Loading...
HomeMy WebLinkAboutres1992-045i WHATCOM COUNTY CO M AGENDA BILL NG = 92 -226A CLEARANCES Initial Date Date Received in Council Office: Atenda date Assi jMed to: originat r PuTI is Works - Eng. 6/9/ 2 DATE to be on agenda— Committee /Council assignment - Division Head: 6/23/92 C6uncil /hearing Dept Hea Prosecutor. Purchasing /Budget: Executive: SUBJECT. Whatcom County Six -Year Road Program for 1993 - 1998 ATTACHMENTS: 1. Letter from County Engineer 4. Priority Rating Scores 2. Resolution 5. Bridge Inspection Deficiency Report 3. Six Year Road Program SUMMARY STATEMENT Related County contract Cleric schedule a hearing? PLEASE fill in Y/N, date— NO /J YES /J IgSted for this item/ project: is rt or cnu a oc w item number(s): First line item # Second line item #— Sulnmaly"' The County Council is authorized to adopt the Six Year Comprehensive Road Program after a public hearing. ORIGINATOR'S RECOMMENDED ACTION.• Recommend approval COMMITTEE ACTION TAKEN.• COUNCIL ACTION TAKEN.• 6/23/92: Council approved the resolution with amendments. 7-0. Related File Numbers. Ordb mice or Resolution Number (this item only): R92 -045 I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 "1 j2 53 54 55 INTRODUCED BY: Consent PROPOSED BY: Public works- Engineerinq DATE INTRODUCED: June 23, 1992 RESOLUTION NO. 92-045 A RESOLUTION IN THE MATTER OF THE WHATCOM COUNTY COMPREHENSIVE SIX YEAR ROAD PROGRAM FOR THE YEARS 1993 THROUGH 1998 WHEREAS, pursuant to RCW 36.81.121, Whatcom County has prepared and adopted a six year comprehensive road program; and WHEREAS, following adoption of said program, the law requires an annual review of the work accomplished under the program and a determination of current County Road needs; and WHEREAS, based upon the findings of the annual review, and after public hearing, a revised and extended comprehensive road program shall be adopted. NOW, THEREFORE, BE IT RESOLVED as follows: 1. That the Whatcom County Comprehensive Road Program for the years 1993 through 1998, which is attached hereto as Exhibit "A ", and is hereby adopted. 2. That the County Engineer is directed to file a copy of same with the County Road Administration Board and the State Secretary of Transportation. PASSED this 23rd day of June ATTEST: A amona Keeves, Clerk of the Council APPROVED AS TO FORM: Civil Deputy Prosecuting Atty. WHATCOM COUNTY COUNCIL WHATCOM COUNTY, WASHINGTON r l ALj QP!L �[ DanieT M. Warner Chairperson 1992. r � - SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 APPROVED: WHATCOM COUNTY HEARING DATE : 06/23/92 ADOPTION DATE: 06/23/92 J U (_ 21081HAMPTON RD. 6170 1 ISLOTEMAKER TO VAN BUREN I IReconstruction, widening, all weather construction, I ]improve vertical alignment, paved shoulders. I I ;071EAST SMITH RD 9508 1 ISR 539 - SR 542 I IReconstruction to all weather standards, widening I lincluding paved shoulders. I I 41071HANNEGAN 9501 1 ITEM MILE - LYNDEN C/L I IReconstruction to all weather standards, widening I lincluding paved shoulders 1 I 510BILUMMI SHORE ROAD 91040 1 ICAGEY - PORTAGE I IReconstruction, widening, shore protection I I I I IXIFI 14001 1 1 1 1 1 RJR CLASS of WK: 34 1 1 WORK CODES: AD I I TOTAL LENGTH: 2.25 1 1 UTILITY CODES: PT IXIFI 15001 7501 15001 8001 I I MJR CLASS of WK: 34 1 1 WORK CODES: AD I I TOTAL LENGTH: 11.25 1 1 UTILITY CODES: PT IXIFI 10001 11001 14001 1 1 1 MJR CLASS of WK: 34 1 1 WORK CODES: AD I I TOTAL LENGTH: 5.50 1 1 UTILITY CODES: PT I UPI 2001 IM 1 IM 1 30001 1 1 MJR CLASS of WK: 34 1 1 WORK CODES: ABD I I TOTAL LENGTH: 3.52 1 1 UTILITY CODES: PT 14001 11661 2341 1 PE IR /W ICON F.A. PROJ NO. I - - ITOT 45501 32751 9751 3001 PE IR /W ICON F.A. PROJ NO. I - - ITOT 35001 21001 8001' 6001 PE IR /W ICON F.A. PROJ N0. I - - ITOT 52001 52001 1 1 PE IR /W ICON F.A. PROJ NO. I - - ITOT I I I 01 0 i I I " 01 0 I I 01 0 I I I 01 0 61 [SPECIFIC SITE IMPROVEMENTS COUNTY NO: 37 RESOL UTION NO: 92-045 1 2001 PE I I IVARIOUS PRIORITIZED LOCATIONS I I MJR CLASS of WK: 36 IR /W I I I Guardrail, channelization, lane widening, I I WORK CODES: HIW Paul F. Rushing P IF I F.A. I I I --- PROJECT COSTS IN THOUSANDS OF DOLLARS I I UTILITY CODES: I FEDERAL R IU I 71171LAKE WHATCOM BLVD. 94120 ICIFI 25001 12001 13001 1 PE I I ICABLE STREET TO LAKE LOUISE ROAD I OBLIGATION I IN IPROJECT IDENTIFICATION / IR /W I IAIUI — EXPENDITURE PLAN— I I WORK CODES: ABD SOURCE ICON I I PLAN 0 ICCI DESCRIPTION OF WORK F.A. [RINI I T I L I I F I R ITLI IRIDI 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 TRAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR IYEAR 1 5TH I T I C ICAW I D I THRU ITHRU T I SI I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y I SI 1 161 1 1 ]YEAR I L I L ITIA I L I YEAR IYEAR 11071BIRCH POINT ROAD 20050 IXIFI 2701 1 1 1 2701 2701 1 1 PE I I IBAY RIDGE DRIVE TO 0.2 MI. E. OF SELDER I I MJR CLASS of WK: 34 IR /W I I (Reconstruction, widening, improve vertical alignment I I WORK CODES: AD ICON I I lall weather construction, paved shoulders. I I TOTAL LE 4GTH:.60 F.A. PROJ NO. I _1 _ I I I I UTILITY CODES: PT - - ITOT 01 0 21081HAMPTON RD. 6170 1 ISLOTEMAKER TO VAN BUREN I IReconstruction, widening, all weather construction, I ]improve vertical alignment, paved shoulders. I I ;071EAST SMITH RD 9508 1 ISR 539 - SR 542 I IReconstruction to all weather standards, widening I lincluding paved shoulders. I I 41071HANNEGAN 9501 1 ITEM MILE - LYNDEN C/L I IReconstruction to all weather standards, widening I lincluding paved shoulders 1 I 510BILUMMI SHORE ROAD 91040 1 ICAGEY - PORTAGE I IReconstruction, widening, shore protection I I I I IXIFI 14001 1 1 1 1 1 RJR CLASS of WK: 34 1 1 WORK CODES: AD I I TOTAL LENGTH: 2.25 1 1 UTILITY CODES: PT IXIFI 15001 7501 15001 8001 I I MJR CLASS of WK: 34 1 1 WORK CODES: AD I I TOTAL LENGTH: 11.25 1 1 UTILITY CODES: PT IXIFI 10001 11001 14001 1 1 1 MJR CLASS of WK: 34 1 1 WORK CODES: AD I I TOTAL LENGTH: 5.50 1 1 UTILITY CODES: PT I UPI 2001 IM 1 IM 1 30001 1 1 MJR CLASS of WK: 34 1 1 WORK CODES: ABD I I TOTAL LENGTH: 3.52 1 1 UTILITY CODES: PT 14001 11661 2341 1 PE IR /W ICON F.A. PROJ NO. I - - ITOT 45501 32751 9751 3001 PE IR /W ICON F.A. PROJ NO. I - - ITOT 35001 21001 8001' 6001 PE IR /W ICON F.A. PROJ N0. I - - ITOT 52001 52001 1 1 PE IR /W ICON F.A. PROJ NO. I - - ITOT I I I 01 0 i I I " 01 0 I I 01 0 I I I 01 0 61 [SPECIFIC SITE IMPROVEMENTS IXIPI 2201 2201 2201 7801 13601 11601 1 2001 PE I I IVARIOUS PRIORITIZED LOCATIONS I I MJR CLASS of WK: 36 IR /W I I I Guardrail, channelization, lane widening, I I WORK CODES: HIW ICON I I I intersection modification I I TOTAL LENGTH: F.A. PROJ NO. I _1 _ I I I I UTILITY CODES: - - ITOT 61 0 71171LAKE WHATCOM BLVD. 94120 IXIPI 6001 6001 1 13001 25001 12001 13001 1 PE I I ICABLE STREET TO LAKE LOUISE ROAD I I MJR CLASS of WK: 34 IR /W I I Ireconstruction through rock cut, structural I I WORK CODES: ABD ICON I I loverlay, widening to provide paved shoulders. I I TOTAL LENGTH: 4.42 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PTC - - ITOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 WHATCOM COUNTY Page 2 91091WICKERSHAM RAILROAD OVERPASS BR. #124 IXIFI 3401 1 1 1 3401 681 1 2721 PE I I IBURLINGTON NORTHERN OVEM40 ON WICKERSHAM ROAD I I MJR CLASS of WK: 4 IR/W I 1 IReplace existing wooden overpass I I WORK CODES: L ICON I I I I I TOTAL LENGTH: .05 F. A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 101091LINDSAY ROAD — BRIDGE #304 IXIFI 1801 1 1 1 1601 361 1 1441 PE I. P IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS I FEDERAL R IU I ICIFI I I IReplace existing wooden bridge I I WORK CODES: L I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI — EXPENDITURE PLAN— ICON SOURCE I I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR IYEAR 1 5TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y I SI 1 161 1 1 (YEAR I L I L ITIA I L I YEAR IYEAR 81171LAKE LOUISE / AUSTIN ST. RD. 4601 IXIPI 6001 6001 8501 7501 28001 16001 12001 I I TOTAL LENGTH: 4.40 1 PE I I ICABLE ST. TO LK. WHATCOM BLVD. I I MJR CLASS of WK: 24 I _1 _ 11 IR /W I I Ireconstruction to all weather standard, I I WORK CODES: DO — — ITOT 01 0 ICON I I Iwidening including paved shoulders. I I TOTAL LENGTH: 4.43 1401 F. A. PROJ NO. I _I _ I I I I UTILITY CODES: PTC — — ITOT 01 0 91091WICKERSHAM RAILROAD OVERPASS BR. #124 IXIFI 3401 1 1 1 3401 681 1 2721 PE I I IBURLINGTON NORTHERN OVEM40 ON WICKERSHAM ROAD I I MJR CLASS of WK: 4 IR/W I 1 IReplace existing wooden overpass I I WORK CODES: L ICON I I I I I TOTAL LENGTH: .05 F. A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 101091LINDSAY ROAD — BRIDGE #304 IXIFI 1801 1 1 1 1601 361 1 1441 PE I. I ISM RIVER I I MJR CLASS of WK: 4 IR /W I I (Reconstruction, widening, drainage, curbs, sidewalks IR /W I I IReplace existing wooden bridge I I WORK CODES: L I I I I TOTAL LENGTH: .33 F. A. ICON I I I I TOTAL LENGTH: .05 F. A. PROJ NO. I _1 _ I I I I UTILITY CODES: 1 PE I I ICITY LIMITS TO SAMISH WAY — — ITOT 01 0 111071HAXTON WAY 12750 IXIFI 5001 4501 1 14001 23501 19501 4001 1 PE I I IBALCH ROAD TO SLATER ROAD I I MJR CLASS of WK: 34 PROJ NO. I _I _ I I IR /W I 1 IStructural overlay to all weather standard, I I WORK CODES: ABD ICON I I (widening with paved shoulders, flood — proofing. I I TOTAL LENGTH: 4.40 F.A. PROJ NO. I _1 _ 11 I I UTILITY CODES: — — ITOT 01 0 121171BBMM DRIVE 51070 1 IPI 501 6501 1 1 7001 1401 5601 1 PE I I IAIRPORT DRIVE TO BAKERVIEW ROAD I I MJR CLASS of WK: 34 IR /W I I (Widening, reconstruction, drainage, curbs, I I WORK CODES: DFGI ICON I I Isidewalks, signalization I I TOTAL LENGTH: .26 F. A. PROJ NO. I _I _ I I I I UTILITY CODES: PT — — ITOT 01 0 131161JAMES STREET ROAD 95016 1 IPI 401 6101 1 1 6501 1301 5201 1 PE I I ICITY LIMITS TO BAKERVIEW I I MJR CLASS of WK: 34 IR /W I I IReconstruction, widening, drainage, curbs, I I WORK CODES: DFG ICON I I Isidewalk I I TOTAL LENGTH: .49 F. A. PROJ NO. I _1 _ I I I I UTILITY CODES: PT — — ITOT 61 0 141171BAKERVIEW ROAD 51600 1 IPI 301 4201 1 1 4501 901 3601 l PE I I IBENNETT WESTERLY TO AIRPORT I I MJR CLASS of WK: 34 IR /W I I (Reconstruction, widening, drainage, curbs, sidewalks I I WORK CODES: DFG ICON I I I I I TOTAL LENGTH: .33 F. A. PROJ NO. I _I _ I I I UTILITY CODES: PT — — ITOT 01 0 151171YEW STREET ROAD 40830 1 IPI 351 3151 15001 1 18561 3701 14801 1 PE I I ICITY LIMITS TO SAMISH WAY I I MJR CLASS of WK: 34 IR /W I I (Reconstruction, widening, drainage, curbs I I WORK CODES: DFG ICON I I Isidewalks I I TOTAL LENGTH: 2.13 F. A. PROJ NO. I _I _ I I I I UTILITY CODES: PT — — ITOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 WHATCOM COUNTY Page 3 P IF I I I I —PROJECT COSTS IN THOUSANDS OF DOLLARS 2501 I FEDERAL R IU I ICIFI I I MJR CLASS of WK: 6 I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI — EXPENDITURE PLAN — I Isignalization and provide turning lanes as needed SOURCE WORK CODES: I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR IYEAR 1 5TH I T I C [CAPP I D I THRU IITIRU T 151 I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y 151 1 IGI 1 1 IYEAR I L I L ITIA I L I YEAR (YEAR 161161MARINE DRIVE 91040 1 IPI 801 7201 1 1 8001 1601 6401 I 1 PE I I IBENNETT TO LOCUST I I MJR CLASS of WK: 34 'I I I I TOTAL LENGTH: IR /W I I (Widening, reconstruction, drainage, curbs I I WORK CODES: DFG _I _ - I I I I ICON I I Isidewalks I I TOTAL LENGTH: .48 – – ITOT F.A. PROD NO. I _I _ 251 251 251 I I I I UTILITY CODES: PT 1501 – – I ITOT 01 0 171161BAKERVIEW ROAD /HANNEGAN INTERSECTION I IPI 1251 1251 1 1 2501 541 1 1961 PE I I IINTERSECTION UPGRADE I I MJR CLASS of WK: 6 IR /W I I Isignalization and provide turning lanes as needed I I WORK CODES: HI ICON I I I I I TOTAL LENGTH:. 05 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: – – ITOT 01 0 181 161BAKERVIEW /MAPLEWOOD /I- 5 /BENNETT 54000 1 IPI 122151 1351 1 1 2601 1081 1 :521 PE I I IBENNETT TO W. MAPLEWOOD I I MJR CLASS of WK: 6 IR /W I I Isignilization of two intersections in close proximity. I I WORK CODES: I ICON I 'I I I I TOTAL LENGTH: F.A. PROJ NO. I _I _ - I I I I UTILITY CODES: – – ITOT 01 0 191 IVARIOUS I IPI 251 251 251 751 1501 1501 1 1 PE I I [VARIOUS I I MJR CLASS of WK: 5 IR /W I I Iconvert gravel roads to B.S.T. I I WORK CODES: AC ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. I _I _ I I I I UTILITY CODES: – – ITOT 01 0 201 )VARIOUS BRIDGES I IPI 301 3801 1 1 4101 901 1 3201 PE I l 113 BRIDGES I I MJR CLASS of WK: 68 IR /W I I Ibridge rail upgrades and end protection I I WORK CODES: LW ICON I I Imodification I I TOTAL LENGTH: F.A. PROJ NO. I _I _ I I I I UTILITY CODES: – – ITOT 01 0 211081TYEE DRIVE 92500/92550/28700 1 IPI 301 5001 6001 1 11301 11301 1 1 PE I I IRODSEVELT – EDWARDS I l MJR CLASS of WK: 25 IR /W I I (Widening, structural overlay, drainage, I I WORK CODES: RDFG ICON I I Icurbs, sidewalks I I TOTAL LENGTH: 1.45 F.A. PROD NO. I _1 _ I I I I UTILITY CODES: – – ITOT 01 0 221 IRAILROAD CROSSINGS IXIPI 3001 3001 3001 8201 17201 351 1 16851 PE I I (VARIOUS LOCATIONS I I MJR CLASS of WK: 6 IR /W I I ISignalization of various railroad crossings I I WORK CODES: I ICON I I I I I TOTAL LENGTH: F.A. PROJ NO. l _I _ I I I I UTILITY CODES: – – ITOT 01 0 231161MARINE DRIVE 91040 1 IPI 201 7001 8001 18801 34001 19001 5001 10001 PE I I [LOCUST – LUMMI SHORE I I MJR CLASS of WK: 34 IR /W I I Iwidening, reconstruction, flood proofing, I I WORK CODES: BDF ICON I I Ipaved shoulders I I TOTAL LENGTH: 4.57 F.A. PROD NO. l _I _ I I I I UTILITY CODES: PT – – ITOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 4 WHATCOM COUNTY P IF I I I I PROJECT COSTS IN THOUSANDS OF DOLLARS 2001 I FEDERAL R IU I ICIFI I I MJR CLASS of WK: 14 1 OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI — EXPENDITURE PLAN— ABD SOURCE ICON I I PLAN 0 11CC1 DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 [RAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR IYEAR 1 5TH I T I C .ICAPP 1 D I THRU ITHRU T 151 I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y I SI 1 191 1 1 (YEAR l L I L ITIA I L I YEAR IYEAR 241071NORTHWE5T DRIVE 95210 IXIPI 201 5001 6401 6401 18001 10001 5001 3001 PE I — — ITOT 01 0 I IAXTON — W. POLE RD. I I MJR CLASS of WK: 34 IR /W I I (Reconstruction to all weather standard, widening, I I WORK CODES: BD ICON I I !including paved shoulder I I TOTAL LENGTH: 2.76 F.A. PROJ NO. I _I I I I I UTILITY CODES: — — ITOT 01 0 251071BIRCH BAY LYNDEN ROAD 92140/92110/93040 1 IPI 201 5001 5501 7001 17701 6701 4001 7001 PE I I IHARBORVIEW — ENTERPRISE I I MJR CLA$5 of WK: 36 IR /W I I Istructural overlay to all weather standard, I I WORK CODES: DH ICON I I Iwiden with paved shoulders I I TOTAL LENGTH: 8.00 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 261171LAKE WHATCOM BLVD 94120 1 IPI 51 451 1 1 501 501 1 1 PE I I (AUSTIN CREEP( I I MJR CLASS of WK: 9 IR /W I I [construct path around bridge I I WORK CODES: N ICON I I I I I TOTAL LENGTH: .10 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 271081CURTIS RD. 52570 IXIPI 501 1501 11001 2001 15001 2001 10001 3001 PE I I 15LATER ROAD TO 1.3 MI. S. OF RURAL I I MJR CLASS of WK: 14 IR /W I I IEliminate curves with new all weather construction, I I WORK CODES: ABD ICON I I Ireconstruct existing to all weather standard, pave I I TOTAL LENGTH: 1.75 F.A. PROJ NO. [ _I _ I Ishoulders. I I UTILITY CODES: PT — — — — ]TOT 01 0 281161WHATCOM CONNECTOR IXIPI 301 1701 9001 9001 20001 16001 1 4001 PE I I ILAKE LOUISE ROAD — YEW STREET ROAD I I MJR CLASS of WK: 1 IR /W I I (Additional evaluation as to location to reserve I I WORK CODES: U ICON I ICON I I Ikey portions of future right —of —way. I I TOTAL LENGTH: 2.50 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT I I UTILITY CODES: — — ITOT 01 0 — — ITOT 01 0 291071SMITH ROAD 95080 1 ISR 539 — NORTHWEST I Istructural overlay to all weather standard, I Iwidening, including paved shoulders. I I I IPI 101 4001 5951 5951 16001 12001 4001 1 PE I I I MJR CLASS of WK: 35 IR /W I I I WORK CODES: DH ICON I I I TOTAL LENGTH: 2.50 F.A. PROD NO. I _I _ I I UTILITY CODES: PT — — ITOT 61 0 301071SLATER ROAD 52860 1 IPI 101 7001 5001 10901 23001 15501 7501 1 PE I I IHAXTON TO I -5 1 1 MJR CLASS of WK: 35 IR/W I I Istructural overlay to all weather standard I I WORK CODES: DH ICON I I Iwidening, including paved shoulders, and I 1 TOTAL LENGTH: 3.80 F.A. PROD NO. I _I _ I (flood proofing. I I UTILITY CODES: — — ITOT 01 0 311081VRN BUREN ROAD 63110 IXIPI 101 201 7201 1 7501 3501 4001 1 PE I I IHAMPTON TO EVERSON C/L I 1 MJR CLASS of WK: 34 1R /W I I IReconstruction to all weather standard, I I WORK CODES: DH ICON I I Iwidening, including paved shoulders. I I TOTAL LENGTH: 1.20 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT — — ITOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 WHATCOM COUNTY Page 5 P IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS 1701 1 I FEDERAL R IIJ I ICIFI IR /W I I [New construction I 1 WORK CODES: RBD I OBLIGATION I IN IPROJECT IDENTIFICATION / IRIUI — EXPENDITURE PLAN — F.A. PROJ NO. SOURCE I I I PLAN 0 ICCI DESCRIPTION OF WORK 1RIN1 351071STRUCTURAL OVERLAYS I T I L L I F I R ITLI IRIDI 1ST 1 20 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR (YEAR 1 5TH I T I C ICAPP I D I THRU 1THRU T I SI I IN] I I 1 6TH I A I A ILATA I R I 3RD 16TH Y I Si 1 161 1 1 (YEAR I L I L ITIA I L I YEAR IYEAR 321071LAKE TERRELL RD. 91080 IXIPI 201 7801 1 1 8001 1251 3751 3001 PE I I ISLATER TO MOUNTAIN VIEW I I MJR CLASS of WK: 35 IR /W I I Istructural overlay, widening with paved shoulders I I WORK CODES: DH ICON I I I I I TOTAL LENGTH: 2.00 F. A. PROJ NO. I _I _ I I I 1 UTILITY CODES: PT — — ITOT 01 0 331081ROOSEVELT RD BYPASS 28160 1 IPI 201 3801 2001 1 6001 3001 2001 1001 PE I I ICUSTOMS VICINITY I I MJR CLASS of WK: IR /W I I ISTUDY AND MODIFY TO IMPROVE TRAFFIC CIRCULATION I I WORK CODES: UAHIK ICON I I I I I TOTAL LENGTH: .50 F.A. PROJ NO. I _I _ I I I 1 UTILITY CODES: PTO — — ITOT 01 0 341091JOHM ROAD I IPI 201 201 1 1301 1701 1701 1 1 PE I I ITYEE — MILL I I MJR CLASS of WK: 1 IR /W I I [New construction I 1 WORK CODES: RBD ICON I I I I TOTAL LENGTH: .30 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — [TOT 01 0 351071STRUCTURAL OVERLAYS I IFI 4001 4001 8001 8001 24001 8001 16001 1 PE i I [VARIOUS PRIORITIZED LOCATIONS I I MJR CLASS of WK: 5 IR /W I I (Conversion of existing roads to all— weather status I I WORK CODES: D ICON I I I I TOTAL LENGTH: 12.00 F. A. PROJ NO. I _i _ I I I 1 UTILITY CODES: — — ITOT 01 0 361 1R /W ACQUISITION I IPI 1001 1001 2001 2001 6001 6001 1 1 PE I I I I I MJR CLASS of WK: 7 IR /W I I IOBTAIN ROW AS AVAILABLE IN ANTIC. OF PROJ. ESTMT. I I WORK CODES: ICON I I 1 I I TOTAL LENGTH: F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 371 IMISCELLANEOUS UNANTICIPATED I IVARIOUS AS NEEDED I IAs needed I I I I 381071BIRCH POINT ROAD — 20050 I IBAY RIDGE DR — SEMIAHM00 DR I (Reconstruction, widening, paved shoulders I I I I 391081LINCO N RD. ^2-6200 I (PORTAL WAY — SHINTAFFER RD I (Widening, reconstruction: Partial funding from I (CITY OF BLAINE $270,000 I I 1 IPI 1001 1001 2001 2001 I I MJR CLASS of WK: 36 1 1 WORK CODES: ABDH I I TOTAL LENGTH: I I UTILITY CODES: I IPI 101 101 2501 4801 1 1 MJR CLASS of WK: 34 1 1 WORK CODES: ABCD I I TOTAL LENGTH: 1.12 I I UTILITY CODES: PT 1 IPl 101 101 3401 1 1 MJR CLASS of WK: 34 1 1 WORK CODES. ABD I I TOTAL LENGTH: 3.50 1 1 UTILITY CODES: PT 6001 6001 1 1 PE I IR /W I ICON I F. A. PROJ NO. l _I _ — — ITOT 01 0 7501 2501 5001 1 PE I IR /W I ICON I F.A. PROJ NO. I _I _ — — ITOT 01 0 1 3601 3601 1 1 PE I IR /W I ICON I F. A. PROJ NO. I _I _ — — 1 TOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 6 WHATMM COUNTY P IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS 1 PE I FEDERAL R IU I ICIFI IR /W I I OBLIGATION I IN (PROJECT IDENTIFICATION / IAIUI — EXPENDITURE PLAN — ICON SOURCE -- , , , , 1 Isignalization I PLAN O ICCI DESCRIPTION OF WORK IRINI I T I L I I F I R ITLI IRIDI 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR (YEAR ]YEAR 1 5TH 1 T I C ICAPP I D I THRU ITHRU T I SI I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y I SI 1 IGI 1 1 IYEAR I L I L ITIA I L I YEAR ]YEAR 401161NORTH SHORE DR. 94150 1 IPI 201 801 9001 1001 11001 3001 8001 — — 1 PE I 01 0 I IBELLINGHAM C/L — U.A.B. BOUNDARY I I MJR CLASS of WK: 34 22001 5001 7001 10001 PE I IR /W l I I MJR CLASS of WK: 34 I (Widening, reconstruction I I WORK CODES: ABDF lR /W l I (Widening, reconstruction, relocation, bank protection: ICON I I I I I TOTAL LENGTH: 1.00 ICON F.A. PROJ NO. I _I _ I i I I UTILITY CODES: PT I _I _ — — 1 1 UTILITY CODES: PT ITOT 01 0 411161AIRPORT DR. 54000 1 IPI 1001 8501 1 l 9501 2001 7501 1 PE I I IBENNETi AV. TO MARINE DR. I I MJR CLASS of WK: 35 IR /W I I (Widen overlay curb gutter sidewalk & I I WORK CODES: ABDFGI ICON I , , , , 1 Isignalization I I TOTAL LENGTH: 1.10 F.A. PROJ N0. I _I — 1I I I UTILITY CODES: — — ITOT 01 0 421091TURKINGTON RD. — BRIDGE #130 1 IPI 2501 1 1 1 2501 2501 1 1 PE i I [JONES CR BR— I I MJR CLASS of WK: 4 ]R /W I I IConstruct clear span bridge following establishment I I WORK CODES: AML ICON I I lof drainage or Dike District I I TOTAL LENGTH: .30 F.A. PROJ NO. I _I 11 I I UTILITY CODES: — — ITOT 01 0 43108]LLOI SHORE 91040 1 IPI 201 801 1M 1 11001 22001 5001 7001 10001 PE I I ICAGEY — HAXTON I I MJR CLASS of WK: 34 lR /W l I (Widening, reconstruction, relocation, bank protection: 1 1 WORK CODES: AMD ICON I I (Joint funding BIA, FCAAP, FHWA, & RAP, possible I I TOTAL LENGTH: 3.93 F.A. PROJ NO. I _I _ I IU.S.C.E. 1 1 UTILITY CODES: PT — — ITOT 011 0 441161W. BAKERVIEW RD 54000 1 IPI 501 1501 12M1 1 14001 2001 10,001 1 PE I I IBENNETT DRIVE TO BELLINGHA_M C/L I I MJR CLASS of WK: 34 IR /W I I ITIA — Widening, drainage, reconstruction, curbs, I I WORK CODES: BDFG ICON I I Igutters, sidewalks I I TOTAL LENGTH: 1.33 F.A. PROJ NO. I _I _ I I 1 I UTILITY CODES: PT — — ITOT 01 0 451081PARK ROAD 9412 1 IPI 501 5501 6001 1 12001 5001 7001 1 PE I I ISOM BAY DR. — S.R. 9 1 1 MJR CLASS of WK: 34 IR /W I I IWidening, reconstruction I I WORK CODES: ABC ICON I I I I I TOTAL LENGTH: 2.78 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 461171ALDERWGOD AVE — 51280/51340 1 IPI 101 401 8001 1 8501 1701 6801 1 PE I I IB'HAM C/L TO AIRPORT DRIVE 1 I MJR CLASS of WK: 34 IR /W I I (Reconstruct to urban section I I WORK CODES: ABDFG ICON I I I I I TOTAL LENGTH: .70 F.A. PROJ NO. 1 _I _ I I 1 I UTILITY CODES: — — ITOT 01 0 471071SLRTER — VANWYCK CONNECTOR 1 IPI 401 501 4501 24001 29401 29401 1 1 PE I I INORTHWEST — SR 542 1 [ MJR CLASS of WK: 1 lR /W l 1 Inew construction I I WORK CODES: ABDI ICON I I I I I TOTAL LENGTH: 6.07 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 491071DRAYTON HARBOR RD. 20050 I IBLAINE C/L - HARBORVIEW RD I (Construction on new alignment, I (Partial funding by City of Blaine I I 501071BIRCH BAY DRIVE 92050 1 IALDERSON TO SHINTAFFER I IWidening, reconstruction I IRID Funding I I 511081MOSQUITO LAKE ROAD 94190 1 [SOUTHWEST OF MIDDLE FORK BRIDGE I IWidening and reconstruction, I I I I 521081BEACH WAY 14750 I ]SLATER - SUCIA I (Reconstruction, widening I I I I 5310810EDARVILLE RD. 56110 1 I SR 542 - GOSFIEN RD. I IWidening, reconstruction I I I I I IPI I I 1 5001 5001 4001 1001 1 PE I I I MJR CLASS of WK: . IR /W I 1 I WORK CODES: ABD ICON I I I TOTAL LENGTH: 1.16 F.A. PROD NO. I _I — I I UTILITY CODES: PT - - ITOT 01 0 1 IPl 101 201 7701 7001 15001 15001 1 1 PE I ! I MJR CLASS of WK: 34 IR /W I I I WORK CODES: ABDG ICON I I I TOTAL LENGTH: 1.97 F.A. PROD NO. I _1 _ 1 I UTILITY CODES: PT - - [TOT 01 0 I IPI 50i 2001 I 1 2501 2501 1 1 PE I I I MJR CLASS of WK: 34 IR /W I I I WORK CODES: ABC ICON I I I TOTAL LENGTH:. 60 F. A. PROD NO. I I _ I I UTILITY CODES: - - ITOT 01 0 I !P1 1 1001 501 1 1501 1501 1 1 PE I I I MJR CLASS of WK: 34 1R /W I I I WORK CODES: ABD ICON I ! I TOTAL LENGTH: .36 F.A. PROJ NO. 1 _I _ I I UTILITY CODES: PT - - ITOT 01 0 I IPI 1 501 4501 1 5001 1501 3501 1 PE 1 1 1 MJR CLASS of WK: 34 IR /W I I I WORK CODES: ABD ICON I I I TOTAL LENGTH: 1.39 F. A. PROJ NO. I _I _ I I UTILITY CODES: PT - - ITOT 01 0 541071NORTH SHORE DR. 94150 l !PI 1 1001 7001 1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 I IUAB BOUNDARY - Y ROAD I 114JR CLASS of WK: 34 Page 7 I IWidening, reconstruction, structural overlay I I WORK CODES: ABD WHATCOM COUNTY IG]N I I I I I TOTAL LENGTH: 1.87 F.A. PROJ NO. I _I _ P I l UTILITY CODES: PT - - ITOT 01 0 551071MT. VIEW 922020 1 IPI 1 I 5001 6001 11001 2501 IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS -- IR /W I I FEDERAL R IU I IC1F1 I I I I TOTAL LENGTH: 3.72 F.A. PROJ NO. I _I _ I OBLIGATION I IN 1PROJECT IDENTIFICATION / IAIUI — EXPENDITURE PLAN— SOURCE I PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IRIDI 1ST 1 20 1 3RD 1 4TH 1 0 1 0 !RAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR (YEAR 1 5TH I T I C ICAPP I D I THRU ITHRU T I Sl I INI I I 1 6TH I A I A 1UATA I R I 3RD 16TH Y I S1 I IGI I I IYEAR I L I L ITIA 1 L I YEAR IYEAR 481071DRAYTON HARBOR RD. 92^200 1 IPI 2201 201 7101 1 7501 5001 2501 1 PE I I IHARBORVIEW RD - BLAINE RD I I MJR CLASS of WK: IR /W I I (Construction partially on new alignment, I I WORK CODES: ABD ICON I I Ibank protection - Partial funding by City of Blaine I I TOTAL LENGTH: .90 F.A. PROJ NO. I _I I 1 1 1 UTILITY CODES: PT - - iTOT 01 0 491071DRAYTON HARBOR RD. 20050 I IBLAINE C/L - HARBORVIEW RD I (Construction on new alignment, I (Partial funding by City of Blaine I I 501071BIRCH BAY DRIVE 92050 1 IALDERSON TO SHINTAFFER I IWidening, reconstruction I IRID Funding I I 511081MOSQUITO LAKE ROAD 94190 1 [SOUTHWEST OF MIDDLE FORK BRIDGE I IWidening and reconstruction, I I I I 521081BEACH WAY 14750 I ]SLATER - SUCIA I (Reconstruction, widening I I I I 5310810EDARVILLE RD. 56110 1 I SR 542 - GOSFIEN RD. I IWidening, reconstruction I I I I I IPI I I 1 5001 5001 4001 1001 1 PE I I I MJR CLASS of WK: . IR /W I 1 I WORK CODES: ABD ICON I I I TOTAL LENGTH: 1.16 F.A. PROD NO. I _I — I I UTILITY CODES: PT - - ITOT 01 0 1 IPl 101 201 7701 7001 15001 15001 1 1 PE I ! I MJR CLASS of WK: 34 IR /W I I I WORK CODES: ABDG ICON I I I TOTAL LENGTH: 1.97 F.A. PROD NO. I _1 _ 1 I UTILITY CODES: PT - - [TOT 01 0 I IPI 50i 2001 I 1 2501 2501 1 1 PE I I I MJR CLASS of WK: 34 IR /W I I I WORK CODES: ABC ICON I I I TOTAL LENGTH:. 60 F. A. PROD NO. I I _ I I UTILITY CODES: - - ITOT 01 0 I !P1 1 1001 501 1 1501 1501 1 1 PE I I I MJR CLASS of WK: 34 1R /W I I I WORK CODES: ABD ICON I ! I TOTAL LENGTH: .36 F.A. PROJ NO. 1 _I _ I I UTILITY CODES: PT - - ITOT 01 0 I IPI 1 501 4501 1 5001 1501 3501 1 PE 1 1 1 MJR CLASS of WK: 34 IR /W I I I WORK CODES: ABD ICON I I I TOTAL LENGTH: 1.39 F. A. PROJ NO. I _I _ I I UTILITY CODES: PT - - ITOT 01 0 541071NORTH SHORE DR. 94150 l !PI 1 1001 7001 1 8001 2001 7-50 2501 PE I I IUAB BOUNDARY - Y ROAD I 114JR CLASS of WK: 34 IR /W I I IWidening, reconstruction, structural overlay I I WORK CODES: ABD IG]N I I I I I TOTAL LENGTH: 1.87 F.A. PROJ NO. I _I _ I I I l UTILITY CODES: PT - - ITOT 01 0 551071MT. VIEW 922020 1 IPI 1 I 5001 6001 11001 2501 6001 2501 PE I I IFERNDALE C/L TO RAINBOW I l MJR CLASS of WK: 34 IR /W I I IWidening, reconstruction, structural overlay I I WORK CODES: ABD ICON I I I I I TOTAL LENGTH: 3.72 F.A. PROJ NO. I _I _ 1 I I I UTILITY CODES: PT - - !TOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 8 WHATCOM COUNTY P IF I I I I -- PROJECT COSTS IN THOUSANDS OF DOLLARS - -- I FEDERAL R IIJ I ICIFI I I WORK CODES: ABC 1 IWidening, reconstruction ICON I I I I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI -- -EXPENDITURE ALAN— I I UTILITY CODES: PT PROJ SOURCE - -- 581071LAKE WHATCOM BLVD. 94120 I PLAN 0 iCCI DESCRIPTION OF WORK IRINI I T I L I I F I R :TLI 1RID1 1ST 120 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR IYEAR 1 5TH I T I C ICAPP I D I THRU ITHRRU T I SI I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y 151 I IGI I I IYEAR I L I L ITIA I L I YEAR !YEAR 561091SHINTAFFER RD. 26310 1 IPI I 1 1001 5001 6001 6001 I 1 PE I I IBIRCH BAY DRIVE - DRAYTON HARBOR I I MJR CLASS of WK: 34 IR /W I I IWidening, reconstruction I I WORK CODES: ABD ICON I I (City of Blaine - 4165,000 ! 1 TOTAL LENGTH: 1.50 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT - - ITOT 01 0 571071SEMIAHM00 DRIVE 20050 1 IPI I 1 100! 5001 6001 2501 3501 1 PE I IBLAINE CIL - ELDERBERRY LANE I I MJR CLASS of WK: 34 I I MJR CLASS of WK: 34 IR /W I I IWidening, reconstruction I I WORK CODES: ABC 1 IWidening, reconstruction ICON I I I I I TOTAL LENGTH: .96 F.A. PROJ NO. 1 _1 _ 1 1 I I UTILITY CODES: PT PROJ - - ITOT 01" 0 581071LAKE WHATCOM BLVD. 94120 1 1P1 I 1 10001 18001 28001 14001 7001 7001 PE I 1 10.4 MI. S. OF LK LOUI5E RD. TO SOUTH BAY 1 1 MJR CLASS of WK: 34 IXIF1 1 1 6501 12001 IR /W I 1 IWidening, reconstruction I I WORK CODES: ABD I IGOODWIN RD - FR05T ROAD ICON I i l I I TOTAL LENGTH: 2.24 F.A. PROJ NO. I I 1 I I UTILITY CODES: PT _I _ - - IT 01 0 591171CORDATA PARKWAY I IPI 1 1 1601 6401 8001 8001 1 1 PE I I IHORTON TO SMITH I I MJR CLASS of WK: 1 IR /W I INew construction: RID Fundino I 1 WORK CODES: ABD ICON I I I - I I TOTAL LENGTH: 1.80 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: - - ITOT 01 0 601071LOOMI "a TRAIL 3270E 11P1 I I 501 6001 6501 3001 3501 I PE I I IBOB HALL - 5UNRI5E I I MJR CLASS of WK: 34 IR /W I 1 IWidening, reconstruction I I WORK CODES: ABC ICON I I I I I TOTAL LENGTH: 2.00 F.A. PROJ NO. I _I I I I I UTILITY CODES: - - ITOT 01 0 611071SOUTH PASS ROAD - 96040 IXIF1 1 1 6501 12001 18501 11001 5001 2501 PE I I IGOODWIN RD - FR05T ROAD I I MJR CLASS of WK: 34 1R /W I I IWidening, reconstruction I I WORK CODES: ABD ICON I I 1 1 1 TOTAL LENGTH: 5.75 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT - - ITOT 01 0 621081NORTH TELEGRAPH RD. 66610 1 IPI 1 1 3001 !0001 13001 6001 7001 1 PE I I 150RENSON RD. - 5UMAS RD. I I MJR CLASS of WK: 34 IR /W I I IWidening, reconstruction I I WORK CODES: ABC ICON 1 I I I I TOTAL LENGTH: 4.07 F.A. PROJ NO. I _I _ 1 1 I I UTILITY CODES: - - 1TOT 01 0 631081WE5T LAUREL RD 953360 1 IPI I 1 1001 5001 6001 2501 3501 1 PE I I 15R 539 - ALDRICH I I MJR CLASS of WK: 34 IR /W I 1 IWidening, reconstruction I I WORK CODES: ABD ICON I I I I 1 TOTAL LENGTH: 1.50 F.A. PROJ NO. I I _ 1 1 1 1 UTILITY CODES: PT - - !TOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 9 WHATCOM COUNTY P IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS 1 I FEDERAL R 1U I ICIFI MJR CLASS of WK: 34 I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI —EXPENDITURE PLAN— - - -- SOURCE - -- I PLAN 0 ICC1 DESCRIPTION OF WORK IRINI I T I L 1 I F I R ITLI IRIDI 1ST 120 1 33RD 1 4TH 1 0 1 0 TRAP I E I 1ST 14TH I I Al IYIIIYEAR IYEAR IYEAR 1 5TH 1 T I C ICAPP I D I THRU ITHRU T I SI I IN! ] I 1 6TH 1 A I A IUATA I R I 3RD 16TH Y 1 91 1 IGI I I IYEAR I L I L ITIA I L I YEAR !;YEAR 641081WEST SHORE DR. 91010 1 IPI 1 1 6001 7001 13001 6001 7001 1 PE I PROD NO. I ILEGOE BAY — NORTH NUGEv'T 1 1 MJR CLASS of WK: 34 I UTILITY CODES: PT IR /W I — — I (Widening — reconstruction I 1 WORK CODES: ABC IPI I 1 1 8001 8001 ICON I 3001 2001 I I I I TOTAL LENGTH: 2.31 I F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT I — — ITOT 01 0 65108IBRUCE RD 92110 1 IPI 1 101 101 3501 3701 1201 2501 1 PE I I IMAINE STREET TO BAY ROAD I I MJR CLASS of WK: 34 IR /W I I (Widening, reconstruction I I WORK CODES: ABCL ICON 1 I I I I TOTAL LENGTH: .75 F.A. PROJ NO. I _1 1 1 I I UTILITY CODES: — — ITOT 01 0 661071HARBORVIEW RD 92200 1 IPI I ] 1 4001 4001 4001 1 1 PE I I IBIRCH BAY— LYNDE'r1 — DRAYTON HARBOR RD. 1 1 MJR CLASS of WK: 34 IR /W ] I IStructural overlay, widening, reconstruction: Blaine I I WORK CODES: ABD ICON I ! ICity Funding $50,000 1 1 TOTAL LENGTH: 1.50 F.A. PROJ NO. I _I I I I I UTILITY CODES: — — ITOT 01 0 671081MOSQUiTO LAKE ROAD 94120 1 IPI I 1 1 3501 3501 1001 2501 I PE I I ISR 5422' — NORTH FORK RD. 1 1 MJR CLASS of WK: 34 IR /W I I IWidening — reconstruction I I WORK CODES. ABC ICON I I I I I TOTAL LENGTH: .95 F.A. PROD NO. ! I _ I I I I UTILITY CODES: PT — — ITOT 01 0 681071CAIN LAKE ROAD 94090 1 IPI I 1 1 8001 8001 3001 3001 2001 PE I I ILK WHATCOM BLVD — SKAGIT CO. I I MJR CLASS of WK: 35 IR /W I I [Widen & reconstruction I I WORK CODES: ABD ICON I 1 1 I I TOTAL LENGTH: 2017.00 F.A. PROJ NO. I I _ I I I l UTILITY CODES: PT — — ]TOT 01 0 691081BOUNDERY BAY , GOODMAN 8 EL'S 92500 1 !PI I 1 1 2001 2001 501 1501 1 PE I I IJOHNSON TO BAY VIEW I I MJR CLASS of WK: 35 IR /W I I I Drainage , widen , reconstruction I I WORK CODES: ABD ICON I I I I I TOTAL LENGTH: .37 F.A. PROJ NO. I _I I I I I UTILITY CODES: P — — ITOT 01 0 701071VISTA DR. 92050 I IPI I I 1 7501 7501 3001 4501 1 PE I I IFERNDU CL TO GRANDVIEW RD I I MJR CLASS of WK: 35 IR /W I I I Widen and reconstruction I I WORK CODES: ABD ICON I I I I I TOTAL LENGTH: 1.89 F.A. PROJ N0. 1 i I I I I UTILITY CODES: PT — — ITOT 01 0 711171SQUALICLIM — BENNETT — MARINE DR. CONNECTOR 1 IPI I ! 1 5 2351 525! 5 "51 1 1 PE I I IBELLINGHAM C/L TO MARINE DRIVE I I MJR CLASS of WK: 1 1R 1W I I INew construction, County portion of joint project with I I WORK CODES: ABDF ICON i I IBellinghan I I TOTAL LENGTH: .45 F.A. PROJ NO. 1 _: 11 1 1 UTILITY CODES: — — !TOT 01 2 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 10 WHATCOM COUNTY P IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS -- I FEDERAL R IU I ICIF1 I I WORK CODES: ABDF IR /W I I OBLIGATION I IN IPROJECT IDENTIFICATION / IAIUI — EXPENDITURE PLAN — I I UTILITY CODES: ICON SOURCE I 1 I PLAN 0 ICC: DESCRIPTION OF WORK IRINI I T I L T I F I R ITLI IR1D1 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYIIIYEAR (YEAR (YEAR 1 5TH I T I C ICAPP I D I THRU ITHRU T I SI I INI I I 1 6TH I A I A IUATA I R I 3RD 16TH Y I SI I IGI I I IYEAR I L I L [TIP 1 L I YEAR ]YEAR 721081OLD SAMISH RD. 94010 1 IPI I 1 1 4001 4001 1001 3001 1 PE I — I IBELLINGHAM C/L EASTERLY 1 I RJR CLASS of WK: 34 I IPI I 1 1 3001 3001 3001 1 IR /W I 1 PE I (Widen and reconstruction I I WORK CODES: ABCD ICON I 1 I I I I TOTAL LENGTH: .80 F.A. PROJ N.O. ] _1 _ I I I I 1 UTILITY CODES: F.A. PROJ — — ITOT 01 0 731071SUNRISE ROAD 92110 1 IP1 I 1 2001 6001 8001 3001 5001 I [EUCLID TO LAKE LOUISE ROAD i PE I I (BIRCH BAY LYNDEN —W. BADGER ROAD I I MJR CLASS of WK: 35 I INew construction I I WORK CODES: ABDF IR /W I I Iwidening, overlay I I WORK CODES: ABCD PROJ NO. I _I _ I I I I UTILITY CODES: ICON I I 1 I I TOTAL LENGTH: 2.00 1 IPI 1001 1 3001 2001 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT 1R /W I I (Intersection modification followed by raising and re— — — ITOT 01 0 741081WEST LAKE SAMISH ROAD 94010 1 IPI I 1 2001 7501 950; 7001 2501 1 1 PE I I ISUMMERLAND — NULLE ROAD I I MJR CLASS of WK: 34 IR /W l I (Reconstruction, widening —paved shoulder I I WORK CODES: ABD ICON I I I I I TOTAL LENGTH: 1.73 F.A. PROJ NO. I _I I I l I UTILITY CODES: PT — — ITOT 01 0 751161BANCROFT /COUNTRY LA�INE 5M@ I IPI I 1 1 3001 3001 3001 1 1 PE l [MARINE DRIVE TO RURAL AUDUE I I MJR CLASS of WK: 35 IR /W 1 1 [structural overlay; widening I I WORK CODES: ABD ICON I I l I I TOTAL LENGTH: 1.41 F.A. PROJ NO. I _1 I I I I UTILITY CODES: — — ITOT 01 0 7610711KICKERVILLE ROAD 92020 I IP] I 1 1 9001 9001 °00i I I PE I I IGRANDVIEW — RAINBOW I I MJR CLASS of WK: 34 IR /W I 1 (Widening, reconstruction, structural overlay: RID Fun— I 1 WORK CODES: ABD ICON I I !ding I I TOTAL LENGT1d: 2.01 F.A. PROJ NO. I _I _ I ] l l UTILITY CODES: — — [TOT 01 0 771071WEST SMITH — HOVANDER 533340 1 IPI I 1 1 6001 6001 3001 3001 1 PE I I IFERNDALE C/L TO FERNDALE C/L I I MJR CLASS of WK: 34 IR /W 11 I (Widening, reconstruction I I WORK CODES: ABD ICON I I I I I TOTAL LENGTH: .91 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: PT — — ITOT 01 0 78116ILAKE LOUISE CONNECTOR I IPI 1001 2501 11501 1 15001 15001 l 1 PE I I [EUCLID TO LAKE LOUISE ROAD I I 'MJR CLASS of WK: 1 IR /W I I INew construction I I WORK CODES: ABDF ICON I I I I I TOTAL LENGTH: .62 F.A. PROJ NO. I _I _ I I I I UTILITY CODES: — — ITOT 01 0 791071MARINE DRIVE 91040 1 IPI 1001 1 3001 2001 6001 3501 2501 I PE I I IKWINA — LUMMI SHORE INTERESECTION 1 I MJR CLASS of WK: 34 1R /W I I (Intersection modification followed by raising and re— I I WORK CODES: ABDH ICON I I Icanstruction easterly to the Noaksack River I I TOTAL LENGTH: 1.10 F.A. PROJ NO. 1 _I _ 1 1 1 UTILITY CODES: PT — — ITOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 11 WHATCOM COUNTY P IF I I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS -- 1 FEDERAL R Ill I ICIFI I OBLIGATION I IN IPROJECT.IDENTIFICATION / IAIUI — EXPENDITURE PLAN— SOURCE -- l PLAN 0 ICCI DESCRIPTION OF WORK IRINI I T I L I. I F I R ITLI IRIDI 1ST 1 2ND 1 3RD 1 4TH 1 0 1 0 IRAP I E I 1ST 14TH I I Al IYII]YEAR [YEAR ]YEAR 1 5TH I T 1 C ICAPP I D I THRU ITHRU T 1 61 1 INI I I 1 6TH I A I A IUATA 1 R I 3RD 16TH Y I SI 1 IGI I I [YEAR I L I L ITIA I L I YEAR !YEAR 801081E. WISER LAKE RD. 9510 1 1P1 I 1 1 8501 8501 5001 3501 1 PE 1 I ISR 539 - HANNEGAN I I MJR CLASS of WK: 34 IR /W I I (Widening, reconstruction I I WORK CODES: ABD ICON I I l I 1 TOTAL LENGT'ri: "c. 12 F. A. PROD NO. I _ I _ 1 I I I UTILITY CODES: PTC - - ITOT 01 0 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 12 WHATCOM COUNTY I SUMMARY OF COSTS BY FUNDING CATEGORY I EXPENDITURE PLAN I I FUNDING PLAN I I FEDERAL OBLIGATION PLAN Totals FUNDED PROJECTS I 1st Year 5590 1 Local 10765 1 Years 1 -3 Years 4 -6 I 2nd Year 2700 1 RAP 2509 1 P E 0 0 0 1 3rd Year 4350 1 CAPP 2000 1 R/W 0 0 0 1 4 -6 Year 4200 1 TIA 0 1 CONTT 0 0 0 1 1 UATA 0 1 I I Fed. 1566 1 1 Totals ... 16840 1 l 16840 0 0 _ 0 UNFUNDED PROJECTS I 1st Year 3765 1 Local 42547 I Years 1 -3 Years 4 -6 Totals (Proposed and Unknown) I 2nd Year 13735 1 RAP 13375 1 P E 0 0 0 1 33rd Year 23890 1 CAPP 200 1 R/W 0 0 0 1 4 -6 Year 333275 1 TIA 2200 1 CONTT 0 0 0 1 1 DATA 8290 1 i l Fed. 8053 1 Totals ... 74665 74665 0 0 0 TOTAL ALL PROJECTS I 1st Year 9355 1 Local 533312 1 Years 1 -3 Years 4 -6 Totals I 2nd Year 16435 i RAP 15884 1 P E 0 0 0 1 3rd Year 28240 1 CAPP 2200 l R/W 0 0 0 1 4 -6 Year 37475 1 TIA 200 I CGNST 0 0 0 I I URTA 8290 l I I Fed. 9619 1 Totals ... 91505 91505 0 0 0