SUBJECT:
1. Reconstruction of Lake Terrell Road and Mountain View Road
ATTACHMENTS:
1. Resolution for establishing County Road Project (CRP) Number and Contract Award
2. Letter to County Executive
3. Approval for Contract Award endorsed by the Executive
4. Contract Information Sheet
5. Project Cost Break Down
6. Bid Tabulations
7. Low Bid Proposal
Related County Contract #:
Should Clerk schedule a hearing: NO/ X / YES / / Requested Date:
SUMMARY STATEMENT:
Resolution establishing CRP Nos. 9980061998007for the
Reconstruction of Lake Terrell Road and Mountain View Road
Also approval of award contract to IMCO General Construction Inc.
as low bidder in the amount of $2,259,495.38.
Ordinance & Resolution
To keep down our copying costs, Indicate
receive a copy after Council action.
Distribution Remmst
ordy arose who rnrrst
List names to Inc right
ADS Facilities Management
ADS Finance
Chris Mohnkern
ADS Huntan Resources
ADSInfa Servires
Assessor
Auditor
Cooperative Extension
District Court
Executive
Francine Kincaid
Health
RECOMMENDED ACTION:
Award Contract
Hearing Examiner
jail
Juvenile
Parks
Planning
COUNCIL ACTION TAKEN:
2002 -205 512112002. Approved 7-0, Res. #2002 -019
Rel
PrOAeCYtor
Public Works
Down Pierce
Sheriff
Superior Court
Treasurer
Other
Jim Karcher
Ordinance or Resoly(Connf ��Nuumrr�ber ^'e
(this item):. -. a 9* G' 0l
5
6
7
8
9
10
26
27
28
29
45
46
47
48
49
50
51
52
53
54
55
INTRODUCED BY
PROPOSED BY PUBLIC IC WORKS DFPARTMFNT
DATE 5/21/02
RESOLUTION NO. 2002 -019
ESTABLISHING COUNTY ROAD PROJECT NOS. 998006/998007
AND THE AWARD OF CONTRACT FOR THE RECONSTRUCTION
OF LAKE TERRELL ROAD AND MOUNTAIN VIEW ROAD
WHEREAS, this project is included in the officially adopted Annual Road Program as Item
Nos. 2 and 3
NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Council:
That CRP 998006/998007 is formally established for the Reconstruction of Lake Terrell
Road and Mountain View Road
The Contract for this project is awarded to IMCO General Construction Inc. in the amount
of their bid of $ 2,259,495.38.
An appropriation from the officially adopted Road Fund Budget and based on the County
Engineer's estimate is hereby made in the amounts and for the purposes shown:
Preliminary Engineering
Right -of -Way
Subtotal R 990,500. nn
Construction Contract R 9 959,jp0 00
Construction Engineering/Testing/Contingency 9R4 777 00
� 11
BF IT FI TRTUFR RFSOT VFII that the construction is to be accomplished by Contract in
accordance with RCW 36.77.020 et. seq.
PASSED this 21 day of May , 2002.
ATTF,$T: WHATCOM COUNTY COUNCIL
WHAT Y +,WASHINGTON
Dana Brown -Davis ( L. Ward Net n,
Clerk of the Council Chairperson
APPROVED AS TO FORM:
(Previously approved as to form
by Dan Gibson on 4/10/98)
Civil Deputy Prosecuting Arty.
WHATCOM COUNTY
DEPARTMENT OF PUBLIC WORKS
JEFFREY M. Monsen, P.E. — Director
DIVISION OF ENGINEERING
Bruce G. Mills, P.E. — County Road Engineer
5280 Northwest Drive, Suite C
Bellingham, WA 98226
MEMO TO:
The Honorable Pete Kremen, County Executive, and
Honorable Members of the Whatcom County Concil
FROM:
Bruce Mills, County Road Engineer
DATE:
May 8, 2002
SUBJECT:
Reconstruction of Lake Terrell Road and Mountain View Road
CRP 998006/998007
Background:
Bid proposals for the subject project were opened on April 23,2002. Based on our review of the
seven bids received, we recommend award of this contract to the low bidder, IMCO General
Construction, Inc. of Bellingham, Washington, in the amount of $2,259,495.38, that being the
amount of their bid including all taxes.
The project is funded under Items 2 and 3 of the approved 2002 Annual Road Construction
Program. Sufficient funds exist to complete the project, which is funded with both federal and
local funds.
The low bid included some mathematically unbalanced bid items; however, after reviewing these
with our legal counsel and with the bidder, we recommend moving forward with the award of the
contract to the low bidder.
Information:
Attached for your review is a copy of the low bid proposal, tabulation of all bids, resolution for
contract award, contract information sheet and agenda bill.
Requested Action:
We request that the County Council authorize the County Executive to enter into a contract with
the low bidder, IMCO General Construction, Inc., for the reconstruction of Lake Terrell Road
and Mountain View Road.
In accordance with W.C.C. 3.98.230, I concur with this recommendation.
Brad Bennett, Finance Manager Date
CC. Jeff Monsen
bgm
Phone: (360) 676 -6730 County: (360) 380 -8110 FAX: (360) 676 -6558
RECONSTRUCTION OF LAKE TERRELL ROAD AND MOUNTAIN VIEW ROAD
CRP 998006/998007
Approval is hereby granted to award the Contract as follows:
Project: Reconstruction of Lake Terrell Road and Mountain View Road
I �m hS rK1ZfI71=1rRTiRii7RSi 1 I
In the amount of $2,259,495.38. being the amount of their bid proposal, including all taxes.
Whatcom County Executive
Approving Authority
=Q�pµCb\999313Mnn n�Wdm
W hatcom County Contract No.
WHATCOM COUNTY CONTRACT
INFORMATION SHEET
Originating Department
Engineering
Contact Person:
James P. Karcher P.E.
Contractor's Name:
IMCO General Construction Inc.
Is this a New Contract? If not, is this an Amendment to an Existing Contract?
Yes X No _ Yes No _
Ifan Amendment, previous number(s):
Is this a renewal?
Yes No X
Contract Amount: (sum of orig contract amt
If a Professional Services Agreement is more than $15,000 or a Bid is more than
and any prior amendments)
$35,000, please submit an Agenda Bill for Council approval and a supporting
$ 2.159 495.38
memo. Any amendment that provides either a 10% increase in amount or more than
This Amendment Amount:
$10, 000, whichever is greater, must also go to Council and will need an agenda bill
$
and supporting memo. If less than these thresholds, just submit to Executive with
Total Amended Amount:
supporting memofor approval.
8.
Council approved (ifnecessary)
Scope of Services
[Insert language from contract (Exhibit A) or summarize, expand space as
Executive signed:
necessary]
10. Contractor Original Returned to dept:
This project provides for improvements to Lake Terrell Road /Mountain
11.
View Road from Slater Road to Rainbow Road, Whatcom County,
Date
Washington. The project will include clearing, grubbing, embankment
construction, grading, drainage improvements, placement of gravel base,
asphalt concrete paving, installing guardrail, detention ponds and
landscaping. All materials, equipment, labor, and the Contractor shall
fiunish other miscellaneous items required to complete the work.
NalureofContractAmt (Checkone)
Fixed Amount Notto Fxeeed X Open Ended
Term of Contract: I
Expiration Date: 12/31/03
Renewal Option Yes X No I
Last Renewal Expires: N/A
Special Dates or clauses that require calendaring.
None
Contract Routine Steps &Steno(G lsien or initiall
lindicate date transmitted)
1.
Prepared by: JPK
Date 519101. [electronic]
1.
Attorney reviewed: DG
Date 4710M [electronic]
3.
Corrections made: DG
Date 10 [electronic] hard copy printed
4.
Attorney signof.. DG
Date 4J10AV
A
Contractor signed.
Date
6.
_
Submitted to Exec Office
Date summary via electronic: hardcopies]
Z
Reviewed by DCA
Date
8.
Council approved (ifnecessary)
Date
9.
Executive signed:
Dale
10. Contractor Original Returned to dept:
Date
11.
County Original to Council
Date
Contract Cover Sheet Page 0
Project Cost Break Down
Project: Reconstruction of Lake Terrell Road and Mountain View Road
CRP 998006/998007
Federal Local Sub Totals
Preliminary Engineering $ 140,000.00 $ 30,500.00 $ 170,500.00
Right of Way
$ 120,000.00 $ 120,000.00
Contract $ 1,370,392.00 $ 889,108.00 $ 2,259,500.00
Construction Engineeringrresting and $ 84,770.00 $ 200,000.00 $ 284,770.00
Contingency
Total Cost $ 1,595,162.00 $ 15239,608.00 $ 2,834,770.00
G'�¢ffi"
gYNd»
888
tl'M
2t
_
_
���,_
zg+Ytla.
p
ggq_
gggg
3$$3(Q9y+..
88tl§
§
§x$8
6
8_
x;
-
8
88$$88$88888$$S8N
BN8$$88
BSSu
8
$$88888888888888$88
8888888
$8888888$$8
8
98»x°,
BL
E
&�£Syrye
938N
dSy9
yY
eyk:�N+
8.
«Nb
u
xri
}n
»
ti
}i
',
�
3
S
'•
�
i^�
n
r
'
,'
`E
',
'
S g
e�
N»
j
u
6
6
Y«
Y
3
p O
88$$888
&GC88$88o
=S$
88888$$
8888Sd8$888
§
§
5
§�'mffipY8M8
8aL
ur,8'
q
Hh
t,Buap,-_
ado
8
S8L888$$8$8888888N
$'88
&$$
"
°as
�
z
88ssssaa's
§8§889
88$$$$$8888$$8$$$$8
88$$$$8
8
88$8$$888$$
"'
NN
N
88888888$$$8$88888'
8'x88888
$$$9
8
CLim�.'P..i
i.TiLrvm
«8ffi
^,B,C^
TJ
g
§
§
§
§§ss
@sss§s"sssI
§
§
Its
§'§
§
§§
§I§
§§
§§
§
§
§"
8$$88888888888$$$$8
8«
8888$
88888888888"
8s8N18888ks
$°$ffi"$8s88888988sr
-
8N88u$$
8
8-
�
C
8$$$888888888$8$888
888$888
88$$$888888
a
&5t
aN
§S§g88twS8U
's
fn
8'
-8'
8888$$8888888$$8$
888~$8
8
888
»T}^'•u1`i1^vY'i�ffi
'Ep�
0
88888888888888'88$88
88888$k
88888888888"
tl
§
§8
§SY8LxY8tlH
8
x8
n�
-`
88888888$8$$888888'
8'$8888
Sffi'�.
^yu,
m7
�$
aGn
xa
^s#
8888888$88888888888
$$88888
8$888888888"
§ueffi
°sssa-
°snm'
'
-
a
s
"
It
§
&s
§
§a
G
§m
§
888s8
S
8
&ag
§
§
§
§
§§
§3
F
8888888888888888888
$88
8888
8888888888k
n y
b y
A
ay
°oo
30p
$Z
0
i
O
O
se
CR
3
A
8g
S
r811
sy>�a
m
%WN3B8k
�
6gmeB
0
�£
o
y
A
r
�
l
g A
� �
R n
g
n
O H
04..
<�R
z°
F
A
8g
S
r811
,� sg
%WN3B8k
N
K O
�£
o
y
A
r
�
l
g A
� �
cP
g
n
O H
04..
�V
z°
s k F+t
8g
S
,� sg
%WN3B8k
�£
A
l
g A
cP
g
04..
9
s k F+t
y
z
o '
A
°O
�o
8
O
O
0
='o
3
8g
8
&95
%WN3B8k
�£
£
$
„g�Ss
d
a
^�
€
?Yy2@r0�,rr2
yx
b
'N'
8-
'88888
T
C
---
°
�G��gTS
„
CeQTTO�
888888$88$$$8$$8"
�0
0
0
a
8
kNGE18B888Y-
E
3 i M'
88.
8888888gSm
">
'
MM
888kk8$888$$k88$�c
xtlkg
8--
=` =yF
tl
mg
r
8888a8
8
88$$88$
8
$
8t$ttf$yyB
k8"
u.yn
m5d'dStiuS's
X8
_
A
ksk88$8EE$89k8k8
$ffikT"
p
—
G
8888888$888$8888"
'-
T;
'o
k
sk888888k'888k8s�c
N
��oNask8ss88s'"
�?
A
k
888$88888$88888"
y
z
o '
A
°O
�o
8
O
O
0
='o
3
J-M CU
RECONSTRUCTION OF LAKE TERRELL /MOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 9980061998007
RECONSTRUCTION OF LAKE TERRELLIMOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 998006/998007
1 LUMP
MOBILIZATION
sum
1
L
1 A a 1% AaM¢A�'Ger
DOLARSSz18 354 655
21835y A6
(Wrinen umP SUm Price)
L.S.
2 FORCE
SPILL PREVENTIONMATER
ACCOUNT
POLLUTION CONTROL
TEN THOUSAND & 001100
DOLLARS
$10,000.00
(Written Force Account Price)
F.A.
3 LUMP
TRAFFIC CONTROL (Vehicles Signs, & Devices)
SUM
yaverj -) hine '}L Wx�c\ {IJC I��.v1ve<(
tt.; r}Y seven Adl.,ng S°/ uJ
DOLLARSM F53i, So $
t'p 53-3.
(Wn LunpSum Price)
L.S.
4 3,600
' TRAFFIC CONTROL LABOR
HOURS
sx o K.5'zoyion
DOLLARS #36 -- $
17—
W;
nn
per HOUR
see minimum bid requirements under
"traffic contrail labor in the special provisions
5 LUMP
CLEARING, GRUBBING AND
SUM
ROADSIDE CLEANUP
11 1l y `1 .(yr
OA.114°rdTeA -[L ;V v5: x-�,oUmj a lq� }L. Jrj"i
one P ss�,_o
DOLLARS9136, S5 I.33$
I3b,laS I.:s3
6 LUMP REMOVAL OF STRUCTURES
SUM AND OBSTRUCTIONS
M L d 1
Sete n'FV l }.�,ca wa ii�iV \ \+e�` DOLLARS ;"%8 `159.22 $ 78y 59 2z-
( ritten Lump Sum Prke) L.S.
7 LUMP SCARIFICATION AND PULVERIZATION OF
SUM EXISTING PAVEMENT
1 1 II�' rp.�SmlHrxND�cuL
'V+Jo G„r,Pre� '1�IAV 'M1°Y \Nev4u'Id 4V r,.� jzA T' I DOLLARS i 2S`I, a53.Ya$ z5J,t59.yc
8 65,000 ROADWAY EXCAVATION, INCLUDING HAUL
CUBIC dd
YARDS qt2 Pl '6/100 DOLLARS $ eti ` Ou.'
(Written Unit Price) per C.V.
-10-
RECONSTRUCTION OF LAKE TERRELUMOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 9980061998007
9
2,000
UNSUITABLE FOUNDATION EXCAVATION,
CUBIC
INCLUDING HAUL
YARDS
T1(`
Nt
DOLLARS
46 --M
$
I1,Sb0'
(Wniten Unit Price)
Per C.V.
10
8,300
EMBANKMENT COMPACTION
CUBIC
YARDS
aide 8 25hou
DOLLARS
45.2S
g
q3,5 7S.'
(Written Unit Price)
per C.Y.
11
800
WATER
M.
GALS.
Y\fne'%tM 9, $311100
DOLLARS
19 8';
$
J5,596.,
(Written Unit Price)
per M.G.
12
1,200
REMOVE AND REPLACE EXISTING QUARRY
CUBIC
SPALLS, INCLUDING HAUL
YARDS
5lA4een 9, 64/,00
DOLLARS
=16.64
$
(Written Unit Price)
per C.Y.
13
56,000
CONSTRUCTION GEOTEXTILE
SQUARE
YARDS
lk 17/100
DOLLARS
3 0.79
g
_
013.12.0.
(Written Unit Price)
Per S.V.
10
130,000
GRAVEL BASE
TONS
g 61�0�
DOLLARS
# 1.53
$
204, loo
oan
(Written Unit Price)
per TON
15
7,600
CRUSHED SURFACING BASE COURSE
TONS
5(x 8 ge %o,
DOLLARS
49,z4si-
(Written Unit Price)
per TON
16
15,500
MODIFIED ASPHALT CONCRETE PAVEMENT,
TONS
CLASS *B*
(r`
-iWArt i '1�YP
DOLLARS
t25 22.
$
39ot910,'
(Written
nit Price)
per TON
-11-
RECONSTRUCTION OF LAKE TERRELLIMOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 9980061998007
17
LUMP
ASPHALT CORES
y
M IM
s y-`
17
LUMP
ASPHALT CORES
SUM
ff
S¢V2n ky"Ared '�t SFJ6n d `iO�oo
DOLLARS
S siJ
$
-75 -f.5D
((Written Lump Sum Price)
L.S.
18
300
COLD PLANING ASPHALT PAVEMENT
SQUARE
o�
YARDS
et l.{ $ 42/ p
DOLLARS
4642
$
to 2526.'
(Wri en Unit Price)
per S.Y.
19
LUMP
SHORING AND CRIBBING OR EXTRA
SUM
EXC,AVATIONII, CLASS wAA''�n
('S(r�TRUCTIU11RE
'hk'�"II.r�JSnIN FW vA 10'IC �{%DoL
¢0 M1n yfAS
DOLLARS
CIS gSty.-
$
ISq$ a—
(Written Lump Sum Price)
L.S.
20
492
CORRUGATED POLYETHYLENE DRAIN PIPE
LINEAR
12 -INCH DIA.
FEET
11M Fo„r g bN�tn+
DOLLARS
Z*24'49
$
12,14 -4.4'16
(Written Unit Price)
per L.F.
21
1,293
CORRUGATED POLYETHYLENE DRAIN PIPE
LINEAR
18 -INCH DIA.
FEET
{'4 P.1gTt & "Moo
DOLLARS
$26•b'1-
$
3 328.91
(WriHenU it Pri )
per L.F.
22
310
CORRUGATED POLYETHYLENE DRAIN PIPE
LINEAR
24 -INCH DIA
FEET
'titir44 JO. Qr DT/IUD
DOLLARS
$35. 03
$
1 Or8'� I. i0
( Wrtten{ Pnce)
per L.F.
23
195
REINFORCED CONCRETE CULVERT PIPE
LINEAR
12 -INCH DIA.
FEET
�ovi4 irour i NT�oo
DOLLARS44q y}
$
tyjtc -*l.65
(Wri. Unit Price)
per L.F.
24
672
REINFORCED CONCRETE CULVERT PIPE
LINEAR
18 -INCH DIA.
FEET
{or14 �r�� � " /too
DOLLARS
444 ID
$
241,635.24,
(Writle�Unit Price)
per L.F.
12-
RECONSTRUCTION OF LAKE TERRELLIMOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 9980061998007
25
132
REINFORCED CONCRETE CULVERT PIPE
°
iW rpi3 �tlj+l d �tk.
6;r
1
,, °.,
-:
24 -INCH DIA.
$ 3,(06*k bO
25
132
REINFORCED CONCRETE CULVERT PIPE
EACH
LINEAR
24 -INCH DIA.
$ 3,(06*k bO
(Writte Unil Price)
per EACH
33 40
FEET
EACH
Sacn*v nine ABt/1on
(� c�
'i"lf�'N `3�X R. Z� /ro0
DOLLARS
lSe.24
$
j,427.64
34 6000
SILT FENCE FOR EROSION CONTROL
(Wntte Unit Price)
per L.F.
26
135
REINFORCED CONCRETE CULVERT PIPE
DOLLARS
Y q 3.(O(
_
$ Zit V'60.
(Written Unit Prins)
per L.F.
LINEAR
30 -INCH DIA.
FEET
S6VCyu{y l"eN lyN✓I lino
DOLLARS
A77 'I9
$
i015z4i.65
(WnttenU tPrice)
per L.F.
27
3
TYPE -1 CATCH BASIN
EACH
65/IO0
iFn,xaxiA Jklo lnuo Ayed -H+*%tJa
S'X DOLLARS
1276.65
$
37 0y .
w15
w et
(Written Unit Price)
per EACH
28
9
TYPE -11- CATCH BASIN
EACH
r
Awo 'INeVSQM d IA%j"XtA
/rou DOLLARS
16 2y6o6. 1 ?523t1SS.S2
SrX SI X&"
(Written Unit Price)
per EACH
29
3
TYPE- 2484NCH CATCH BASIN
EACH
I .
-IbnO ib..,,,C..u.,A'� YvmAaA c2ty P,lali"p.
—��'
B%J)OLLARS
1 3rSbS.Li S
$
10;706.55
(Written Unit Rice)
per EACH
30
1
TYPE- 2604NCH CATCH BASIN
EACH
-I. t e0k k ir.AwA Al,,yh cR41'.G,AOU-ARS
5,»32.46$
se5z.410
(Written Unit Priceµ%
per EACH
31
60
12 -INCH DIAMETER DUCTILE IRON
LINEAR
WATER MAIN
FEET
r
�l7rW 1l+rer L wlai
DOLLARS
g 43.42
y
2,e05-
20
(WnHe UnitUnitP )
per L.F.
32 80
GEOTEXTILE - ENCASED CHECK DAM
EACH
�Iht`I {1VL %pd�lnn
DOLLARS 4S.orc
$ 3,(06*k bO
(Writte Unil Price)
per EACH
33 40
ROCK CHECK DAM
EACH
Sacn*v nine ABt/1on
DOLLARS �9 -82
6 3,192.80
(WriHenU it Price)
per EACH
34 6000
SILT FENCE FOR EROSION CONTROL
LINEAR
FEET
�1
r�
hY2G ni b1 /Inn
DOLLARS
Y q 3.(O(
_
$ Zit V'60.
(Written Unit Prins)
per L.F.
-13-
RECONSTRUCTION OF LAKE TERRELUMOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 9980061998007
35
� A
$' �1. 6
u
'lIFA J�Ul li%.♦ t
l�.,F r�:'
1 �� e. . p� ;
1
�-y
1
J ForiY SzO /rno
DOLLARS
35
5
ROADSIDE SEEDING
ACRES
1
1
J ForiY SzO /rno
DOLLARS
�I,o`1u. 20
10201. —
Gi�l�.ousar�C�
(Written Unit Price)
per ACRE
36
1100
EXTRUDED CEMENT CONCRETE CURB
LINEAR
FEET
/•�
11V� $ 4�roU
DOLLARS
5.4 }
$
b.o
(Written Unit Price)
per L.F.
37
2
TYPE 2- RAISED PAVEMENT MARKER
HUNDRED
-(�0e tti vAw,&( iiVe kp4 /loo
DOLLARS
85 °5.—
S
Irol o•�
(Written Unit Price)
per HUNG
38
1,000
BEAM GUARDRAIL TYPE 1 WITH 6-FOOT POSTS
LINEAR
FEET
�pq gp yr g. IWi /r 01)
DOLLARS
gl8 l�
$
t6,180.-
pA even Uni�
per L.F.
39
1,000
BEAM GUARDRAIL TYPE I WITH 9-FOOT POSTS
LINEAR
FEET
- yW¢m.�"Y g2D /ron
DOLLARS
s20.?p
S
20,21 o -'
(WrdtenU tPL)
per L.F.
40
10
BEAM GUARDRAIL TEST LEVEL 3 TERMINAL
EACH
pp y,
&n�
� —
-teen- "UCU. A &,I. LJxA, l �..- fo%KDOLLPRS
4.444.
S
44.44o. —
41 1,350 WIRE FENCE TYPE
LINEAR
FEET g R, as A00 DOLLARS #x•03 $ eJwlo -5n
(Written Unit Price) per L.F.
42 3 DOUBLE WIRE GATE -20 FOOT WIDE
EACH (r^ (� y
t ..r G.0 ne�Wa riiiH dour b50 /roc) DOLLARS J'ys4.50 $ 1,3G3-so
(Written Unit Price) per EACH
43 4 MONUMENT
EACH /(�� II f/•
"CweG IyN k A Jige %. 4O /io0 DOLLARS`r 50 S .— $ z02o
(Written Unit Price) per EACH
44 1400 QUARRYSPALLS
TONS rr u0
tb,keP d 93/10t) DOLLARS 3 ILA It) 3 S 200902
(Written Unit Price) Per TON
14-
RECONSTRUCTION OF LAKE TERRELLIMOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
CRP NOS. 998006/998007
45 1,000 CRUSHED LIMESTONE
TONS (r�+
±t49en 91231l0o DOLLARS A15. 23 $ )5230.'
(Written Unit Price) per TON
46 3 RESIDENTIAL MAILBOX
EACH
Pwa(.'4Y SoVen $ 43 /tOV DOLLARS } 8 '+-43 $ 2b'2. 2'j
(W en U it Price) per EACH
47 LUMP RELOCATE EXISTING
SUM FLASHING SIGNAL SYSTEM
+w
u' aa9
g25i 648.`1S k 2S, e48.CIS
45 1,000 CRUSHED LIMESTONE
TONS (r�+
±t49en 91231l0o DOLLARS A15. 23 $ )5230.'
(Written Unit Price) per TON
46 3 RESIDENTIAL MAILBOX
EACH
Pwa(.'4Y SoVen $ 43 /tOV DOLLARS } 8 '+-43 $ 2b'2. 2'j
(W en U it Price) per EACH
47 LUMP RELOCATE EXISTING
SUM FLASHING SIGNAL SYSTEM
15-
+w
Fu AinIsnne sx kv"6A -Gk� eiAU&"/t4DOLLARS
g25i 648.`1S k 2S, e48.CIS
(Written Lump Sum Price) "
L.S.
48
45,000
PAINT STRIPE
LINEAR
FEET
"'VID0
DOLLARS
0. cot
$ 405°. —
(Written Unit Price)
per L.F.
49
160
PLASTIC STOP LINES
LINEAR
FEET
5lx & 067400
DOLLARS
4 (''0t"
$ 969.60
(Written Unit Price)
per L.F.
50
FORCE
REPAIR OR REPLACE EXISTING PUBLIC AND
ACCOUNT
PRIVATE FACILITIES
TWENTY FIVE THOUSND
DOLLARS
$25,000.00
(Written Force Account Price)
F.A.
51
LUMP
*DETENTION PONDS
SUM
�awiY_5_tdL_h"�DUSahc�
ohe �u1�n.i SPnietsiN ¢Ip�d
L8OLLARS
Ll 1'78.19
$ 49 198.29
tWritten Lump Sum Price)
L.S.
52
LUMP
•54 -INCH DIA. POND CONTROL STRUCTURES
SUM
iile k6usar
-6e-♦`
nhafi (,3. R ErA Lu
DOLLARS
42S S54 1S2
$ 25 SS 4I-b2
(Written Lump Sum Price)
L.S.
*three locations for this hem
(Ax
**amount subject to SIDE requirements (see next page)
* *TOTAL BID AMOUNT
$ 7r 259, N95.-Ff ,38
�o W+ Ilion
I 1 n
41109 Muv�1'r.j �i mre .K.,r+� - oVr�oJW xitj
-i02
DOLLARS
TOTAL:
ab "1 ooi
CENTS
Writtena Price
15-
Washington State
Disadvantaged Business
-'/ Department olTranzl2ortatim Enterprise Utilization Certification
To be 012i ee W award Of Te antxt ft bidder mwt BI aW god auernK as pen a Maier propose, fe Nfe" oNfrodan reseng to
assevarboad feMU EnWpio ( DBE) reaiemeaa. This ovif"Non aef be deemed a ped a me reaJae anb FWUe to N aut and
submit NOW ovela ion. fe bWrabn of a fees o nifleeora or Insufficient pmfecbd use of DBEs. seep be aonddered m evidence that be
poposal k mn.espansYS b M Invitation b M.
f {omutlon on remittal imm Is svWNa ban pAWBE pve (m) Tsaosg].
IMCO General Construction, Inc. ovises Bet ae owm&gaaea.nfegee Business Enterprises)
w.e saw+
(DBE) hen ideas mNaaad rpardbe paNgpatlon a Me prdsa aM, tlb a tle suooesehl Bdder on fYa pmjad, M M+11 swW ubaaraW b a
anwinb reply apeansnfe wM the bM.bp MCI a YrdlaW: ans oeaaaly, me soldiers! tlaeU.
Y,i ji
4� �
� • at• 'r�( 3
WPW
Disadvantaged Business Enterprise Subcontracting Goal: Th OF TOTAL BID AMOUNT " DBE Total S 154f, DLAS.
aw
Regular Dealer alsbas resat be approved by fe Dike of Equal Oppor", Wash. Stab Dem dTnnspMatIM
on each conic l -
See the aection • Oalalfry DBE Parkpirtion Tainted Meap Be BW In he centred Doamrnt.
The contracting ADera.T Mf elate the above date to delari vwfvm er or not de bolder his mat Net goal or de average goal
altilmera a(" bidden.
DOT Fwra 222L EF
aevep Ime
LK TFRREiI/MTN VIEwtM- WiNZ999W1 -16-
NON - COLLUSION DECLARATION
RECONSTRUCTION OF
LAKE TERRELL /MOUNTAIN VIEW ROAD
SLATER ROAD TO RAINBOW ROAD
I, by signing the proposal, hereby declare, under penalty of perjury under the laws of the United
States that the following statements are true and correct:
That the undersigned person(s) firm, association or corporation has (have) not, either directly or
indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action
in restraint of free competitive bidding in connection with the project for which this proposal is
submitted.
That by signing the signature page of this proposal, I am deemed to have signed and have
agreed to the provisions of this declaration.
NOTICE TO ALL BIDDERS
To report bid rigging activities call:
1- 800.424 -9071
The U.S. Department of Transportation ( USDOT) operates the above toll free "hotline" Monday
through Friday 8:00 a.m. to 5:00 p.m. Eastern time. Anyone with knowledge of possible bid
rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report such
activities.
The "hotline" is part of USDOT's continuing effort to identify and investigate highway construction
contract fraud and abuse and is operated under the direction of the USDOT inspector General. All
information will be treated confidentially and caller anonymity will be respected.
u. rEMLLi rnVJEWt"s sw SW - 17 -
BIDDER IDENTIFICATION
The name of the Bidder submitting this proposal, the address and phone number to which all
communications concerned with this proposal shall be made and the number which has been
assigned indicating the Bidder is licensed to do business in the State of Washington are as follows:
Firm Name: IMCO General Construction, Inc.
Address: 4509 Guide Meridian
Bellingham, WA 98225
Telephone: 360 - 671 -3936
The Firm submitting this proposal is a: _
Contractor's Number: IMCOGI *21581
Sole Proprietorship
Partnership
Corporation
The names and titles of the principal officers of the corporation submitting this proposal, or of the
partnership, or of all persons interested in this proposal as principals are as follows:
NOTE: Signatures of this proposal must be identified above. Failure to identify the Signatories
will be cause for considering the proposal irregular and for subsequent rejection of the
bid.
LK TER EL1/M VIEW{ WBM49i8N] - 18-
BID PROPOSAL SIGNATURE AND ADDENDUM
ACKNOWLEDGMENT
The bidder is hereby advised that by signature of this proposal he/she is deemed to have
acknowledged all requirements and signed all certificates contained herein. The undersigned
hereby agrees to pay labor not less than the prevailing rates of wages or less than the hourly
minimum rate of wages as specified in the Specifications and Conditions, for this project.
CASH ❑ IN THE AMOUNT OF
CERTIFIED CHECK ❑ ($
DOLLARS
PROPOSAL BOND ® IN THE AMOUNT OF 5% OF THE BID.
Receipt is hereby acknowledged by addendum(s) No.(s) f &
SIGNATURE OF AUTHO E FFICIAL(S)
(PROPOSAL MUST BE SIGNED)
FIRM NAME: IMCO General Constructi Inc.
(Seal)
STATE OF WASHINGTON )
) ss.
COUNTY OF WHATCOM )
On this kr day of Ax t t 2002, before me personally appeared
t V to me personally known to be the person described in
and who exeWedNN,A qye instrument and who acknowledged to me the�act of signing thereof
TTNN lDl�.Trty A
�h NOTARY PUB KS, in and for the
State of Washington, residing at: I eh 1 r A
My Commission Expires:- )�07
This prop femble and any alteration of the firm's name entered hereon without
prior permis pgpW$atcom County will be cause for considering the proposal irregular and for
subsequent rejection of the bid.
� TUR WMT VJEWf". emus 7 —19—
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that we, IMCO GENERAL CONSTRUCTION, INC. of
4509 GUIDE MERIDIAN, BELLINGHAM, WA 98226 as principal and
the TRAVELERS CASUALTY AND SURETY COMPANY OF AMERICA
a corporation duly organized under the laws of the State of CONNECTICUT
and having Its principal lace of business at 3850 BANK OF AMERICA TOWER,701 FIFTH AVE.
g P SEATTLE, WA 98104
in the State of Washington, as Surety, are held and firmly bound unto Whatcom County, a
Municipal Corporation in the State of Washington, in the full and penal aunt of five percent (5 %) of
the total bid amount appearing on the bid proposal of said principal for the work hemina@er
described, for the payment of which, well and truly to be made, we bind our heirs, executors,
administrators and assigns, and successors and assigns, jointly and severally, firmly by these
presents.
The condition of this bond is such that, whereas, the principal herein is herewith submitting his or
its bid proposal for the Reconstruction of Lake Terrell/Mountain View Road, Slater Road to
Mountain View Road, CRP Nos. 998006 and 998007 said bid proposal, by reference thereto,
being hereby made a part hereoL
NOW, THEREFORE, if the said bid proposal submitted by the said PRINCIPAL. be accepted, and
the contract be awarded to said PRINCIPAL, and if said PRINCIPAL shall duly make and enter
into and execute said contract and shall famish the performance bond as required by the bidding
and contract documents within a period of ten (10) days from and after said award, exclusive of the
day of such award, then its obligation to pay the above- mentioned penal sum as liquidated damages
shall be null and void. otherwise it shall remain and be in full force and effect.
SIGNED AND SEALED this 23RD day of APRIL 2002.
IMCO GENERAL CONSTRUCTION, INC.
By D- I 1 (Seal)
TRAVELERS CASUALTY AND S rTy COMPANY
OF AMERICA
AttornmIIn -Fact v
ANNE REINKEN YER
The Attorney -m -fact who executes this bond in behalf of the surety company, must attach a copy of
his power -of attorney as evidence of his authority.
-20-
WHATCOM COUNTY
DEPARTMENT OF PUBLIC WORKS
SUBCONTRACTOR LIST
Prepared in Compliance with RCW 39.30.060 as amended.
TO BE SUBMITTED WITH THE BID PROPOSAL
Project Name: Reconstruction of Lake TerrelUMountain View Road (Slater to Rainbow Road
Failure to list subcontractors who are proposed to perform work of heating, ventilation and
air conditioning, plumbing as described in Chapter 18.106 RCW, and electrical work as
described in Chapter 19.28 RCW, will result in your bid being nonresponsive and therefore
void.
Subcontractor(s) that are proposed to perform work of heating, ventilation and air
conditioning, plumbing as described in Chapter 18.106 RCW, and electrical work as
described in Chapter 19.28 RCW must be listed below. The work to be performed is to be
listed below the subcontractor'(s) name.
If no subcontractor is listed below, the bidder acknowledges that it does not intend to use any
subcontractor to perform those items of work.
•
Subcontractor Name Set i I Oerit -Ic
Work to be Performed ELECTRICAL
Subcontractor Name & `C
Work to be Performed NVAC
Subcontractor Name Se`t PoiLLprw.
Work to be Performed PLUMBING