Loading...
HomeMy WebLinkAboutSpecial Committee of the Whole September 10 20131 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 WHATCOM COUNTY COUNCIL Special Committee of the Whole September 10, 2013 CALL TO ORDER Council Chair Kathy Kershner called the meeting to order at 1:07 p.m. in the Council Chambers, 311 Grand Avenue, Bellingham, Washington. ROLL CALL (1:06:36 PM) Present: Barbara Brenner, Sam Crawford, Kathy Kershner, Bill Knutzen, Ken Mann, Carl Weimer and Pete Kremen. Absent: None. SPECIAL PRESENTATION 1. CONSULTANT DLR GROUP TO PRESENT A JAIL PLANNING UPDATE (AB2013- 04213) Jack Louws, County Executive, stated today's presentation includes a schedule update and discussion of operating and construction costs. The cost estimates include the full build out of phases one and two of the facility. Brenner stated she would like to receive meeting documents before the meeting so she has time to read it and prepare before the meeting, even if the documents are draft. Bill Valdez, DLR Group, read from a presentation (on file). The estimates are based on the 2026 needs estimate, which calls for a 649 bed jail. The initial number of beds in phase one is 521 beds. Operational and construction costs are based on phase one and phase two. Lori Coppenrath, DLR Group, continued the presentation beginning with the areas included in the operational budget, which includes only the jail, not the Sheriff's Office. Valdez concluded the presentation beginning with the estimated construction cost budget. The subtotal cost of brick and mortar construction is $79 million. Including various soft costs, the grant total estimate is $109 million. Knutzen asked the potential for estimates to come in under budget due to lower construction costs as a result of economic factors. Valdez stated the cost estimators base their estimates on whatever the middle bid would be, based on the current bid climate. If the construction climate changes, those values can go up or down, which requires the contingency budget. Knutzen asked if they are limited to how many general contractors can bid. Valdez stated the numbers are based on a design bid build delivery method, which is an open bid. Special Committee of the Whole, 9/10/2013, Page 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 They would receive bids from all interested general contractors who are able to bond the project. If they choose, a different delivery model could require qualifications ahead of time. Mann stated incorporate alternative sentencing and other programs into the design. He asked if the current estimates allow for alternative programs and when they will discuss which alternative programs and facilities they would like to include. Valdez stated the County already has many alternative programs. Whatcom County is extremely progressive with its incarceration alternatives. Not all of the jail population can work in an alternative program. The psychological and medical areas are sized to accommodate all future needs. Additional programs outside of the jail is a bigger social discussion that may still need to occur. Coppenrath described the design's plan for alternative evaluations. Kershner asked if the design will include medical service areas onsite so they don't have to take inmates to the emergency room, as is happening right now. Coppenrath stated the medical facilities will be larger and more comprehensive. There will still be instances in which they will have to take an inmate to the hospital. There will be nursing staff, but not a doctor, onsite 24 hours per day, seven days per week. Brenner stated it seems like the amount estimated for mental health and substance abuse services is low. Valdez stated they are the program spaces outside the housing units. Brenner asked if the estimates are for the square footage, not the programs themselves. Valdez stated that's correct. Special needs housing is included in the housing estimates. Two of the 12 in phase one would be dedicated to special needs. Brenner asked the definition of third party commissioning fees under the soft costs section. Valdez stated it's when they bring in a commissioning agent as the project is under construction and again after construction to make sure everything was installed properly and functions properly. It's more than just inspection. The person has expertise in electrical and mechanical systems. It adds an extra level of oversight and expertise to make sure the building functions as designed. Brenner asked about building art. Valdez stated it is a State requirement. They are going to modify the estimate. It's about aesthetic improvements. Brenner asked if landscaping costs are included. Valdez stated they are, in the site work requirements. He has more detailed information available. Kremen stated the allocation of a three percent owner's contingency is low. Valdez stated it is low at this time. Other line items with margins and estimates have higher contingencies already built in. As they further define the estimates, the estimating contingency will be decreased. By the time they arrive at bid day, the owners contingency will be closer to five to eight percent. Mann referenced the diversion and alternative programs and asked for a snapshot of the jail population and who is available and qualifies for alternative programs. Valdez stated that detailed information will be in the needs assessment report, which will be available in a few weeks. They can present on that topic in October. Mann stated he would like that information in a report and a presentation on that topic. He's hearing about this from the community. Special Committee of the Whole, 9/10/2013, Page 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Weimer stated defense lawyers in the community say Whatcom County has chosen a conservative amount of time people can get off for good behavior. Other counties in the state are more liberal in that time, which reduces jail population. He asked if that was taken into account when they came up with the jail population number. Bill Elfo, County Sheriff, stated it fluctuates with the behavior of the inmate. In the main jail, the population has aggressively grown into a population of people with bad behavior and institutional behavior problems. Others are diverted into the alternative center, which has more liberal policies on good time. They also have other privileges while in that facility. They operate to what the statutes require. Most prisoners are pre -trial inmates anyway. Brenner stated she would like a discussion with the Sheriff's Office on alternative programs and what else the County can do. Elfo stated invest more in the community to make mental health services more accessible. In the jail, some people with mental illness are either dangerous and violent. The State cut the funding for Western State Hospital. Instead of a two to three week process, the process is three or four months long. People who are severely mentally ill and violent have to stay in cells by themselves, which takes up a lot of space. State law allows them to divert people to a fully functional mental health triage center for certain misdemeanor crimes. The County is not set up to do that. Those people are in for a very short period of time for misdemeanors. Brenner asked if the design includes smaller single cells that meet standards. Elfo stated there are a number of single cells in the new facility design. The treatment facility in the jail would provide a certain level of treatment during incarceration. The average length of stay in the jail is 21 days. The opportunity for meaningful change is limited. If they are serious about fixing the mental health system and cutting down the jail population, they must begin in the community before people are arrested. Brenner stated they can get someone stabilized on medication in less than 21 days. Elfo stated they can't force medication on people. However, people come into the jail who are on Medicaid, and they lose that benefit as soon as they are in jail. When they are released, they don't have the wherewithal to reenroll in Medicaid. The Jail and Health Department put a staff person in the jail to help with that process. At the State and federal level, resources are drying up. Brenner stated they need to include the structure and cost for the new jail. She hasn't seen those numbers. Mann asked if there is anything the County can do to change the law that ends Medicaid when in jail. Elfo stated there have been several efforts. To date, there has been no progress. Kremen stated this has been a high priority for the National Association of Counties. He serves on the larger county caucus, which has met three times in the White House with both Republican and Democratic administrations on this issue. It's a cheap shift from the federal government to local government. They will continue to pursue a change in federal policy. Kershner asked if navigators of the new Affordable Care Act can spend a day in the jail, so those being released can be navigated to Medicaid. Elfo stated a Health Department position is assigned to the jail to do that. If there are other options as a result of the Affordable Care Act, he will want to exploit those options. Special Committee of the Whole, 9/10/2013, Page 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 Kershner asked if the budget is what the Executive anticipated. Louws stated it's a lot of money. At this stage of planning, the design group has been realistic anticipating their needs in 20 or 25 years. Based on other projects built in the state, the numbers are realistic. A one -tenth of a one percent sales tax increase equals about $3.2 million per year for Whatcom County. It takes about $65,000 per million dollars of debt to service it. The sales tax increase would service approximately $50 million of debt service. Two - tenths are available to use if they choose to go that route. They also have existing capacity in the original one -tenth that was already passed. Administrative staff will put together options for paying the capital costs and operations. They are 25 to 30 percent done with that exercise. He looks forward to talking with the Council, the cities, and community members in the next few months to find the best path forward for paying for this facility. They will find a way to fund it. The supplemental environmental impact statement (SEIS) will come forward, and they should be able to make a decision on the property in November or December. Through the remainder of this year and next year, engage in the cities and citizens to develop a working plan to move forward. They will need to go to the voters with a sales tax increase proposal or a property tax. This is a realistic snapshot of operation and construction estimates. They also included an estimate for maintaining the facility to a high level of quality. Make sure they build what they need. Be as open as they can and engage the community. Kershner stated a concern is that whoever builds the jail be a qualified contractor who builds a quality building that will last. She doesn't know how to write that into the process, but don't build a building that will be obsolete in ten or 20 years. Make sure they build it right the first time. Louws stated it's also necessary to have the vision to spend the right amount of money and identify the right products and quality of products in the bid documents. Install the right mechanical systems at the onset of construction. As the building begins to age, make sure they maintain it. They haven't yet talked about the specific process for selecting a contractor. Brenner stated figure out how the quality can be guaranteed. It's about more than trying to find someone who seems qualified. Louws stated there was a different philosophy when this jail was built. The State gave the County a certain amount of money, and the County tried to do what it could with that money. Those years were extremely difficult for the economy. Brenner stated things started going bad on that building immediately. Louws stated they will take all those things into consideration. He believes in the team. They will do what they can to minimize the risk related to project quality. Brenner asked if the property tax increases if the County does a bond. Louws stated the County can pay for a bond through either a property tax increase or sales tax increase. The County would bond the project and pay it off over time. Brenner asked how long the bond would be and what the rate may be. Louws stated the bond would be for 25 to 30 years. Special Committee of the Whole, 9/10/2013, Page 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Kremen stated it was prudent to include replacement and maintenance costs in the budget. They didn't have to do that. The bottom line would have appeared less. It's realistic to budget for maintenance. He is concerned about the likelihood of significantly higher interest rates in the next couple of years. The bond interest rate will have a huge impact on what the people of Whatcom county will pay for this facility. Louws stated the cost of money is going up. It would have a big impact. Crawford asked what the stepping stones are in the design. Louws stated stepping stones one and two are the Sheriff's office. Stepping stone three is 90 percent jail and ten percent Sheriff's office. The Sheriff's office headquarters would move to this site. The Sheriff's facilities estimate is about $11 million of the $109 million project. The County hired DLR to look at what would happen to the existing jail and Sheriff's Office and developing a fourth Superior Court courtroom. Demolition and large scale site change is not included in these estimates. Crawford referenced line 30 of the budget estimates and asked how much of the sales tax the County receives. Louws stated most of the money goes to the City of Ferndale. The building would not be built in Whatcom County. OTHER BUSINESS There was no other business. ADJOURN The meeting adjourned at 2:16 p.m. The Council approved these minutes on October 8, 2013. ATTEST: Council Clerk - Minutes Transcription WHATCOM COUNTY COUNCIL WHATCOM COUNTY, WASHINGTON Kathy Kershner, Council Chair Special Committee of the Whole, 9/10/2013, Page 5