HomeMy WebLinkAboutres2018-036WHA TCOM COUNTY COUNCIL AGENDA BILL No. 2018-268
CLEARANCES
Initial
Date
Date Received in Council Office
Agenda Date
Assi ned to:
Originator:
GSS
917118
f'-FjZ't, f-r"'A _t A
N ---
9125118
Council /Introduction
Division Head:
GSS
917118
1019118
Public Hearing
Dept. Head:
/1
13 6
EP 1 2 0 8
Prosecutor:
KNF
9110118
Purchasing /Budget:
A 1K
0UNUL
Executive: 1h
1�
9 -7
TITLE OF DO i 09wn
Resolution adopting the Six-Year Water Resources Improvement Program (WRIP), 2019-2024
A TIA CHMENTS.
• Memorandum
• Resolution
• Six-Year WRIP, 2019-2024
• Proiect Narratives
SEPA review required? ) Yes (X) NO
Should Clerk schedule a hearing? (X) Yes NO
SEPA review completed? ) Yes NO
Requested Date: October 9, 2018 (public hearing required under
RCW86.15.120)
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE.
Resolution by the Whatcom County Flood Control Zone District Board of Supervisors adopting the Six-
Year Water Resources Improvement Program (WRIP) for 2019-2024. The adoption by resolution is
pursuant to the Revised Code of Washington (RCW 86.15.110).
COMMITTEE A CTION.-
COUNCIL ACTION. •
9/25/2018: Introduced 6-0, Byrd out of the room
10/9/2018: Approved 6-0, Resolution 2018-036
(Council acting as the FCZDBS)
Related County Contract
Related File Numbers:
Ordinance or Resolution Number:
Res. 2018-036
Please Note: Once adopted and signed, ordinances and resolutions are available for viewing and printing on
the County's website at: www.co.whatcom.wa.uslcouncil.
PROPOSED BY:
INTRODUCED: gf75f1 R
2018 -036
RESOLUTION NO.
(A Resolution of the Whatcom County Flood Control Zone District Board of
Supervisors)
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT
SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM
FOR THE YEARS 2019 THROUGH 2024
WHEREAS, pursuant to RCW 86.15.110, flood control or storm water control
improvements may be extended, enlarged, acquired, or constructed by a zone pursuant to a
resolution adopted by the Board of Supervisors; and
WHEREAS, Whatcom County Public Works Department on behalf of the Flood
Control Zone District has prepared a Six -Year Water Resources Improvement Program for
adoption; and
WHEREAS, pursuant to RCW 86.15.120, the supervisors shall hold a public hearing
prior to adopting the resolution; and
WHEREAS, the Six -Year Water Resources Improvement Program attached hereto as
Exhibit °A" has been reviewed and determined to be consistent with the County's
comprehensive plan and is consistent with the following plans:
• Lower Nooksack River Comprehensive Flood Hazard Management Plan,
October 1999
• Jones Creek Debris Flow Study, March 2004
• WRIA 1 Salmon Recovery Plan, October 2005
• Birch Bay Comprehensive Stormwater Plan, July 2006
• Lake Whatcom Comprehensive Stormwater Plan, March 2008
• Lake Samish Basin Comprehensive Stormwater Plan, July 2012
• Swift Creek Sediment Management Action Plan, July 2013
• Lake Whatcom Management Program 2015 -2019 Work Plan, April 2015
• Nooksack River System -Wide Improvement Framework, June 2016; and
Page 1
WHEREAS, pursuant to RCW 86.15.110, for constructed improvements the
preliminary engineering studies are on file with the Whatcom County Public Works
Department; and
WHEREAS, pursuant to RCW 86.15.110, the estimated cost of the acquisition or
construction of the improvement, together with supporting data is included in the Six -Year
Water Resources Improvement Program; and
WHEREAS, the improvements will benefit one or more zones, subzones and the
county as a whole;
NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Flood Control Zone
District Board of Supervisors as follows:
That the Whatcom County Flood Control Zone District Six -Year Water Resources
Improvement Program for the years 2019 through 2024, which is attached hereto as
Exhibit "A ", is hereby adopted.
APPROVED this loth day of October , 2018.
®w 0�0`$lR�t�Ett�89 /Afp�.d
A7.
ATTEST
CJ!_ N' � b
a
Dana Arowri i vis'_C le 166 the, `ouncil
F-
APPROVD AS TO `F R%'1:
;ecutor
Page 2
Flood I ntr one District Board of
Sup rvi or
WH T O NTY, WASHINGTON
Rud Browne, Chair
W HATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 20192024 SIR -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A UPDATED 09/06/2018
Agate Heights Estate /Bay lane, Phases 2 (LW CSPX CIP -11, CIP -12):
1 System upgrades to improve water q uality--bioinfiltration swales, 07- 102 60.5
reduce ditch erosion, media filter drains, and treatment vaults
2 Northshore Drlve,Edgewater Lane (LW CIP -18): System upgrades to
improve water lit b'ofiltrat on swales, reduce ditch erosion 14'002 62.2
qua y-
3 Silver Beach Creek (LW CSPX CIP -04, CIP -06): Main channel 07 -095 60.5
restoration below Hillsdale using natural vegetation
4 Sudden Valley (LW CSPp CIP -16, CIP -17): Drainage systems upgrades
and outfall retrofits 13 -004 46.3
Lowell Drive end Cedarbrook Court (LW CIP -19): Construction 2022.
5
no of p pe, media filtration, and natural drainage system 14 -003 621
improvements
Glen Cove Lane /Lakeside Street (LW CIP -20): Construction 2023.
6 System upgrade to improve water quality- bioinfiltration swales, filter 15.002 58.2
vaults; media filter drains, and rain gardens
7 South Bay OH,,: Constuction 2024. System upgrades to improve I6 -010 62.2
water quality - biofiltration swales, reduce ditch erasion
Strawberry Point /Lake Whatcom Blvd; Constuction 2025, System
8 upgrades to improve water quality- vaults, biofiltration swales, 17 -001 62.2
channel restoration
81rch Bay Drive Outfall Improvement (PW -3) & Birch Bay Drive &
9 Petticore Lane Storm Drain improvements (PW -2): Replace CBs,
upsize pipes, clean and re-establish roadside ditches on Birch Bay 07 -242 3J.8
Drive from Holeman Aveune to Pt. Winter- Rd
Harborview Road Drainage improvements Phase 1(CR -1): Install new
10 low level system along Birch Bay Drive (CR 2, Hl 11 Ups ze culverts
and instail new high level system along Harbory ew Road to tarry 07 -217 52 0
upland water directly to Birch Bay
lnra lane Drainage &Tide Gate Modifications (TC1-2): Replace
11 cxusting tide gate structure and repair embankment, install Type 2 CS 18 -008 42.5
and culvert under Birch Bay Drive
Semlahmoo Drive Drainage Improvements North (BP 2) Upsize
12 culverts and re establ sh roads de ditch on east side of Sem'ahmoo 38-9 50.3
Drve
Holeman Avenue Storm Drain Int.1 ants (PW -1): Replace CBs,
13 upsize culverts, re- establish ditch on Holeman Ave near Birch Bay 07 -242 37.8
Drive
Wooldridge Ave /Sunset Dr Drainage Improvements (TC21: Improve
14 drainage system to reduce local flooding and incorporate water 13 -007 52.2
quality treatment
Semiahmgo Drive Drainage Improvements -South (BP -S): Upsuc
35 culverts and re establish roadside ditch on east side of Semiahmoo 18.010 48,6
Drive
Birch Bay Drive & Pedestrian Facility Project: BBWARM contribution
16 toward st,rmwater improvements as part of larger road fund project 07.030 72.1
in Birch Bay
Y
17 Shallow Shore Drive Drainage Improvements 18 -007 44A
Page 1 of 2
RW
CN $ 700,000
REET
RW
Chl
RW
CN
RW
CN
4
RW
CN
RW
CN
$ 900,000
PE $ 160,000
REET
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
PE
-
RW _$ 10,000
REET
RW
RW
RW
RW
RW
$ 620,000
-
ON
CN
$ 450,000 -. gEET
CN
CN
CN
CN
RE S RW $ 10,000
CN
REET
FE
RW
$ 100,000 REET
PE
PE
CN
$ 30,000
$ 260,000
REET
REET
PE
RW
Chl
$ 12-
120,060
j $ 20,000
BEET
REET
PE
RW
ICN
PE
RW
CN $ 600,000
REET
$ 1,160,000
PE $ 15,000
1 REET
PE
$ 30,000 REET
PE
$ 120,000
REET
PE
PE
PE
PE
PE
PE
RE
RW
CN
RW
CN
$ 10,000. REET
RW
CN
RW
CN
$ �REET
RW
CN
qW
[N
$50,000
PE
P E
-
PE
$ 125,000
REET
PE
$ 75,000
REET
PE
PE
PE _
PE
PE
PE
PE
PE
RW
-_-
RW
RW
$ 1D,000
REET
RW
RW
RW.
90,000
CN
CN
CN
CN
BEET
CN
PE
PE
RW
PE
PE
RW
PE
PE
RW
PE
PE
RW
$ 125,000
$ 10,000
REET
REET
PE $ 75,000
PE
RW
REET
PE
PE
RW `
$ 620,000
CN
CN
CN
CN
CN
CN $ 410,000
FEET
PE
PE
PE
PE
PE $ 125,000
REET
PE $ 75,000
REET
PE
RW
PE
RW
PE
RW
PE
RW
PE
RW $ 20,000
REET
PE
RW
$ 220,000
PE
PE
PE
PE
i
PE
PE
PE
PE
PE -
PE
RE '.$ 125,000
PE
REET
_
RW
RW
RW
RW
RW
RW
5 125,000
CN
CN
CN
CN
CN
CN
PE $ 1221500
BBWARM
IM
PE
PE
PE
2M
PE
PE
MEM
_
RW $ 10,000
BBWARM
RW
_
RW
RVy
RW
RW
CN $ 200,000
REET
Chl
CN
CN
CN
CN
$ 1,064,500
CN $ 5451000
BBWARM
CN
CN
-1_
!
CN
Chl
CN
CN
PE $ 36,000
BBWARM
PE
$ 200,000 BBWARM
PE
PE
pg -
RW
CN
-
CN
RW
CN
CN
$ 30,000 'BBWARM
$ 200,000 �'REFT
$ 92D,00D .BBWARM
RW
CN
j
RW
CN
CN
I
RW
CN.
CN
RW
CN
CN
$ 1,685;000
PE $ 66,000
BBWARM
PE
$ 34,500 BBWARM
PE
$ 15,000
BBWARM
PE
pE
PE
-
RW
RW
CN
$ 200,000
BEET
RW
RW
RW
$ 450,5001
CN
CN
CN
$ 135,000
BBWARM
CN
Cry
Chi
-
PE
PE
$ 50,000 BBWARM
PE
PE
PE
PE,
.
RW
CN
RW
CN
RW
CN
RW
CN
$ 150,000
BBWARM
RW
CN i
RW
CN - -
$ 200,000
_
PE
PE
PE
$ 85,000
BBWARM
PE
PE
PE
R.
-
RW
RW
RW
RW $ 10,000
REET
RW
$ 285,000
-
CN
CN
PE
RW
RE
PE
-
CN
PE
RW
CN
PE
CN
PE
RW
CN
PE
_
CN
PE
RW
CN
PE
$ 2.0,000
BEET
CN $ 190,000
PE
RW $ 20,000
CN
PE $ 65,000
BEET
BBWARM
BBWARM
CN
PE
CN $ 20.,0.0
CN $ 800,000
PE
(REET
BBWARM
$220,000
RW
RW
_
RW
RW
RW
RW
$ 65,000
CN
CN
CN
CN
-
CN
ON
.-_-
PE
PE
PE
PE
PE
pE
RW -.
RW
RW
RW
RW
RW
$ 250,000
CN
CN
CN
$ 250,000 (BBWARM
CN
CN
CN
_
PE
PE
$ 50,000 REET
PE
PE
PE
PE
RW
RW
RW
RW
RW
RW
$ 230,000
CN
CN
IN
CN
$ 180,0001
CN
CN
Page 1 of 2
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT 2019 -2029 SIX -YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A UPDATED 09/06/2018
nowa.;.
Total through 2019�
706,000 �FEMA Fed/State grant
$2,046,000
dF, or ati" along approximately 300 ft of levee
®__�
wo,�w■��
®w
CN 20,000
®
project)
®
®�
���wwwwim■ww���w
®w
®
. - .... .
®
®��m�-
®mow
c■w
®
.. ... ••. - . .. . . . -
®
®®
.
Elm-
,IveM th—gh levee with one large
Abbott Levee Upstream Ti,.I, .- Extend,rd realign Upstream and.f
ojaFtTot.1
••.
���w
��w■��w
�
w