Loading...
HomeMy WebLinkAboutres1985-0311 2 3 4 5 6 7 8 9 10 11 12 13 1 14 15 16 17 18' 19 20 21 22 23 24 25 26 27 ")Po DATE June 1985 INTRODUCED BY Cole PROPOSED BY Public Works Department RESOLUTION NO. 85 -31 A RESOLUTION IN THE MATTER OF THE HEARING ON WHATCOM COUNTY'S SIX -YEAR COMPREHENSIVE ROAD PROGRAM WHEREAS, pursuant to RCW 36.81.121, the Whatcom County Council shall prepare a comprehensive road program for the ensuing six calendar years, and WHEREAS, pursuant to a public hearing of this road program, the Council shall adopt and file the same with the Director of Highways, and WHEREAS, a road program for the years 1985 throuogh 1990 has now been prepared by the County Engineer and submitted to the Council. NOW, THEREFORE, BE IT RESOLVED THAT THE DATE OF July 11, 1985 at 7:30 p.m., be set for the hearing of Whatcom County's Six -Year Comprehensive Road Program. Dated this 20th day of June , 1985. WHATCOM COUNTY COUNCIL WHATCOM COUNTY, WASH14GTON ATTEST: & ,L.-C Clerk of the Courltil Approved as to form: Q"— _Q b -MiT Ueputry' P cutin Attorney P nald G. 41'ans Vice — Chairman SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date _ City /County WHATCOM Adoption Date 'ty No. Resolution No. .aunty No. 3 Priority No Major Class Carryover Pro'. of work Functional PROJECT COSTS IN THOUSANDS OF-DOLLARS- Classification OBLIGATION SCHEDULE FUNDING SOURCE TOTAL YEAR Ist PROJECT DEN IFICA ON SCR P ION OF WORK Work Total City Ave. /St: Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 9 0 11 12 13 14 15 16 1 Britton 4641 Greenville No. .3 mi 4 ABCDN U.30 16 x 40 UAB 32 8 40 Widening, reconstruciton 3 2 Lakeway 9412 Bham C/L - Euclid 4 ABCD 0.60 16 x 85U 200 UAB 840 210 1U50 Widening, reconstruction 3 FGJ 3 W. Axton 5368 Guide Mer= Northwest 4 ABCD 2.50 07 x 1300 1040 FAS 260 13UO Widening, reconstruction 3 5 4 Bridge 291 Massey Rd. /Sumas R 4 L 0.01 09 x 114 88 BROS 26 114 Bridge replacement 5 Bridge 130 Turkington /Jones Cr. 4 L 0.01 09 20 100 120 120 6 Gulf 9250 Marine -Tyee Rd. 4 ABDF 0.65 08 x 325 RAP 225 100 325 Widening, reconstruction 3 G 7 Haynie 9310 Valley View -Stein 4 ABCD 1.50 07 x 450 RAP 150 300 450 Widening, reconstruction 3 8 18 Railroad Crossings 6 I 0- x 270 270 270 27U 1065 RRP 15 1080 SA 'ity /County WHATCOM . i ty No. County No. 3 Prinritv No SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Carryover Proj. of work Hearing Date Adoption Date Resolution No. Functional PROJECT COSTS IN THOUSANDS OF DOLLARS T Classification OBLIGATION SCHEDULE UNDING SOURCE TOTAL YEAR PROJECT IDENTIFICATION/DESCRIPTION OF WORK Work Total 1st City Ave. /St: Name of Number - Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemen 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 6 1 2 13 14 6 9 Bridge #131 Turkington /McCarty 4 ABKL 09 x 20 16 FEMA 4 2U Replace-temp. bridge 10 Bridge #51A Flynn Rd. /Fishtrap 4 L 0.01 09 x 114 88 BROS 26 114 Replace Bridge 11 Birch Bay Drive 9205 4 ABD 0.35 07 x 3U 30 FHWA 0 30 Seawall 12 Lummi Shore 9104 Lummi View -Kwina 4 ABCD 6.32 08 5U 50 500 1650 1100 RAP 70U 45U 2250 Widening, relocation, reconstruction BIA FCAAP 13 Morrison Storm Drainage 4 ABD 0.2 09 x 30 3U 3U 14 Marine -9104 Bancroft -Jones 3 ABCD 0.7U 19 x 90 90 90 Widening, reconstruction 4 5 15 Gooseberry Dock 503 & apprch. 4 T 0.02 07 60U 480 FBR 120 600 Partial replacement SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 City /County WHATCOM Eity No. County No. 3 Major Class Carryover Proj. Prioritv No. of work Hearing Date _ Adoption Date Resolution No. Functional PROJECT COSTS IN THOUSAND 0 DOLLARS F Classification OBLIGATION - FUNDING SOURCE TOTAL Ist YEAR PROJECT IDENTIFICATION/DESCRIPTION OF WORK Work Total City Ave. /St: Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemen 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 6 7 8 9 10 11 12 13 14 16 Various Locations 3 ADHJ x 148 120 120 2UU 529 HEP 59 588 High Hazard location improvements 6 17 Haynie 931U Giles- Valley View 4 ABCD 1.21 07 5U 300 RAP 280 70 350 Widening- reconstruction 18 Haynie 9310 Stein -Delta Line 4 ABCD 0.5U U7 5U 100 RAP 12U 3U 150 Widening - reconstruction 3 19 Drayton Harbor 9205 Harborview to C/L 4 ABCD 1.18 07 x 20 200 200 2U0 620 620 2U Misc. Unanticipated Projects 1OU IOU 1UO 300 6UO 6UU 21 Bridge #3U4 Lindsay Rd. /Sumas R. 4 L U.U1 U9 2U 20 260 24U BROS 60 300 Bridge replacement or rehab. 22 West Pole 9538 Guide /Woodlyn 4 ABCD 2.23 07 2U 350 350 230 RAP $00 450 950 Widening, reconstruction 3 5 23 Marine Dr. 9104 C /L- Bennett 4 ABDF 0.29 16 60 600 640 LAB 1040 260 1300 Widening, reconstruction 2 FHIJ L SA City /County WHATCOM 'ity No. county No. Priority No. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Carryover Proj. of work Functional PROJECT COS 1: 1 Classification OBLIGATION SCHEDULE YEAR Hearing Date Adoption Date Resolution No. PROJEC DENTIFICATION /DESCRIPTION OF WORK City Ave. /St:-Name of Number Co. Road Number or Road Name Beginning and Ending Termini Work Codes Total Length (Miles) st Annual Elemen 2nd 3rd 4,5 8 6th FEDERAL AMT. PRO- GRAM STATE AMT. LOCAL TOTAL FUNDS 1 2 4 6 9 1 2 3 4 15 16- 24 Bennett 5107 Cottonwood /Marine 2 ABDF 0.56 17 400 200 UAB 54U 60 6UU Widening, reconstruction 4 GHIJ 6 25 Bennett 5107 I -5 Cottonwood 2 ABDF 0.66 17 12U 2UU 28U UAB 540 6U 6U0 Widening, reconstruction 4 GHIJ 6 26 Marine 5506 Bennett/ Bancroft 3 ABCD 1.99 16 3U 130 240 7UO UAB 880 220 11UU Widening, reconstruction 4 FG 5 27 Birch Bay 9205 Alderson- Shintaffer 4 ABDE 2.1U 07 2UO 100 1200 2UO FEMA 500 8UU 1500 Reconstruction 3 GOK RAP 5 RID Paths Trails 28 So Pass 9604 Lawrence -Frost Rd. 4 ABCD 9.00 07 50 500 500 2750 RAP 1000 2800 3800 Widening, reconstruction, realignment 29 Whatcom Connector Yew -Lk Louise 1 ABDJ 2.50 20 40 100 2500 2130 FAUS 530 2660 New construction SA ,ity /County WHATCOM City No. County No. 3 Priority No. SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Carryover Proj. of work Functional PROJECT COST: 7 1 Classification UBLIGATION SCH UL YEAR Hearing Date Adoption Date Resolution No. PKUJtG1 lUtNiirii,AIiunytscKIPIIUN UP MURK City Ave. /St: Name of Number Co. Road Number or Road Name Beginning and Ending Termini Work Codes Total Length (Miles) 1st Annual Elemen 2nd 3rd 4,5 & 6th FEDERA AMT. PRO- GRAM STATE AMT. LOCAL TOTAL FUNDS 1 2 3 4 b 7­7 8 9 10 11 12 13 14 15 16 30 Kwina Rd Haxton -Lummi Shore 3 ABU 1.U2 09 30 420 450 450 Widening, reconstruction 4 5 31 Northwest & Smith Bike Trail 3 4.0 07 15 20 Paths 35 35 Trails 32 E. Smith 9508 Everson Goshen -Mt. Baker 3 ABU 3.28 07 5U 5OU 500 250 RAP 750 550 1300 Widening, reconstruction 4 5 33 Yew St. Rd. 4083 Ch - Samish 3 ABD 2.13 17 50 850 UAB 720 180 900 Widening, reconstruction 4 34 Ferndale 9113 Slater -Fdle CA 4 ABCD 1.56 07 200 50 100 525 FCAAP. 125 750 875 Widening, reconstruction 3 5 35 B.B. - Lynden 9304 Bob Hall - Rathbone 3 ABD 1.02 07 50 400 360 FAS 90 450 Widening, reconstruction 4 36 Bridge #252 Hannegan /Nooksack 07 150 150 150 SA City /County WHATCOM pity No. County No. 3 Priority No. City Ave. /St: Name of Number Co. Road Number or Road Name Beoinnina and Endina Termini 37 Bridge #149 Potter Rd. /Slough Bridge replacement or rehab. 38 Bridge #83 Blaine Ro. /Dakota Cr. Bridge replacement or rehab. 39 Cable /Terrace 9412 Euclid -Blvd. Widening, reconstruction 40 Park Rd. 9412 So. Bay Dr. - SR9 Widening, realignment, reconstruction 41 Lk. Whatcom Blvd. 5502 Cable -UAB Widening, realignment, reconstruction 42 Loomis Tr. 3270 Sunrise -Bob Hall Widening, reconstruction 43 W. Badger 9310 Sunrise -Delta Line Widening, reconstruction SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Class rk Functional Classification Work Tots Codes Length (Miles 4 L I U. 01 1 09 4 L 0. U3 07 5 I ABCD I 0.70 116 5 I ABCD I 2.78 I 08 4 ABDL 5.05 16 4 ABC 2.00 07 4 ABC 1.00 07 r Hearing Date _ Adoption Date Resolution No. TOTAL Ist Element 2nd I 3rd I '6th$ AMTER� GRAM I AMT. I LOCAL I FUNDS 2U 2U 31U 28U BROS 70 350 2U 20 760 64U BRS 160 800 60 600 340 UAB 90U 100 1000 55 5UO 645 RAP 500 700 1200 100 140U 3500 UAB 4000 1000 5000 60 740 RAP 500 300 800 150 250 RAP 250 150 4UO SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date ;ity /County WHATCOM Adoption Date City No. Resolution No. County No. 3 Major Class Carryover Proj. Priority No. of work Functional PROJECT COSTS IN THOUSAN S OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE YEAR PROJECT EN ICA ION DESCR PT ON OF WORK Work Total 1st TOTAL City Ave. /St: Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 1 2 3 4 6 7 8 11 12 13 14 15 1 44 Hannegan 950 VanOyk- Nooksack 5 ABDL 1.57 07 60 480 RAP 250 350 60U Widening, structural overlay or FAS 45 Sunrise 9211 B.B. Lyn- Badger 4 ABC1 2.00 07 100 250 50U 68U FAS 17U 850 Widening, reconstruction 3 5 46 Delta Line 931U W. Badger- Haynie 4 ABC 0.50 07 90 150 RAP 192 48 240 Widening, reconstruction 3 5 47 Mt. View 92U2 Rainbow -Lk. Terrell 4 ABCD 0.5U 07 IOU 200 30U 300 Widening, reconstruction 3 5 48 Kickerville 9202 Grandview - Rainbor 3 ABD 2.01 07 900 900 900 Widening, reconstruction (all weather) 49 Rainbow 9202 Kickerville -Mt. View 5 D 1.20 07 100 100 100 Resurface 50 E. Smith 9508 Everson Goshen -Stary 4 ABD 1.50 07 300 RAP 240 60 300 Rehabilitation, resurfacing 5 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 "ity /County WHATCOM ,ity No. County No. Major Class Carryover Proj. Priority No, of work Functional PROJECT COST: Classification I OBLIGATION SCHEDULE YEAR Hearing Date Adoption Date Resolution No. PROJECT ID N F CATION/DESCRIPTIO"F WORK Work Total 1st TOTAL City Ave. /St. Name of Number Codes Length Annual 2nd 3rd 4,5 8 FEDERA PRO- STATE Co. Road Number or Road Name (Miles Elemeni I 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini 2 3 4 5 6 7 8 10 11 12 13 14 15 16 51 Marine Dr. 9104 Ferndale -Lummi Shore 3 ABD U.85 U7 3UO RAP 240 60 3UO Widening, reconstruction 4 52 Lk. Terrell 9108 Slater -Mt. View 4 ABCD 2.UO 07 5U 750 RAP 500 3UO 8OU Widening, reconstruction 3 5 53 Mosquito Lk. 9419 Mt. Baker - Township 4 ABCD 2.89 08 100 1200 1300 13UO Widening, realignment, reconstruction 3 5 54 Marine Pt. Roberts 2816 Edwards to Roosevelt 4 ABCD 2.02 09 150 700 850 850 Widening, reconstruction 3 5 55 N. Telegraph 6661 Sorenson -Sumas 4 ABCD 4.15 08 300 140U 1700 1700 Widening, reconstruction, realignment 3 5 56 Blaine 9217 Drayton -B.B. Lynden 4 ABCD 1.90 09 100 700 800 BUD Widening, reconstruction 3 SA SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date City /County WHATCOM Adoption Date City No. Resolution No. County No. Major Class Carryover Proj. Priority No. of work Functional PROJECT COSTS IN THOUSANDS OF DOLLAR Classification OBLIGATION SCHEDULE FUNDING SOURC AR " PROJECT IDENTIFICATION/DESCRIPTION OF WORK Work otal 1st TOTAL City Ave. /St: Name of Number Codes Length Annual 2nd 3rd 4,5 & FEDERAL PRO- STATE Co. Road Number or Road Name (Miles) Elemeni 6th AMT. GRAM AMT. LOCAL FUNDS Beginning and Ending Termini i 2 57 Lk. Louise 5545 Blvd -2Mi West 1 ABCD 2.UU 16 192u UAB 1540 38U 192U Widening, reconstruction 58 H St.3470 C/L -Guide Meridian 4 ABCD 10.77 07 4500 RAP 1000 3500 4500 Widening, vertical alignment, reconstruction 3 5 59 Mt. View 9202 Lk.Terrell- Ferndale C/L 4 ABCD 3.22 07 1250 RAP 1000 250 1250 Widening, reconstruction 3 5 6U E. Wiser Lk. 9521 Guide - Hannegan 3 ABD 2.20 09 850 RAP 50U 350 850 4 5 61 W. Laurel 9536 Guide Meridian - Aldrich 4 ABCD 1.50 08 650 RAP 5UU 150 65U Widening, reconstruction 3 5 62 Lk. Whatcom Blvd. 9412 Lk. Louise -So. Bay 4 ABCD 2.88 07 28UU 2800 2800 3 5 SA City /County WHATCOM City No. County No. Priority No. PROJECT IDEN CA ON ESCR P City Ave. /St: Name of Number Co. Road Number or Road Name Beginning and Ending Termini 1 2 63 W. Pole 9538 Woodlyn- Northwest Widening, reconstruction 64 1 W. Shore 9101 Legoe Bay- Nugent 65 Drayton Harbor 9220 Blaine - Harborview Widening, resurface 66 Lk. Louise 4601 M.P. 2.33- Austin Widening, reconstruction, realignment 67 Old Samish 9401 C/L .80 Mi. E. Reconstruction 68 Bridge #328 Rock Rd -Saar Cr. 69 Slater- VanWyck Connector New Construction SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class of work Functional Classification Work Total I Codes I Length I I Miles 5 I ABCD 1 0.50 107 4 ABCD 2.31 08 3 5 5 CD 0.9U 07 5 J ABCD I 1.63 116 4 ABCD 0.80 17 3 5 4 L 0.01 09 I I AB J I I 6.07 107 r Hearing Date Adoption Date Resolution No. STATE Elemed 2nd I 3rd 1 46th& I AMTERAI� GRRAM I AMT. I LOCAL I FUNDS 225 1 1 1 1 225 1 225 1660 1 1 1 1 166U I 166U 600 1 1 1 1 600 1 60U 1600 UAB 1250 350 1600 500 5UO 500 120 96 BROS 24 120 2940 2940 2940 SA City /County WHATCOM City No. County No. Priority No. PROJECT IDENT ICAT ON D SCRIP ION 0 City Ave. /St: Name of Number Co. Road Number or Road Name Beginning and Ending Termini 2 7U Squalicum- Bennett /Marine Dr Connector - New Construction 71 Stewart Road New Construction 72 Slater 9108 Haxton- LkTerrell Widening, Reconstruction 73 E Laurel 9536 Guide - Hannegan Widening, reconstruction 74 Halverstick 6218 - Northwood - SR9 Widening, reconstruction 75 Drayton Harbor 2005 - Harborview -C /L Widening, reconstruction 76 Lummi View 9104 - Haxton-Lumni Shore Widenino. reconstruction SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Hearing Date _ Adoption Date Resolution No. Major Class Carryover Pro'. of work Functional PROJECT COSTS IN THOUSANDS OF DOLLARS Classification OBLIGATION SCHEDULE FUNDING SOURCE YEAR Work o al 1st TOTAL Codes Length Annual 2nd 3rd 4,5 & FEDERA PRO- STATE (Miles Elemen 6th AMT. GRAM AMT. LOCAL FUNDS 1 ABDF 19 875 875 875 GH IJ 1 ABDI 1.72 09 1395 1395 1395 J 4 ABD 2.50 U7 1000 1000 1000 3 4 ABD 2.50 08 1000 IOUO lUOU 3 4 ABD 5.5U 08 1500 1500 1500 3 4 ABD 1.18 07 550 55U 55U 3 4 ABD 1.63 08 700 700 700 3 SA 'ity /County WHATCOM „i ty No. County No. 3 Priority No. City Ave. /St.'Name of Number Co. Road Number or Road Name Beainnina and Ending Termini 77 Roosevelt 2820 - Province - Bayview Widening, reconstruction 78 Boundary Bay 9250 - APA- Bayview Widening, reconstruction 79 APA Rd. 2870 Tyee- Boundary Bay Widening, reconstruction SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1986 to 1991 Major Class Carryover Proj. of work Functional PROJECT COS N HOU Classification I OBLIGATION SCHEDULE AR Work otal 1st Codes Length Annual 2nd 3rd 4,5 8 FED (Miles) Elemen 6th AMT 3 4 b 6 7 8 1 9 1 11 2 4 ABD 1.U8 09 475. 3 4 ABD 1.37 08 600 3 4 ABD 1.50 09 650 3 Hearing Date _ Adoption Date Resolution No. PRO- I STATE TOTAL GRAM AMT. I LOCAL FUNDS 475 475 600 60U 650 650