Loading...
HomeMy WebLinkAboutres1992-0684TCOM COUNTY COUNCTr, AGENDA BILL I ON • . :• CLEARANCES Initial Date Date Received in Council Office: Agenda Date Assigned To: Originator- Executive �� j6'( n UU II 1Y1 D OCT 13 1992 WH pTlOM COUNTY COUNCIL 10/27/92 Council /Intro Division Head- 11/24/92 Council /Hearing Department Head - Prosecutor Review- Purchasing /Budget Dir, Executive- � J UBJP-C, l : v Capital Facilities Improvment Program Resolution ATTACHMENTS: Proposed Resolution and appended attachments Public Hearing Needed? Yes /ZC/N %/ SUMMARY STATEMENT.• Executive submittal of comprehensive multi -year capital facilities plan for 1993 -98 ORIGINATOR'S RECOMMENDED ACTION.• Pass as proposed COMMITTEE ACTION (including dates): COUNCIL ACTION (including dates): 10/27/92' Intro 11/24/92: Council approved the resolution. 7 -0 Related File Numbers: Ordinance or Resolution Number.• R92 -068 4�b 93CapFac.Res INTRODUCED BY: Consent PROPOSED BY: Executive DATE:October 21,. 1992 RESOLUTION NO. 92 -068 A RESOLUTION IN THE MATTER OF ADOPTING A MULTI -YEAR CAPITAL FACILITIES IMPROVEMENT PROGRAM WHEREAS, Subsection 3.22.(e) of the Whatcom County Charter gives the County Executive the authority to provide the County Council with capital improvement plans for the present and future development of the county; and WHEREAS, the Whatcom County Council through Resolution 92 -050, established a priority for the 1993 budget to develop and submit with the 93 Executive Recommended Budget a comprehensive, multi -year, county -wide document containing major capital expenditures; and WHEREAS, prudent financial management practices dictate the development of.a comprehensive capital facilities plan; and WHEREAS, the so called "Growth Management Act" requires the County develop a capital facilities element within the Comprehensive Plan and pledge Real Estate Excise Taxes for the financing of the same; NOW, THEREFORE BE IT RESOLVED: the Whatcom County Council hereby resolves to adopt the attached documents including: (1) the County Parks Levy Fund project list; (2) the Physical Plant and Facilities Capital Program; and (3) the One Year Road Program; as the comprehensive capital facilities plan for Whatcom County. The previously adopted Resolution 92 -045 is hereby referenced as the Six Year Road Program plan through 1998. Passed this 24th day of November ,' 1992. WHATCOM COUNTY COUNCIL WHATCOM COUNTY, `WASHINGTON DANIEL WARNER, CHAIR ATTEST: CLERK OF THE COUNCIL APPROVED AS TO FORM: RANDALL J. CHIEF CIVIL VrPUTY PROSECUTING ATTORNEY CAPITAL IMPROVEMENT - PROJECTS FOR 1993 (LEVY FUNDED) 1993 Project List 1. Hovander Homestead Park Barn repair .................... $24,000.00 2. Repair road at Hovander Homestead Park .................... 14,500.00 3. Replace equipment shed at Hovander Homestead Park ........... 8,000.00 4. Replace El Toros Sailboats for Outdoor Program ............... 5,000.00 5. Replace intermediate sailboats for Outdoor Program ............ 12,000.00 6. Remodel kitchen at Pt. Roberts Senior Center ................ 15,459.00 7. Replace riding lawn mower at Shop .......................... 9,000.00 8. Remodel restrooms at Samish Park ......................... 5,000.00 9. Replace logs in swimming area at Samish Park ................ 4,500.00 10. Replace signs /repair trail on Interurban Trail .................. 16,680.00 11. Gravel parking lot at Pine and Cedar Lakes Trailhead ............ 2,000.00 12. Rebuild trails at Pine and Cedar Lakes ..................... 19,120.00 13. Repair building (roof and painting) at Bay Horizon Park .......... 32,826.00 14. Remodel restrooms in shower building at Silver Lake Park ........ 1,000.00 15. Replace playground equipment at Silver Lake Park .............. 9,000.00 16. Repair Service Building at Silver Lake Park ...... ............. 25,000.00 17. Replace food concession equipment at Silver Lake Park .......... 7,300.00 18. Install smoke alarm system of Bellingham Senior Center .......... 3,500.00 19. Boardwalk replacement Lighthouse Marine Park .......:......... 4,000.00 20. Replace riding mower at Lighthouse Marine Park ............... 8,000.00 21. Rebuild pile driver ....... ............................... 1,000.00 .' Total of 1993 17 I •1 1 co V 0l (n 4�h O ko Qt � N ~ O O O 2 (n W W CD r W � N J. O i c J• O y, r N t1 C F C✓ Sp -nm G`: O CD (D (D N co Z (D S3% N o;)o jr,3 (l�� CO a CD v D> N J• O 4�h °, t7 t F N O 12 J. J J• C+ (n � J. J• ce a m N CD w N N w N N N Qt � N C+ 00 O pp� V "O i S t7J 'm W YD t1 C F C✓ Sp -nm G`: O CD (D (D J. C Q a -Fi ..D ��rJ O O O SL t F N O J. J J• C+ (n � J. J• ce a m 3 -- I.- C O N 0 � N C+ C')C pp� V "O i C W YD t1 C F C✓ Sp -nm G`: O CD (D (D J. C Q a -Fi ..D ��rJ O V)V)z r- -n -n N v 0 � � O N N i [p-�[n J. jw \1 J J. J. J J• C+ (n � J. J• ce a m N NN:t>rc-) O � p ca� •z t8 a '"i O O a W � J. 2 to CD z C O r 0 o CD 3 t2 io C+ D -- I.- n—(W WG7 O N N O R O C')C pp� V "O i C YD C✓ Sp -nm G`: • -n W-V J. C Q a -Fi ..D ��rJ =r C to (n J `L V)V)z r- -n -n N v 0 � � N i [p-�[n J. jw \1 J J. J. J J• C+ (n � J. J• ce CD eo J. N NN:t>rc-) � eu eu CD CD 0 0 0 ,a, m m m m N .J J. w rn o o -n r as R c ,-. N C O C) op I rmTl p to CD R n m -10 C) �1 CT, S J(I(,�1[� C O V V t...! C) o V C r Q C+ O 0• 0 S o oo -- a n—(W WG7 J. C CD J R O C')C pp� V "O i C YD C✓ Sp -nm G`: • -n W-V J. C Q a -Fi ..D ��rJ =r C to (n J `L -n N v 0 � � N i [p-�[n J. jw \1 J J. J. J J• C+ (n � J. J• ce CD eo J. N rD W (n � z C-) W D> CD CD v v v A 3 C-) cr rD 21 i z= -f DS D JCD i w a-n0 J � J fD �� V W t31 • N V b4 b4 64 O J (DD N CCD CAD fnD 'n m O =-c=+ 8. J. O $;C+ ' � J =� J N J V i :C7 C-) W D> CD CD v v v A 3 C-) cr rD 21 i z= -f DS D JCD i w a-n0 J � J fD �� V W t31 • N V b4 b4 64 O J (DD N CCD CAD fnD 'n m O =-c=+ 8. J. O $;C+ ' � J TJ D 'n 3 V 4. o 1-' W W p� O VI (~77 pgp W 4�- N p� V O\ W V � V N O c�i, N V O W OD O 0) l0 (NCI r wg C-:) O � O C ;o O-5 O c$ a o r o L(a PCIL m c) c/1 3 W W i O J. M tC-+ 0 CL W (.n P, rn (D C+ N Z O co (D Z O Q, o o 0) < 4•� pp o fD O �c-)zc-n --. rL O0 N N r C7 ... 0. `+ a QD O O If & c +� M o J J• `I-° In 7C �+ ? 8 f!1 (D N N b+ ~ �I iL co (D m Q v cn 3 O J J Q W (.i1 c+ _ c cu a C sy N L —0 g .. o (/ C 70 y W (� V ~ ko pO� O J fD �X} J W r � O C C (D fD J. 1 O f1 —, N � n ry� R'� (� CD (-) oo D C N O g g•� C —) C -+ p <--) �. (D V) U] c'h C, o-nrn (D Ja . S 91) Z — C C.+ S (Z D 8- (D -n N 0 � -n N cn O5 co J. (n I\ I\ r\ C:) (") ---I o�� z DGi. e� D Ln CD C C 1 D W S O to J J J. n (D N `/ co cn y `/ • I\ IJ v o, 64 64 64 0 o(9(pp ION-51 c+ l� �+ � (D C+ In -n m y t cr Z� LDL c a V) Z• �• Z c Oc8 O -� Ft O (rD 3 tC-+ P, rn m_crI �o cVrl Ul O �O o o pp o pp O �c-)zc-n --. N N r C7 ... QD If c +� M o J J• `I-° -n r a �. o v cn cn VI F c .. o W (� V ~ O ko fD I- C C N � n O V Ul O N to -' Ul VI O I'J I.J zy J. to 5 o o w o w o C+ r C-+ O {D� CN) 7 NO Ul DLO O `� 05 IN sw � CD Ul 8 CD (-) oo D C N O g g•� C —) C -+ p <--) �. (D V) U] c'h C, o-nrn (D Ja . S 91) Z — C C.+ S (Z D 8- (D -n N 0 � -n N cn O5 co J. (n I\ I\ r\ C:) (") ---I o�� z DGi. e� D Ln CD C C 1 D W S O to J J J. n (D N `/ co cn y `/ • I\ IJ v o, 64 64 64 0 o(9(pp ION-51 c+ l� �+ � (D C+ In -n m y t cr Z� LDL c a V) Z• �• Z c Oc8 O -� Ft ^I T a c,) co pi C (ND C1 C+y QCC� C pr 40 -n 'n W -v —I cn = :4-(p to -"nNV n s T7 N J. c+ N J. J. H Qo c F W N co vvQv --9 9 -1 CD°<a�g J J 3 =o I fD W � • N v • � r cn v t r • • v 69 69 69 3 I z° w� a. �n Ii- ti- C •- Z• m N m m CN7l � W N FN•+ -n rr m N rDD o) D ° cl+ - �F cam+ ° ° v J � a J CR v 'n O N V N W to zz O Ul C) O q°� W O O O n C G W 3(D 2 a W co co o CD cc o A < r m W n o �+ g a z J. pp N J. N rD L _ (D � N N -�i. � < ;Q fD rD � J• � O D � � O 9 N F+ (n• (a• Ln J J r O C+ f+ tit J ° 3 Sr r ° 3 � to � v rn . a Ol Ol Ol V • cncnyrn V x 7d m m H a J J. P n r N CD Fpp-+ C fD l0C�:1 p O V 8 � � � 1 � o N fD rm77 r•�-+ c�0 to m " ~ ^ Ul Ul A o N Ln O c :: �_ ro N � q� � N ct CJ1 O O �^-+S CA r a cC+ c a c,) co pi C (ND C1 C+y QCC� C pr 40 -n 'n W -v —I cn = :4-(p to -"nNV n s T7 N J. c+ N J. J. H Qo c F W N co vvQv --9 9 -1 CD°<a�g J J 3 =o I fD W � • N v • � r cn v t r • • v 69 69 69 3 I z° w� a. �n Ii- ti- C •- Z• m N m m I CD -n rr m N rDD o) D ° cl+ - �F cam+ ° ° v J � a J 3 �1 °z too W Q h C I � I E Co v dl A W IV r P"R • C) W a Fq 00 M 0) rrl rr�� r Iv r QQ QQ zrz o h o �' n rr cn i-� m v� 8 to -0 C-,) m r_ C� p3� r � V) co ; cA'i -NS CD n op o U3 CD z c r N o N 0 o a m-nT ofD -ADS CCD CD - oco -�V)c-� O CCD 3 N N h ID -n cn W W pp� co co pCS� p3� W N O " 3. J• -1 r no ct • CD CD CD cF Op C CD cr co CD Ln N CD C-1 C O CCD °'' CD CD a ' noon y 3 O CD f y C n � N ¢7 M a0 4 `� g `� o a f D z °z � C--) -n ;-A cncn:1>rm CD 71C -hTJ co A C fD n C M. N T T T T T T T T N O M— lD CO -+• v n F-� -n r _ c + a~i .-. o N s_ g N CARD OF J. CD N CD n sID p� 70 -01 C 1 O f � N 1 0 o (Q�1 1 W a `a (..7 J C 0 � is O O 0 V V V V V 8 3 �1 °z too W Q h C I � I E DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Birch Point Road -from 0.4 mi. west to 0.2 mi. East of Selder Road EXPENDITURES Contract $ 280.,000 Preliminary Engineering 10,000 Right-of-way 10,000 TOTAL $ 3001P000 nPgrDTPTTnm REVENUES R'ECEi 10 0 C T 1 I) iS -9 9 SHIRLEYVAN ZANY V EN COUNTf EXECUTwE NUMBER 1 Developers /REET Funds $ 70,000 Local Funds 230,000 TOTAL 300,000 This project will include excavation and roadway reconstruction to provide added lane width and improved sight distance at this location. It is anticipated that the roadway will be widened to two 11 -foot driving lanes with paved shoulders of 3 -5 feet, depending on geometrics. This project lies within the area proposed for incorporation into the proposed new City of Birch Bay. The status of the proposed incorporation will determine whether the project proceeds or is deleted. PROJECT NAME: Hampton Road NUMBER 2 -2.25 mi. from Slotemaker to Van Buren EXPENDITURES REVENUES Contract $1,200,000 Local Funds $1,0701P000 Preliminary Engineering 90,000 RAP Funds 250,000 Right -of -way 301P000 TOTAL $1,320,000 . TOTAL $1,320,000 DESCRIPTION This project will continue the program of constructing an all- weather road between Lynden and Everson. It will require necessary excavation and total reconstruction to provide added lane width, paved shoulders and improved sight distance. It is anticipated that the road will be constructed with two 12 -foot driving lanes and paved shoulders of 3 -5 feet, depending on geometrics. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: E. Smith Road NUMBER 3 -2.25 mi. from SR 542 (Mt. Baker Hwy.) to Mission Road EXPENDITURES REVENUES Contract $1,250,000 Local Funds $151765000 Preliminary Engineering 100,000 RAP Funds 234,000 Right -of -way 605000 TOTAL $15410,000 TOTAL $1,4105000 nFCf PTPTTnm This project will require needed excavation and total roadway reconstruction to provide added lane width and paved shoulders to an all- weather road standard. It is anticipated that two 12 -foot lanes with paved shoulders of 4 -5 feet, depending on geometrics, will be provided. PROJECT NAME: Lummi Shore Road -from 0.4 mi. north of Portage to south of Cagey EXPENDITURES 711/: RL110 Contract $ 1905000 Local Funds Preliminary Engineering 10,000 TOTAL $ —TOWUb TOTAL DESCRIPTION NUMBER 4 $ 200,000 111 Continuing erosion is undermining this portion of Lummi Shore Road necessitating numerous one -lane segments be required. On -going discussions with the BIA, Lummi Nation, Federal. Highways, Corps of Engineers, WSDOT and the County are still being held with a comprehensive solution being hopefully attained. This budget item is anticipated as either independently correcting the most southerly problem site, or alternately, providing at least partial matching monies for a more comprehensive solution. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Specific Site Improvements NUMBER 5 - Various prioritized site improvements EXPENDITURES Contract Right-of-way TOTAL DESCRIPTION $ 180,000 20,000 REVENUES Local Funds TOTAL $ 200,000 III This is a continuation of the on -going County program of reviewing different locations and carrying out relatively short but specific traffic improvements. Priority comparisons allow this program to improve specific problems on a site by site basis. It is anticipated that most of these improvements will involve guardrail installation, although lane and shoulder widening, intersection modi- fication and /or sight distance improvements will also be reviewed. PROJECT NAME: Lake Whatcom Blvd. -1 mi. Rocky Ridge Vicinity (2200 blk.) EXPENDITURES Contract $ 110,000 Right -of -way $ 402000 Preliminary Engineering 102000 TOTAL , DESCRIPTION REVENUES Local Funds TOTAL NUMBER 6 $ 150,000 This location on Lake Whatcom Blvd. is extremely narrow with a rock cliff imme- diately adjoining the roadway on the uphill side and a steep drop -off on the side towards the lake. This roadway segment ranks as the poorest of any arterial in the County system. Public requests have been received for guardrail installation which is not possible without either construction of a very costly retaining wall to support the guardrail or alternately, narrowing up an already narrow roadway to the extent that truck and bus traffic would be faced with a one -lane situation. It is intended to proceed with an environmental review, design and right -of -way in 1993 so that the project may hopefully be bid for rock and concrete work to be performed in early 1994 and pavement to follow during late spring /summer 1994. The road would be widened sufficiently to pro- vide two safe 12-foot lanes with paved shoulders for use by pedestrians and bicyclists, as well as providing an improved safety zone for stalled vehicles or recovery zone for the motoring public. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Wickersham Bridge No. 124 NUMBER 7 - Burlington Northern Railroad Overpass EXPENDITURES REVENUES Construction $ 280,000 BROS Funds $ 272,000 Preliminary Engineering 50,000 Local Funds 68,000 Right-of-way 1011000 TOTAL 340,000 TOTAL 34011000 nrgrpTPTTnm This project has been approved with funding by the Federal Bridge Replacement -Off System (BROS) program. and will provide a badly needed overpass capable of carrying legal loads to serve this area. It is anticipated that the bridge width will be 28 -foot curb to curb and the length will be approximately 125 -feet. PROJECT NAME: Lindsay Road Bridge over Sumas River - Bridge #304 EXPENDITURES Contract $ 150,000 Preliminary Engineering 20,000 Right-of-way 10,000 TOTAL 0,0 DESCRIPTION REVENUES BROS Funds Local Funds TOTAL NUMBER 8 $ 144,000 3611000 This bridge has received a commitment for Federal Bridge Replacement - Off System (BROS) funds and will provide for the replacement of an existing defi- cient load limit structure with a modern bridge, capable of carrying legal loads. The length of the bridge will be 60 -feet and the width 28 -foot curb to curb. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Birch Bay - Lynden Road -2 mi. from Enterprise to Delta Line Road EXPENDITURES REVENUES Contract $ 4609000 Local Funds Preliminary Engineering 30,000 Other (CAPP) Right -of -way 109000 TOTAL 5009000 TOTAL DFSCRTPTTn N NUMBER 9 $ 129,000 371,000 500,000 This project is for a structural overlay and paved shoulders in order to provide a wider, safer roadway as part of the on -going program extending the four miles that were reconstructed in 1991 and 1992. This project will provide for two all- weather 12 -foot driving lanes with 4 -8 foot paved shoulders on each side, depending on geometrics. $371,000 of the cost of this project will come from the portion of the County's Gas Tax designated for County Arterial Preservation Projects (CAPP). PROJECT NAME: Tyee Drive - Point Roberts -0.6 mi. from Benson to Gulf EXPENDITURES Contract $ 350,000 Preliminary Engineering 40,000 Right -of -way 109000, TOTAL 400900 DFSCRTPTTnN REVENUES Point Roberts Gas Tax (PRGT) Local Funds TOTAL NUMBER 10 $ 320,000 4009000 This project has been ranked No. 1 by the Point Roberts Gas Tax Advisory Committee and will widen this developing block of Tyee to provide for a center left turn lane, thus facilitating left turn movements to commercial establish- ments. It is anticipated that it will be built to a curb and gutter urban stan- dard with sidewalks questionable, depending upon funding. This project is being constructed by a combination of County general road revenues, together with $320,000. in receipts from the Point Roberts 1 -cent gas tax. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Misc. Unanticipated EXPENDITURES REVENUES Contract $ 2311000 Local Funds Day Labor 251000 Preliminaty Engineering 211000 TOTAL 5011000 TOTAL NUMBER 11 $ 50,000 50,000 This project provides for small unanticipated projects which inevitably occur between budgeting sessions with anticipation of part being performed by County crews and part by contract. PROJECT NAME: Slater Road NUMBER 12 -4.5 mi. from I -5 to Naxton Way EXPENDITURES REVENUES Preliminary Engineering 10,000 Local Funds $ 1011000 TOTAL $ 10,000 TOTAL 101009 nFSCRTPTTn N This project is to provide for preliminary engineering for the continuing , upgrade of Slater Road with the next segment anticipated for construction in 19949 depending on fund availability. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Curtis Road - Country Lane to Slater (1 -Z) NUMBER 13 EXPENDITURES REVENUES Preliminary Engineering $ 5,000 Local Funds $ 5,000 TOTAL, $—fib TOTAL 5,0 nFCCPTPTTnN This project, as yet unfunded, provides for the widening and re- construction to all- weather standards of the Curtis Road so as to enhance industrial development and provide additional employment. Applications have been made to the Transportation Improvement Board (T.I.B) for project funding. Without T.I.B. funding, the project will not proceed unless driven by industrial development. PROJECT NAME: Naxton Way -South Red River Road to 0.5 mi. south of Lummi Shore Road NUMBER 14 EXPENDITURES REVENUES Preliminary Engineering $ 5,000 Local Funds $ 5,000 TOTAL $ -5�6� TOTAL $606 nFCrPTPTTnN This project should at this time be considered with respect to elevation of the roadway so as to provide access to Gooseberry Point during times of flooding. The budgeted amount is basically to perform the necessary preliminary engi- neering to more accurately determine what is the most cost effective and prac- tical to select. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Yew Street Road - Bellingham Ch to Samish Way EXPENDITURES REVENUES Preliminary Engineering $ 5,000 Local Funds TOTAL. X00 TOTAL nrgrR TPTT0N NUMBER 15 $ 5,000 The City.of Bellingham has improved their portion of Yew Street Road, thus emphasizing the need for the County to upgrade its portion of this roadway. The budgeted amount will only perform a portion of the preliminary engineering with the intent being to determine whether it would be desirable to improve the entire unincorporated portion of the road or.just the portion adjoining the city. PROJECT NAME: Marine Drive NUMBER 16 -from Nooksack River Bridge to Lummi Shore and Kwina Intersections EXPENDITURES REVENUES Preliminary Engineering $ 37,000 Local Funds $ 3711000 TOTAL $ 3T9uuu TOTAL , npq PTPTTnN This project would upgrade and improve an intersection complex that needs upgrading and modification realignment together with the possible elevation and floodproofing of the roadway easterly to the Nooksack River. Problems relating to the Tribal TERO law and right-of-way complications have continued to delay this work but a modest amount of money continues to be budgeted so that the pro- ject may move forward when the legal questions are resolved. DEPARTMENT OF -PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Hannegan Road (Phase I) NUMBER 17 -Ten Mile to Pole EXPENDITURES REVENUES Contract $610,000 Preliminary Engineering 60,000 Local Funds $770,000 Right -of -way 100,000 TOTAL T T7_0 ,0 W TOTAL $770,0 00 nFSCRTPTTnN This project is a continuation of our overlay /reconstruction program of upgrading the Hannegan Road to an all- weather road status. Preliminary soil explorations through the Four Mile Creek drainage area near Beard Road have revealed an extensive deposit of peat, up to 16 -feet in depth, which tapers to a few feet deep on either side. Total affected area is about 1,800 feet in length. As Hannegan Road is a major route in the County with a great deal of truck traffic, this area of constant roadway settlement and required maintenance needs to be stabilized. Phase 1 of this project will include excavation and removal of the peat deposits, and backfill of the area with screening material or river gravel, and replacement of the existing bridge with a box culvert. A temporary BST surface will be placed on the road until Phase 2 work is begun. The future Phase 2 portion of this project will involve widening and reconstructing the roadway to an all- weather roadway from Ten Mile Road to East Pole Road (SR 544). PROJECT NAME: Lake Louise Road NUMBER 18 -Cable Street for 0.5 mi. EXPENDITURES REVENUES Preliminary Engineering $ 10,000 Local Funds $ 50,000 Right -of -way 40,000 TOTAL $-5rlw TOTAL $—Su ,� nFSCRTPTTnN This project is in accordance with the County Council's intent to upgrade the classification and conditions of the Lake Louise Road while classifying the Lake Whatcom Blvd. as a lower level arterial. This funding will provide for prelimi- nary design and right -of -way acquisition through the hillside curved area south of.Fremont Street. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Bennett Drive /Airport Drive - Intersection Signalization EXPENDITURES Preliminary Engineering $ 5,000 TOTAL , 00 nrrnn TnrT n \1 REVENUES Local Funds TOTAL NUMBER 19 $ 5,000 $--5-51 UDb This small appropriation is intended to keep this project viable by doing preliminary engineering as necessary to hopefully qualify for matching monies for the signalization of this intersection. PROJECT NAME: Gravel Conversions NUMBER 20 (as funded) EXPENDITURES REVENUES Preliminary Engineering $ 2,000 Property owner $ 2751000 contributions Day Labor 25,000 TOTAL $ 27, TOTAL $ 27,000 nrc'rrn rnrrnkl This item number provides for the bituminous surface treatment of existing gravel roads on a property owner request basis. Preparation of the roadway will be paid by County Maintenance funds and bituminous surface treatment expense would be paid by the property owner. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Right -of -Way Acquisition (as prioritized) EXPENDITURES REVENUES Right -of -Way 9011000 Local Funds TOTAL $�fU TOTAL nFgrPTPTTnN NUMBER 21 $ 90,000 The inclusion of this item is to provide for right-of-way acquisition for needed arterial improvements, as indicated on the Six -Year Road Program, but not yet funded on the One -Year Program. The advance acquisition of right -of -way in this manner will minimize project delays due to right -of -way acquisition and thus, facilitate better budgetary planning and scheduling of the construction program, as well as reducing ultimate right -of -way acquisition costs. PROJECT NAME: Railroad Crossings - Various Locations EXPENDITURES Right -of -Way $ 1011000 Preliminary Engineering 40,000 REVENUES Federal RRP Funds Local Funds TOTAL T_7F1 09 TOTAL nPgrPTPTTnm NUMBER 22 $ 40,000 5,000 111 Whatcom County continues to apply for signalization of unsignalized railroad crossings, utilizing Federal Railroad Protective matching monies. This very nominal appropriation is intended to provide a line item if expenditures are needed to begin preliminary engineering for railroad crossings that are con- sidered by the State to be eligible for funding. The work itself .would likely follow in 1994. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Hannegan /Bakerview Intersection NUMBER 23 - Signalization EXPENDITURES REVENUES Contract $21511000 REET Funds $1805000 Preliminary Engineering $ 405000 Hazard Elimination 1255000 Right -of -Way 505000 Program (HEP) TOTAL $TUFITO TOTAL $3�,0U npgrR TPTT nm Traffic at this intersection is causing severe backups on Bakerview Road. It does meet design warrants for signalization and matching money from Federal sources has been committed for this purpose. The severity of the situation, however, is considered to merit signalization even though Federal monies may only cover $125,000 of the total cost. PROJECT NAME: Bennett /Airport /Maplewood -Signal ization NUMBER 24 EXPENDITURES REVENUES Preliminary Engineering $ 5,000 Local Funds $ 51,000 TOTAL $blluu6 TOTAL $6 npgrPTPTTnm This intersection does meet design warrants for signalization at this time. However, any signalization project here must be synchronized with signalization of the adjacent freeway ramps; thus greatly increasing project costs. Therefore, this . signalization project will not proceed unless driven by future development or State ramp. DEPARTMENT OF PUBLIC WORKS 1993 BUDGET NARRATIVE COUNTY ROAD FUND ANNUAL CONSTRUCTION PROGRAM PROJECT NAME: Various Bridge Approaches EXPENDITURES Preliminary Engineering $ 25,000 Right -of -Way 29000 TOTAL $ 20 REVENUES Hazard Elimination Program (HEP) Local Funds TOTAL NUMBER 25 $ 16,000 11,000 $-27,--90-0 This Hazard Elimination Program is substantially federally funded safety program to improve the safety to the motoring public as they approach bridges. The study is presently under way to determine on which bridges these funds could most beneficially be expended. 0 0 tz M ,n z v T, M d� to � a Y ITI 'TJ 0 0 tz M ,n z v T, M d� to � 2 n a r M F z I n r CA a M a r M O O a a LA 00 � O o 0 o LA S W c z W 2 n a r M F z I n r CA a M a r M O O a Qo H T�T^ V, !r ^H l b � y Q Fri Q n 3 M� /V M• I 1 l`J n 0 P'.0 f.n1 N h-+ C) b a w N b cum zq y 0 y 0 0 d y QQ qQ O O0 .- a _ w QQ w= y b a� d y n d O o y a a w ,o o :h a N ° ti a y .y O' G 0 oo may, `�� co h o c ° �. E. H_ d a° a a y N Qq g E. � � d , twn 21. .pn w w G Oti `G 7a0 y 00 P a Cd a M w w g w `aw O u p••, to QQ a O 0° a' a w a O or N y w d a d Ct1 C y E ie a y C c o C31 7 fE .0.� d 0 .0.� :� E N d x x mC) x Ozz � m� �p t+ N N W a N N _A 8 •,000 Vii 88 b W by 8 �N O O O W Npp 8� BWi O 8W O A O N N N Qo H T�T^ V, !r ^H l b � y Q Fri Q n 3 M� /V M• I 1 l`J n 0 P'.0 f.n1 N h-+ V, rrhC^ VJ r� ro H C� H ro 0 M l O °O ro �o �o N N C 00 J G7 [l7 .n b a, a a O ° go � z m 0 y z 0 0 o a �z �:3 b z Spa; �.*rvC z z ba,zz o z. CO • gr� � � a?c0 � <oo � � y' W � � P• � � Opp � w � Gt � (i 1�l co cn .� a °0, a p to o „ ao 0 o ? ^^ C7 t� c ❑ ❑ p °° ° ° a z tb hA p fA a°a o z o co Q a ° R° a p1 a cn x x x x tz Cxd� Ozc mz C) 90% S U Cil N U O� 00 V, rrhC^ VJ r� ro H C� H ro 0 M l O °O ro �o �o N N FBI b FBI n n FBI ^O^ M` 11 ra n 0 O n !T N N W o� CA c !+ a b `d z� 4O z z z � � () J U A W w M O~0 N M OR �m M m 3 H ::r C� E g c o H oo ag• . d U) co d co c O 0 a x °, V 441 o, CL °, z o o o •c �..ti �° C7 0 9 0 w o n a C �'• Ct1 , C P; O p3o H co d ry y Q � m 1.4 O 7j CL m O y Co 3 R rt y O OT b b O w b '4 ° �^ H =° d � N a as w 01 n /b E0 ti 4p 0g � bg g0cc� .-o r0•n O O n tr 3CJ q0 C� 3 �i C y b o . : B. n et , qQ O Cti ° n. fg^ E R Q O O a 3 H QS 10 O 3 0 7 3 E fC 6 ray y "' fC fC C 3 d O fC 3 w H OR ^ !T! x O 7. ri �7w CT1 O . 3 0 "J. o. T aq y W 7 to _ 3 y `� O_ t xi a0 , tz d ti CO " $ a �_. � 3 a P. �' O C o d C o `� (� o 'dam` a= a. a a c o tr `�o n io z Vi �•n U tr Cif. C E a o " 3 3 3 .f°, - a tr 0 (n ? 3 ., �° 3 gtr as c W o b b b to b m 0' 18n OO ���.pp. 8N 8O 8O SO 8A O O W O O O O O t+ N U O� FBI b FBI n n FBI ^O^ M` 11 ra n 0 O n !T N N W cn F� F� A F� rfy r n �b r A 1� A 0 O n ►'l r�1 � y F� � W U H F O _G'l7 O m 00 0 � bOn CCD CD O C�1 cue uNi O F u�i '� tin � ry0 '17 3 5 0 o, n 5 O d n rn w ai r� CD y �' n �. T O CD qq CD of °, Fe o °_' a o d c E W i n w •c c a, o O d y O . �• C. OO y O a 0 p7 y G O c c w y �, CD U O g 7p o w p O n �o CD CD y O a ~^ O R o-di C $. O S. ►r�y�y�y CD CD O 7 (� u� `Cow" O =• �. �" d 'd R �•i ta. S O o-ti Ci G G g. Ni 'U z d .d•' fe fo Q d `C O O d �. 'U 'a W 0 OO�fp �7 Q4. n to'cJ �� y G o to O q E �. R C m ._ o. CD 'l n0 "' a C17 R a w o o b c o a _ 5• O 7 od _ O w fp Qp R tz z fA � x a x x tz x tz 0 x x0 H t 41 z (m � ry � U o U o o 8O O � U �G 8O O U _8O O � cn F� F� A F� rfy r n �b r A 1� A 0 O n ►'l r�1 � y F� � EXHIBIT A PHI..ICAL PLANT & FACILITIES PR_sRAM 1993 FISCAL YEAR CAPITAL IMPROVEMENTS TO THE COUNTY'S PHYSICAL PLANT AND FACILITIES $15,000 and Under FUND NO. 505 594 IS 6200 PROJECT PROJECT PROJECT FUND BI -26 DESCRIPTION AMOUNT 1. Relocate and complete work on radio 6,000 CGOB& tower /apparatus on Courthouse roof. CEXF 2. Replace non - working glass breakage 8,000 PH &F devices in the Jail 3. Installation of stainless steel 9,000 PH &F shower liners in County Jail work release area. 4. Carpet lower level at Health Dept. 9,500 PH &F 5. Evalation of fire alarm monitoring 9,500 PH &F system in jail (system outdated) 6. Proposed lighting enhancement for 7,500 PH &F Health Department (Puget Power grant of $22,000 for energy conservation measure will pay balance). 7. Flood coat roofs at 401 Grand Avenue 5,000 PH &F and 316 Lottie Street 8. Carpet lower level of Forest 3,000 PH &F Street Annex 9. Seal asphalt parking lot at Forest 3,000 PH &F Street Annex to prevent damage from water freezing in hairline cracks 10. Seal asphalt parking lot at Health 3,000 PH &F Department to prevent damage from water freezing hairline cracks 11. Survey and encapsulate asbestos in 7,500 PH &F Courthouse facilities 12. Rent storage space for Auditor's 10,700 BMF Dept /Election Section for voting machines & other election functions. 13. Provide truck wash station at 6,000 ER &R Central Shop 14. Modify exhaust system in Central Shop 10,000 ER &R 15. Facilities survey for ADA compliance 10,000 PH &F GRAND TOTAL $107,600