Loading...
HomeMy WebLinkAboutres1985-0341 2 3 4. 5 6' 7 8 4' 10 I 11 12 13 14 15 16 17 18 19 20 21 22 23. 24 25 26 27 28 29 30 31 32 DATE June 20, 1985 INTRODUCED BY Consent PROPOSED BY Public Works Department RESOLUTION NO. 85-34 A RESOLUTION IN THE MATTER OF THE WHATCOM COUNTY COMPREHENSIVE'SIX YEAR ROAD PROGRAM FOR THE YEARS 1986 THROUGH 1991 WHEREAS, pursuant to RCW 36.81.121, Whatcom County has prepared and adopted a six -year comprehensive road program; and WHEREAS, following adoption of said program the law requires an annual review of the work accomplished under the program and a determination of current county road needs; and WHEREAS, based upon the findings of the annual review, and after public hearing, a revised and extended comprehensive road program shall be adopted. NOW, THEREFORE, BE IT RESOLVED as follows: 1. That the Whatcom County Comprehensive Road Program for the years 1986 through 1991, which is attached hereto as Exhibit "A ", be and is hereby adopted. 2. That the County Engineer is directed to file a copy of same with the Director. PASSED this 11th day of July 1985. WHATCOM COUNTY COUNCIL WHATCOM COUNTY, WASHINGTON r William P`Roehl, Chair ATTEST: PaA Clerk of the Councy APPROVED AS TO FORM: 4andaJ. a is ll puty Prosecu ' g Attorney SA City /County WHATCOM City No. County No. 3 Priority No. City-Ave. /St:-Name of- Number Co. Road Number or Road Name Beqinninq and Endinq Termini 1 Britton 4641 Greenville No. .3 mi Widening, reconstruciton 2 Lakeway 9412 Bham CA - Euclid Widening, reconstruction 3 W. Axton 5368 Guide Mer- Northwest Widening, reconstruction 4 Bridge 291 Massey Rd. /Sumas R Bridge replacement 5 Bridge 130 Tu rki ngton/J ones Cr. 6 Gulf 9250 Marine -Tyee Rd. Widening, reconstruction 7 Haynie 9310 Valley View -Stein Widening, reconstruction 8 18 Railroad Crossings SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Carryover Proj. of work Functional Classification OBLIGAT WORK Work Total 1st Codes Length Annual 2nd (Miles Elemen 4 ABCDN 0.30 16 x 40 3 4 ABCD 0.60 16 x 850 200 3 F &I 4 ABCD 2.50 07 x 1300 3 5 4 L 0.01 09 x 114 4 L 0.01 09 20 100 4 ABDF 0.65 U8 x 325 3 G - 4 ABCD 1.50 07 x 450 3 6 I 0- x 270 270 Hearing Date Adoption Date Resolution No. 3rd 4,5 & FEDERA PRO- STATE 6th I AMT. GRAM AMT. LOCAL UAB UAB 1040 FAS :: RAP RAP 270 1 270 I 1065 1 RRP 32 8 840 210 260 26 120 225 100 150 300 15 TOTAL FUNDS 40 1050 1300 114 120 325 450 1080 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date City /County WHATCOM Adoption Date City No. Resolution No. County No. 3 Major Class Carryover Proj. Priority No. of work Functional PROJECT COSTS IN THOUSANDS OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE . YEAR ' PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL City Ave. /St." Name of-Number - Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Element 6th- AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 5 6 7 8 9 1 10 11 12 13 14 15 16 9 Bridge #131 Turk i ngton/McCarty 4 ABKL 09 x 20 16 FEMA 4 20 Replace -temp. bridge 10 Bridge #51A Flynn Rd. /Fishtrap 4 L 0.01 09 x 114 88 BROS 26 114 Repl ace - Bridge 11 Birch Bay Drive 9205 4 ABD 0.35 07 x 30 30 FHWA 0 30 Seawall 12 Lummi Shore 9104 Lummi View -Kwina 4 ABCD 6.32 08 50 50 500 1650 1100 RAP 700 450 2250 Widening, relocation, reconstruction BIA FCAAP 13 Morrison Storm Drainage 4 ABD 0.2 09 x 30 30 30 14 Marine -9104 Bancroft-Jones 3 ABCD 0.70 19 x .90 90 90 Widening, reconstruction 4 5 15 Gooseberry Dock 503 & apprch. 4 T 0.02 07 600 480 FBR 120 600 Partial replacement SA City /County WHATCOM City No. County No. 3 Priority No. PROJECT IDENTIFICATION /DESCRIPTI City-Ave./St:-Name of Number - Co. Road Number or Road Name Beqinninq and Ending Termini 16 Various Locations High Hazard location improvements 17 Haynie 9310 Giles- Valley View Widening- reconstruction 18 Haynie 9310 Stein -Delta Line Widening- reconstruction 19 Drayton Harbor 9205 Harborview to CA 20 Misc. Unanticipated Projects 21 Bridge #304 Lindsay Rd. /Sumas R. Bridge replacement or rehab. 22 West Pole 9538 Guide /Woodlyn Widening, reconstruction 23 Marine Dr. 9104 C /L- Bennett Widening, reconstruction SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Ca of work Functional E Classification WORK Work Total Codes Length (Miles er Proj. Hearing Date Adoption Date Resolution No. YtAK 1st Annual 2nd 3rd 4,5 & FEDERA PR0- STATE Elemen 6th- AMT. GRAM AMT. LOCAL 3 ADHJ x 148 120 120 200 529 HEP 6 4 ABCD 1.21 07 50 300 RAP 4 ABCD 0.50 07 50 100 RAP 3 4 ABCD 1.18 07 x 20 200 200 200 100 100 100 300 4 L 0.01 09 20 20 260 240 BROS 4 ABCD 2.23 07 20 350 350 230 RAP 3 5 4 ABDF 0.29 16 60 600 640 UAB 2 FHIJ L 59 280 70 120 30 620 600 60 500 450 1040 260 TOTAL FUNDS 588 350 150 620 600 300 950 1300 SA City /County WHATCOM City No. County No. Priority No. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Carryover Proj. of work Functional PROJECT COST; Classification OBLIGATION SCHEDULE Hearing Date Adoption Date Resolution No. YEAR TOTAL PROJECT IDENTIFICATION/DESCRIPTION OF WORK Work Total 1st City Ave. /St:'Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 6 8 9 10 11 12 3 14 15 16 24 Bennett 5107 Cottonwood /Marine 2 ABDF 0.56 17 400 200 UAB 540 60 600 Widening, reconstruction 4 GHIJ 6 25 Bennett 5107 I -5 Cottonwood 2 ABDF 0.66 17 120 200 280 UAB 540 60 600 Widening, reconstruction 4 GHIJ 6 26- Marine 5506 Bennett/ Bancroft 3 ABCD 1.99 16 30 130 240 700 UAB 880 220 1100 Widening, reconstruction 4 FG 5 27 Birch Bay 9205 Alderson - Shintaffer 4 ABDE 2.10 07 200 100 1200 200 FEMA 500 800 1500 Reconstruction 3 GOK RAP 5 RID Paths Trails 28 So Pass 9604 Lawrence -Frost Rd, 4 ABCD 9.00 07 50 500 500 2750 RAP 1000 2800 3800 Widening, reconstruction, realignment 29 Whatcom Connector Yew -Lk Louise 1 ABDJ 2.50 20 40 100 2500 2130- FAUS 530 2660 New construction SA City /County WHATCOM City No. County No. 3 Priority No. PROJECT IDENTIFICATION /DESCRIPTION OF City Ave. /St: -Name of Number Co. Road Number or Road Name Beqinninq and Endinq Termini 30 Kwina Rd Haxton -Lummi Shore Widening, reconstruction 31 Northwest & Smith Bike Trail 32 E. Smith 9508 Everson Goshen -Mt. Baker Widening, reconstruction 33 Yew St. Rd. 4083 C/L - Samish Widening, reconstruction 34 Ferndale 9113 Slater -Fdle C/L Widening, reconstruction 35 B.B.- Lynden 9304 Bob Hall- Rathbone Widening, reconstruction 36 Bridge #252 Hannegan /Nooksack SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class of work Functional Classification Work Total Codes Length (Miles 3 ABD 1.02 09 4 5 3 4.0 07 3 ABD 3.28 07 4 5 3 ABD 2.13 17 4 4 ABCD 1.56 07 3 5 4 I ABD 1• 1.02 107 I 1 1 07 Carryover Proi. Hearing Date Adoption Date Resolution No. YLAR ' 1st TOTAL Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Elemenl 6th AMT. GRAM AMT. LOCAL FUNDS 30 1 420 450 1 450 15 20 Paths 35 35 Trail s 50 500 500 250 RAP 750 550 1300 50 850 UAB 720 180 900 200 I 50 I 100 I 525 I I FCAAP I 125 I 750 4 875 50 400 360 FAS 90 450 150 150 150 SA — SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date City /County WHATCOM Adoption Date City No. Resolution No. County No. 3 Major Class Carryover Proj. Priority No. of work Functional PROJECT COSTS IN THOUSANDS OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE YEAR PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL City Ave. /St.-Name of'Number ' Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 2 3 4 6 9 2 3 4 6 37 Bridge #149 Potter Rd. /Slough 4 L 0.01 09 2U 20 310 280 BROS 70 350 Bridge replacement or rehab. 38 Bridge #83 Blaine Rd. /Dakota Cr. 4 L 0.03 07 20 20 760 640 BRS 160 800 Bridge replacement or rehab. 39 Cable /Terrace 9412 Euclid -Blvd. 4 ABCD 0.70 16 60 600 340 UAB 900 100 1000 Widening, reconstruction 3 FGJ 5 40 - Park Rd. 9412 So. Bay Dr. - SR9 4 ABCD 2.78 08 55 500 645 RAP 500 700 1200 Widening, realignment, reconstruction 3 5 1 Lk. Whatcom Blvd. 5502 Cable -UAB 4 ABDL 5.05 16 100 1400 3500 UAB 4000 1000 5000 Widening, realignment, reconstruction 42 Loomis Tr. 3270 Sunrise -Bob Hall 4 ABC 2.00 07 60 740 RAP 500 300 800 Widening, reconstruction 43 W. Badger 9310 Sunrise -Delta Line 4 ABC 1.00 07 150 250 RAP 250 150 400 Widening, reconstruction SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date City /County WHATCOM Adoption Date ..City No. Resolution No. ounty No. 3 Major Class Carryover Proj. Priority No. of work Functional PROJECT COSTS IN THOUSANDS OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE YEAR PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL City Ave. /St: -Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Be inning and Ending Termini 1 2 3 4 6 9 2 3 4 6 44 Hannegan 950 VanDyk- Nooksack 5 ABDL 1.57 07 60 480 RAP 250 350 600 Widening, structural overlay or FAS 45 Sunrise 9211 B.B. Lyn- Badger 4 ABC1 2.00 07 100 250 500 680 FAS 170 850 Widening, reconstruction 3 5 46 Delta Line 9310 W. Badger- Haynie 4 ABC 0.50 07 90 150 RAP 192 48 240 Widening, reconstruction 3 5 47 Mt. View 9202 Rainbow -Lk. Terrell 4 ABCD 0.50 07 100 200 300 300 Widening, reconstruction 3 5 48 Kickerville 9202 Grandview - Rainbor 3 ABD 2.01 07 900 900 900 Widening, reconstruction (all weather) 49 Rainbow 9202 Kickerville -Mt. View 5 D 1.20 07 100 100 100 Resurface 50 E. Smith 9508 Everson Goshen -Stary 4 ABD 1.50 07 300 RAP 240 60 300 Rehabilitation, resurfacing 5 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 City /County WHATCOM City No. ,County No. 3 Priority No. PROJECT IDENTIFICATION /DESCRIPTION OF City Ave. /St:'Name of Number Co. Road Number or Road Name Beginning and Ending Termini 51 Marine Dr. 9104 Ferndale -Lummi Shore 07 Widening, reconstruction 52 Lk. Terrell 9108 Slater -Mt. View ABCD Widening, reconstruction 53 Mosquito Lk. 9419 Mt. Baker - Township Widening, realignment, reconstruction 54 Marine Pt. Roberts 2816 Edwards to Roosevelt ABCD Widening, reconstruction 55 N. Telegraph 6661 Sorenson -Sumas Widening, reconstruction, realignment 56 Blaine 9217 Drayton -B.B. Lynden ABCD Widening, reconstruction Major Class of work Functional Classification Work Total Codes Length (Miles 3 ABD 0.85 07 4 4 ABCD 2.00 07 3 5 4 ABCD 2.89 08 3 5 4 ABCD 2.02 09 3 5 4 ABCD 4.15 08 3 5 4 ABCD 1.90 09 3 Carryover Pro.i. Hearing Date _ Adoption Date Resolution No. TtAK st TOTAL Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Elemen 6th AMT. GRAM AMT. LOCAL FUNDS 300 1 1 1 1 RAP 1 240 1 60 1 300 50 1 750 1 1 RAP 1 500 1 300 1 800 100 1 1200 1 1 1 1 1300 1 1300 300 1 1400 1 1 1 1 1700 1 1700 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date City /County WHATCOM Adoption Date City No. Resolution No. County No. 3 r Major Class Carryover Proj. Priority No, of work Functional PROJECT COSTS IN THOUSANDS OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE YEAR ' PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL City Ave. /St:-Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 57 Lk. Louise 5545 Blvd -2Mi West 1 ABCD 2.00 16 1920 UAB 1540 380 1920 Widening, reconstruction 58 H St.3470 C/L -Guide Meridian 4 ABCD 10.77 07 4500 RAP 1000 3500 4500 Widening, vertical alignment, reconstruction 3 5 59 Mt. View 9202 Lk.Terrell- Ferndale CA 4 ABCD 3.22 07 1250 RAP 1000 250 1250 Widening, reconstruction - 3 5 60 E. Wiser Lk. 9521 Guide - Hannegan 3 ABD 2.20 09 850 RAP 500 350 850 4 5 61 W. Laurel 9536 Guide Meridian - Aldrich 4 ABCD 1.50 08 650 RAP 500 150 650 Widening, reconstruction. 3 5 62 Lk. Whatcom Blvd. 9412 Lk. Louise -So. Bay 4 ABCD 2.88 07 2800 2800 2800 3 5 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date City /County WHATCOM Adoption Date City No. Resolution No. County No. 3 Major Class Carryover Proj. Priority No. of work Functional PROJECT COSTS IN THOUSANDS OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE YEAR _ PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL City Ave. /St:'Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemen 6th- AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 6 7 8 9 10 11 12 13 14 16 63 W. Pole 9538 Woodlyn- Northwest 4 ABCD 0.50_ 07 225 225 225 Widening, reconstruction 3 5 64 W. Shore 9101 Legoe Bay- Nugent 4 ABCD 2.31 08 1660 16.60 1660 3 5 65 Drayton Harbor 9220 Blaine - Harborview 5 CD 0.90 07 600 600 600 Widening, .resurface 66 Lk. Louise 4601 M.P. 2.33- Austin 4 ABCD 1.63 16 1600 UAB 1250 350 1600 Widening, reconstruction, realignment 3 5 67 Old Samish 9401 C/L .80 Mi. E. 4 ABCD 0.80 17 500 500 500 Reconstruction 3 5 68 Bridge #328 Rock Rd -Saar Cr. 4 L 0.01 09 120 96 BROS 24 120 69 Slater- VanWyck Connector 1 ABDI 6.07 07 2940 2940 2940 New Construction J SA City /County WHATCOM City No. County No. 3 'Priority No. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Ca of work. Functional j Classification [ r P ro.i . Hearing Date_ Adoption Date Resolution No. YEAR PROJECT IDENTIFICATION/DESCRIPTION OF WORK Work Total 1st TOTAL_ City.Ave. /St:"Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 6 7 8 9 0 1 12 13 14 15 16 70 Squalicum- Bennett /Marine Dr 1 ABDF 19 875 875 875 Connector - New Construction GHIJ 71 Stewart Road 1 ABDI 1.72 09 1395 1395 1395 New Construction J 72 Slater 9108 Haxton- LkTerrell 4 ABD 2.50 07 1000 1000 1000 Widening, Reconstruction 3 73 E Laurel 9536 Guide - Hannegan 4 ABD 2.50 08 1000 1000 1000 Widening, reconstruction 3 :'4 Halverstick 6218- Northwood - SR9 4 ABD 5.50 08 1500 1500 1500 Widening, reconstruction 3 75 Drayton Harbor 2005 - Harborview -C /L 4 ABD 1.18 07 550 550 550 Widening, reconstruction 3 76 Lummi View 9104 - Haxton-Lummi Shore 4 ABD 1.63 08 700 700 700 Widening, reconstruction- 3 SA City /County WHATCOM City No. :County No. 3 Priority No. ROJECT IDENTIFICATION /DESCRIPTION OF City Ave. /St:,Name of Number Co. Road Number or Road Name Beginning and Ending Termini 77 Roosevelt 2820 - Province - Bayview Widening, reconstruction 78 Boundary Bay 9250 - APA- Bayview Widening, reconstruction 79 APA Rd. 2870 Tyee - Boundary Bay Widening, reconstruction SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class of work Functional Classification Work Total Codes Length (Miles 4 ABD 1.08 09 3 4 ABD 1.37 08 3 4 1 ABD 1 1.50 1 09 3 Carryover Proi. Hearing Date Adoption Date Resolution No. UBLIUAIlUN ')UHLOULL - I-UNUlN6 JUUKLL YEAR st TOTAL Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Elemen 6th, AMT. GRAM AMT. LOCAL FUNDS 475 I I I f 475 I 475 650 1 1 1 1 650 1 650