INTRODUCED BY-: MUENSCHER
PROPOSED BY: Public Works Dept.
DATE INTRODUCED: April 17, 198
RESOLUTION NO. 86 -16
A RESOLUTION AUTHORIZING THE COUNTY EXECUTIVE TO ENTER
INTO A CONTRACT FOR CONSULTING SERVICES WITH G.H.R. &
ASSOCIATES FOR THE PURPOSE OF DESIGN AND SUPERVISION
OF CONSTRUCTION OF STORM DRAINAGE PROJECT LOCATED AT
CLIFFSIDE SUBDIVISION SOUTH OF MARINE DRIVE IN THE
UNINCORPORATED AREA OF WHATCOM COUNTY
WHEREAS, submittals to RFP (request for proposal) have been received i
accordance with the Revised Code of Washington and County ordinances; and
WHEREAS, a Selection Review Committee has reviewed the submittals and
selected G.H.R. & Associates as their first choice and recommended to the Count
Executive that a contract be entered into with G.H.R. & Associates for design,
engineering, surveying and project management of the Cliffside drainage project
and
WHEREAS, it is determined by the Whatcom County Council that it is
necessary to enter into an agreement with consulting engineers at this time to
provide the services included in Exhibit A attached hereto; and
WHEREAS, the consultants hereby agree to perform those services speci-
fically set forth within the agreement by and between Whatcom County and the
consultant, including Exhibit A attached hereto;
NOW, THEREFORE, BE IT RESOLVED that the Whatcom County Executive is
hereby authorized to enter into an agreement by and between Whatcom County and
G.H.R. & Associates to perform services as stated within the agreement and in
accordance with the Scope of Work (Exhibit A).
The agreement for consulting services between Whatcom County and G.H.R.
& Associates shall stipulate reimbursement to the consultant for services ren-
dered in a sum not to exceed $ 26, 000. 00, and said sum includes costs inciden-
tal to and necessary for the completion of the Cliffside drainage project. The
schedule of charges is set forth in Exhibit B attached hereto. The sums shall
be paid in monthly installments as costs are incurred and billed by the con-
sultant firm.
RESOLUTION - 1.
Date drafted: 4/10/86
1
2
3
4
5
6
7
8
9
10
11
12
13.
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
PASSED this 17th
ATTEST:
4'
Carol, Ebergsollf
Clerk of the Coun i 1
APPROVED AS TO FORM:
Kanaajj i. VMS
Civil Deputy osecuting Attorney
Resolution - 2.
date drafted: 4/10/86
day of April 1986.
WHATCOM COUNTY COUNCIL
WHATC0M COUNT H GTON
ALD G.
Chairperson
SCOPE OF WORK ELEMENTS
1. Extent of drainage design and runoff volume computations.
2. Engineering studies prior to design recommendations.
3. Finding of permit requirements relative to design
4. Alignment of easements.
5. Secure easments and right -of -ways.
6. Joint meeting with all agencies, utility companies and home owners' asso-
ciation.
7. Preliminary design of project and engineer's cost estimate.
8. Preliminary specifications and standards.
9. Final design with contract specification for bidding
10. Submit for approvals to all local agencies and home owners' association.
11. Bidding for construction contract.
12. Award contract.
13. Pre - construction conference with contractor, all agencies, utility companies
and home owners' association.
14. Notice to proceed with construction.
15. Approval of all materials for construction.
16. Construction contract management:
a. Inspection and testing,
b. Pay requests,
c. Change orders,
d. Project time scheduling,
e. Project progress reporting,
f. Monitoring project budget.
17. As- builts of improvements.
18. Certification of completion of project.
` WHATCOM COUNTY DEPARTMENT OF PUBLIC WORKS
PROJECT MANAGEMENT FOR CLIFFSIDE DRIVE
AGREEMENT FOR CONSULTING SERVICES - GHR & ASSOCIATES
APRIL 14, 1986 - REVISED
EXHIBIT "B" - SCHEDULE OF CHARGES
Task - Design Phase
Project Engineer
Project Surveyor
Soil Engineer
Planner
Design Technician
Computer /Draftsman
Survey Crew, Two man (28hrs each)
Clerical
Reports /Progress Stmt.
Task - Construction Task
Project Engineer
Project Surveyor
Inspector
Design Technician
Computer /Draftsman
Survey Crew, Two -man (80hr each)
Clerical
Reports /Progress Payments
HRS *$AMT= $AMT
51
@
40
= 2040.00
18
@
40
= 720.00
8
@
35
= 280.00
9
@
35
= 315.00
34
@
25
= 850.00
36
@
25
= 900.00
56
@
30
= 1680.00
12
@
17.5 =
210.00
10
@
17.5
= 175.00
ST $ 7170.00
80
@
40
= 3200.00
30
@
40
= 1200.00
240
@
25
= 6000.00
16
@
25
= 400.00
16
@
25
= 400.00
160
@
30
= 4800.00
75
@
17.5 =
1312.50
60
@
17.5
= 1050.00
ST $ 18362.50
TOTAL SALARY COSTS INCLUDING OVERHEAD
TOTAL NON- DIRECT SALARY COSTS
Travel, reproduction, communication
TOTAL ESTIMATED CONTRACT AMOUNT
Douglas N. Campbell, P.E. 2 -
9 P
NOTE: See attached fee schedule
$ 25532.50
467.50
$ 26000.00
GEORGE 11. RAPER, P.L.S.
.Res: 366 `5(14
C:.I1.11. & ASS®CIA"I'L
CIVIL ENGINEERS • LAND SURVEYOPS
366 NIA It I IN ST. • P.O. BOX 1697 • RI.AINE, WA 4R7"I
(206) 332 -5825
April 14, 1986
SCHEDULE OF HOURLY RATES
PRINCIPAL ENGINEER (Licensed Engineer)
PRINCIPAL SURVEYOR (Licensed Surveyor)
SURVEY PARTY (Two Man Crew)
SURVEY PARTY (Three Man Crew)
COMPUTER / DRAFTSMAN
CONSTRUCTION INSPECTOR
CLERICAL
)1't ;I.. \S N. ( ANIVIS4:LL. P.L.
li
vs: 6 17-0357
$ 40.00
40.00
60.00
80.00
25.00
30.00
17.50
The above hourly rates include equipment, supplies, vehicles
and overhead. L'