeology, bid support
Construction contract, ROW
Construction staking, as -built survey, permitting assitance, engineering oversight
Permit expense
55,000 Design, archaeology, bid support
Construction contract, ROW
20,000 Construction staking, as -built survey, permitting assitance, engineering oversight
Permit expense
9259019001 Lora Lane Drainage & Tide Gate Modifications
6630 PROFESSIONAL SERVICES 40,000 Design, archaeology, bid support
7380 CAPITAL OUTLAYS - OTHER IMPROVEMENTS Construction contract, ROW
6699 OTHER SERVICES INTERFUND 10,000 Construction staking, as -built survey, permitting assitance, engineering oversight
7199 OTHER MISC INTERFUND Permit expense
Total Expenditures 760,000
.Object Code Totals
6630 PROFESSIONAL SERVICES.
345,000
6699 OTHER SERVICES INTERFUND
60,000
7199 OTHER MISC INTERFUND
0
7380 CAPITAL OUTLAYS OTHER IMPROVEMENTS
355,000
`.. 8351 TRANSFER OUT.
0
Total Expenditures
760,000
Exhibit A
Page 11 of 11
Exhibit B
Whatcom County Flood Control Zone District
Flood Capital Program
2022
Department
Fund
Database
ID No.
Project Title
Year
Cost
Flood Capital Program
Public Works
Flood Fund
07-002
Marietta Acquisition
2022
$
75,000
Public Works
Flood Fund
20-001
Marine Drive Levee 2020 Damage Repair
2022
$
335,000
Public Works
Flood Fund
16-007
Abbott Levee Protection and Improvement
2022
$
310,000
Public Works
Flood Fund
16-003
Lynden Levee Improvement
2022
$
55,000
Public Works
Flood Fund
07-105
Jones Creek Debris Flow Protection
2022
$
385,000
Public Works
Flood Fund
16-008
Cougar Creek Early Action Project
2022
$
95,000
Public Works
Flood Fund
20-002
Everson Overflow Pipeline Bank Stabilization
2022
$
180,000
Public Works
Flood Fund
20-003
Truck Road Flood Damage
2022
$
290,000
Public Works
Flood Fund
16-005
Bertrand Creek Levee Stabilization
2022
$
285,000
Public Works
Flood Fund
07-104
Ferndale Levee Improvement
2022
$
578,000
Public Works
Flood Fund
18-006
Glacier -Gallup Alluvial Fan Restoration
2022
$
325,000
Public Works
Flood Fund
20-004
Dahlberg Wetland Mitigation Site
2022
$
160,000
Public Works
Flood Fund
07-002
Floodplain Acquisition
2022
$
1,060,000
Total
$
4,133,000
Public Works
BBWARM
18-009
Semiahmoo Drive Drainage Improvements
2022
$
440,000
Public Works
BBWARM
20-011
Charel Terrace Stormwater Outfall Improvements
2022
$
95,000
Public Works
BBWARM
07-242
Holeman Avenue Stormwater Improvements PW-1
2022
$
90,000
Public Works
BBWARM
19-004
Normar Place Stormwater Improvements
2022
$
75,000
Public Works
BBWARM
18-008
Lora Lane Drainage & Tide Gate Modification
2021
$
80,000
Total
$
780,000
Exhibit B
Page 1 of 1