SUBJECT:
Resolution adopting the Whatcom County 2004 Annual Road Construction Program '..
ATTACHMENTS:
1. Memo to County Executive and Council
2. Resolution
3. 1004 Annual Construction Program
4. Summary Sheets or Construction Funded Projects
Related County Contract #:
Should Clerk schedule a hearing: NO / / YES /X / Requested Date: 10117103
SUMMARY STATEMENT:
Introduction and approval of the 2004 Ann ual Road Construction
Program
Ordinance & Resolution
To Mep down our copying costs, indicate
receive a co after Council action
Distribution Request
only those who must
List wines to the ri ht.
ADS Faci/ides Management
ADS Finance
ADSHuman Resources
ADS Info Services
Assessor
Auditor
Cooperative Enens'on
District Court
Executive
Health
RECOMMENDED ACTION:
Council Approval
Heating Exan%ner
Jail
Juvenile
Parks
Planning
COUNCIL ACTION TAKEN:
2003 -332 ION/2003 : Introduced
10121/2003'. Amended and approved 7 -0, Res. #2003 -061
Relt
Proserutor
Public Works
Joe Rutan
Sheri
Superior Conn
Treasurer
Other
Ordinance or Resol ion Number
(this im): ✓ vte�
I teR
H,MMBWA... !Cauevaan,
sat
I SPONSORED BY: Consent
2 PROPOSED BY: Public Works— F gling
3 INTRODUCTION DATE: 10/8/01
RESOLUTION NO. 2003 -061
ADOPTING THE WHACOM COUNTY
2004 ANNUAL CONSTRUCTION PROGRAM
WHEREAS, pursuant to RCW 36.81.130, the Whatcom County Engineer did file
with the Whatcom County Council a recommended plan for laying out, construction,
maintenance and special maintenance of County roads for the fiscal year of 2004; and
WHEREAS, the Whatcom County Council held a public meeting on the 21 st day
of October , 2003, and has considered the testimony given as well as the recommended
plan; and
WHEREAS, the Whatcom County Council had determined that said plan is
necessary as nearly as practicable to the Whatcom County 2004 -2009 Six-Year
Transportation Program, adopted by Resolution 2003 -042 signed July 8, 2003.
NOW, THEREFORE, BE IT RESOLVED that the 2004 Whatcom County Annual
Construction Program is hereby adopted as shown on the attachment hereto.
BE IT FURTHER RESOLVED that no changes be made in the program without the
unanimous vote of the Whatcom County Council.
BE IT FURTHER RESOLVED that the 2004 Annual Construction Program be filed
with the Director of Highways of the State of Washington.
APPROVEDthis 21st day of
ATTEST:
Dana rown- Davis, -Council Clerk
APPROVED AS TO FORM:
Civil Deputy Prosecuting Attorney
2003.
WHATCOM COUNTY COUNCIL
WHA COM COUNTY, WASHINGTON
an McShane, Council Chair
} \ \ {/
0 100
!
wo-
am
\ \\
f
!!)[
} \ \ {/
0 100
!
;
f
!!)[
0 10
G
m
-
-
I
\
\
\
j
`
/
/
\
/
\
\
\
\
m
0
/
\
\
u
\
/ \ \ \E
n no
)}
0 100
wo
\ / \z 00 m0 N \0
_ ;
; .
.
Oil
cc
OOCOMW
(() \)(
cc
_
\
\
\
/
\
\\
Wheltom County Public Works 1/12
2004 Annual Construction Program
Project Narrative
Sunrise Road (Birch Bay - Lynden to west Badger) -CRP #998023
Item #1 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Sunrise Road is located 8 -miles southeast of the City of Blaine and 4.5 -miles west of
the City of Lynden in Sections 17,18,19, & 20 of T40N, R2E. The existing 2 -mile
section of road is very narrow and has failing concrete panels. The project involves
widening the road from 22' to 34' from Birch Bay - Lynden Road to West Badger.
Associated with the roadway improvements will be new drainage ditches, stormwater
quantity & quality facilities, and two (2) new 53' bridges across the south fork of
Dakota Creek. Also included in the construction will be the relocation of utility
poles, road resurfacing, the addition of guardrail, permanent signing, and installation
of stormwater detention/infiltration ponds.
Project Status:
Design and ROW Acquisition will be completed late 2003 /early 2004, Construction will occur in 2004.
Project Funding:
Federal / State — N/A
Local - $297809000
Environmental Permitting (Agencies/Permits) — NPDES; SEPA; HPA; CORPS; CLR/CAO
Right -of -Way Acquisition ($ Est.) - $1509000
Day Labor ($ Est.) - $ 50,000
H VSLn'SUrviae NUeYiw MwJCmV rmg tlac
Whatcom County Public Works M2
2004 Annual Construction Program
Project Narrative
Austin Creek Bridge #116 Replacement - CRP #903009
Item #2 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Project Narrative: New Construction Features:
This project is located on Lake Whatcom Boulevard (Mile Post 4.33) in Sudden
Valley, approximately 8 miles southeast of the City of Bellingham in Section 8,
T37N, R4E. Bridge #116 over Austin Creek is approximately 61' long and 24' wide.
The existing structure is being replaced in conjunction with the future reconstruction
of Lake Whatcom Boulevard from Lake Louise Road to Rocky Ridge. The proposed
improvements to Lake Whatcom Boulevard will increase the roadway width by 16'
making the existing structure obsolete. The proposed bridge will be 40' wide, greatly
improving bicycle and pedestrian safety, and approximately 80' long.
Total Width
40'
Lane Width
12'
Shldr Width
8'
Curb / Gutter
I No
Sidewalk
No
Brdg Rplc (length)
80'
Project Status:
Design will be complete in 2003 -2004. ROW Acquisition and Construction will occur in 2004.
Project Funding:
Federal / State —
N/A
Local-
$11785,000
Environmental Permitting (Agencies/Permits) — HPA, SEPA, CLR/CAO.
Right -of -Way Acquisition IS Est.) - $25,000
Day Labor ($ Est.) — N/A
Imo. < .. ".. "m
Cfeek
s'
BELLINGHAM r� '` a
oh LOCATION
11 IT
Lake av kay Y
0
SIC —�� � bT Whatcom
�SOm all �{ j� •
Whatcom County Public Works 3/12
2004 Annual Construction Program
Project Narrative
High Bridge #115 Replacement - CRP #900902
Item #3 - 2004 Annual Construction Program
Construction Funding Year(s): 2004 -2005
rrolect iNarranve:
This project is located on Lake Whatcom Boulevard, in Sections 16 & 17,
T37N, R4E. The existing High Bridge No. 115 is a three -span beam bridge,
having a width of 22' (10' lanes, 1' shoulder) and a length of 122' with a
concrete substructure. In the winter of 1998 a slide took place near the North
abutment. The structure was not damaged but the failure created a serious
concern of further instability. The new two span bridge will be wider, (11'
Imes, 6' shoulders) and avoid the area of instability, soften horizontal
approach curves, and reduce the rock fall potential on the existing roadway.
Near rnnctn✓tinn Fran....
Total Width
34'
Lane Width
11'
Shldr Width
6'
Curb / Gutter
No
Sidewalk
No
Brdg Rplc (length)
2 @110'
Project Status:
Design and ROW Acquisition will be complete in 2004 with construction in Years 2004 & 2005
Project Funding:
Federal / State - $ 960,000 (BRAG)
Local - $ 2559000
Total $19215,000
Environmental Permitting (Agencies/Permits) — BA, HPA, ECS, SEPA, CLR/CAO, SHORELINES
Right -of -Way Acquisition ($ Est.) - $15,000
Day Labor ($ Est.) — N/A
BELLINGHAM 2 a YArE
�b Lake
IAKFWAY WU o ST
T won
- -� *e `" ^e Whatcom ea
r
n n
MOCRAT EVE�LE S'
ASS ST
UDLAS
�o
Pa p'p" I o
i BELLINGHAM Luke
PROJECT Louse
Louse
c C LOCATION
LC e
puavel
f � o
Oq,B
__ - - - - -_ OLD
SAWSH
Whetcom County Public Works 4112
2W4 Annual Construction Program
Project Narrative
Hutchinson Creek Bridge #157 Replacement - CRP #902001
Item #4 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Hutchinson Creek Bridge is located 3 miles East of Acme on Mosquito Lake Road in
Section 2, T37N, R5E. Hutchinson Creek Bridge currently has a length of 50' and a
width of 24' (10' lane, 2' shoulder) and has a deteriorated substructure. The
replacement project will involve the removal of the old bridge structure, support piles
and abutments within the OHWM, followed by the regarding & widening of the
channel, replacement with new support piles/bulkheads, bridge deck and guardrails.
The road approaches will be repaved and ditches realigned.
New Construction Features:
Total Width
28'
Lane Width
it,
Shldr Width
3'
Curb / Gutter
No
Sidewalk
No
Brdg Rplc (length)
72'
Project Status:
Design will be complete in 2003. Construction and ROW Acquisition will occur in 2004.
Project Funding:
Federal / State — $424,000 (BRAG)
Local- $326,000
Total- $750,000
Environmental Permitting (Agencies/Permits) — BA, ECS, HPA, CLR/CAO, SEPA, SHORLINES
Right -of -Way Acquisition ($ Est.) - $50,000
Day Labor ($ Est.) - N/A
Whatcom County Public Works 5/12
20(14 Actual Construction Program
Project Narrative
Frost Road Culvert/Bridge Replacement - CRP #903005
Item #5 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Project Narrative: New Construction Features:
This project is located in Sec 8, Twp 40 N, Rag 5E. The CRP includes
construction of a 120' free span bridge to reopen Frost Road, which was
closed in December 2001 due to failure of the Saar Creek culvert. Several
design alternatives have been examined for reopening Frost Road; however,
the bridge alternative is preferred based on lifecycle cost, fish passage, and
1 t C 1' b'1'
ong- erm ounty to 1 1ty.
Project Status:
Design will be complete in 2003 -2004. Construction will occur in 2004.
Project Funding:
Federal / State — N/A
Local - $589,000
Environmental Permitting (Agencies/Permits) — HPA
Right -of -Way Acquisition is Est.) —N /A
Day Labor ($ Est.) — N/A
Total Width
28'
Lane Width
12'
Shtdr Width
2'
Qvb /Gutter
No
Sidewalk
No
Brdg RPic (length)
120'
JHALVERSTICK R DPMAS
o 744
ROCK RD.
°
0. n
° E
N
y
J
o
°
500
i
eek
Gt
9
w
o
BILLVIEW
CLEARBROOK
D. h
BISHOP
JOda
x vS
6
RD.
��ES
MDR AN
54
BADGER RD.
�
� p�
MINAKER
RD.
DAD
C
v
C
ppS
SurnpS
DEETER
wo
D.
�o
D1H
0 Creek
PROJECT
LOCATION
RD. ALM R
D.
i
P
w
a
a
c
Whatcom County Public Works 6/12
2Wa Annual Construction Program
Project Narrative
Lakeway Drive/Terrace Ave North - CRP #902004
(Bellingham City Limits to Lakeview Street)
Item #6 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
This project is located in Section 34, T38N, R3E. The scope of work consists
of delineating failed areas within the existing roadway section (12' lane, 10'
shoulder, 5' sidewalk on South side), grinding off the existing pavement to a
depth of approximately 4 inches, performing subgrade repairs to the failed
areas, constructing sidewalks, repaving the entire roadway With a 2 inch base
lift and a 2 inch wearing lift of asphalt concrete pavement class B.
Project Status:
Design will be completed in late 2003/early 2004, with construction in 2004.
New Construction Features:
Total Width
'
Lane Width
12
Shldr Width
10'
Curb / Gutter
'
Sidewalk
'
Brdg Rplc (length)
N/A
' Match Existing
Project Funding:
Federal / State
— N/A
Other -
$300,000 (CAPP)
Local-
$ 209000
Total -
$320,000
Environmental Permitting (Agencies/Permits) — SEPA
Right -of - -Way Acquisition ($ Est.) —N /A
Day Labor ($ Est.) —N /A
W hatcom County Public Works 7/12
2004 Annual Construction Program
Project Narrative
Lummi View Drive - CRP #900905
Item 97 - 2004 Annual Construction Program
Construction Funding Year(s): 2004 -2005
Project Narrative: New Construction Features:
This project is located on the Lummi Indian Reservation, in Section 2, T37N,
RIE. The scope of work is to reconstruct % mile of Lummi Shore Road and
re -align approximately I V2 miles of Lummi View Road. The Bureau of Indian
Affairs is performing the design and construction engineering work, with the
County participating in the design & construction review, and providing local
a._a., r.._ nnm.._a n.._..._.,..:,._
Total Width
36'
Lane Width
12'
Shldr Width
6'
Curb / Gutter
No
Sidewalk a
5'
Brdg Rplc (length)
N/A
_- - -_ .. - -_ ---
one side, Mckenzie to
Stomish Grounds
t Status:
and ROW Acquisition will be completed in late 2003 /early 2004, with construction in 2004.
Project Funding:
Federal / State — N/A
Local - $1,200,000
Environmental Permitting (Agencies/Permits) — BA, HPA, ECS, SEPA, CLR/CAO, SHORELINES
Right -of -Way Acquisition ($ Est.) — N/A
Day Labor ($ Est.) — N/A
®-
i LUMMI
a
V"
INDIAN
BELLINGHAM
F2F5.
BELLINGHAM
DAY
nnn
_
t,.,.w•/
�rurlo,.
.TEf,'
m.
... ,..., _9ou,x
p
xmvx= u
Whatcom County Public Works 8/12
2M4 Annual Construciam Program
Project Narnfivc
Unanticipated Site Improvements - CRP #904005
Item #25 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Project Narrative:
This Construction Program item addresses the unanticipated project(s) that
may arise during a given year that requires immediate action due to safety
concerns, environmental factors, traffic volumes or accident history, funding
or grant availability and other issues not related to an existing program
project.
Project Status:
Design will be complete in 2004 with construction in 2004.
Project Funding:
Federal / State — N/A
Local - $200,000
Environmental Permitting (Agencies/Permits) — Unknown.
Right -of -Way Acquisition IS Est.) — Unknown.
Day Labor ($ Est.) — Subject to Council approval.
New Construction Features:
Total Width
N/A
Lsne Width
N/A
Shldr Width
N/A
Curb /Gutter
N/A
Sidewalk
N/A
Brdg Rplc (length)
N/A
Due to the nature of this program item, no map exists. Council review and prioritization will be provided at
future date.
Whatcom County Public Works 9112
2004 Annual Construction Program
Project Narrative
Gravel Road Conversions - CRP #904006
Item #26 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
rrojecr narrative: New Construction Features:
This project varies in location. Gravel road conversions are part of the annual 'see below
construction program. This change in surface type converts existing gravel Total Width
roads to a more durable, harder surfaced BST (Bituminous Surface Treatment)
Lane Width
that has a resurfacing frequency of approximately 7 years. Changing the Shldr width
surface type increases Whatcom County's share of State Motor Vehicle Fuel Curb / Gutter Ni
Sidewalk N/
Tax revenues, while decreasing Maintenance and Operations expenses. Brdg Rplc (length) N/
Project Status:
Design will be complete in 2004 with construction in 2004.
Project Funding:
Federal / State — N/A
Local - $200,000
Environmental Permitting (Agencies/Permits) —HPA, SEPA, CLR/CAO, SHORELINES
Right -of -Way Acquisition ($ Est.) —N /A
Day Labor ($ Est.) - $190,000
Road Name
Mileage
Existing Width
Proposed BST Width
Assink
0.93
28'
26'
Lindsay
1.11
22'
20'
Marshall Hill
1.44
20'
18'
Saxon
1.33
16' and 18'
18'
Alternate Roads
Crape
0.22
14'
18'
George
0.62
12'
18'
Nooksack
0.27
22'
20'
Deal
0.19
12'
18'
James
0.21
10'
18'
Cornell Creek
0.41
16'
18'
Hopewell
0.33
12'
18'
Gilmore
0.26
12' and 14'
18,
Oceans
0.22
14'
18'
Sumas Rd.
0.16
16'
18'
Sorenson
0.25
10'
18'
Whatcom County Public Works 10/12
2004 Annual Construction Program
Project Narrative
Shoulder Widenings & Trails - CRP #904007
Item #27 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Project Narrative:
This Construction Program item addresses proposed shoulder widening and
trails adjacent to existing County roadways that require multimodal bicycle
and pedestrian improvements due to safety concerns, traffic volumes /
accident history, and funding or grant availability. Actual project locations
are still under development.
New Construction
Total width
I Lane width
Shldr width
Cudewarb / Glk utter
Si
n.d., p„I, no.,...t,i
Project Status:
Design will be complete in 2004 with construction in 2004.
Project Funding:
Federal / State — N/A
Local- $250,000
Environmental Permitting (Agencies/Permits) — Unknown
Right -of -Way Acquisition ($ Est.) — $10,000
Day Labor ($ Est.) — Subject to Council approval.
Actual project locations still under development. Council review and prioritization will be provided at future
date.
Whatco n County Public Worts 11112
200.4 Annual Construction Program
Project Narrative
Johnson Creek/Mosquito Lake Road Culvert - CRP #903008
Item #28 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Project Narrative: New Construction Features:
This project is located on Mosquito Lake Road at Johnson Creek in Sec 26, Lane width Match
Twp 38N, Rug 5E. The existing culvert is a barrier to fish passage. This CRP 1 Existinit
includes installation of a 19' span replacement culvert to allow fish to Sh1dr Width Match
access the upstream spawning and rearing habitat. ,,
Existin
Project Status:
Design will be completed in 2004 with construction in 2004.
Project Funding:
Federal / State — N/A
Local - $270,000
Environmental Permitting (Agencies/Permits) —HPA, SEPA, CLR/CAO
Right -of -Way Acquisition ($ Est.) — N/A
Day Labor ($ Est.) — Subject to Council approval.
— o �
VAN ZANDT d pow
/
NDUiH l$vvEv
H � eirep Lr.
Or asiWro
0 Fork
CIIPPer Tgin9 Jorgensen
Lake °F
kn s° 4
C�
s G
Sa are
ME Gm gv
{ z4 PROJECT
LOCATION
g eer
Gf
u_ecaay
p
l
ACNE Ve
xv
�� �O Jr i�
Whalcom County Public Worlu. 12/12
2004 Annual Construction Program
Project Narrative
Subdivision Overlays - CRP 9904008
Item #29 - 2004 Annual Construction Program
Construction Funding Year(s): 2004
Project Narrative:
This project is located in Sections 10 & 11, TON, R3W and Section 35,
T41N, R3 W. The work entails an asphalt concrete overlay on the following
subdivisions/streets: Maple Beach - Alder St, Birch St, Cedar St, Maple St,
Elm St, Derby Ave, Limerick Ave, Meadow Ln.; South Beach - South Beach
Rd, Maple Ave, Crystal Beach Rd, Ash Ave, Waters Rd, Kendor Dr, Saturna
PI, Waldron Pl.; Marina Basin - Marina Dr, Iolanda Pl, Edwards Dr.
Project Status:
Design will be complete in 2004 with construction in 2004 - 2005
Project Funding:
Federal / State – N/A
Local - $320,000
Environmental Permitting (Agencies/Permits) – N/A
Right -of -Way Acquisition ($ Est.) – N/A
Day Labor ($ Est.) – N/A
Is xrrnr POINT ROBERT:
n
i
Marina Basin
New Construction Features:
Lane Width
Match
Existing
Shldr Width
Match
Existing
Curb / Gutter
N/A
Sidewalk i
N/A
Brdg Rplc (length)
I N/A
Maple Beach
—/ South Beach