Loading...
HomeMy WebLinkAboutres2001-054WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2001 -368 CLEARANCES Onginwor: Initial ROM Owe ZO723 Date Recetvedin Councif Office R 22 2 pp � p 2 W L w E p V E ' NOV 0 6 2001 WHATCOM COUNTY COUNCIL Agenda Dale IZ /73/07 Anignedto: Introduction Divinan Dead: RCM IO/23 D,271a, Public Hearing , Dept Head. o Prormalar PureDaeing/Bad%et ills � Esetvtdve, SUBJECT: Resolution adopting the Whatcom County 2002 Annual Road Construction Program ATTACHMENTS: 1. Memo 2. Resolution Related County Contract #: Should Clerk schedule a hearing: NW _1 YES /_x/ Requested Date: 11127101 SUMMARYSTATEMENT: Introduction and approval of the 2002 Annual Road Construction Program. Ordinance & Resolution To keep dour our copyiagcans, awicale receive a copy after Coneailaction Distribution Request only lhorewho mast Listrmmes rothe right. ADS FaTifi= Management ADS Finance ADSHuman Resources ADSInfo Semlcea Assessor Aumror Coopero eF#mion otorC Un Ezecudve Heath RECOMMENDED ACTION.• Council Approval. HearingE Mner Jaa Juvenue Parks riummng COUNCIL ACTION TAKEN: 2001 -368 11/13/2001: Introduced 11127/2001: Amended and approved 5-0, Imhof, Brenner absent, Res. #2001-054 -Welt Mrs rrosecutor Public Works Bruce Mills She +A AMP The Coun Treasurer Other Ordinance or Resolu {ion u _r� (this item): W[LITCOMCOUNTY DEPARTMENT OF PUBLIC WORKS DIVISION OF ENGINEERING Jeffrey M. Monsen, P.E. - Director Bruce G. Mills, P.E. — County Road Engineer 5280 Northwest Drive, Suite C Bellingham, WA 98226 MEMO TO: The Honorable Pete Kremen, County Executive, and R C Rs Honorable Members of the Whatcom County Council E D FROM: Bruce Mills, County Road Engineer1� r DATE: October 23, 2001 PETE K Rt :`til?UN SUBJECT: 2002 Annual Road Construction Program Backeround: RCW 36.81.130 requires the adoption of an annual road construction program. Adoption of this program is an element of the County budget adoption process. Information: A proposed Resolution is enclosed for your consideration. Requested Action: Hold a public hearing and adopt the 2002 Annual Road Construction Program. cc: Jeff Monsen bgm\ Ene. Phone: 136016]6 -6]30 County: 13601380 -8110 FAX: 136016]6 -6558 I SPONSORED BY: Consent 2 PROPOSED BY: Public Works - Engineering 3 INTRODUCTION DATE: 11/13/01 4 RESOLUTION NO. 2001 -054 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 ADOPTING THE WHATCOM COUNTY 2002 ANNUAL ROAD CONSTRUCTION PROGRAM WHEREAS, pursuant to RCW 36.81.130, the Whatcom County Engineer did file with the Whatcom County Council a recommended plan for the laying out, construction, maintenance and special maintenance of County roads for the fiscal yew of 2002; and WHEREAS, the Whatcom County Council held a public meeting on the 27' day of November, 2001, and has considered the testimony given as well as the recommended plan; and WHEREAS, the Whatcom County Council had determined that said plan is necessary as nearly as practicable to the Whatcom County 2002 -2007 Six -Year Transportation Program, adopted by Resolution 2001 -037 signed July 24, 2001. NOW, THEREFORE, BE IT RESOLVED that the 2002 Whatcom County Annual Road Construction Program is hereby adopted as shown on the attachment hereto. BE IT FURTHER RESOLVED that no changes be made in the program without the unanimous vote of the Whatcom County Council. BE IT FURTHER RESOLVED that the 2002 Annual Road Construction Program be filed with the Director of Highways of the State of Washington. APPROVED this 27 ATTEST: L2 I Dana Brown- Davis, County Clerk APPROVED AS TO FORM: Z�.'b Civil Deputy Prosecuting Attorney day of November ,2001. WHATCOM COUNTY COUNCIL WHATCOM COUNTY, WASHINGTON L. Chair (7) TYPE OF W K A GradaN B Onamage F Cieewalks B. Base STOP Cmme G. T;Ofic Faadhes C. Bitum SUrl Tmalmenl H. PANS. Trails Bikeways B. AON.C,C. Payemenl L &NOes E Gaff &GOMM J Ferry Fatililles Ml CONSTRUCTION PROGRAM WXATCAM COUNTY- 2002 M Y LABOR COMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - wlumns (1I) ♦ 115) (B) COMPUTED MY LABOR LIMIT pae back) .............. .. (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - cdomn (15) p m C must M smaller Mml one B) IF LINE C AMOUNT IS GREATER THAN LINE B, CHECK BOX AGENCYACTION D rvy yQgTCOM Date of suMn'IU101 Rewm. Pnp. fa INS Oale of Emimnmental Assessment STW Date W Final "mum ONinanrvJRestal NO <f11��t«'nm �t�eui�u�m�u��u >•�w��c����u� �sura mn seen m antEF Yfa MEMO © ®.o IM.M ©�IU�.... ..... ©©. M.� © ®®W....� ..nom IM■MI©�IM�MIM..� ::, ..,..... ©©.= M.MI©��M®.MIMING mum= M.M©MUMM..M.M Nun MI.MI©MMUM.... ...o IM.MI©OSIMMO....ER MEMO IM.IZ©NGEME.. .IEF . ,.. ® ®. IM■RE©ERIMEN.. IMER .. -... ;,wT ())TYPE OF WO RN A. Ga9'gBIXal ]e F SNewalks B. 6ase6 TCP UUrse 6. Tmalcoalmes C. &bm Sol Tmabeanl H Pom. Tab.&keways O. ALP.C.C. Ramnml L Bry s E. Cub 6C tbs J. Ferry Faa4ties ANNUAL CONSTRUCTION PROGRAM WHATCOU COUNTY -2W2 DAYUeoRCOMPUTATroN NI TOTAL CONSTRUCTION PROGRAM -♦tlms (14) ♦ (15) (B) COM%ITED MY LABOR LIMR(saa bM.).... _ ........ (L) TOTAL MY LABOR CONSTRUCTION PROGRAM -aMmn 05) (Wb C Curt Snub Tmt DI IF LINE C M100NT IS GREATER THAN UNE B. CHELI(BOX AGENCY ACTION Canty WHATC4M Dale &submittal W Ream. Pecg. ",w Dab a EnWamrenal Aauaament vi —Ir DabdF IAdl OtlinaiwTasdudn No IIemN 6N Road Poll R®! Log No. LRP No. RoyElPmjetl Name antl LOation Pm)ect LenpN (Mlles) UL NA CS TS Typo of WoM (See Wmk m]es) EnAmm- Centel gWLL Swma(FUnES ' Grand Tool qLI 585 a Funtla (1,OWb) unby Engm 595.10 i0 Wry ontred 595.29 1WY Cabo- rq (51,gW) 6ouma (7)TYFE OF WORN A. GMlne 0 Drainage F. Siaewalbs B. Sax 8 TOP Course G. Traffic Faolities C. Diane Guff Treatment H. Paft Tails, Bikeways D. A CJP.GC. Pavement I. alleges E. Cum &Gullets J. Feny Fatides ANNUAL CONSTRUCTION PROGRAM WHATCOM COUNTY -2002 OAYI 8ORCOMPO1ATION (A) TOTAL CONSTRUCTION PROGRAM -commm (14) a (15) (B) COMPUTED DAY LABOR LIMIT (see bad)... _.... (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - Women (15) (line C must W amallar them any B) IF LINE C AMOUNT IB GREATER THAN LINE B, CHECK BOX AGENCY ACTION County WHATCOM Dalemsuomtw[ot Rewm. Frog. 50.946 Dateol Environmental Asaesamenl vi TO Orate of Final Al ptim 6yr Reed Prcg.k OminancelResdutim CRP Nd. No Item% 6yr Reed Prcg.k Road U:G No, CRP Nd. RoaNPrgM Name and Lration Prot Lento (Mlles) uL NA CS TS Type of Work (See WOM tttles) Ermined- mental AsmO Sours of Funds TIMATED EXPENDITURES (1,0 1 Grand Trial qLL 595 Commands Funds (1,OCtls) Erpm 595.10 Hills r Way 59520 Contact DIY Labor (51,OW) rqe 6wrce 14 14 127W 901014 Marine Drive Banci Fund Is LMumt S adet 151 16 AGO E 100 W W 1W 15 15 127W BRINGS Lummi View Gave Lumns Share Read to west 0.60 miles 0 W 8 AGO 5 W 40 20 W 16 16 89800 NW27 Potler Rrei Bridge #148 Replacement Stadia Fwd NmFtaQ Rver 0.20 9 1 S 12 40 BR W W 17 17 32780 999010 Weat BadgerRoad Sunrise Rea] Is MaMVmM Rmd 2.01 7 ABD E too W 50 NO 18 18 44170 901W4 EastMpN Lake Samisa Dave detonation InterserLm Improvements 020 B ABDG E 30 20 10 30 19 19 WZTgi SMuker WNenirgs Versus Ocabons ABDH E 260 10 10 230 2W 20 20 4560 4420 W2004 Lake'wy, Drlve?emtt Avenue Norm Bellinglwm City limits 0 Lakeviex Street 0.79 16 D E 10 10 10 21 21 4W30 99801 Yew Street Rmd Samim Way to Kingvnlll 0W 17 ABDEFH E W W W 22 29 46010 02W9 Lake Louise RmC Sudden Valley Campgryuna m Austin Street 173 16 ABG E 170 170 170 23 32 84190 W2011 I Mulmain Creek Badge 9157 Repacement Neatens Like Read 010 81 $ J0 30 30 24 67 02012 Tow WaYAryuisnon 20 20 W 25 W 912013 Speufic Site Imdrovemants Vaaous LmaOOns ISO 10 140 1 W 26 69 02014 Gavel Cmvemams Various LosBons 150 W PRIV 10 190 260 27 41 44120 93ID15 Lake Wnalwm Boulevard 2 1.65 17 ABEL E 19 10 10 U) i PE OF WORK AGENCY ACTION A Grading 8 Pmnaye F. Saewalks B. Rase B TM Cmro G. Tmfic Fachiles C. Bltum Sulf Trwtlnml H. Pallas. Trails, Bikeways O, ACJP.C.C. Pavement I. Bridges E Cum G GuNrs J Femy Faalltles P OAYUBOR COMPUTATION (A) TOTAL CONSTRUCTION PROG11AM-mlumns(14)♦(15) )a) COMPUTED DAY IABOR UNIT (see units) ........... _.. (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM - column )15) )Ilne C must be smallu Man Lit B) IF LINE C AMOUNT IS GREATER THAN LINE B, CHECK BOX OMinanmRteadWCn No. vuz�iet AGENCY ACTION Cmnly WHATCOM Dale of submittal M Remm. PrW $8,&8 Oakol EnvlrcnmanWn Assessm nt 6 Dale W Final Ailmlim OMinanmRteadWCn No. vuz�iet §Rwm seen amMa . 4d. (7) TYPE OF WORK A. Bidding &oramage F. Slaewalks B, Base a Told Counts, G. Tratic Faelilles C, Bdum SuR Tmamienl IF Pallid, Trald Bikeways D. AC.N C.C. Pavement I, BndWs E. Curb &Sultana J, Ferry Faclides WHATCOM COUNTY -M02 OAYIABORCOMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - Woods (14) +(15) (B) COMP 1TEO DAY LABOR LIMIT (see ba4) _. (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM -col (15) (Line C must be smaller Nan line B) IF LINE C AMOUNT IS GREATER THAN LINE B. CHECK BOX AGENCYACTION County WHATf'DM Data of aubmuUl of Boone PiW s6 old Data of Environmental Assessment 110 Data of Final Ailoguon ONinanmAesduton ill Ifemp 6 y Road PruD4 Road Loa No. CRP No. RoatllPmjevt Name and LOratim Pnyect Len9N (Miles) UL NA CS TS Type of (&ee WOM See �1 monial- mental Assmt of TIMA '(1,000'8) Found Total ALL 595 sWCdbn FuMS (1,W0's) Offers I Offer FUME Ei 59540 19 o Way 59520 Gnlratl Day LaM' (S1,000) Source ou ALTERNATE PROJECTS (unfuMm) 1 22 55110 W2005 Hannegan Read lnlenec8cns Tom Lanes at VaW is Locafbns T AIDED E 10 10 10 2 23 LIM 902006 Can take Rom Sdurlural bmlay SkWi1 County Lire W take Mat¢m Blvd, 2,17 T ABD E 10 10 10 3 24 47051 902007 tMN Shore Roatl Bellingham ON Limb to Y Based! 28116, T ADD E 25 25 25 4 26 26199 902M Lii Build Shintutkr ROadb5R548 1.74 T ABD E 70 30 40 70 5 28 12790 WIWI Marne Dove Locust Steel to Bennet Dmre 048 16 ABOEF E 20 20 2(I 6 W 23510 W1903 mind DMe FemAale Gry Uni No SR 548 190 7 ADD E 20 20 20 7 31 127W 902010 HaPon Way Kwma Rood No Slater Road 1.82 7ABDI E 10 10 10 8 37 22210 WHOW GrmiMieer ROmlPoint Adilehpn Read Birch Bay Dnve b JaQSm Down 1.48 7 ADD E 10 10 10 9 25 "M Samish Way 15 Ori Ramp b Bellingham City Limits 275 17 ADD E 750 2p 730 75(t 10 27 218M 998311 Kirherville Rom Ri i sew Road b SR 518 2.01 7 ADD E 10 10 10 11 33 441W 499(1 Case Seval Lakeview Steel b Lake WTai Bw 0A7 16 D E 10 10 10 12 34 44120 wagal take Whalcan Boulevand Cable Soot to Strawberry Point Road 150 17 ADD E 10 10 10 0 TYPE OF WORK A. Grading & Darman F. Sidewalks B. Base B Too COi G. Traffic Fatalities C. BiNm Sad Treatment H. Pams, Trans, Bikeways D . A.CIP.CC. Pavemem I. BrieOes E, Curti 6 Cutlers J Ferry Fatalities WHATCOM COUNTY -2002 OAYLABORCOMPUTAUM (A) TOTAL CONSTRUCTION PROGRAM -m4mns (14) 1 D5) (B) COMPUTED DAY LABOR LIMIT (ss s EaU)... _ ............ (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM -xlumn (15) (line C most be smaller Man line B) IF LINE C AMOUNT IS GREATER IRAN LINE B, CHECK BOX OrmmanuaResolutlyl No AGENCY ACTION County WHAiCOM Date of smarten or Recom. Pray. 58,906 Date of Environmental 1,312 Assessment 110 Date of Final Adoption OrmmanuaResolutlyl No Pore. zq) ItsmN 6fr Road Proa.p Read Log No. CRP N0. RoadlPmpCl Name arm Location prole 11 Lergto (Mlles) UL N A CS TS Type of Work (See Work miles) Envircry mental Asset Source of FUMS 6a6 ) Grand TWaI ALL 595 sWCtpn n Y Funtls (1ms1 En9m 595.10 mi o Way Contract 595.20 Day Li (St,000) role Scarce 13 35 21010 Abandon View Read lake Terrell Rea! 0 Femdala City Limits 277 ] ABB E 10 10 10 Pore. zq) jq TYPE OF WORK A. Ga0icq 0O2inage F SiEmniks B. Base O TWCwrse G. Traffic Fachnes C, BIWm Surf Treaunenl H. Pa6u.Trzlls, Bikeways o. A.CR.CC. Pavement I. Badges E. Cum BGUtk J Ferry Fatlffies ANNUAL CONSTRUCTION PROGRAM WHATCOM COUNTY -2002 OAYIABORCOMPUTATION (A) TOTAL CONSTRUCTION PROGRAM - wlumrts (14) +(15) (B) COMPUTED DAY LABOR LIMIT (see GadQ ............... _. (C) TOTAL DAY LABOR CONSTRUCTION PROGRAM -oci (15) (line C must be smaller Man line B) IF LINE C AMOUNT 1S GREATER THWJ LINE B, CHECK BG% AGENCY ACTION County WHgTCOM Data of submacal of Recom. Frog. $0.916 Gateof Envarraw lal (it) Halt Assessment 110 Data of Final Anal CRP No. Gminaneemesoll Patent LenpM (Miles) No (it) Halt Ite'np 6yr Road! Pag7.9 Read Loa No. CRP No. RwNPrteca Name and Location Patent LenpM (Miles) lr� UL NA CS TS THm of Wale (Sce WOM wdesl Fail menBa Assmt Soure, of Funds ES➢MA 0 PENDITURES 1. ) Gravel Total ALL595 CmsVUCtion Funds (100]5) Funds Firm. 595.10 g Way 595.20 con"a Day Labor (E1.0^A) qe Scarce 14 36 63350 63260 099011 Van Buren ReadlLindsay Hard Hanpton Rwtl b SR 546 1 8 T ABDI E 10 10 10 15 43 23500 Bay Road Valley Maw Read Inlerseclim 0 6 ADD E 10 10 to 16 TB WTal Ournnentw ROu"ludy Yew Strand Road to lake Lease Road 2.50 E 2W 200 2C0