SUBJECT.
Structural Prelevel and Shoulder Widening of Birch Bay Drive, CRP 998022
Request for additional County construction fund authorization
ATTACHMENTS:
1. Memo to County Executive /Council
2. Resolution
3. Contract Information Sheet
Related County Contract # :9903024
Should Clerk schedule a hearing: NO Al YES /_/ Requested Date.
JMMARYSTATEMENT.
Resolution authorizing the expenditure of an additional $117,000
towards the completion of the Structural Prelevel and Shoulder
Widening of Birch Bay Drive, CRP 998022.
Ordinance & Resolution
To keep down our copying costs, indicate
receive a copy after Council action.
Distribution Rei►uest
only those who must
List names to the right.
ADS Facilities Management
ADS Finance
ADS Human Resources
ADS Info Services
Assessor
Auditor
Cooperative Extension
District Court
Executive
Francine Kincaid
Health
RECOMMENDED ACTION:
Approval of Resolution.
Hearing Examiner
Jail
Juvenile
Parks
Planning
COUNCIL ACTION TAKEN. •
1999-209 6/15/99: Approved 6 -0, Imhof absent, Res. #99 -026
Iceh
Prosecutor
Public Works
Dawn Pierce
Sheriff
Superior Court
Treasurer
Other
Mike Roberts
Ordinance or Resolutio Number
(this item):
l:UGEND. i-.qo 60W W - — i ���
WhTATCOM COUNTY
DEPARTMENT OF PUBLIC WORKS
Jeffrey M. Monsen, P.E. - Director
MEMO TO: The Honorable Pete Kremen and
Honorable Members of the County Council
ADMINISTRATION
Bruce G. Mills, P.E. - Assistant Director
316 Lottie Street
Bellingham, WA 98225
RECEIVED
FROM: Jeff Monsen, Director JUN 0 4 1999
PETE KREM N
DATE: June 3, 1999 COUNTYEXECUTIVE.
SUBJECT: Structural Prelevel and Shoulder Widening of Birch Bay Drive —
Request for Additional County Funds
On March 23, 1999 the County Council awarded the contract for the subject project to Colacurcio
Brothers, Inc., in the amount of $506,665.00, with a total project budget (including engineering,
right -of -way, inspection and contingencies) of $581,665.00.
Birch Bay Drive was scheduled to be chip - sealed this summer by the Public Works Department,
following the addition of paved asphalt shoulders by Colacurcio Brothers, Inc. To prepare the
roadway surface for chip sealing, the majority of Birch Bay Drive was preleveled with asphalt this
spring to take out dips and bumps, resulting in a temporary smooth asphalt surface on most of the
road.
Public Works has received very favorable feedback from the residents and businesses along Birch
Bay Drive, especially about the new smooth roadway surface. Given the somewhat urban nature of
the Birch Bay area, we see some real advantages in keeping the asphalt roadway surface smooth by
overlaying with asphalt, rather than chip - sealing the travel lanes. The asphalt overlay will also have
a longer service life than a chip -seal surface.
Maintenance & Operations estimates that they would be spending about $50,000 to chip -seal this
area. It is our recommendation at this time that we forego the chip - sealing of Birch Bay Drive, and
instead that we overlay the entire roadway surface and new shoulders with about one inch of asphalt
pavement.
In doing this, the construction overrun will exceed 10 percent of the contract amount. We
therefore request that the Council authorize the expenditure of an additional $117,000 towards
the completion of the Birch Bay Drive project. This will raise the authorized construction
contract amount to $623,665, and raise the total project budget to $698,665.
Sufficient funds exist within the annual construction program budget to cover this additional
expense.
bgm\
SPONSORED BY: Consent
PROPOSED BY: Public Works - En ing eerin Div.
INTRODUCTION DATE: June 15, 1999
RESOLUTION NO. 99 -026
A RESOLUTION AUTHORIZING ADDITIONAL COUNTY ROAD CONSTRUCTION
FUND AUTHORIZATION FOR THE STRUCTURAL PRELEVEL AND
SHOULDER WIDENING OF BIRCH BAY DRIVE
WHEREAS, Whatcom County Resolution 99 -011 authorized the total project
expenditure of $581,665 for the structural prelevel and shoulder widening of Birch Bay Drive, of
which $506,665 was designated for the construction contract with Colacurcio Brothers, Inc., and
WHEREAS, during the course of construction, it was recommended that Birch Bay Drive
should be surfaced with a smooth asphalt roadway surface instead of a chip -seal surface.
NOW, THEREFORE, BE IT RESOLVED that. the Whatcom County Council hereby
authorizes the additional expenditure of $117,000 for the completion of the structural prelevel
and shoulder widening of Birch Bay Drive.
APPROVED this 15 day of June , 1999.
ATTEST:
\ A
ana rown- Davis, Council Cler
APPROVED AS TO FORM:
Deputy 61MY'l 1, W-1 m 5.M..
Civil • •
WHATCOM COUNTY COUNCIL
WHATCOM COUNTY, WASHINGTON
M • ene Dawson, Council Chair