HomeMy WebLinkAboutres1985-0341
2
3
4.
5
6'
7
8
4'
10 I
11
12
13
14
15
16
17
18
19
20
21
22
23.
24
25
26
27
28
29
30
31
32
DATE June 20, 1985 INTRODUCED BY Consent
PROPOSED BY Public Works Department
RESOLUTION NO. 85-34
A RESOLUTION IN THE MATTER OF THE WHATCOM COUNTY
COMPREHENSIVE'SIX YEAR ROAD PROGRAM FOR THE YEARS
1986 THROUGH 1991
WHEREAS, pursuant to RCW 36.81.121, Whatcom County has prepared and
adopted a six -year comprehensive road program; and
WHEREAS, following adoption of said program the law requires an annual
review of the work accomplished under the program and a determination of
current county road needs; and
WHEREAS, based upon the findings of the annual review, and after public
hearing, a revised and extended comprehensive road program shall be adopted.
NOW, THEREFORE, BE IT RESOLVED as follows:
1. That the Whatcom County Comprehensive Road Program for the years
1986 through 1991, which is attached hereto as Exhibit "A ", be and is hereby
adopted.
2. That the County Engineer is directed to file a copy of same with
the Director.
PASSED this 11th day of July 1985.
WHATCOM COUNTY COUNCIL
WHATCOM COUNTY, WASHINGTON
r
William P`Roehl, Chair
ATTEST:
PaA
Clerk of the Councy
APPROVED AS TO FORM:
4andaJ. a is
ll
puty Prosecu ' g Attorney
SA
City /County WHATCOM
City No.
County No. 3
Priority No.
City-Ave. /St:-Name of- Number
Co. Road Number or Road Name
Beqinninq and Endinq Termini
1 Britton 4641 Greenville No. .3 mi
Widening, reconstruciton
2 Lakeway 9412 Bham CA - Euclid
Widening, reconstruction
3 W. Axton 5368 Guide Mer- Northwest
Widening, reconstruction
4 Bridge 291 Massey Rd. /Sumas R
Bridge replacement
5 Bridge 130 Tu rki ngton/J ones Cr.
6 Gulf 9250 Marine -Tyee Rd.
Widening, reconstruction
7 Haynie 9310 Valley View -Stein
Widening, reconstruction
8 18 Railroad Crossings
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Carryover Proj.
of work
Functional
Classification OBLIGAT
WORK Work Total 1st
Codes Length Annual 2nd
(Miles Elemen
4
ABCDN
0.30
16
x
40
3
4
ABCD
0.60
16
x
850
200
3
F &I
4
ABCD
2.50
07
x
1300
3
5
4
L
0.01
09
x
114
4
L
0.01
09
20
100
4
ABDF
0.65
U8
x
325
3
G -
4
ABCD
1.50
07
x
450
3
6
I
0-
x
270
270
Hearing Date
Adoption Date
Resolution No.
3rd 4,5 & FEDERA PRO- STATE
6th I AMT. GRAM AMT. LOCAL
UAB
UAB
1040 FAS
::
RAP
RAP
270 1 270 I 1065 1 RRP
32 8
840 210
260
26
120
225 100
150 300
15
TOTAL
FUNDS
40
1050
1300
114
120
325
450
1080
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
City /County WHATCOM Adoption Date
City No. Resolution No.
County No. 3
Major Class Carryover Proj.
Priority No. of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
. YEAR '
PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL
City Ave. /St." Name of-Number - Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles) Element 6th- AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
1
2
3
4
5
6
7
8
9
1 10
11
12
13
14
15
16
9
Bridge #131 Turk i ngton/McCarty
4
ABKL
09
x
20
16
FEMA
4
20
Replace -temp. bridge
10
Bridge #51A Flynn Rd. /Fishtrap
4
L
0.01
09
x
114
88
BROS
26
114
Repl ace - Bridge
11
Birch Bay Drive 9205
4
ABD
0.35
07
x
30
30
FHWA
0
30
Seawall
12
Lummi Shore 9104 Lummi View -Kwina
4
ABCD
6.32
08
50
50
500
1650
1100
RAP
700
450
2250
Widening, relocation, reconstruction
BIA
FCAAP
13
Morrison Storm Drainage
4
ABD
0.2
09
x
30
30
30
14
Marine -9104 Bancroft-Jones
3
ABCD
0.70
19
x
.90
90
90
Widening, reconstruction
4
5
15
Gooseberry Dock 503 & apprch.
4
T
0.02
07
600
480
FBR
120
600
Partial replacement
SA
City /County WHATCOM
City No.
County No. 3
Priority No.
PROJECT IDENTIFICATION /DESCRIPTI
City-Ave./St:-Name of Number -
Co. Road Number or Road Name
Beqinninq and Ending Termini
16 Various Locations
High Hazard location improvements
17 Haynie 9310 Giles- Valley View
Widening- reconstruction
18 Haynie 9310 Stein -Delta Line
Widening- reconstruction
19 Drayton Harbor 9205 Harborview to CA
20 Misc. Unanticipated Projects
21 Bridge #304 Lindsay Rd. /Sumas R.
Bridge replacement or rehab.
22 West Pole 9538 Guide /Woodlyn
Widening, reconstruction
23 Marine Dr. 9104 C /L- Bennett
Widening, reconstruction
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Ca
of work
Functional E
Classification
WORK Work Total
Codes Length
(Miles
er Proj.
Hearing Date
Adoption Date
Resolution No.
YtAK
1st
Annual 2nd 3rd 4,5 & FEDERA PR0- STATE
Elemen 6th- AMT. GRAM AMT. LOCAL
3
ADHJ
x
148
120
120
200
529
HEP
6
4
ABCD
1.21
07
50
300
RAP
4
ABCD
0.50
07
50
100
RAP
3
4
ABCD
1.18
07
x
20
200
200
200
100
100
100
300
4
L
0.01
09
20
20
260
240
BROS
4
ABCD
2.23
07
20
350
350
230
RAP
3
5
4
ABDF
0.29
16
60
600
640
UAB
2
FHIJ
L
59
280 70
120 30
620
600
60
500 450
1040 260
TOTAL
FUNDS
588
350
150
620
600
300
950
1300
SA
City /County WHATCOM
City No.
County No.
Priority No.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Carryover Proj.
of work
Functional PROJECT COST;
Classification OBLIGATION SCHEDULE
Hearing Date
Adoption Date
Resolution No.
YEAR
TOTAL
PROJECT IDENTIFICATION/DESCRIPTION OF WORK
Work
Total
1st
City Ave. /St:'Name of Number
Codes
Length
Annual
2nd
3rd
4,5 &
FEDERAL
PRO-
STATE
Co. Road Number or Road Name
(Miles)
Elemeni
6th
AMT.
GRAM
AMT.
LOCAL
FUNDS
Beginning and Ending Termini
1
2
3
4
6
8
9
10
11
12
3
14
15
16
24
Bennett 5107 Cottonwood /Marine
2
ABDF
0.56
17
400
200
UAB
540
60
600
Widening, reconstruction
4
GHIJ
6
25
Bennett 5107 I -5 Cottonwood
2
ABDF
0.66
17
120
200
280
UAB
540
60
600
Widening, reconstruction
4
GHIJ
6
26-
Marine 5506 Bennett/ Bancroft
3
ABCD
1.99
16
30
130
240
700
UAB
880
220
1100
Widening, reconstruction
4
FG
5
27
Birch Bay 9205 Alderson - Shintaffer
4
ABDE
2.10
07
200
100
1200
200
FEMA
500
800
1500
Reconstruction
3
GOK
RAP
5
RID
Paths
Trails
28
So Pass 9604 Lawrence -Frost Rd,
4
ABCD
9.00
07
50
500
500
2750
RAP
1000
2800
3800
Widening, reconstruction, realignment
29
Whatcom Connector Yew -Lk Louise
1
ABDJ
2.50
20
40
100
2500
2130-
FAUS
530
2660
New construction
SA
City /County WHATCOM
City No.
County No. 3
Priority No.
PROJECT IDENTIFICATION /DESCRIPTION OF
City Ave. /St: -Name of Number
Co. Road Number or Road Name
Beqinninq and Endinq Termini
30 Kwina Rd Haxton -Lummi Shore
Widening, reconstruction
31 Northwest & Smith Bike Trail
32 E. Smith 9508 Everson Goshen -Mt. Baker
Widening, reconstruction
33 Yew St. Rd. 4083 C/L - Samish
Widening, reconstruction
34 Ferndale 9113 Slater -Fdle C/L
Widening, reconstruction
35 B.B.- Lynden 9304 Bob Hall- Rathbone
Widening, reconstruction
36 Bridge #252 Hannegan /Nooksack
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class
of work
Functional
Classification
Work Total
Codes Length
(Miles
3
ABD
1.02
09
4
5
3
4.0
07
3
ABD
3.28
07
4
5
3
ABD
2.13
17
4
4
ABCD
1.56
07
3
5
4 I ABD 1• 1.02 107
I 1 1 07
Carryover Proi.
Hearing Date
Adoption Date
Resolution No.
YLAR '
1st TOTAL
Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Elemenl 6th AMT. GRAM AMT. LOCAL FUNDS
30 1 420
450 1 450
15 20 Paths 35 35
Trail s
50 500 500 250 RAP 750 550 1300
50 850 UAB 720 180 900
200 I 50 I 100 I 525 I I FCAAP I 125 I 750 4 875
50 400 360 FAS 90 450
150 150 150
SA
— SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
City /County WHATCOM Adoption Date
City No. Resolution No.
County No. 3
Major Class Carryover Proj.
Priority No. of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
YEAR
PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL
City Ave. /St.-Name of'Number ' Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
2
3
4
6
9
2
3
4
6
37
Bridge #149 Potter Rd. /Slough
4
L
0.01
09
2U
20
310
280
BROS
70
350
Bridge replacement or rehab.
38
Bridge #83 Blaine Rd. /Dakota Cr.
4
L
0.03
07
20
20
760
640
BRS
160
800
Bridge replacement or rehab.
39
Cable /Terrace 9412 Euclid -Blvd.
4
ABCD
0.70
16
60
600
340
UAB
900
100
1000
Widening, reconstruction
3
FGJ
5
40 -
Park Rd. 9412 So. Bay Dr. - SR9
4
ABCD
2.78
08
55
500
645
RAP
500
700
1200
Widening, realignment, reconstruction
3
5
1
Lk. Whatcom Blvd. 5502 Cable -UAB
4
ABDL
5.05
16
100
1400
3500
UAB
4000
1000
5000
Widening, realignment, reconstruction
42
Loomis Tr. 3270 Sunrise -Bob Hall
4
ABC
2.00
07
60
740
RAP
500
300
800
Widening, reconstruction
43
W. Badger 9310 Sunrise -Delta Line
4
ABC
1.00
07
150
250
RAP
250
150
400
Widening, reconstruction
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
City /County WHATCOM Adoption Date
..City No. Resolution No.
ounty No. 3
Major Class Carryover Proj.
Priority No. of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
YEAR
PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL
City Ave. /St: -Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS
Be inning and Ending Termini
1
2
3
4
6
9
2
3
4
6
44
Hannegan 950 VanDyk- Nooksack
5
ABDL
1.57
07
60
480
RAP
250
350
600
Widening, structural overlay
or FAS
45
Sunrise 9211 B.B. Lyn- Badger
4
ABC1
2.00
07
100
250
500
680
FAS
170
850
Widening, reconstruction
3
5
46
Delta Line 9310 W. Badger- Haynie
4
ABC
0.50
07
90
150
RAP
192
48
240
Widening, reconstruction
3
5
47
Mt. View 9202 Rainbow -Lk. Terrell
4
ABCD
0.50
07
100
200
300
300
Widening, reconstruction
3
5
48
Kickerville 9202 Grandview - Rainbor
3
ABD
2.01
07
900
900
900
Widening, reconstruction (all weather)
49
Rainbow 9202 Kickerville -Mt. View
5
D
1.20
07
100
100
100
Resurface
50
E. Smith 9508 Everson Goshen -Stary
4
ABD
1.50
07
300
RAP
240
60
300
Rehabilitation, resurfacing
5
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
City /County WHATCOM
City No.
,County No. 3
Priority No.
PROJECT IDENTIFICATION /DESCRIPTION OF
City Ave. /St:'Name of Number
Co. Road Number or Road Name
Beginning and Ending Termini
51
Marine Dr.
9104 Ferndale -Lummi Shore
07
Widening,
reconstruction
52
Lk. Terrell
9108 Slater -Mt. View
ABCD
Widening,
reconstruction
53
Mosquito Lk.
9419 Mt. Baker - Township
Widening,
realignment, reconstruction
54
Marine Pt.
Roberts 2816 Edwards to Roosevelt
ABCD
Widening,
reconstruction
55
N. Telegraph
6661 Sorenson -Sumas
Widening,
reconstruction, realignment
56
Blaine 9217
Drayton -B.B. Lynden
ABCD
Widening,
reconstruction
Major Class
of work
Functional
Classification
Work Total
Codes Length
(Miles
3
ABD
0.85
07
4
4
ABCD
2.00
07
3
5
4
ABCD
2.89
08
3
5
4
ABCD
2.02
09
3
5
4
ABCD
4.15
08
3
5
4
ABCD
1.90
09
3
Carryover Pro.i.
Hearing Date _
Adoption Date
Resolution No.
TtAK
st TOTAL
Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Elemen 6th AMT. GRAM AMT. LOCAL FUNDS
300 1 1 1 1 RAP 1 240 1 60 1 300
50 1 750 1 1 RAP 1 500 1 300 1 800
100 1 1200 1 1 1 1 1300 1 1300
300 1 1400 1 1 1 1 1700 1 1700
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
City /County WHATCOM Adoption Date
City No. Resolution No.
County No. 3
r Major Class Carryover Proj.
Priority No, of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
YEAR '
PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL
City Ave. /St:-Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
57
Lk. Louise 5545 Blvd -2Mi West
1
ABCD
2.00
16
1920
UAB
1540
380
1920
Widening, reconstruction
58
H St.3470 C/L -Guide Meridian
4
ABCD
10.77
07
4500
RAP
1000
3500
4500
Widening, vertical alignment, reconstruction
3
5
59
Mt. View 9202 Lk.Terrell- Ferndale CA
4
ABCD
3.22
07
1250
RAP
1000
250
1250
Widening, reconstruction -
3
5
60
E. Wiser Lk. 9521 Guide - Hannegan
3
ABD
2.20
09
850
RAP
500
350
850
4
5
61
W. Laurel 9536 Guide Meridian - Aldrich
4
ABCD
1.50
08
650
RAP
500
150
650
Widening, reconstruction.
3
5
62
Lk. Whatcom Blvd. 9412 Lk. Louise -So. Bay
4
ABCD
2.88
07
2800
2800
2800
3
5
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
City /County WHATCOM Adoption Date
City No. Resolution No.
County No. 3
Major Class Carryover Proj.
Priority No. of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
YEAR _
PROJECT IDENTIFICATION DESCRIPTION OF WORK Work Total 1st TOTAL
City Ave. /St:'Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles) Elemen 6th- AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
1
2
3
4
6
7
8
9
10
11
12
13
14
16
63
W. Pole 9538 Woodlyn- Northwest
4
ABCD
0.50_
07
225
225
225
Widening, reconstruction
3
5
64
W. Shore 9101 Legoe Bay- Nugent
4
ABCD
2.31
08
1660
16.60
1660
3
5
65
Drayton Harbor 9220 Blaine - Harborview
5
CD
0.90
07
600
600
600
Widening, .resurface
66
Lk. Louise 4601 M.P. 2.33- Austin
4
ABCD
1.63
16
1600
UAB
1250
350
1600
Widening, reconstruction, realignment
3
5
67
Old Samish 9401 C/L .80 Mi. E.
4
ABCD
0.80
17
500
500
500
Reconstruction
3
5
68
Bridge #328 Rock Rd -Saar Cr.
4
L
0.01
09
120
96
BROS
24
120
69
Slater- VanWyck Connector
1
ABDI
6.07
07
2940
2940
2940
New Construction
J
SA
City /County WHATCOM
City No.
County No. 3
'Priority No.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Ca
of work.
Functional j
Classification [
r P ro.i .
Hearing Date_
Adoption Date
Resolution No.
YEAR
PROJECT IDENTIFICATION/DESCRIPTION OF WORK
Work
Total
1st
TOTAL_
City.Ave. /St:"Name of Number
Codes
Length
Annual
2nd
3rd
4,5 &
FEDERAL
PRO-
STATE
Co. Road Number or Road Name
(Miles
Elemeni
6th
AMT.
GRAM
AMT.
LOCAL
FUNDS
Beginning and Ending Termini
1
2
3
4
6
7 8
9
0
1
12
13
14
15
16
70
Squalicum- Bennett /Marine Dr
1
ABDF
19
875
875
875
Connector - New Construction
GHIJ
71
Stewart Road
1
ABDI
1.72
09
1395
1395
1395
New Construction
J
72
Slater 9108 Haxton- LkTerrell
4
ABD
2.50
07
1000
1000
1000
Widening, Reconstruction
3
73
E Laurel 9536 Guide - Hannegan
4
ABD
2.50
08
1000
1000
1000
Widening, reconstruction
3
:'4
Halverstick 6218- Northwood - SR9
4
ABD
5.50
08
1500
1500
1500
Widening, reconstruction
3
75
Drayton Harbor 2005 - Harborview -C /L
4
ABD
1.18
07
550
550
550
Widening, reconstruction
3
76
Lummi View 9104 - Haxton-Lummi Shore
4
ABD
1.63
08
700
700
700
Widening, reconstruction-
3
SA
City /County WHATCOM
City No.
:County No. 3
Priority No.
ROJECT IDENTIFICATION /DESCRIPTION OF
City Ave. /St:,Name of Number
Co. Road Number or Road Name
Beginning and Ending Termini
77 Roosevelt 2820 - Province - Bayview
Widening, reconstruction
78 Boundary Bay 9250 - APA- Bayview
Widening, reconstruction
79 APA Rd. 2870 Tyee - Boundary Bay
Widening, reconstruction
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class
of work
Functional
Classification
Work Total
Codes Length
(Miles
4 ABD 1.08 09
3
4 ABD 1.37 08
3
4 1 ABD 1 1.50 1 09
3
Carryover Proi.
Hearing Date
Adoption Date
Resolution No.
UBLIUAIlUN ')UHLOULL - I-UNUlN6 JUUKLL
YEAR
st TOTAL
Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Elemen 6th, AMT. GRAM AMT. LOCAL FUNDS
475 I I I f 475 I 475
650 1 1 1 1 650 1 650