Loading...
HomeMy WebLinkAboutres1986-0161 2 3 4 5 6 7 8 9 10 11 12 13. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 INTRODUCED BY-: MUENSCHER PROPOSED BY: Public Works Dept. DATE INTRODUCED: April 17, 198 RESOLUTION NO. 86 -16 A RESOLUTION AUTHORIZING THE COUNTY EXECUTIVE TO ENTER INTO A CONTRACT FOR CONSULTING SERVICES WITH G.H.R. & ASSOCIATES FOR THE PURPOSE OF DESIGN AND SUPERVISION OF CONSTRUCTION OF STORM DRAINAGE PROJECT LOCATED AT CLIFFSIDE SUBDIVISION SOUTH OF MARINE DRIVE IN THE UNINCORPORATED AREA OF WHATCOM COUNTY WHEREAS, submittals to RFP (request for proposal) have been received i accordance with the Revised Code of Washington and County ordinances; and WHEREAS, a Selection Review Committee has reviewed the submittals and selected G.H.R. & Associates as their first choice and recommended to the Count Executive that a contract be entered into with G.H.R. & Associates for design, engineering, surveying and project management of the Cliffside drainage project and WHEREAS, it is determined by the Whatcom County Council that it is necessary to enter into an agreement with consulting engineers at this time to provide the services included in Exhibit A attached hereto; and WHEREAS, the consultants hereby agree to perform those services speci- fically set forth within the agreement by and between Whatcom County and the consultant, including Exhibit A attached hereto; NOW, THEREFORE, BE IT RESOLVED that the Whatcom County Executive is hereby authorized to enter into an agreement by and between Whatcom County and G.H.R. & Associates to perform services as stated within the agreement and in accordance with the Scope of Work (Exhibit A). The agreement for consulting services between Whatcom County and G.H.R. & Associates shall stipulate reimbursement to the consultant for services ren- dered in a sum not to exceed $ 26, 000. 00, and said sum includes costs inciden- tal to and necessary for the completion of the Cliffside drainage project. The schedule of charges is set forth in Exhibit B attached hereto. The sums shall be paid in monthly installments as costs are incurred and billed by the con- sultant firm. RESOLUTION - 1. Date drafted: 4/10/86 1 2 3 4 5 6 7 8 9 10 11 12 13. 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 PASSED this 17th ATTEST: 4' Carol, Ebergsollf Clerk of the Coun i 1 APPROVED AS TO FORM: Kanaajj i. VMS Civil Deputy osecuting Attorney Resolution - 2. date drafted: 4/10/86 day of April 1986. WHATCOM COUNTY COUNCIL WHATC0M COUNT H GTON ALD G. Chairperson SCOPE OF WORK ELEMENTS 1. Extent of drainage design and runoff volume computations. 2. Engineering studies prior to design recommendations. 3. Finding of permit requirements relative to design 4. Alignment of easements. 5. Secure easments and right -of -ways. 6. Joint meeting with all agencies, utility companies and home owners' asso- ciation. 7. Preliminary design of project and engineer's cost estimate. 8. Preliminary specifications and standards. 9. Final design with contract specification for bidding 10. Submit for approvals to all local agencies and home owners' association. 11. Bidding for construction contract. 12. Award contract. 13. Pre - construction conference with contractor, all agencies, utility companies and home owners' association. 14. Notice to proceed with construction. 15. Approval of all materials for construction. 16. Construction contract management: a. Inspection and testing, b. Pay requests, c. Change orders, d. Project time scheduling, e. Project progress reporting, f. Monitoring project budget. 17. As- builts of improvements. 18. Certification of completion of project. ` WHATCOM COUNTY DEPARTMENT OF PUBLIC WORKS PROJECT MANAGEMENT FOR CLIFFSIDE DRIVE AGREEMENT FOR CONSULTING SERVICES - GHR & ASSOCIATES APRIL 14, 1986 - REVISED EXHIBIT "B" - SCHEDULE OF CHARGES Task - Design Phase Project Engineer Project Surveyor Soil Engineer Planner Design Technician Computer /Draftsman Survey Crew, Two man (28hrs each) Clerical Reports /Progress Stmt. Task - Construction Task Project Engineer Project Surveyor Inspector Design Technician Computer /Draftsman Survey Crew, Two -man (80hr each) Clerical Reports /Progress Payments HRS *$AMT= $AMT 51 @ 40 = 2040.00 18 @ 40 = 720.00 8 @ 35 = 280.00 9 @ 35 = 315.00 34 @ 25 = 850.00 36 @ 25 = 900.00 56 @ 30 = 1680.00 12 @ 17.5 = 210.00 10 @ 17.5 = 175.00 ST $ 7170.00 80 @ 40 = 3200.00 30 @ 40 = 1200.00 240 @ 25 = 6000.00 16 @ 25 = 400.00 16 @ 25 = 400.00 160 @ 30 = 4800.00 75 @ 17.5 = 1312.50 60 @ 17.5 = 1050.00 ST $ 18362.50 TOTAL SALARY COSTS INCLUDING OVERHEAD TOTAL NON- DIRECT SALARY COSTS Travel, reproduction, communication TOTAL ESTIMATED CONTRACT AMOUNT Douglas N. Campbell, P.E. 2 - 9 P NOTE: See attached fee schedule $ 25532.50 467.50 $ 26000.00 GEORGE 11. RAPER, P.L.S. .Res: 366 `5(14 C:.I1.11. & ASS®CIA"I'L CIVIL ENGINEERS • LAND SURVEYOPS 366 NIA It I IN ST. • P.O. BOX 1697 • RI.AINE, WA 4R7"I (206) 332 -5825 April 14, 1986 SCHEDULE OF HOURLY RATES PRINCIPAL ENGINEER (Licensed Engineer) PRINCIPAL SURVEYOR (Licensed Surveyor) SURVEY PARTY (Two Man Crew) SURVEY PARTY (Three Man Crew) COMPUTER / DRAFTSMAN CONSTRUCTION INSPECTOR CLERICAL )1't ;I.. \S N. ( ANIVIS4:LL. P.L. li vs: 6 17-0357 $ 40.00 40.00 60.00 80.00 25.00 30.00 17.50 The above hourly rates include equipment, supplies, vehicles and overhead. L'