HomeMy WebLinkAboutord1999-074WHATCOM COUNTY COUNCIL AGENDA BILL NO. '49-410
CLEARANCES
Initi4l
Date
Date Received in Council Office
Agenda Date
Assigned to:
)ginator: Matt W. Aamot
� c5�
1 �%l
1u'�,{u J` �_ I' �l
O C 19 1999
OCT
Vi WHATCO COUNTY
YYYY ICOCIVNiCIIIL
10 -26 -99
Council Introduction
Division Head. Sylvia Goodwin
I o 99
`J
Planning & Development
Committee
Dept. Head: Michael T. Knapp
I1 -23 -99
Q c t> OD LA ti CAL,
Prosecutor. Dave Grant
, ,,/
PurchasingBudget:
/J /t
TY
Executive: Pete Kremen
SUBJECT: Ordinance adopting omprehensive Plan amendments relating to the Blaine Urban Growth Area (File # CMP99- 00006).
ATTACHMENTS.
(1) Proposed Ordinance.
SEPA review required? ( x ) Yes ( ) NO
SEPA review completed? ( x ) Yes ( ) NO
Should Clerk schedule a hearing? ( ) Yes ( xt ) NO
Requested Date:
I The Council must hold a hearing if they want to change the Planning
Commission's recommendation (WCC 20.10.110 and WCC 20.90.090).
?MMARYSTATEMENT.• The request is to adopt amendments to the Whatcom
eunty Comprehensive Plan that would remove an area east of Blaine from the
Urban Growth Area and modify the policies of the. Comprehensive Plan.
The Growth Management Act requires that Comprehensive Plan amendments be
considered only once per year, with certain exceptions. All amendments must be
considered concurrently. In 1999, the County Council initiated 13 amendments
for review under Resolution No. 99 -012. The Planning Commission held
multiple hearings to consider these amendments. The Planning Commission
took a final vote on the package of the 13 amendments on October 14, 1999. The
Council is requested to adopt the Planning Commission's recommendations or,
alternatively, to hold a hearing and adopt modifications to the Commission's
recommendations. The Council can not adopt the amendments until 60 days
after they were sent to the State Department of Community, Trade & Economic
Development, which occurred on September 23, 1999 (RCW 36.70A.106/WAC
365 -195 -620). Additionally, -the amendments have to be adopted prior to or along
with the budget (WCC 20.10.040). Therefore, it appears that the request should
be voted on at the Council's November 23, 1999 meeting.
Distribution Request
Indicate those who should receive a copy after Council action.
List specific names to the right.
ADS Facilities Management
ADS Finance
ADS Human Resources
ADS Info Services
Assessor
Auditor
Cooperative Extension
District Court
Executive
Health
Hearing Examiner
Michael Bobbink
jail
COUNCIL ACTION TAKEN.
1999-410 10/26/99: Introduced
11/9/99: Held in Committee
11/23/99: Amended and adopted 7 -0, Ord. #99 -074
i
lat.
Related File Numbers: AB99 -074
Juvenile
Parks
Planning
Michael T. Knapp
Prosecutor
Public Works
Sheriff
Superior Court
Treasurer
Other
Ordinance or Resolution N tuber
(this item): •
I :Planning\Rezone \Comp.99\Agenda Bills \.CMP99- 00006.doc
File Ref: CMP99 -00006 SPONSORED BY: Consent
10 -15 -99 PROPOSED BY: Planning & Development Services
INTRODUCTION DATE: 10/26/99.
ORDINANCE NO. 99 -074
AMENDING THE WHATCOM COUNTY
COMPREHENSIVE PLAN TEXT AND MAP REGARDING
THE BLAINE UGA
WHEREAS, The Whatcom County Council passed Resolution 99 -012 on March 23, 1999
initiating 13 Comprehensive Plan amendments, and related amendments to the Official Whatcom
County Zoning Ordinance (Title 20), for review in 1999; and
WHEREAS, One of the proposed amendments is a request to amend the Comprehensive
Plan text and map relating to the Blaine Urban Growth Area; and
WHEREAS, The Deputy SEPA Official for Whatcom County issued a determination of
non - significance on May 11, 1999; and
WHEREAS, Pursuant to RCW 36.70.390, legal notice was published in the Bellingham
Herald on June 10, 1999; and
WHEREAS, The Planning Commission held a public hearing on the subject amendment on
June 24, 1999 and considered all testimony;
WHEREAS, The Planning Commission held a work session on October 14, 1999 to consider
all the amendments concurrently, as required by WCC 20.10.100; and
WHEREAS, The Planning Commission evaluated the merits of each amendment in
relationship to the County Wide Planning Policies and the goals, policies and objectives of the
Comprehensive Plan, as required by WCC 20.10.100; and
WHEREAS, The Planning Commission issued Findings of Fact & Reasons for Actions,
Conclusions and Recommendations on the amendments; and
WHEREAS, the County Council has considered the Planning Commission's Findings of
Fact & Reasons for Action, Conclusions, and Recommendations for all the amendments, as
required by WCC 20.10.110; and
WHEREAS, the County Council has considered all the amendments concurrently so that
the cumulative effect of the various proposals can be ascertained, as required by-the Growth
Management Act (RCW 36.70A.130) and WCC 20.10.010; and
WHEREAS, the County Council finds that the Comprehensive Plan amendments
recommended by the Planning Commission conform to the Growth Management Act; and
WHEREAS, the County Council finds the subject Comprehensive Plan amendments are
in the best interest of the public health, safety, and welfare, based on the following findings and
conclusions:
FINDINGS
1. Public notice was published in the Bellingham Herald June 10, 1999.
2. A determination of nonsignificance was issued by the SEPA Official on May 11 1999.
3. Whatcom County's Comprehensive Plan was deemed invalid by the Western Washington
Growth Management Hearings Board (Final Decision and Order, Case NO. 97-2-0030c in
September of 1996). Blaine's Urban Growth Area was included in the list of items deemed
out of compliance.
4. The City of Blaine submitted a hearing brief in response to the September 1996 invalidity
determination in which the City offered to remove the Aquifer Protection and Drayton
Harbor areas if their removal would allow the WWGMHB to remove the invalidity issue
regarding Blaine's UGA. The WWGMHB agreed that the invalidity ruling pertaining to the
Blaine UGA would be removed from the list of invalidity'issues if the two areas were
removed.
5. Whatcom County appealed the WWGMHB determination of invalidity to the Washington
State-Superior Court (NO. 98-005463). A Superior Court Decision overturned the
determination of invalidity made by the WWGMHB and affirmed the County's assertion that
the WWGMB erred in its definition of standing and presumption of validity.
6. The City of Blaine had proceeded with amending its comprehensive plan prior to the
Superior Court Decision issued in Case No. 98- 005463.
7. Whatcom County Council passed Emergency Resolution NO..98 -067 in October of 1998.
This resolution was passed in response to Drayton Harbor resident's requests to allow sewer
expansion into the area to alleviate a severe water quality problem.
8. Whatcom County Planning Commission held a public hearing on January 14, 1999 to take
public testimony regarding changing the area UGA designation to Short Term Planning Area.
Additional study sessions were held with Planning Commission to discuss possible options.
As a result, draft policies were developed that allowed for a change from Long Term to Short
Term Planning Area designation.
9. Removing the Drayton Harbor Area from Blaine's UGA would preclude the potential for
extension of public sewer to that area.
10. Removing the Aquifer Protection Area will have no impact on potential development in that
area. Blaine held no future development plans for the area. Whatcom County's current
Comprehensive Plan designation is Rural. The zoning designation is R10A.
11. Protection of the Aquifer is addressed in the items for inclusion in an interlocal agreement
between Blaine and Whatcom County and by the County's Critical Area Ordinance WCC
16.16.
4
CONCLUSIONS
1. Whatcom County asserts that the Blaine UGA is valid and has always been valid as evidenced
by Superior Court Decision NO.98 -2- 005463 and that removing this area is not required to
remove the WWGMHB determination of invalidity.
2. Removal of the Drayton Harbor Area would preclude the option for public sewer and improved
water quality in Drayton Harbor due to GMA and County Comprehensive Plan restriction of
sewer service extension outside of Short Term Planning Areas..
3. Removal of the Aquifer Protection Area would not have any major impacts to either potential
development in that area or in additional environmental protections for that area due to the
provisions listed for inclusion within Blaine's Interlocal Agreement with Whatcom County.
4. Several additions were proposed for Policy 2T -7. Bullets #16 and #17 provide potential
difficulties if imposed as County requirements. Whatcom County encourages the City of Blaine
to require developers to comply with City standards as a condition of service provision rather
than requesting the County to require standards, which were authorized by another jurisdiction.
Similar difficulties are inherent with #17. The alternative language included in the Analysis
section of this report is preferred.
NOW, THEREFORE, BE IT ORDAINED by the Whatcom County Council that:
Section 1. The text of the Whatcom County Comprehensive Plan is hereby amended as shown on
Exhibit 1.
Section 2. The map of the Whatcom County Comprehensive Plan is hereby amended as
shown on Exhibit 2.
Section 3. Adjudication of invalidity of any of the sections, clauses, or provisions of this Ordinance
shall not affect or impair the validity of the Ordinance as a whole or any part thereof other than the
part so declared to be invalid.
ADOPTED this 23 day of November 1999.
WHATCOM COUNTY COUNCIL
ATTEST- WHATCOM COUNTY WASHINGTON
t.,
Dana Brown- Davis, Council Clerk Marlene Dawson, Chairperson
APPRO D as to form: (0 Approved () Denied
.- �
Civil Deputy Prosecutor Pete Kref6n, Executive
Date: Z J 4
Exhibit 1.
Amend Chapter 2 the "atcom County Comprehensive Plan as follows:
Blaine
County goals encourage Blaine to develop at average net densities of four units per
residential acre. Although future densities are lower than those sought by county goals,
there is good justification for the Blaine Urban Growth Area. It should be particularly
noted that the City of Blaine has completed a detailed wetland inventory for its urban
growth area. This inventory identified as much as twice as many wetlands as the
National Wetland Inventory which was used by the county.
Blaine is a unique community within Whatcom County. The central part of Blaine has
developed at relatively moderate to high densities. However, newer outlying areas,
particularly the Semiahmoo area, which has developed as a resort community with low
density residential clustered around a golf course, are zoned residential but contain
large open spaces which contribute to the very low average density for the city.
Issues in determining the Blaine Urban Growth Area include housing affordability, water
quality protection, overlapping jurisdiction of service provision with the Birch Bay Water
and Sewer District, and an abundance of urban zoning adjacent to the existing city
limits.
Housing Affordability
According to the Blaine Comprehensive Plan, well over 50% of the building permits
issued since 1989 have been in the Semiahmoo area with an average value of
$240,000. Of the 365 single - family residential lots sold at Semiahmoo between 1987
and 1994, only 124 have been developed. At the same time, only 37% of people
employed within Blaine live within the city limits (City of Blaine survey, 1993). A number
of lots in the area are purchased for recreational homes, investment, or future
development-as retirement residences. Most of the jobs in Blaine are in hotels, motels,
restaurants, bars, gas stations, retail sales, nursing homes and fish processing plants.
The above statistics paint a picture of a community with a shortage of housing in the
lower income brackets. The urban growth area for Blaine is intended to be of sufficient
size and location to provide an adequate housing supply for low and moderate income
workers and to allow for master planned resort and residential communities and long-
term development.
4
Water Quality and Quantity
The City of Blaine has a draft 20 -year water system plan that is currently under review
by the City Council. The City owns and operates a municipal water system which
provides domestic, commercial, industrial and irrigation water to retail customers within
the City limits and within greater Blaine. The system also provides surplus water on a
wholesale contract basis to the Birch Bay Water and Sewer District and the Bell Bay
Jackson Water Association.
The source supply for the City derives from a 30- square mile groundwater aquifer
system in the Dakota Creek watershed east of the City. The City currently has
permitted water rights to withdraw up to 2770 GPM of water supplies from the aquifers
and has completed the drilling of two additional wells. Application has also been made
for water rights to allow for the expansion of its system to meet growth requirements.
Based on an investigation and analysis of the aquifers, the City can adequately meet its
current 20 -year projected needs.
Service Provision
The Utility Element of the proposed Blaine Comprehensive Plan discusses the
availability of services. Without obtaining further water supply or reducing demands, it
appears Blaine may have difficulty providing an adequate water supply. Several
options are proposed to increase the supply; none are guaranteed.
Immediately south of Blaine is Birch Bay, a large unincorporated county urban growth
area. Zoning in this area is currently at urban levels, subject to availability of adequate
water and sewer, primarily four units to the acre. Birch Bay is served by the Birch Bay
Water and Sewer District, which presently receives water through a contract with
Blaine. There is some question whether this contract will stay in force. The district has
contracted with Public Utility District #1 for an alternate or additional source of water
using the Public Utility District allocation from the Nooksack River. A legal challenge
may delay this action for some time.
The water issues in and around Blaine are complicated and clear solutions have not yet
been achieved. It may be appropriate to re- evaluate expanding
AFeas the boundaries of the Urban Growth Area when resolutions to water supply have
been achieved.
5
IV. Existing Urban Levels of Zoning
Blaine is surrounded by areas of County Urban Residential zoning. These areas are
historically where urban growth is anticipated but are limited in their development levels
until water and sewer service are extended. Community Value Statements prohibit the
use of down zoning as an implementation tool to achieve Growth Management goals.
Thus, wherever Blaine has requested the inclusion of land zoned UR, it has been
included in the UGA. In some cases, however, water and potential sewer service are
by the Birch Bay Water and Sewer District. Efforts to develop interlocal agreements
between Birch Bay Water and Sewer District and Blaine continue on an ongoing basis.
Areas included in the UGA - (Map UGA -2)
East
The urban growth area for Blaine includes land designated for medium to high density
development in the area immediately east of the City. It has historically been identified as
a growth area for Blaine and has been designated with Urban Residential zoning by the
county. Services are easily provided and it is an appropriate area to include and it provides .
an opportunity for Blaine to encourage the development of median income housing. Blaine
is the only city in the county where the number of people employed exceeds the
population. It appears that there is not sufficient housing to accommodate workers.
Inclusion of this area should help to resolve this problem.
South
The land area south of Drayton Harbor has been included because of its-location,
sandwiched between the western and eastern expanses of the Blaine city limits which, at
this time, is only connected by water. It is also included because of the urban level of
zoning historically assigned by the county (UR4). Blaine does not propose to serve this
area with utilities. The Birch Bay Water and Sewer District will provide water and sewer
when future development occurs. Blaine seeks control of the area to coordinate
transportation planning and ensure water quality protection and coordinated shoreline
management. In recognition of these factors, the county has included this area; however,
the county is very concerned that the water quality of Drayton Harbor be protected.
Blaine's protection of the area must meet or exceed the county levels.- -
An area south of Blaine known as West Semiahmoo and Cannery Hill has been included.
This area has been traditionally zoned for urban development, has approved preliminary
plats, and is intended to be served with water and sewer from either the Birch Bay Water
. � . �r. �s�� .s!ne!�e!�rer:�r_�r7�r!
MoN
NW-01-11
Y.
PM
South
The land area south of Drayton Harbor has been included because of its-location,
sandwiched between the western and eastern expanses of the Blaine city limits which, at
this time, is only connected by water. It is also included because of the urban level of
zoning historically assigned by the county (UR4). Blaine does not propose to serve this
area with utilities. The Birch Bay Water and Sewer District will provide water and sewer
when future development occurs. Blaine seeks control of the area to coordinate
transportation planning and ensure water quality protection and coordinated shoreline
management. In recognition of these factors, the county has included this area; however,
the county is very concerned that the water quality of Drayton Harbor be protected.
Blaine's protection of the area must meet or exceed the county levels.- -
An area south of Blaine known as West Semiahmoo and Cannery Hill has been included.
This area has been traditionally zoned for urban development, has approved preliminary
plats, and is intended to be served with water and sewer from either the Birch Bay Water
and Sewer District or Blaine.
The Loomis Trail area located south of Blaine and just west of Interstate -5 has been
included in the growth area requested by Blaine, based on the fact that it presently has a
vested application for a planned unit development pernnit for urban development under
Whatcom County zoning regulations. The City of Blaine and the Birch Bay Water and
Sewer District will provide services to the Loomis Trail development. An additional
development, Sunday Harbor, located just south of California Creek,.west of Blaine Road
was also included. This development provides smaller, urban density residential lots and
is served by Birch Bay Water and Sewer District
GOAL 2T: Provide a sufficient Urban Growth Area for Blaine to PFGVIde
ensure an adequate housing supply and obtain Growth
Management Act and county land use goals.
Policy 2T-2-1: No annexation of Cannery Hill or West Semiahmoo is permitted until
the identity of the sewer and water purveyor in that area is resolved
by determination of the agency with jurisdiction or by agreement
between the Birch Bay Water and Sewer District and the City of
Blaine. The conditions of annexations should be consistent with this
resolution or agreement.
Policy 2T-32: Require Blaine to increase critical area protection and water quality
controls within Blaine's jurisdiction sufficient to protect Drayton
Harbor.
Policy 2T-43: Ensure that Blaine adopts measures to implement in -fill policies in the
proposed Blaine Comprehensive Plan. -
Policy 2T-64: Re- adjust the Short-Term Planning Areas as urban services are made
available.
Policy 2T-65: Ensure that adequate capital facilities can be provided to the Blaine
Urban Growth Area.
Policy 2T-7-6: Negotiate and adopt an interlocal agreement which provides for:
• restriction of extension of urban levels of service to urban uses
outside the Short-Term Planning Areas of the UGA
• revenue sharing formula.
• establishing and maintaining urban levels of service within the
UGA.
• identification of needed improvements and establishment of how
they will be paid. for.
• land use and zoning designations and levels of development
within the UGA and review of procedures and standards, including
water_ quality protection for Drayton Harbor, for development
proposals.
• coordination with the county of greenbelts and open space.
• use and coordination of a Geographic Information System.
• timing and procedures for review of adequate land supply.
• consistency with the Coordinated Water System Plan.
• exploration of transferring densities from rural areas of the county
into Blaine or the UGA.
• re- examination of the boundaries between Blaine UGA and the
county's unincorporated Birch Bay UGA once service issues have
been resolved.
• implementation of the proposed Critical Aquifer Recharge
Protection Plan, as included in the current Blaine Groundwater
Management Program, including adequate protection. of the
Category I Wetlands located in the area.
• Creation of an Aquifer Recharge Protection Overlay.
• Establishment of a transfer of development rights program to
further reduce development impacts within the established
watershed protection area.
• County will provide timely notification of any development
application within the city UGA and shall assign considerable
weight to all city comments prior to making a final decision.
0