HomeMy WebLinkAboutres1992-045i
WHATCOM COUNTY CO M AGENDA BILL NG = 92 -226A
CLEARANCES
Initial
Date
Date Received in Council Office:
Atenda date
Assi jMed to:
originat r
PuTI is Works - Eng.
6/9/
2
DATE to be
on agenda—
Committee /Council assignment -
Division Head:
6/23/92
C6uncil /hearing
Dept Hea
Prosecutor.
Purchasing /Budget:
Executive:
SUBJECT. Whatcom County Six -Year Road Program for 1993 - 1998
ATTACHMENTS:
1. Letter from County Engineer 4. Priority Rating Scores
2. Resolution 5. Bridge Inspection Deficiency Report
3. Six Year Road Program
SUMMARY STATEMENT
Related County contract Cleric schedule a hearing? PLEASE fill in Y/N, date— NO /J YES /J
IgSted for this item/ project: is rt or cnu a oc w
item number(s): First line item # Second line item #—
Sulnmaly"' The County Council is authorized to adopt the Six Year Comprehensive
Road Program after a public hearing.
ORIGINATOR'S RECOMMENDED ACTION.•
Recommend approval
COMMITTEE ACTION TAKEN.•
COUNCIL ACTION TAKEN.•
6/23/92: Council approved the resolution with amendments. 7-0.
Related File Numbers. Ordb mice or Resolution Number (this item only):
R92 -045
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
"1
j2
53
54
55
INTRODUCED BY: Consent
PROPOSED BY: Public works- Engineerinq
DATE INTRODUCED: June 23, 1992
RESOLUTION NO. 92-045
A RESOLUTION IN THE MATTER OF THE WHATCOM COUNTY
COMPREHENSIVE SIX YEAR ROAD PROGRAM FOR THE YEARS
1993 THROUGH 1998
WHEREAS, pursuant to RCW 36.81.121, Whatcom County has prepared and adopted
a six year comprehensive road program; and
WHEREAS, following adoption of said program, the law requires an annual
review of the work accomplished under the program and a determination of current
County Road needs; and
WHEREAS, based upon the findings of the annual review, and after public
hearing, a revised and extended comprehensive road program shall be adopted.
NOW, THEREFORE, BE IT RESOLVED as follows:
1. That the Whatcom County Comprehensive Road Program for the years 1993
through 1998, which is attached hereto as Exhibit "A ", and is hereby
adopted.
2. That the County Engineer is directed to file a copy of same with the
County Road Administration Board and the State Secretary of
Transportation.
PASSED this 23rd day of June
ATTEST:
A amona Keeves,
Clerk of the Council
APPROVED AS TO FORM:
Civil Deputy Prosecuting Atty.
WHATCOM COUNTY COUNCIL
WHATCOM COUNTY, WASHINGTON
r l
ALj
QP!L
�[
DanieT M. Warner
Chairperson
1992.
r � -
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98
APPROVED:
WHATCOM COUNTY HEARING DATE : 06/23/92
ADOPTION DATE: 06/23/92 J U (_
21081HAMPTON RD. 6170
1 ISLOTEMAKER TO VAN BUREN
I IReconstruction, widening, all weather construction,
I ]improve vertical alignment, paved shoulders.
I I
;071EAST SMITH RD 9508
1 ISR 539 - SR 542
I IReconstruction to all weather standards, widening
I lincluding paved shoulders.
I I
41071HANNEGAN 9501
1 ITEM MILE - LYNDEN C/L
I IReconstruction to all weather standards, widening
I lincluding paved shoulders
1 I
510BILUMMI SHORE ROAD 91040
1 ICAGEY - PORTAGE
I IReconstruction, widening, shore protection
I I
I I
IXIFI 14001 1 1 1
1 1 RJR CLASS of WK: 34
1 1 WORK CODES: AD
I I TOTAL LENGTH: 2.25
1 1 UTILITY CODES: PT
IXIFI 15001 7501 15001 8001
I I MJR CLASS of WK: 34
1 1 WORK CODES: AD
I I TOTAL LENGTH: 11.25
1 1 UTILITY CODES: PT
IXIFI 10001 11001 14001 1
1 1 MJR CLASS of WK: 34
1 1 WORK CODES: AD
I I TOTAL LENGTH: 5.50
1 1 UTILITY CODES: PT
I UPI 2001 IM 1 IM 1 30001
1 1 MJR CLASS of WK: 34
1 1 WORK CODES: ABD
I I TOTAL LENGTH: 3.52
1 1 UTILITY CODES: PT
14001 11661 2341 1 PE
IR /W
ICON
F.A. PROJ NO. I
- - ITOT
45501 32751 9751 3001 PE
IR /W
ICON
F.A. PROJ NO. I
- - ITOT
35001 21001 8001' 6001 PE
IR /W
ICON
F.A. PROJ N0. I
- - ITOT
52001 52001 1 1 PE
IR /W
ICON
F.A. PROJ NO. I
- - ITOT
I
I
I
01 0
i
I
I "
01 0
I
I
01 0
I
I
I
01 0
61 [SPECIFIC SITE IMPROVEMENTS
COUNTY NO: 37
RESOL UTION NO: 92-045
1 2001 PE I
I IVARIOUS PRIORITIZED LOCATIONS
I I MJR CLASS of WK: 36
IR /W I
I I Guardrail, channelization, lane widening,
I I WORK CODES: HIW
Paul F.
Rushing
P IF I
F.A.
I I I --- PROJECT COSTS IN THOUSANDS
OF DOLLARS
I I UTILITY CODES:
I FEDERAL
R IU I
71171LAKE WHATCOM BLVD. 94120
ICIFI
25001 12001
13001 1 PE I
I ICABLE STREET TO LAKE LOUISE ROAD
I OBLIGATION
I IN IPROJECT IDENTIFICATION /
IR /W I
IAIUI — EXPENDITURE PLAN—
I I WORK CODES: ABD
SOURCE
ICON I
I PLAN
0 ICCI DESCRIPTION OF WORK
F.A.
[RINI I
T I
L I I
F
I
R ITLI
IRIDI 1ST 1 2ND 1 3RD 1 4TH 1
0 1
0 TRAP I
E
I 1ST 14TH
I I Al
IYIIIYEAR IYEAR IYEAR 1 5TH I
T I
C ICAW I
D
I THRU ITHRU
T I SI
I INI I I 1 6TH I
A I
A IUATA I
R
I 3RD 16TH
Y I SI
1 161 1 1 ]YEAR I
L I
L ITIA I
L
I YEAR IYEAR
11071BIRCH POINT ROAD 20050
IXIFI 2701 1 1 1
2701
2701 1
1 PE I
I IBAY RIDGE DRIVE TO 0.2 MI.
E. OF SELDER
I I MJR CLASS of WK: 34
IR /W I
I (Reconstruction, widening,
improve vertical alignment
I I WORK CODES: AD
ICON I
I lall weather construction,
paved shoulders.
I I TOTAL LE 4GTH:.60
F.A. PROJ
NO.
I _1 _
I I
I I UTILITY CODES: PT
-
-
ITOT 01 0
21081HAMPTON RD. 6170
1 ISLOTEMAKER TO VAN BUREN
I IReconstruction, widening, all weather construction,
I ]improve vertical alignment, paved shoulders.
I I
;071EAST SMITH RD 9508
1 ISR 539 - SR 542
I IReconstruction to all weather standards, widening
I lincluding paved shoulders.
I I
41071HANNEGAN 9501
1 ITEM MILE - LYNDEN C/L
I IReconstruction to all weather standards, widening
I lincluding paved shoulders
1 I
510BILUMMI SHORE ROAD 91040
1 ICAGEY - PORTAGE
I IReconstruction, widening, shore protection
I I
I I
IXIFI 14001 1 1 1
1 1 RJR CLASS of WK: 34
1 1 WORK CODES: AD
I I TOTAL LENGTH: 2.25
1 1 UTILITY CODES: PT
IXIFI 15001 7501 15001 8001
I I MJR CLASS of WK: 34
1 1 WORK CODES: AD
I I TOTAL LENGTH: 11.25
1 1 UTILITY CODES: PT
IXIFI 10001 11001 14001 1
1 1 MJR CLASS of WK: 34
1 1 WORK CODES: AD
I I TOTAL LENGTH: 5.50
1 1 UTILITY CODES: PT
I UPI 2001 IM 1 IM 1 30001
1 1 MJR CLASS of WK: 34
1 1 WORK CODES: ABD
I I TOTAL LENGTH: 3.52
1 1 UTILITY CODES: PT
14001 11661 2341 1 PE
IR /W
ICON
F.A. PROJ NO. I
- - ITOT
45501 32751 9751 3001 PE
IR /W
ICON
F.A. PROJ NO. I
- - ITOT
35001 21001 8001' 6001 PE
IR /W
ICON
F.A. PROJ N0. I
- - ITOT
52001 52001 1 1 PE
IR /W
ICON
F.A. PROJ NO. I
- - ITOT
I
I
I
01 0
i
I
I "
01 0
I
I
01 0
I
I
I
01 0
61 [SPECIFIC SITE IMPROVEMENTS
IXIPI 2201 2201 2201 7801
13601 11601
1 2001 PE I
I IVARIOUS PRIORITIZED LOCATIONS
I I MJR CLASS of WK: 36
IR /W I
I I Guardrail, channelization, lane widening,
I I WORK CODES: HIW
ICON I
I I intersection modification
I I TOTAL LENGTH:
F.A.
PROJ NO. I _1 _
I I
I I UTILITY CODES:
- - ITOT 61 0
71171LAKE WHATCOM BLVD. 94120
IXIPI 6001 6001 1 13001
25001 12001
13001 1 PE I
I ICABLE STREET TO LAKE LOUISE ROAD
I I MJR CLASS of WK: 34
IR /W I
I Ireconstruction through rock cut, structural
I I WORK CODES: ABD
ICON I
I loverlay, widening to provide paved shoulders.
I I TOTAL LENGTH: 4.42
F.A.
PROJ NO. I _I _
I I
I I UTILITY CODES: PTC
- - ITOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98
WHATCOM COUNTY
Page 2
91091WICKERSHAM RAILROAD OVERPASS BR. #124 IXIFI 3401 1 1 1 3401 681 1 2721 PE I
I IBURLINGTON NORTHERN OVEM40 ON WICKERSHAM ROAD I I MJR CLASS of WK: 4 IR/W I
1 IReplace existing wooden overpass I I WORK CODES: L ICON I
I I I I TOTAL LENGTH: .05 F. A. PROJ NO. I _I _
I I I I UTILITY CODES: — — ITOT 01 0
101091LINDSAY ROAD — BRIDGE #304
IXIFI 1801 1 1 1
1601
361
1 1441 PE
I.
P IF I
I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS
I FEDERAL
R IU I
ICIFI
I
I IReplace existing wooden bridge
I I WORK CODES: L
I OBLIGATION
I IN (PROJECT IDENTIFICATION /
IAIUI — EXPENDITURE PLAN—
ICON
SOURCE
I
I PLAN
0 ICCI DESCRIPTION OF WORK
IRINI I
T I
L I I
F
I
R ITLI
IRIDI 1ST 1 2ND 1 3RD 1 4TH 1
0 1
0 IRAP I
E
I 1ST 14TH
I I Al
IYIIIYEAR IYEAR IYEAR 1 5TH I
T I
C ICAPP I
D
I THRU ITHRU
T I SI
I INI I I 1 6TH I
A I
A IUATA I
R
I 3RD 16TH
Y I SI
1 161 1 1 (YEAR I
L I
L ITIA I
L
I YEAR IYEAR
81171LAKE LOUISE / AUSTIN ST. RD. 4601
IXIPI 6001 6001 8501 7501
28001
16001 12001
I I TOTAL LENGTH: 4.40
1 PE I
I ICABLE ST. TO LK. WHATCOM BLVD.
I I MJR CLASS of WK: 24
I
_1 _
11
IR /W I
I Ireconstruction to all weather standard,
I I WORK CODES: DO
— —
ITOT
01 0
ICON I
I Iwidening including paved shoulders.
I I TOTAL LENGTH: 4.43
1401
F. A. PROJ
NO.
I _I _
I I
I I UTILITY CODES: PTC
— —
ITOT 01 0
91091WICKERSHAM RAILROAD OVERPASS BR. #124 IXIFI 3401 1 1 1 3401 681 1 2721 PE I
I IBURLINGTON NORTHERN OVEM40 ON WICKERSHAM ROAD I I MJR CLASS of WK: 4 IR/W I
1 IReplace existing wooden overpass I I WORK CODES: L ICON I
I I I I TOTAL LENGTH: .05 F. A. PROJ NO. I _I _
I I I I UTILITY CODES: — — ITOT 01 0
101091LINDSAY ROAD — BRIDGE #304
IXIFI 1801 1 1 1
1601
361
1 1441 PE
I.
I ISM RIVER
I I MJR CLASS of WK: 4
IR /W I
I (Reconstruction, widening, drainage, curbs, sidewalks
IR /W
I
I IReplace existing wooden bridge
I I WORK CODES: L
I I
I I TOTAL LENGTH: .33
F. A.
ICON
I
I
I I TOTAL LENGTH: .05
F. A.
PROJ NO.
I
_1 _
I I
I I UTILITY CODES:
1 PE I
I ICITY LIMITS TO SAMISH WAY
— —
ITOT
01 0
111071HAXTON WAY 12750
IXIFI 5001 4501 1 14001
23501
19501
4001
1 PE
I
I IBALCH ROAD TO SLATER ROAD
I I MJR CLASS of WK: 34
PROJ NO.
I _I _
I I
IR /W
I
1 IStructural overlay to all weather standard,
I I WORK CODES: ABD
ICON
I
I (widening with paved shoulders, flood — proofing.
I I TOTAL LENGTH: 4.40
F.A.
PROJ NO.
I
_1 _
11
I I UTILITY CODES:
— —
ITOT
01 0
121171BBMM DRIVE 51070
1 IPI 501 6501 1 1
7001
1401
5601
1 PE
I
I IAIRPORT DRIVE TO BAKERVIEW ROAD
I I MJR CLASS of WK: 34
IR /W
I
I (Widening, reconstruction, drainage, curbs,
I I WORK CODES: DFGI
ICON
I
I Isidewalks, signalization
I I TOTAL LENGTH: .26
F. A.
PROJ NO.
I
_I _
I I
I I UTILITY CODES: PT
— —
ITOT
01 0
131161JAMES STREET ROAD 95016
1 IPI 401 6101 1 1
6501
1301
5201
1 PE
I
I ICITY LIMITS TO BAKERVIEW
I I MJR CLASS of WK: 34
IR /W
I
I IReconstruction, widening, drainage, curbs,
I I WORK CODES: DFG
ICON
I
I Isidewalk
I I TOTAL LENGTH: .49
F. A.
PROJ NO.
I
_1 _
I I
I I UTILITY CODES: PT
— —
ITOT
61 0
141171BAKERVIEW ROAD 51600
1 IPI 301 4201 1 1
4501 901
3601
l PE I
I IBENNETT WESTERLY TO AIRPORT
I I MJR CLASS of WK: 34
IR /W I
I (Reconstruction, widening, drainage, curbs, sidewalks
I I WORK CODES: DFG
ICON I
I I
I I TOTAL LENGTH: .33
F. A.
PROJ NO.
I _I _
I
I I UTILITY CODES: PT
— —
ITOT 01 0
151171YEW STREET ROAD 40830
1 IPI 351 3151 15001 1
18561 3701
14801
1 PE I
I ICITY LIMITS TO SAMISH WAY
I I MJR CLASS of WK: 34
IR /W I
I (Reconstruction, widening, drainage, curbs
I I WORK CODES: DFG
ICON I
I Isidewalks
I I TOTAL LENGTH: 2.13
F. A.
PROJ NO.
I _I _
I I
I I UTILITY CODES: PT
— —
ITOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98
WHATCOM COUNTY
Page 3
P
IF I
I I I —PROJECT COSTS IN THOUSANDS
OF DOLLARS
2501
I FEDERAL
R
IU I
ICIFI
I I
MJR CLASS of WK:
6
I OBLIGATION
I
IN IPROJECT IDENTIFICATION /
IAIUI — EXPENDITURE PLAN —
I Isignalization and provide turning lanes as needed
SOURCE
WORK CODES:
I PLAN
0
ICCI DESCRIPTION OF WORK
IRINI I
T I
L I I
F
I
R
ITLI
IRIDI 1ST 1 2ND 1 3RD 1 4TH 1
0 1
0 IRAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR IYEAR IYEAR 1 5TH I
T I
C [CAPP I
D
I THRU IITIRU
T
151
I INI I I 1 6TH I
A I
A IUATA I
R
I 3RD 16TH
Y
151
1 IGI 1 1 IYEAR I
L I
L ITIA I
L
I YEAR (YEAR
161161MARINE DRIVE 91040
1 IPI 801 7201 1 1
8001
1601 6401
I
1 PE I
I IBENNETT TO LOCUST
I I MJR CLASS of WK: 34
'I I
I I
TOTAL LENGTH:
IR /W I
I (Widening, reconstruction, drainage, curbs
I I WORK CODES: DFG
_I _
- I I
I I
ICON I
I Isidewalks
I I TOTAL LENGTH: .48
– – ITOT
F.A. PROD
NO.
I _I _
251 251 251
I I
I I UTILITY CODES: PT
1501
– –
I
ITOT 01 0
171161BAKERVIEW ROAD /HANNEGAN INTERSECTION
I IPI
1251 1251 1
1
2501
541
1 1961 PE
I
I IINTERSECTION UPGRADE
I I
MJR CLASS of WK:
6
IR /W
I
I Isignalization and provide turning lanes as needed
I I
WORK CODES:
HI
ICON
I
I I
I I
TOTAL LENGTH:.
05
F.A.
PROJ NO. I
_I _
I I
I I
UTILITY CODES:
– – ITOT
01 0
181 161BAKERVIEW /MAPLEWOOD /I- 5 /BENNETT 54000
1 IPI
122151 1351 1
1
2601
1081
1 :521 PE
I
I IBENNETT TO W. MAPLEWOOD
I I
MJR CLASS of WK:
6
IR /W
I
I Isignilization of two intersections in close proximity.
I I
WORK CODES:
I
ICON
I
'I I
I I
TOTAL LENGTH:
F.A.
PROJ NO. I
_I _
- I I
I I
UTILITY CODES:
– – ITOT
01 0
191 IVARIOUS
I IPI
251 251 251
751
1501
1501
1 1 PE
I
I [VARIOUS
I I
MJR CLASS of WK:
5
IR /W
I
I Iconvert gravel roads to B.S.T.
I I
WORK CODES:
AC
ICON
I
I I
I I
TOTAL LENGTH:
F.A.
PROJ NO. I
_I _
I I
I I
UTILITY CODES:
– – ITOT
01 0
201 )VARIOUS BRIDGES
I IPI
301 3801 1
1
4101
901
1 3201 PE
I
l 113 BRIDGES
I I
MJR CLASS of WK:
68
IR /W
I
I Ibridge rail upgrades and end protection
I I
WORK CODES:
LW
ICON
I
I Imodification
I I
TOTAL LENGTH:
F.A.
PROJ NO. I
_I _
I I
I I
UTILITY CODES:
– – ITOT
01 0
211081TYEE DRIVE 92500/92550/28700
1 IPI
301 5001 6001
1
11301
11301
1 1 PE
I
I IRODSEVELT – EDWARDS
I l
MJR CLASS of WK:
25
IR /W
I
I (Widening, structural overlay, drainage,
I I
WORK CODES:
RDFG
ICON
I
I Icurbs, sidewalks
I I
TOTAL LENGTH:
1.45
F.A.
PROD NO. I
_1 _
I I
I I
UTILITY CODES:
– – ITOT
01 0
221 IRAILROAD CROSSINGS
IXIPI
3001 3001 3001
8201
17201
351
1 16851 PE
I
I (VARIOUS LOCATIONS
I I
MJR CLASS of WK:
6
IR /W
I
I ISignalization of various railroad crossings
I I
WORK CODES:
I
ICON
I
I I
I I
TOTAL LENGTH:
F.A.
PROJ NO. l
_I _
I I
I I
UTILITY CODES:
– – ITOT
01 0
231161MARINE DRIVE 91040
1 IPI
201 7001 8001
18801
34001
19001
5001 10001 PE
I
I [LOCUST – LUMMI SHORE
I I
MJR CLASS of WK:
34
IR /W
I
I Iwidening, reconstruction, flood proofing,
I I
WORK CODES:
BDF
ICON
I
I Ipaved shoulders
I I
TOTAL LENGTH:
4.57
F.A.
PROD NO. l
_I _
I I
I I
UTILITY CODES:
PT
– – ITOT
01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 4
WHATCOM COUNTY
P
IF I
I I I PROJECT COSTS IN THOUSANDS OF DOLLARS
2001
I FEDERAL
R
IU I
ICIFI
I I MJR CLASS of WK:
14
1 OBLIGATION
I
IN (PROJECT IDENTIFICATION /
IAIUI — EXPENDITURE PLAN—
ABD
SOURCE
ICON I
I PLAN
0
11CC1 DESCRIPTION OF WORK
IRINI I
T I
L I I
F
I
R
ITLI
IRIDI 1ST 1 2ND 1 3RD 1 4TH 1
0 1
0 [RAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR IYEAR IYEAR 1 5TH I
T I
C .ICAPP 1
D
I THRU ITHRU
T
151
I INI I I 1 6TH I
A I
A IUATA I
R
I 3RD 16TH
Y
I SI
1 191 1 1 (YEAR l
L I
L ITIA I
L
I YEAR IYEAR
241071NORTHWE5T DRIVE 95210
IXIPI 201 5001 6401 6401
18001
10001 5001
3001 PE I
— — ITOT 01 0
I IAXTON — W. POLE RD.
I I MJR CLASS of WK: 34
IR /W I
I (Reconstruction to all weather standard, widening,
I I WORK CODES: BD
ICON I
I !including paved shoulder
I I TOTAL LENGTH: 2.76
F.A. PROJ
NO.
I _I
I I
I I UTILITY CODES:
—
—
ITOT 01 0
251071BIRCH BAY LYNDEN ROAD 92140/92110/93040 1 IPI 201 5001 5501 7001 17701 6701 4001 7001 PE I
I IHARBORVIEW — ENTERPRISE I I MJR CLA$5 of WK: 36 IR /W I
I Istructural overlay to all weather standard, I I WORK CODES: DH ICON I
I Iwiden with paved shoulders I I TOTAL LENGTH: 8.00 F.A. PROJ NO. I _I _
I I I I UTILITY CODES: — — ITOT 01 0
261171LAKE WHATCOM BLVD 94120 1 IPI 51 451 1 1 501 501 1 1 PE I
I (AUSTIN CREEP( I I MJR CLASS of WK: 9 IR /W I
I [construct path around bridge I I WORK CODES: N ICON I
I I I I TOTAL LENGTH: .10 F.A. PROJ NO. I _I _
I I I I UTILITY CODES: — — ITOT 01 0
271081CURTIS RD. 52570
IXIPI 501 1501 11001
2001
15001 2001
10001 3001 PE I
I 15LATER ROAD TO 1.3 MI.
S. OF RURAL
I I MJR CLASS of WK:
14
IR /W I
I IEliminate curves with
new all weather construction,
I I WORK CODES:
ABD
ICON I
I Ireconstruct existing to
all weather standard, pave
I I TOTAL LENGTH:
1.75
F.A.
PROJ NO. [ _I _
I Ishoulders.
I I UTILITY CODES:
PT
— —
— — ]TOT 01 0
281161WHATCOM CONNECTOR
IXIPI 301 1701 9001
9001
20001 16001
1 4001 PE I
I ILAKE LOUISE ROAD — YEW
STREET ROAD
I I MJR CLASS of WK:
1
IR /W I
I (Additional evaluation
as to location to reserve
I I WORK CODES:
U
ICON I
ICON I
I Ikey portions of future
right —of —way.
I I TOTAL LENGTH:
2.50
F.A.
PROJ NO. I _I _
I I
I I UTILITY CODES: PT
I I UTILITY CODES:
— —
ITOT 01 0
— — ITOT 01 0
291071SMITH ROAD 95080
1 ISR 539 — NORTHWEST
I Istructural overlay to all weather standard,
I Iwidening, including paved shoulders.
I I
I IPI 101 4001 5951 5951 16001 12001 4001 1 PE I
I I MJR CLASS of WK: 35 IR /W I
I I WORK CODES: DH ICON I
I I TOTAL LENGTH: 2.50 F.A. PROD NO. I _I _
I I UTILITY CODES: PT — — ITOT 61 0
301071SLATER ROAD 52860
1 IPI 101 7001 5001 10901
23001 15501
7501
1 PE I
I IHAXTON TO I -5
1 1 MJR CLASS of WK: 35
IR/W I
I Istructural overlay to all
weather standard
I I WORK CODES: DH
ICON I
I Iwidening, including paved
shoulders, and
I 1 TOTAL LENGTH: 3.80
F.A.
PROD NO.
I _I _
I (flood proofing.
I I UTILITY CODES:
— —
ITOT 01 0
311081VRN BUREN ROAD 63110
IXIPI 101 201 7201 1
7501 3501
4001
1 PE I
I IHAMPTON TO EVERSON C/L
I 1 MJR CLASS of WK: 34
1R /W I
I IReconstruction to all weather standard,
I I WORK CODES: DH
ICON I
I Iwidening, including paved
shoulders.
I I TOTAL LENGTH: 1.20
F.A.
PROJ NO.
I _I _
I I
I I UTILITY CODES: PT
— —
ITOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98
WHATCOM COUNTY
Page 5
P
IF I
I I I — PROJECT COSTS IN THOUSANDS OF DOLLARS
1701 1
I FEDERAL
R
IIJ I
ICIFI
IR /W I
I [New construction
I 1 WORK CODES:
RBD
I OBLIGATION
I
IN IPROJECT IDENTIFICATION /
IRIUI
— EXPENDITURE PLAN —
F.A. PROJ NO.
SOURCE
I I
I PLAN
0
ICCI DESCRIPTION OF WORK
1RIN1
351071STRUCTURAL OVERLAYS
I
T I
L L I
F
I
R
ITLI
IRIDI
1ST 1 20 1 3RD
1 4TH 1
0 1
0 IRAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR IYEAR (YEAR
1 5TH I
T I
C ICAPP I
D
I THRU 1THRU
T
I SI
I IN]
I I
1 6TH I
A I
A ILATA I
R
I 3RD 16TH
Y
I Si
1 161
1 1
(YEAR I
L I
L ITIA I
L
I YEAR IYEAR
321071LAKE TERRELL RD. 91080
IXIPI
201 7801
1 1
8001
1251 3751
3001 PE I
I ISLATER TO MOUNTAIN VIEW
I I
MJR CLASS of WK:
35
IR /W I
I Istructural overlay, widening with paved shoulders
I I
WORK CODES:
DH
ICON I
I I
I I
TOTAL LENGTH:
2.00
F. A. PROJ
NO.
I _I _
I I
I 1
UTILITY CODES:
PT
— —
ITOT 01 0
331081ROOSEVELT RD BYPASS 28160 1 IPI 201 3801 2001 1 6001 3001 2001 1001 PE I
I ICUSTOMS VICINITY I I MJR CLASS of WK: IR /W I
I ISTUDY AND MODIFY TO IMPROVE TRAFFIC CIRCULATION I I WORK CODES: UAHIK ICON I
I I I I TOTAL LENGTH: .50 F.A. PROJ NO. I _I _
I I I 1 UTILITY CODES: PTO — — ITOT 01 0
341091JOHM ROAD
I IPI 201 201 1
1301 1701
1701 1
1 PE I
I ITYEE — MILL
I I MJR CLASS of WK:
1
IR /W I
I [New construction
I 1 WORK CODES:
RBD
ICON I
I
I I TOTAL LENGTH:
.30
F.A. PROJ NO.
I _I _
I I
I I UTILITY CODES:
— —
[TOT 01 0
351071STRUCTURAL OVERLAYS
I IFI 4001 4001 8001
8001 24001
8001 16001
1 PE i
I [VARIOUS PRIORITIZED LOCATIONS
I I MJR CLASS of WK:
5
IR /W I
I (Conversion of existing roads to all— weather status
I I WORK CODES:
D
ICON I
I
I I TOTAL LENGTH:
12.00
F. A. PROJ NO.
I _i _
I I
I 1 UTILITY CODES:
— —
ITOT 01 0
361 1R /W ACQUISITION I IPI 1001 1001 2001 2001 6001 6001 1 1 PE I
I I I I MJR CLASS of WK: 7 IR /W I
I IOBTAIN ROW AS AVAILABLE IN ANTIC. OF PROJ. ESTMT. I I WORK CODES: ICON I
I 1 I I TOTAL LENGTH: F.A. PROJ NO. I _I _
I I I I UTILITY CODES: — — ITOT 01 0
371 IMISCELLANEOUS UNANTICIPATED
I IVARIOUS AS NEEDED
I IAs needed
I I
I I
381071BIRCH POINT ROAD — 20050
I IBAY RIDGE DR — SEMIAHM00 DR
I (Reconstruction, widening, paved shoulders
I I
I I
391081LINCO N RD. ^2-6200
I (PORTAL WAY — SHINTAFFER RD
I (Widening, reconstruction: Partial funding from
I (CITY OF BLAINE $270,000
I I
1 IPI 1001 1001 2001 2001
I I MJR CLASS of WK: 36
1 1 WORK CODES: ABDH
I I TOTAL LENGTH:
I I UTILITY CODES:
I IPI 101 101 2501 4801
1 1 MJR CLASS of WK: 34
1 1 WORK CODES: ABCD
I I TOTAL LENGTH: 1.12
I I UTILITY CODES: PT
1 IPl 101 101 3401
1 1 MJR CLASS of WK: 34
1 1 WORK CODES. ABD
I I TOTAL LENGTH: 3.50
1 1 UTILITY CODES: PT
6001 6001 1 1 PE I
IR /W I
ICON I
F. A. PROJ NO. l _I _
— — ITOT 01 0
7501 2501 5001 1 PE I
IR /W I
ICON I
F.A. PROJ NO. I _I _
— — ITOT 01 0
1 3601 3601 1 1 PE I
IR /W I
ICON I
F. A. PROJ NO. I _I _
— — 1 TOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 6
WHATMM COUNTY
P
IF I
I I I — PROJECT COSTS IN THOUSANDS
OF
DOLLARS
1 PE
I FEDERAL
R
IU I
ICIFI
IR /W
I
I OBLIGATION
I
IN (PROJECT IDENTIFICATION /
IAIUI — EXPENDITURE PLAN —
ICON
SOURCE --
, , , ,
1 Isignalization
I PLAN
O
ICCI DESCRIPTION OF WORK
IRINI I
T I
L
I I
F
I
R
ITLI
IRIDI 1ST 1 2ND 1 3RD 1 4TH 1
0 1
0
IRAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR (YEAR ]YEAR 1 5TH 1
T I
C
ICAPP I
D
I THRU ITHRU
T
I SI
I INI I I 1 6TH I
A I
A
IUATA I
R
I 3RD 16TH
Y
I SI
1 IGI 1 1 IYEAR I
L I
L
ITIA I
L
I YEAR ]YEAR
401161NORTH SHORE DR. 94150
1 IPI 201 801 9001 1001
11001
3001 8001
— —
1 PE I
01 0
I IBELLINGHAM C/L — U.A.B. BOUNDARY
I I MJR CLASS of WK: 34
22001
5001
7001 10001 PE
I
IR /W l
I I MJR CLASS of WK: 34
I (Widening, reconstruction
I I WORK CODES: ABDF
lR /W
l
I (Widening, reconstruction, relocation, bank protection:
ICON I
I I
I I TOTAL LENGTH: 1.00
ICON
F.A. PROJ
NO.
I _I _
I i
I I UTILITY CODES: PT
I
_I _
— —
1 1 UTILITY CODES: PT
ITOT 01 0
411161AIRPORT DR. 54000
1 IPI 1001 8501 1 l
9501
2001
7501
1 PE
I
I IBENNETi AV. TO MARINE DR.
I I MJR CLASS of WK: 35
IR /W
I
I (Widen overlay curb gutter sidewalk &
I I WORK CODES: ABDFGI
ICON
I
, , , ,
1 Isignalization
I I TOTAL LENGTH: 1.10
F.A.
PROJ N0.
I
_I —
1I
I I UTILITY CODES:
— —
ITOT
01 0
421091TURKINGTON RD. — BRIDGE #130
1 IPI 2501 1 1 1
2501
2501
1
1 PE
i
I [JONES CR BR—
I I MJR CLASS of WK: 4
]R /W
I
I IConstruct clear span bridge following establishment
I I WORK CODES: AML
ICON
I
I lof drainage or Dike District
I I TOTAL LENGTH: .30
F.A.
PROJ NO.
I
_I
11
I I UTILITY CODES:
— —
ITOT
01 0
43108]LLOI SHORE 91040
1 IPI 201 801 1M 1 11001
22001
5001
7001 10001 PE
I
I ICAGEY — HAXTON
I I MJR CLASS of WK: 34
lR /W
l
I (Widening, reconstruction, relocation, bank protection:
1 1 WORK CODES: AMD
ICON
I
I (Joint funding BIA, FCAAP, FHWA, & RAP, possible
I I TOTAL LENGTH: 3.93
F.A.
PROJ NO.
I
_I _
I IU.S.C.E.
1 1 UTILITY CODES: PT
— —
ITOT
011 0
441161W. BAKERVIEW RD 54000
1 IPI 501 1501 12M1 1
14001
2001
10,001
1 PE
I
I IBENNETT DRIVE TO BELLINGHA_M C/L
I I MJR CLASS of WK: 34
IR /W
I
I ITIA — Widening, drainage, reconstruction, curbs,
I I WORK CODES: BDFG
ICON
I
I Igutters, sidewalks
I I TOTAL LENGTH: 1.33
F.A.
PROJ NO.
I
_I _
I I
1 I UTILITY CODES: PT
— —
ITOT
01 0
451081PARK ROAD 9412
1 IPI 501 5501 6001 1
12001
5001
7001
1 PE
I
I ISOM BAY DR. — S.R. 9
1 1 MJR CLASS of WK: 34
IR /W
I
I IWidening, reconstruction
I I WORK CODES: ABC
ICON
I
I I
I I TOTAL LENGTH: 2.78
F.A.
PROJ NO.
I
_I _
I I
I I UTILITY CODES:
— —
ITOT
01 0
461171ALDERWGOD AVE — 51280/51340
1 IPI 101 401 8001 1
8501
1701
6801
1 PE
I
I IB'HAM C/L TO AIRPORT DRIVE
1 I MJR CLASS of WK: 34
IR /W
I
I (Reconstruct to urban section
I I WORK CODES: ABDFG
ICON
I
I I
I I TOTAL LENGTH: .70
F.A.
PROJ NO.
1
_I _
I I
1 I UTILITY CODES:
— —
ITOT
01 0
471071SLRTER — VANWYCK CONNECTOR
1 IPI 401 501 4501 24001
29401
29401
1
1 PE
I
I INORTHWEST — SR 542
1 [ MJR CLASS of WK: 1
lR /W
l
1 Inew construction
I I WORK CODES: ABDI
ICON
I
I I
I I TOTAL LENGTH: 6.07
F.A.
PROJ NO.
I
_I _
I I
I I UTILITY CODES:
— —
ITOT
01 0
491071DRAYTON HARBOR RD. 20050
I IBLAINE C/L - HARBORVIEW RD
I (Construction on new alignment,
I (Partial funding by City of Blaine
I I
501071BIRCH BAY DRIVE 92050
1 IALDERSON TO SHINTAFFER
I IWidening, reconstruction
I IRID Funding
I I
511081MOSQUITO LAKE ROAD 94190
1 [SOUTHWEST OF MIDDLE FORK BRIDGE
I IWidening and reconstruction,
I I
I I
521081BEACH WAY 14750
I ]SLATER - SUCIA
I (Reconstruction, widening
I I
I I
5310810EDARVILLE RD. 56110
1 I SR 542 - GOSFIEN RD.
I IWidening, reconstruction
I I
I I
I IPI I I 1 5001 5001 4001 1001 1 PE I
I I MJR CLASS of WK: . IR /W I
1 I WORK CODES: ABD ICON I
I I TOTAL LENGTH: 1.16 F.A. PROD NO. I _I —
I I UTILITY CODES: PT - - ITOT 01 0
1 IPl 101 201 7701 7001 15001 15001 1 1 PE I
! I MJR CLASS of WK: 34 IR /W I
I I WORK CODES: ABDG ICON I
I I TOTAL LENGTH: 1.97 F.A. PROD NO. I _1 _
1 I UTILITY CODES: PT - - [TOT 01 0
I IPI 50i 2001 I 1 2501 2501 1 1 PE I
I I MJR CLASS of WK: 34 IR /W I
I I WORK CODES: ABC ICON I
I I TOTAL LENGTH:. 60 F. A. PROD NO. I I _
I I UTILITY CODES: - - ITOT 01 0
I !P1 1 1001 501 1 1501 1501 1 1 PE I
I I MJR CLASS of WK: 34 1R /W I
I I WORK CODES: ABD ICON I
! I TOTAL LENGTH: .36 F.A. PROJ NO. 1 _I _
I I UTILITY CODES: PT - - ITOT 01 0
I IPI 1 501 4501 1 5001 1501 3501 1 PE 1
1 1 MJR CLASS of WK: 34 IR /W I
I I WORK CODES: ABD ICON I
I I TOTAL LENGTH: 1.39 F. A. PROJ NO. I _I _
I I UTILITY CODES: PT - - ITOT 01 0
541071NORTH SHORE DR. 94150
l !PI 1 1001 7001 1
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO
98
I IUAB BOUNDARY - Y ROAD
I 114JR CLASS of WK: 34
Page 7
I IWidening, reconstruction, structural overlay
I I WORK CODES: ABD
WHATCOM COUNTY
IG]N I
I I
I I TOTAL LENGTH: 1.87
F.A.
PROJ NO. I _I _
P
I l UTILITY CODES: PT
- - ITOT 01 0
551071MT. VIEW 922020
1 IPI 1 I 5001 6001
11001 2501
IF I
I I I — PROJECT COSTS IN THOUSANDS
OF
DOLLARS --
IR /W I
I FEDERAL
R
IU I
IC1F1
I I
I I TOTAL LENGTH: 3.72
F.A.
PROJ NO. I _I _
I OBLIGATION
I
IN 1PROJECT IDENTIFICATION /
IAIUI — EXPENDITURE PLAN—
SOURCE
I PLAN
0
ICCI DESCRIPTION OF WORK
IRINI I
T I
L
T I
F
I
R
ITLI
IRIDI 1ST 1 20 1 3RD 1 4TH 1
0 1
0
!RAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR IYEAR (YEAR 1 5TH I
T I
C
ICAPP I
D
I THRU ITHRU
T
I Sl
I INI I I 1 6TH I
A I
A
1UATA I
R
I 3RD 16TH
Y
I S1
I IGI I I IYEAR I
L I
L
ITIA 1
L
I YEAR IYEAR
481071DRAYTON HARBOR RD. 92^200
1 IPI 2201 201 7101 1
7501
5001 2501
1 PE I
I IHARBORVIEW RD - BLAINE RD
I I MJR CLASS of WK:
IR /W I
I (Construction partially on
new alignment, I I WORK CODES: ABD
ICON I
I Ibank protection - Partial
funding by City of Blaine I I TOTAL LENGTH: .90
F.A. PROJ
NO.
I _I
I 1
1 1 UTILITY CODES: PT
-
-
iTOT 01 0
491071DRAYTON HARBOR RD. 20050
I IBLAINE C/L - HARBORVIEW RD
I (Construction on new alignment,
I (Partial funding by City of Blaine
I I
501071BIRCH BAY DRIVE 92050
1 IALDERSON TO SHINTAFFER
I IWidening, reconstruction
I IRID Funding
I I
511081MOSQUITO LAKE ROAD 94190
1 [SOUTHWEST OF MIDDLE FORK BRIDGE
I IWidening and reconstruction,
I I
I I
521081BEACH WAY 14750
I ]SLATER - SUCIA
I (Reconstruction, widening
I I
I I
5310810EDARVILLE RD. 56110
1 I SR 542 - GOSFIEN RD.
I IWidening, reconstruction
I I
I I
I IPI I I 1 5001 5001 4001 1001 1 PE I
I I MJR CLASS of WK: . IR /W I
1 I WORK CODES: ABD ICON I
I I TOTAL LENGTH: 1.16 F.A. PROD NO. I _I —
I I UTILITY CODES: PT - - ITOT 01 0
1 IPl 101 201 7701 7001 15001 15001 1 1 PE I
! I MJR CLASS of WK: 34 IR /W I
I I WORK CODES: ABDG ICON I
I I TOTAL LENGTH: 1.97 F.A. PROD NO. I _1 _
1 I UTILITY CODES: PT - - [TOT 01 0
I IPI 50i 2001 I 1 2501 2501 1 1 PE I
I I MJR CLASS of WK: 34 IR /W I
I I WORK CODES: ABC ICON I
I I TOTAL LENGTH:. 60 F. A. PROD NO. I I _
I I UTILITY CODES: - - ITOT 01 0
I !P1 1 1001 501 1 1501 1501 1 1 PE I
I I MJR CLASS of WK: 34 1R /W I
I I WORK CODES: ABD ICON I
! I TOTAL LENGTH: .36 F.A. PROJ NO. 1 _I _
I I UTILITY CODES: PT - - ITOT 01 0
I IPI 1 501 4501 1 5001 1501 3501 1 PE 1
1 1 MJR CLASS of WK: 34 IR /W I
I I WORK CODES: ABD ICON I
I I TOTAL LENGTH: 1.39 F. A. PROJ NO. I _I _
I I UTILITY CODES: PT - - ITOT 01 0
541071NORTH SHORE DR. 94150
l !PI 1 1001 7001 1
8001 2001
7-50 2501 PE I
I IUAB BOUNDARY - Y ROAD
I 114JR CLASS of WK: 34
IR /W I
I IWidening, reconstruction, structural overlay
I I WORK CODES: ABD
IG]N I
I I
I I TOTAL LENGTH: 1.87
F.A.
PROJ NO. I _I _
I I
I l UTILITY CODES: PT
- - ITOT 01 0
551071MT. VIEW 922020
1 IPI 1 I 5001 6001
11001 2501
6001 2501 PE I
I IFERNDALE C/L TO RAINBOW
I l MJR CLASS of WK: 34
IR /W I
I IWidening, reconstruction, structural overlay
I I WORK CODES: ABD
ICON I
I I
I I TOTAL LENGTH: 3.72
F.A.
PROJ NO. I _I _
1 I
I I UTILITY CODES: PT
- - !TOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 8
WHATCOM COUNTY
P
IF I
I I I -- PROJECT COSTS IN THOUSANDS
OF
DOLLARS - --
I FEDERAL
R
IIJ I
ICIFI
I I WORK CODES: ABC
1 IWidening, reconstruction
ICON I
I I
I OBLIGATION
I
IN IPROJECT IDENTIFICATION /
IAIUI -- -EXPENDITURE ALAN—
I I UTILITY CODES: PT
PROJ
SOURCE - --
581071LAKE WHATCOM BLVD. 94120
I PLAN
0
iCCI DESCRIPTION OF WORK
IRINI I
T I
L
I I
F
I
R
:TLI
1RID1 1ST 120 1 3RD 1 4TH 1
0 1
0
IRAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR IYEAR IYEAR 1 5TH I
T I
C
ICAPP I
D
I THRU ITHRRU
T
I SI
I INI I I 1 6TH I
A I
A
IUATA I
R
I 3RD 16TH
Y
151
I IGI I I IYEAR I
L I
L
ITIA I
L
I YEAR !YEAR
561091SHINTAFFER RD. 26310
1 IPI I 1 1001 5001
6001
6001 I
1 PE I
I IBIRCH BAY DRIVE - DRAYTON HARBOR
I I MJR CLASS of WK: 34
IR /W I
I IWidening, reconstruction
I I WORK CODES: ABD
ICON I
I (City of Blaine - 4165,000
! 1 TOTAL LENGTH: 1.50
F.A. PROJ NO.
I _I _
I I
I I UTILITY CODES: PT
- -
ITOT 01 0
571071SEMIAHM00 DRIVE 20050
1 IPI I 1 100! 5001
6001 2501
3501 1 PE I
IBLAINE CIL - ELDERBERRY LANE
I I MJR CLASS of WK: 34
I I MJR CLASS of WK: 34
IR /W I
I IWidening, reconstruction
I I WORK CODES: ABC
1 IWidening, reconstruction
ICON I
I I
I I TOTAL LENGTH: .96
F.A.
PROJ NO. 1 _1 _
1 1
I I UTILITY CODES: PT
PROJ
- - ITOT 01" 0
581071LAKE WHATCOM BLVD. 94120
1 1P1 I 1 10001 18001
28001 14001
7001 7001 PE I
1 10.4 MI. S. OF LK LOUI5E RD. TO SOUTH BAY
1 1 MJR CLASS of WK: 34
IXIF1 1 1 6501 12001
IR /W I
1 IWidening, reconstruction
I I WORK CODES: ABD
I IGOODWIN RD - FR05T ROAD
ICON I
i l
I I TOTAL LENGTH: 2.24
F.A.
PROJ NO. I
I 1
I I UTILITY CODES: PT
_I _
- - IT 01 0
591171CORDATA PARKWAY I IPI 1 1 1601 6401 8001 8001 1 1 PE I
I IHORTON TO SMITH I I MJR CLASS of WK: 1 IR /W
I INew construction: RID Fundino I 1 WORK CODES: ABD ICON I
I I - I I TOTAL LENGTH: 1.80 F.A. PROJ NO. I _I _
I I I I UTILITY CODES: - - ITOT 01 0
601071LOOMI "a TRAIL 3270E
11P1 I I 501 6001
6501 3001
3501
I PE I
I IBOB HALL - 5UNRI5E
I I MJR CLASS of WK: 34
IR /W I
1 IWidening, reconstruction
I I WORK CODES: ABC
ICON I
I I
I I TOTAL LENGTH: 2.00
F.A.
PROJ
NO. I _I
I I
I I UTILITY CODES:
-
- ITOT 01 0
611071SOUTH PASS ROAD - 96040
IXIF1 1 1 6501 12001
18501 11001
5001
2501 PE I
I IGOODWIN RD - FR05T ROAD
I I MJR CLASS of WK: 34
1R /W I
I IWidening, reconstruction
I I WORK CODES: ABD
ICON I
I 1
1 1 TOTAL LENGTH: 5.75
F.A.
PROJ
NO. I _I _
I I
I I UTILITY CODES: PT
-
- ITOT 01 0
621081NORTH TELEGRAPH RD. 66610 1 IPI 1 1 3001 !0001 13001 6001 7001 1 PE I
I 150RENSON RD. - 5UMAS RD. I I MJR CLASS of WK: 34 IR /W I
I IWidening, reconstruction I I WORK CODES: ABC ICON 1
I I I I TOTAL LENGTH: 4.07 F.A. PROJ NO. I _I _
1 1 I I UTILITY CODES: - - 1TOT 01 0
631081WE5T LAUREL RD 953360 1 IPI I 1 1001 5001 6001 2501 3501 1 PE I
I 15R 539 - ALDRICH I I MJR CLASS of WK: 34 IR /W I
1 IWidening, reconstruction I I WORK CODES: ABD ICON I
I I I 1 TOTAL LENGTH: 1.50 F.A. PROJ NO. I I _
1 1 1 1 UTILITY CODES: PT - - !TOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 9
WHATCOM COUNTY
P
IF I
I I I
— PROJECT COSTS IN THOUSANDS
OF DOLLARS
1
I FEDERAL
R
1U I
ICIFI
MJR CLASS of WK: 34
I OBLIGATION
I
IN IPROJECT IDENTIFICATION /
IAIUI
—EXPENDITURE PLAN—
-
- -- SOURCE -
--
I PLAN
0
ICC1 DESCRIPTION OF WORK
IRINI
I
T I
L 1 I
F
I
R
ITLI
IRIDI
1ST 120 1 33RD 1 4TH 1
0 1
0 TRAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR IYEAR IYEAR 1 5TH 1
T I
C ICAPP I
D
I THRU ITHRU
T
I SI
I IN!
] I 1 6TH 1
A I
A IUATA I
R
I 3RD 16TH
Y
1 91
1 IGI
I I IYEAR I
L I
L ITIA I
L
I YEAR !;YEAR
641081WEST SHORE DR. 91010
1 IPI
1 1 6001 7001
13001
6001 7001
1 PE I
PROD NO.
I ILEGOE BAY — NORTH NUGEv'T
1 1
MJR CLASS of WK: 34
I
UTILITY CODES: PT
IR /W I
— —
I (Widening — reconstruction
I 1
WORK CODES: ABC
IPI
I 1 1 8001
8001
ICON I
3001 2001
I I
I I
TOTAL LENGTH: 2.31
I
F.A. PROJ
NO.
I _I _
I I
I I
UTILITY CODES: PT
I
—
—
ITOT 01 0
65108IBRUCE RD 92110 1 IPI 1 101 101 3501 3701 1201 2501 1 PE I
I IMAINE STREET TO BAY ROAD I I MJR CLASS of WK: 34 IR /W I
I (Widening, reconstruction I I WORK CODES: ABCL ICON 1
I I I I TOTAL LENGTH: .75 F.A. PROJ NO. I _1
1 1 I I UTILITY CODES: — — ITOT 01 0
661071HARBORVIEW RD 92200 1
IPI
I ] 1 4001
4001
4001
1
1 PE
I
I IBIRCH BAY— LYNDE'r1 — DRAYTON HARBOR RD. 1
1
MJR CLASS of WK: 34
IR /W
]
I IStructural overlay, widening, reconstruction: Blaine I
I
WORK CODES: ABD
ICON
I
! ICity Funding $50,000 1
1
TOTAL LENGTH: 1.50
F.A.
PROJ NO.
I
_I
I I I
I
UTILITY CODES:
— —
ITOT
01 0
671081MOSQUiTO LAKE ROAD 94120 1
IPI
I 1 1 3501
3501
1001
2501
I PE
I
I ISR 5422' — NORTH FORK RD. 1
1
MJR CLASS of WK: 34
IR /W
I
I IWidening — reconstruction I
I
WORK CODES. ABC
ICON
I
I I I
I
TOTAL LENGTH: .95
F.A.
PROD NO.
!
I _
I I I
I
UTILITY CODES: PT
— —
ITOT
01 0
681071CAIN LAKE ROAD 94090 1
IPI
I 1 1 8001
8001
3001
3001 2001
PE
I
I ILK WHATCOM BLVD — SKAGIT CO. I
I
MJR CLASS of WK: 35
IR /W
I
I [Widen & reconstruction I
I
WORK CODES: ABD
ICON
I
1 1 I
I
TOTAL LENGTH: 2017.00
F.A.
PROJ NO.
I
I _
I I I
l
UTILITY CODES: PT
— —
]TOT
01 0
691081BOUNDERY BAY , GOODMAN 8 EL'S 92500 1
!PI
I 1 1 2001
2001
501
1501
1 PE
I
I IJOHNSON TO BAY VIEW I
I
MJR CLASS of WK: 35
IR /W
I
I I Drainage , widen , reconstruction I
I
WORK CODES: ABD
ICON
I
I I I
I
TOTAL LENGTH: .37
F.A.
PROJ NO.
I
_I
I I I
I
UTILITY CODES: P
— —
ITOT
01 0
701071VISTA DR. 92050 I
IPI
I I 1 7501
7501
3001
4501
1 PE
I
I IFERNDU CL TO GRANDVIEW RD I
I
MJR CLASS of WK: 35
IR /W
I
I I Widen and reconstruction I
I
WORK CODES: ABD
ICON
I
I I I
I
TOTAL LENGTH: 1.89
F.A.
PROJ N0.
1
i
I I I
I
UTILITY CODES: PT
— —
ITOT
01 0
711171SQUALICLIM — BENNETT — MARINE DR. CONNECTOR 1
IPI
I ! 1 5 2351
525!
5 "51
1
1 PE
I
I IBELLINGHAM C/L TO MARINE DRIVE I
I
MJR CLASS of WK: 1
1R 1W
I
I INew construction, County portion of joint project with I
I
WORK CODES: ABDF
ICON
i
I IBellinghan I
I
TOTAL LENGTH: .45
F.A.
PROJ NO.
1
_:
11 1
1
UTILITY CODES:
— —
!TOT
01 2
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 10
WHATCOM COUNTY
P
IF I
I I I
— PROJECT COSTS IN THOUSANDS
OF
DOLLARS
--
I FEDERAL
R
IU I
ICIF1
I I WORK CODES: ABDF
IR /W
I
I OBLIGATION
I
IN IPROJECT IDENTIFICATION /
IAIUI
— EXPENDITURE PLAN —
I I UTILITY CODES:
ICON
SOURCE
I 1
I PLAN
0
ICC: DESCRIPTION OF WORK
IRINI
I
T I
L
T I
F
I
R
ITLI
IR1D1
1ST 1 2ND 1 3RD 1 4TH 1
0 1
0
IRAP I
E
I 1ST 14TH
I
I Al
IYIIIYEAR (YEAR (YEAR 1 5TH I
T I
C
ICAPP I
D
I THRU ITHRU
T
I SI
I INI
I I 1 6TH I
A I
A
IUATA I
R
I 3RD 16TH
Y
I SI
I IGI
I I IYEAR I
L I
L
[TIP 1
L
I YEAR ]YEAR
721081OLD SAMISH RD. 94010
1 IPI
I 1 1 4001
4001
1001 3001
1 PE I
—
I IBELLINGHAM C/L EASTERLY
1 I
RJR CLASS of WK: 34
I IPI I 1 1 3001
3001
3001
1
IR /W I
1 PE
I (Widen and reconstruction
I I
WORK CODES: ABCD
ICON I
1
I I
I I
TOTAL LENGTH: .80
F.A. PROJ
N.O.
] _1 _
I
I I
I 1
UTILITY CODES:
F.A.
PROJ
—
—
ITOT 01 0
731071SUNRISE ROAD 92110
1 IP1 I 1 2001 6001
8001
3001
5001
I [EUCLID TO LAKE LOUISE ROAD
i PE
I
I (BIRCH BAY LYNDEN —W. BADGER ROAD
I I MJR CLASS of WK: 35
I INew construction
I I WORK CODES: ABDF
IR /W
I
I Iwidening, overlay
I I WORK CODES: ABCD
PROJ NO.
I _I _
I I
I I UTILITY CODES:
ICON
I
I 1
I I TOTAL LENGTH: 2.00
1 IPI 1001 1 3001 2001
F.A.
PROJ
NO.
I
_I _
I I
I I UTILITY CODES: PT
1R /W I
I (Intersection modification followed by raising and re—
—
—
ITOT
01 0
741081WEST LAKE SAMISH ROAD 94010
1 IPI I 1 2001 7501
950;
7001
2501
1
1 PE
I
I ISUMMERLAND — NULLE ROAD
I I MJR CLASS of WK: 34
IR /W
l
I (Reconstruction, widening —paved shoulder
I I WORK CODES: ABD
ICON
I
I I
I I TOTAL LENGTH: 1.73
F.A.
PROJ
NO.
I
_I
I I
l I UTILITY CODES: PT
—
—
ITOT
01 0
751161BANCROFT /COUNTRY LA�INE 5M@
I IPI I 1 1 3001
3001
3001
1
1 PE
l [MARINE DRIVE TO RURAL AUDUE
I I MJR CLASS of WK: 35
IR /W
1
1 [structural overlay; widening
I I WORK CODES: ABD
ICON
I
I l
I I TOTAL LENGTH: 1.41
F.A.
PROJ
NO.
I
_1
I I
I I UTILITY CODES:
—
—
ITOT
01 0
7610711KICKERVILLE ROAD 92020
I IP] I 1 1 9001
9001
°00i
I
I PE
I
I IGRANDVIEW — RAINBOW
I I MJR CLASS of WK: 34
IR /W
I
1 (Widening, reconstruction, structural overlay: RID Fun—
I 1 WORK CODES: ABD
ICON
I
I !ding
I I TOTAL LENGT1d: 2.01
F.A.
PROJ
NO.
I
_I _
I ]
l l UTILITY CODES:
—
—
[TOT
01 0
771071WEST SMITH — HOVANDER 533340 1 IPI I 1 1 6001 6001 3001 3001 1 PE I
I IFERNDALE C/L TO FERNDALE C/L I I MJR CLASS of WK: 34 IR /W 11
I (Widening, reconstruction I I WORK CODES: ABD ICON I
I I I I TOTAL LENGTH: .91 F.A. PROJ NO. I _I _
I I I I UTILITY CODES: PT — — ITOT 01 0
78116ILAKE LOUISE CONNECTOR
I IPI 1001 2501 11501 1
15001 15001
l
1 PE I
I [EUCLID TO LAKE LOUISE ROAD
I I 'MJR CLASS of WK: 1
IR /W I
I INew construction
I I WORK CODES: ABDF
ICON I
I I
I I TOTAL LENGTH: .62
F.A.
PROJ NO.
I _I _
I I
I I UTILITY CODES:
— —
ITOT 01 0
791071MARINE DRIVE 91040
1 IPI 1001 1 3001 2001
6001 3501
2501
I PE I
I IKWINA — LUMMI SHORE INTERESECTION
1 I MJR CLASS of WK: 34
1R /W I
I (Intersection modification followed by raising and re—
I I WORK CODES: ABDH
ICON I
I Icanstruction easterly to the Noaksack River
I I TOTAL LENGTH: 1.10
F.A.
PROJ NO.
1 _I _
1
1 1 UTILITY CODES: PT
— —
ITOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 11
WHATCOM COUNTY
P
IF I
I I I — PROJECT COSTS IN THOUSANDS
OF
DOLLARS --
1 FEDERAL
R
Ill I
ICIFI
I OBLIGATION
I
IN IPROJECT.IDENTIFICATION /
IAIUI — EXPENDITURE PLAN—
SOURCE
--
l PLAN
0
ICCI DESCRIPTION OF WORK
IRINI I
T I
L
I. I
F
I
R
ITLI
IRIDI 1ST 1 2ND 1 3RD 1 4TH 1
0 1
0
IRAP I
E
I 1ST 14TH
I
I Al
IYII]YEAR [YEAR ]YEAR 1 5TH I
T 1
C
ICAPP I
D
I THRU ITHRU
T
1 61
1 INI I I 1 6TH I
A I
A
IUATA 1
R
I 3RD 16TH
Y
I SI
1 IGI I I [YEAR I
L I
L
ITIA I
L
I YEAR !YEAR
801081E. WISER LAKE RD. 9510
1 1P1 I 1 1 8501
8501
5001 3501
1 PE 1
I ISR 539 - HANNEGAN
I I MJR CLASS of WK: 34
IR /W I
I (Widening, reconstruction
I I WORK CODES: ABD
ICON I
I l
I 1 TOTAL LENGT'ri: "c. 12
F. A. PROD
NO.
I _ I _
1 I
I I UTILITY CODES: PTC
- -
ITOT 01 0
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 93 TO 98 Page 12
WHATCOM COUNTY
I
SUMMARY OF COSTS BY FUNDING CATEGORY
I
EXPENDITURE
PLAN
I I
FUNDING PLAN
I I
FEDERAL OBLIGATION PLAN
Totals
FUNDED PROJECTS I
1st Year
5590
1 Local
10765 1
Years 1 -3
Years 4 -6
I
2nd Year
2700
1 RAP
2509 1
P E
0
0
0
1
3rd Year
4350
1 CAPP
2000 1
R/W
0
0
0
1
4 -6 Year
4200
1 TIA
0 1
CONTT
0
0
0
1
1 UATA
0 1
I
I Fed.
1566 1
1
Totals ...
16840
1
l
16840
0
0
_
0
UNFUNDED PROJECTS I
1st Year
3765
1 Local
42547 I
Years 1 -3
Years 4 -6
Totals
(Proposed and Unknown) I
2nd Year
13735
1 RAP
13375 1
P E
0
0
0
1
33rd Year
23890
1 CAPP
200 1
R/W
0
0
0
1
4 -6 Year
333275
1 TIA
2200 1
CONTT
0
0
0
1
1 DATA
8290 1
i
l Fed.
8053 1
Totals ...
74665
74665
0
0
0
TOTAL ALL PROJECTS I
1st Year
9355
1 Local
533312 1
Years 1 -3
Years 4 -6
Totals
I
2nd Year
16435
i RAP
15884 1
P E
0
0
0
1
3rd Year
28240
1 CAPP
2200 l
R/W
0
0
0
1
4 -6 Year
37475
1 TIA
200 I
CGNST
0
0
0
I
I URTA
8290 l
I
I Fed.
9619 1
Totals ...
91505
91505
0
0
0