Loading...
HomeMy WebLinkAboutres2002-018WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2002 - 146 CLEARANCES Dare Date Received in Council Office Agenda Date Assigned To Ong Dept Canny Council 3/512002 V MAR 5 2002 i�HATC MM COUNTY COUNCIL 3/12/2002 P &D /Council Division Head: Dept. Head. Prosecutor 3_Z z Budget: Executive. SUBJECT. Resolution opposing 660 Megawatt Sumas 2 Electrical Generating Facility ATTACHMENTS SUMMARYSTATEMENT. Related County Contract N: Should the Clerk schedule a hearing7(YN) Requested Date Resolution opposing the location and construction of the 660 megawatt Sumas Energy 2 electrical generating facility as proposed in Sumps, Washington RECOMMENDED MOTION (for final action): COUNCIL ACTION TAKEN 2002-146 3112/2002: Item was pulled 3/26/2002: Approved 5 -1 -0, Crawford opposed McShane out of roam, Res. #2002-018 Related File Numbers: Ordinance or Resolution Number (this item only): RE5. 2QJ2 - 019 S su RES 306 PROPOSED BY: Fleetwood SPONSORED BY: Consent INTRODUCED: 3/26/2001 RESOLUTION NO. 2002 -018 EXPRESSING COUNTY COUNCIL OPPOSITION TO THE LOCATION AND CONSTRUCTION OF THE SUMAS ENERGY 2 ELECTRICAL GENERATING FACILITY WHEREAS, Whatcom County and the Attorney General's State Counsel for the Environment are both parties in the Energy Facility Site Evaluation Council's ( EFSEC) process for permitting the proposed 660 megawatt electrical generating facility known as Sumas Energy 2 (SE2); and WHEREAS, Whatcom County and the State Counsel for the Environment have previously delivered testimony to EFSEC outlining concerns and objections to the SE2 project; and WHEREAS, the Whatcom County Council is elected to represent the citizens of Whatcom County and is charged with the broad responsibility of protecting the health, safety, and general welfare of the public; and WHEREAS, area residents are deeply concerned that the construction and operation of the SE2 plant may severely impact their health and quality of life; and WHEREAS, questions concerning the health impacts resulting from low- frequency noise for surrounding neighbors have not been determined to the satisfaction of the council; and WHEREAS, operation of the plant will require the utilization of significant quantities of groundwater; and WHERAS, the quantity of groundwater to be extracted from the surrounding aquifer may impact present users, particularly in agricultural lands; and WHEREAS, groundwater quality can be affected by substantial extraction; and WHEREAS, flood modeling and potential flood hazard impacts have not been fully completed or analyzed to date; and Page 1 WHEREAS, seismic activity in the area raises questions about the economic feasibility of constructing the facility with adequate safety precautions; and WHEREAS, the need for additional energy in light of already permitted and recently constructed facilities remains questionable; and WHEREAS, the unique nature of Whatcom County's relationship with the Province of British Columbia provides continuous opportunities for promoting the general welfare of the citizens of both jurisdictions. NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Council that in order to promote and protect the economic, environmental, health, safety, and general welfare interests of the citizens of Whatcom County, the Council hereby stands opposed to the location, construction, and operation of the proposed Sumas Energy 2 electrical generating facility. APPROVED this 26 day of March , 2002. / "ATTE Dana Brown - Davis, C erk of the CounZil PROVED AS TO FORM: Civil uty Prosecutor WHATCOM COUNTY COUNCIL WHATCOM C 'N /TY, WASHINGTON N /L. Ward N Icon, uncil Chair Page 2