HomeMy WebLinkAboutres1985-0311
2
3
4
5
6
7
8
9
10
11
12
13 1
14
15
16
17
18'
19
20
21
22
23
24
25
26
27
")Po
DATE June 1985
INTRODUCED BY Cole
PROPOSED BY Public Works Department
RESOLUTION NO. 85 -31
A RESOLUTION IN THE MATTER OF THE HEARING ON WHATCOM COUNTY'S
SIX -YEAR COMPREHENSIVE ROAD PROGRAM
WHEREAS, pursuant to RCW 36.81.121, the Whatcom County Council shall
prepare a comprehensive road program for the ensuing six calendar years, and
WHEREAS, pursuant to a public hearing of this road program, the Council
shall adopt and file the same with the Director of Highways, and
WHEREAS, a road program for the years 1985 throuogh 1990 has now been
prepared by the County Engineer and submitted to the Council.
NOW, THEREFORE, BE IT RESOLVED THAT THE DATE OF July 11, 1985 at 7:30
p.m., be set for the hearing of Whatcom County's Six -Year Comprehensive Road
Program.
Dated this 20th day of June , 1985.
WHATCOM COUNTY COUNCIL
WHATCOM COUNTY, WASH14GTON
ATTEST:
& ,L.-C
Clerk of the Courltil
Approved as to form:
Q"— _Q b
-MiT Ueputry' P cutin Attorney
P nald G. 41'ans
Vice — Chairman
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date _
City /County WHATCOM Adoption Date
'ty No. Resolution No.
.aunty No. 3
Priority No
Major Class Carryover Pro'.
of work
Functional
PROJECT COSTS IN THOUSANDS OF-DOLLARS-
Classification
OBLIGATION SCHEDULE
FUNDING SOURCE
TOTAL
YEAR
Ist
PROJECT DEN IFICA ON SCR P ION OF WORK
Work
Total
City Ave. /St: Name of Number
Codes
Length
Annual 2nd 3rd
4,5 &
FEDERAL
PRO-
STATE
Co. Road Number or Road Name
(Miles
Elemeni
6th
AMT.
GRAM
AMT.
LOCAL
FUNDS
Beginning and Ending Termini
1
2
3
4
9
0
11
12
13
14
15
16
1
Britton 4641 Greenville No. .3 mi
4
ABCDN
U.30
16
x
40
UAB
32
8
40
Widening, reconstruciton
3
2
Lakeway 9412 Bham C/L - Euclid
4
ABCD
0.60
16
x
85U
200
UAB
840
210
1U50
Widening, reconstruction
3
FGJ
3
W. Axton 5368 Guide Mer= Northwest
4
ABCD
2.50
07
x
1300
1040
FAS
260
13UO
Widening, reconstruction
3
5
4
Bridge 291 Massey Rd. /Sumas R
4
L
0.01
09
x
114
88
BROS
26
114
Bridge replacement
5
Bridge 130 Turkington /Jones Cr.
4
L
0.01
09
20
100
120
120
6
Gulf 9250 Marine -Tyee Rd.
4
ABDF
0.65
08
x
325
RAP
225
100
325
Widening, reconstruction
3
G
7
Haynie 9310 Valley View -Stein
4
ABCD
1.50
07
x
450
RAP
150
300
450
Widening, reconstruction
3
8
18 Railroad Crossings
6
I
0-
x
270
270
270
27U
1065
RRP
15
1080
SA
'ity /County WHATCOM
. i ty No.
County No. 3
Prinritv No
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Carryover Proj.
of work
Hearing Date
Adoption Date
Resolution No.
Functional
PROJECT COSTS IN
THOUSANDS OF DOLLARS
T Classification
OBLIGATION SCHEDULE
UNDING SOURCE
TOTAL
YEAR
PROJECT IDENTIFICATION/DESCRIPTION OF WORK
Work
Total
1st
City Ave. /St: Name of Number -
Codes
Length
Annual
2nd
3rd
4,5 &
FEDERAL
PRO-
STATE
Co. Road Number or Road Name
(Miles)
Elemen
6th
AMT.
GRAM
AMT.
LOCAL
FUNDS
Beginning and Ending Termini
1
2
3
4
6
1
2
13
14
6
9
Bridge #131 Turkington /McCarty
4
ABKL
09
x
20
16
FEMA
4
2U
Replace-temp. bridge
10
Bridge #51A Flynn Rd. /Fishtrap
4
L
0.01
09
x
114
88
BROS
26
114
Replace Bridge
11
Birch Bay Drive 9205
4
ABD
0.35
07
x
3U
30
FHWA
0
30
Seawall
12
Lummi Shore 9104 Lummi View -Kwina
4
ABCD
6.32
08
5U
50
500
1650
1100
RAP
70U
45U
2250
Widening, relocation, reconstruction
BIA
FCAAP
13
Morrison Storm Drainage
4
ABD
0.2
09
x
30
3U
3U
14
Marine -9104 Bancroft -Jones
3
ABCD
0.7U
19
x
90
90
90
Widening, reconstruction
4
5
15
Gooseberry Dock 503 & apprch.
4
T
0.02
07
60U
480
FBR
120
600
Partial replacement
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
City /County WHATCOM
Eity No.
County No. 3
Major Class Carryover Proj.
Prioritv No. of work
Hearing Date _
Adoption Date
Resolution No.
Functional
PROJECT COSTS IN THOUSAND 0 DOLLARS
F
Classification
OBLIGATION -
FUNDING SOURCE
TOTAL
Ist
YEAR
PROJECT IDENTIFICATION/DESCRIPTION OF WORK
Work
Total
City Ave. /St: Name of Number
Codes
Length
Annual
2nd 3rd 4,5 &
FEDERAL
PRO-
STATE
Co. Road Number or Road Name
(Miles)
Elemen
6th
AMT.
GRAM
AMT.
LOCAL
FUNDS
Beginning and Ending Termini
1
2
3
4
6
7
8
9
10
11
12
13
14
16
Various Locations
3
ADHJ
x
148
120
120
2UU
529
HEP
59
588
High Hazard location improvements
6
17
Haynie 931U Giles- Valley View
4
ABCD
1.21
07
5U
300
RAP
280
70
350
Widening- reconstruction
18
Haynie 9310 Stein -Delta Line
4
ABCD
0.5U
U7
5U
100
RAP
12U
3U
150
Widening - reconstruction
3
19
Drayton Harbor 9205 Harborview to C/L
4
ABCD
1.18
07
x
20
200
200
2U0
620
620
2U
Misc. Unanticipated Projects
1OU
IOU
1UO
300
6UO
6UU
21
Bridge #3U4 Lindsay Rd. /Sumas R.
4
L
U.U1
U9
2U
20
260
24U
BROS
60
300
Bridge replacement or rehab.
22
West Pole 9538 Guide /Woodlyn
4
ABCD
2.23
07
2U
350
350
230
RAP
$00
450
950
Widening, reconstruction
3
5
23
Marine Dr. 9104 C /L- Bennett
4
ABDF
0.29
16
60
600
640
LAB
1040
260
1300
Widening, reconstruction
2
FHIJ
L
SA
City /County WHATCOM
'ity No.
county No.
Priority No.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Carryover Proj.
of work
Functional PROJECT COS
1: 1 Classification OBLIGATION SCHEDULE
YEAR
Hearing Date
Adoption Date
Resolution No.
PROJEC DENTIFICATION /DESCRIPTION OF WORK
City Ave. /St:-Name of Number
Co. Road Number or Road Name
Beginning and Ending Termini
Work
Codes
Total
Length
(Miles)
st
Annual
Elemen
2nd
3rd
4,5 8
6th
FEDERAL
AMT.
PRO-
GRAM
STATE
AMT.
LOCAL
TOTAL
FUNDS
1
2
4
6
9
1
2
3
4
15
16-
24
Bennett 5107 Cottonwood /Marine
2
ABDF
0.56
17
400
200
UAB
54U
60
6UU
Widening, reconstruction
4
GHIJ
6
25
Bennett 5107 I -5 Cottonwood
2
ABDF
0.66
17
12U
2UU
28U
UAB
540
6U
6U0
Widening, reconstruction
4
GHIJ
6
26
Marine 5506 Bennett/ Bancroft
3
ABCD
1.99
16
3U
130
240
7UO
UAB
880
220
11UU
Widening, reconstruction
4
FG
5
27
Birch Bay 9205 Alderson- Shintaffer
4
ABDE
2.1U
07
2UO
100
1200
2UO
FEMA
500
8UU
1500
Reconstruction
3
GOK
RAP
5
RID
Paths
Trails
28
So Pass 9604 Lawrence -Frost Rd.
4
ABCD
9.00
07
50
500
500
2750
RAP
1000
2800
3800
Widening, reconstruction, realignment
29
Whatcom Connector Yew -Lk Louise
1
ABDJ
2.50
20
40
100
2500
2130
FAUS
530
2660
New construction
SA
,ity /County WHATCOM
City No.
County No. 3
Priority No.
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Carryover Proj.
of work
Functional PROJECT COST:
7 1 Classification UBLIGATION SCH UL
YEAR
Hearing Date
Adoption Date
Resolution No.
PKUJtG1 lUtNiirii,AIiunytscKIPIIUN UP MURK
City Ave. /St: Name of Number
Co. Road Number or Road Name
Beginning and Ending Termini
Work
Codes
Total
Length
(Miles)
1st
Annual
Elemen
2nd
3rd
4,5 &
6th
FEDERA
AMT.
PRO-
GRAM
STATE
AMT.
LOCAL
TOTAL
FUNDS
1
2
3
4
b
77
8
9
10
11
12
13
14
15
16
30
Kwina Rd Haxton -Lummi Shore
3
ABU
1.U2
09
30
420
450
450
Widening, reconstruction
4
5
31
Northwest & Smith Bike Trail
3
4.0
07
15
20
Paths
35
35
Trails
32
E. Smith 9508 Everson Goshen -Mt. Baker
3
ABU
3.28
07
5U
5OU
500
250
RAP
750
550
1300
Widening, reconstruction
4
5
33
Yew St. Rd. 4083 Ch - Samish
3
ABD
2.13
17
50
850
UAB
720
180
900
Widening, reconstruction
4
34
Ferndale 9113 Slater -Fdle CA
4
ABCD
1.56
07
200
50
100
525
FCAAP.
125
750
875
Widening, reconstruction
3
5
35
B.B. - Lynden 9304 Bob Hall - Rathbone
3
ABD
1.02
07
50
400
360
FAS
90
450
Widening, reconstruction
4
36
Bridge #252 Hannegan /Nooksack
07
150
150
150
SA
City /County WHATCOM
pity No.
County No. 3
Priority No.
City Ave. /St: Name of Number
Co. Road Number or Road Name
Beoinnina and Endina Termini
37 Bridge #149 Potter Rd. /Slough
Bridge replacement or rehab.
38 Bridge #83 Blaine Ro. /Dakota Cr.
Bridge replacement or rehab.
39 Cable /Terrace 9412 Euclid -Blvd.
Widening, reconstruction
40 Park Rd. 9412 So. Bay Dr. - SR9
Widening, realignment, reconstruction
41 Lk. Whatcom Blvd. 5502 Cable -UAB
Widening, realignment, reconstruction
42 Loomis Tr. 3270 Sunrise -Bob Hall
Widening, reconstruction
43 W. Badger 9310 Sunrise -Delta Line
Widening, reconstruction
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Class
rk
Functional
Classification
Work Tots
Codes Length
(Miles
4 L I U. 01 1 09
4 L 0. U3 07
5 I ABCD I 0.70 116
5 I ABCD I 2.78 I 08
4 ABDL
5.05
16
4 ABC
2.00
07
4 ABC
1.00
07
r
Hearing Date _
Adoption Date
Resolution No.
TOTAL
Ist Element 2nd I 3rd I '6th$ AMTER� GRAM I AMT. I LOCAL I FUNDS
2U
2U
31U
28U
BROS
70
350
2U
20
760
64U
BRS
160
800
60
600
340
UAB
90U
100
1000
55
5UO
645
RAP
500
700
1200
100
140U
3500
UAB
4000
1000
5000
60
740
RAP
500
300
800
150
250
RAP
250
150
4UO
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
;ity /County WHATCOM Adoption Date
City No. Resolution No.
County No. 3
Major Class Carryover Proj.
Priority No. of work
Functional PROJECT COSTS IN THOUSAN S OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
YEAR
PROJECT EN ICA ION DESCR PT ON OF WORK Work Total 1st TOTAL
City Ave. /St: Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
1
2
3
4
6
7
8
11
12
13
14
15
1
44
Hannegan 950 VanOyk- Nooksack
5
ABDL
1.57
07
60
480
RAP
250
350
60U
Widening, structural overlay
or FAS
45
Sunrise 9211 B.B. Lyn- Badger
4
ABC1
2.00
07
100
250
50U
68U
FAS
17U
850
Widening, reconstruction
3
5
46
Delta Line 931U W. Badger- Haynie
4
ABC
0.50
07
90
150
RAP
192
48
240
Widening, reconstruction
3
5
47
Mt. View 92U2 Rainbow -Lk. Terrell
4
ABCD
0.5U
07
IOU
200
30U
300
Widening, reconstruction
3
5
48
Kickerville 9202 Grandview - Rainbor
3
ABD
2.01
07
900
900
900
Widening, reconstruction (all weather)
49
Rainbow 9202 Kickerville -Mt. View
5
D
1.20
07
100
100
100
Resurface
50
E. Smith 9508 Everson Goshen -Stary
4
ABD
1.50
07
300
RAP
240
60
300
Rehabilitation, resurfacing
5
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
"ity /County WHATCOM
,ity No.
County No.
Major Class Carryover Proj.
Priority No, of work
Functional PROJECT COST:
Classification I OBLIGATION SCHEDULE
YEAR
Hearing Date
Adoption Date
Resolution No.
PROJECT ID N F CATION/DESCRIPTIO"F WORK Work Total 1st TOTAL
City Ave. /St. Name of Number Codes Length Annual 2nd 3rd 4,5 8 FEDERA PRO- STATE
Co. Road Number or Road Name (Miles Elemeni I 6th AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
2
3
4
5
6
7
8
10
11
12
13
14
15
16
51
Marine Dr. 9104 Ferndale -Lummi Shore
3
ABD
U.85
U7
3UO
RAP
240
60
3UO
Widening, reconstruction
4
52
Lk. Terrell 9108 Slater -Mt. View
4
ABCD
2.UO
07
5U
750
RAP
500
3UO
8OU
Widening, reconstruction
3
5
53
Mosquito Lk. 9419 Mt. Baker - Township
4
ABCD
2.89
08
100
1200
1300
13UO
Widening, realignment, reconstruction
3
5
54
Marine Pt. Roberts 2816 Edwards to Roosevelt
4
ABCD
2.02
09
150
700
850
850
Widening, reconstruction
3
5
55
N. Telegraph 6661 Sorenson -Sumas
4
ABCD
4.15
08
300
140U
1700
1700
Widening, reconstruction, realignment
3
5
56
Blaine 9217 Drayton -B.B. Lynden
4
ABCD
1.90
09
100
700
800
BUD
Widening, reconstruction
3
SA
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date
City /County WHATCOM Adoption Date
City No. Resolution No.
County No.
Major Class Carryover Proj.
Priority No. of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLAR
Classification OBLIGATION SCHEDULE FUNDING SOURC
AR "
PROJECT IDENTIFICATION/DESCRIPTION OF WORK Work otal 1st TOTAL
City Ave. /St: Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE
Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS
Beginning and Ending Termini
i
2
57
Lk. Louise 5545 Blvd -2Mi West
1
ABCD
2.UU
16
192u
UAB
1540
38U
192U
Widening, reconstruction
58
H St.3470 C/L -Guide Meridian
4
ABCD
10.77
07
4500
RAP
1000
3500
4500
Widening, vertical alignment, reconstruction
3
5
59
Mt. View 9202 Lk.Terrell- Ferndale C/L
4
ABCD
3.22
07
1250
RAP
1000
250
1250
Widening, reconstruction
3
5
6U
E. Wiser Lk. 9521 Guide - Hannegan
3
ABD
2.20
09
850
RAP
50U
350
850
4
5
61
W. Laurel 9536 Guide Meridian - Aldrich
4
ABCD
1.50
08
650
RAP
5UU
150
65U
Widening, reconstruction
3
5
62
Lk. Whatcom Blvd. 9412 Lk. Louise -So. Bay
4
ABCD
2.88
07
28UU
2800
2800
3
5
SA
City /County WHATCOM
City No.
County No.
Priority No.
PROJECT IDEN CA ON ESCR P
City Ave. /St: Name of Number
Co. Road Number or Road Name
Beginning and Ending Termini
1 2
63 W. Pole 9538 Woodlyn- Northwest
Widening, reconstruction
64 1 W. Shore 9101 Legoe Bay- Nugent
65 Drayton Harbor 9220 Blaine - Harborview
Widening, resurface
66 Lk. Louise 4601 M.P. 2.33- Austin
Widening, reconstruction, realignment
67 Old Samish 9401 C/L .80 Mi. E.
Reconstruction
68 Bridge #328 Rock Rd -Saar Cr.
69 Slater- VanWyck Connector
New Construction
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class
of work
Functional
Classification
Work Total I
Codes I Length
I I Miles
5 I ABCD 1 0.50 107
4 ABCD 2.31 08
3
5
5 CD 0.9U 07
5 J ABCD I 1.63 116
4 ABCD 0.80 17
3
5
4 L 0.01 09
I I AB J I I 6.07 107
r
Hearing Date
Adoption Date
Resolution No.
STATE
Elemed 2nd I 3rd 1 46th& I AMTERAI� GRRAM I AMT. I LOCAL I FUNDS
225 1 1 1 1 225 1 225
1660 1 1 1 1 166U I 166U
600 1 1 1 1 600 1 60U
1600 UAB 1250 350 1600
500 5UO 500
120 96 BROS 24 120
2940 2940 2940
SA
City /County WHATCOM
City No.
County No.
Priority No.
PROJECT IDENT ICAT ON D SCRIP ION 0
City Ave. /St: Name of Number
Co. Road Number or Road Name
Beginning and Ending Termini
2
7U Squalicum- Bennett /Marine Dr
Connector - New Construction
71 Stewart Road
New Construction
72 Slater 9108 Haxton- LkTerrell
Widening, Reconstruction
73 E Laurel 9536 Guide - Hannegan
Widening, reconstruction
74 Halverstick 6218 - Northwood - SR9
Widening, reconstruction
75 Drayton Harbor 2005 - Harborview -C /L
Widening, reconstruction
76 Lummi View 9104 - Haxton-Lumni Shore
Widenino. reconstruction
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Hearing Date _
Adoption Date
Resolution No.
Major Class Carryover Pro'.
of work
Functional PROJECT COSTS IN THOUSANDS OF DOLLARS
Classification OBLIGATION SCHEDULE FUNDING SOURCE
YEAR
Work o al 1st TOTAL
Codes Length Annual 2nd 3rd 4,5 & FEDERA PRO- STATE
(Miles Elemen 6th AMT. GRAM AMT. LOCAL FUNDS
1 ABDF
19
875
875
875
GH IJ
1 ABDI
1.72
09
1395
1395
1395
J
4 ABD
2.50
U7
1000
1000
1000
3
4 ABD
2.50
08
1000
IOUO
lUOU
3
4 ABD
5.5U
08
1500
1500
1500
3
4 ABD
1.18
07
550
55U
55U
3
4 ABD
1.63
08
700
700
700
3
SA
'ity /County WHATCOM
„i ty No.
County No. 3
Priority No.
City Ave. /St.'Name of Number
Co. Road Number or Road Name
Beainnina and Ending Termini
77 Roosevelt 2820 - Province - Bayview
Widening, reconstruction
78 Boundary Bay 9250 - APA- Bayview
Widening, reconstruction
79 APA Rd. 2870 Tyee- Boundary Bay
Widening, reconstruction
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991
Major Class Carryover Proj.
of work
Functional PROJECT COS N HOU
Classification I OBLIGATION SCHEDULE
AR
Work otal 1st
Codes Length Annual 2nd 3rd 4,5 8 FED
(Miles) Elemen 6th AMT
3 4 b 6 7 8 1 9 1 11 2
4 ABD 1.U8 09 475.
3
4 ABD 1.37 08 600
3
4 ABD 1.50 09 650
3
Hearing Date _
Adoption Date
Resolution No.
PRO- I STATE TOTAL
GRAM AMT. I LOCAL FUNDS
475 475
600 60U
650 650