HomeMy WebLinkAboutord2010-033 WHATCOM COUNTY COUNCIL AGENDA BILL NO. AB2010- 238
CLEARANCES Initial Date Date Received in Council Office Agenda Date Assigned to:
Originator: . 6/8 Council Introduction
Doug Goldt/tore
0
Division Head: I L. Il - V I 0 - Planning and
ill Wain Harrison 5/34' // 7/ 27 / 2010 Development
A49418
JUN
J U N 0 1 2
0 10
Committee
ee
Dept Head: 7/ 27/ 2010 Council
David Stalheim i �� t ETC 0 C O U NTY Prosecutor: /� T Royce Buckingham i% 5 -2Kt( C OU N C I L
Purchasing/Budget:
Brad Bennett ‘ , —
Executive:
Pete Kremen
�� 6 — ( — (0
TITLE OF DOCUMENT: Pipeline Safety Ordinance
ATTACHMENTS:
( 1 ) Proposed Zoning Code Amendment
(2) Whatcom County Planning Commission Findings of Fact and Reasons for Action
SEPA review required? ( x ) Yes ( ) NO Should Clerk schedule a hearing? ( ) Yes ( x ) NO
SEPA review completed? ( x ) Yes ( ) NO Requested Date:
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE: (If this item is an ordinance or requires a public
hearing, you must provide the language for use in the required public notice. Be specific and cite RCW or WCC as appropriate. Be
clear in explaining the intent of the action.)
Proposed amendment to the Whatcom County Zoning Code, Title 20 . The proposed amendment is; to minimize
the likelihood of accidental damage to pipelines by ensuring early communication between those developing
property and pipeline operators; to limit exposure of land uses with high on-site populations that are difficult to
evacuate and land uses that serve emergency functions to the risk of injury or damage in the event of a pipeline
failure; and to ensure that there is adequate protection of existing pipelines from inadvertent damage during
nearby construction.
COMMITTEE ACTION: COUNCIL ACTION:
7 / 27 / 2010 : Forwarded to Council for 6 / 08 / 2010 : Introduced
approval 7 / 27 / 2010 : Council Amended & Adopted 6 - 1
Crawford opposed
Ord . 2010- 033
Related County Contract #: Related File Numbers: Ordinance or Resolution Number:
Ord . 2010- 033
Please Note: Once adopted and signed, ordinances and resolutions are available for viewing and printing on
the County 's website at: www. co.whatcom. wa.us/council.
C:\Documents and Settings\dgoldtho\Desktop\Pipeline Safety\agendabillftipeline safety.doc
SPONSORED BY: Consent
PROPOSED BY: PDS
INTRODUCTION DATE: 6 / 8 / 2010
ORDINANCE NO. 2010- 033
AMENDING WCC TITLE 20, TO ADD PIPELINE SAFETY REGULATIONS
WHEREAS, Whatcom County Planning and Development Services responded to a 2007
Whatcom County Council proposal, Resolution Number 2007-034, to amend the zoning code to
include pipeline safety and development changes, as processed under case file number
ZON2007-00014 .
WHEREAS, due to other priorities, Whatcom County Planning and Development
Services first reviewed this amendment and public hearing in early 2010.
WHEREAS, Pursuant to RCW 36 . 70A. 106, a Notification for 60-Day Review of
Development Regulation Amendment was submitted to the State of Washington, Department of
Commerce on February 2, 2010 .
WHEREAS, a determination of non-significance (DNS) was issued under the State
Environmental Policy Act (SEPA) on February 8, 2010, case number SEP2010-00012 .
WHEREAS, the SEPA DNS Legal Notice was published one time in the Bellingham
Herald on February 8, 2010 .
WHEREAS, Notice of the proposed Planning Commission Public Hearing was
published in the Bellingham Herald on March 14, 2010 .
WHEREAS, Planning staff prepared a staff report dated March 15 , 2010, summarizing
the proposal, background information, amendment analysis, findings of fact and reasons for
action, conclusions, and recommendations of ordinance language.
WHEREAS, the Whatcom County Planning Commission held a public hearing on
March 25, 2010, and voted to form a subcommittee to prepare draft ordinance language for
consideration .
WHEREAS, the Whatcom County Planning Commission subcommittee held public
meetings on March 29th, April 7th, and April 14th, 2010, and prepared a draft ordinance for
review by the Planning Commission at their April 22, 2010 public hearing.
WHEREAS, the Whatcom County Planning Commission held a public hearing on April
22, 2010, and modified the draft ordinance and invited further public comment.
WHEREAS, the Whatcom County Planning Commission held a public hearing on May
13 , 2010, and voted unanimously to recommend approval to the Whatcom County Council for
the proposed zoning text amendment.
FINDINGS OF FACT AND REASONS FOR ACTION
1 . Most of the transmission pipelines in the county were built in rural areas. Many of those
rural areas are now being faced with increased development, and some pipelines are now
within UGAs and five year review areas . As new homes and businesses are increasingly
placed in close proximity to pipelines it is important for the county to do what it can to
ensure the safety of its citizens and the environment.
2. Both the Washington Utilities and Transportation Commission and the federal Pipeline
and Hazardous Materials Safety Administration have recognized the growing problem of
development encroaching on existing pipelines, and are encouraging local government to
act proactively in their planning near pipelines.
3 . By Resolution Number 2007-034, the Whatcom County Council initiated a formal review
of a proposal as included within Attachment A of that resolution.
4 . The SEPA DNS was distributed on February 8, 2010 to : WA Department of Ecology
SEPA Unit (Olympia), WA Department of Ecology (Bellingham), WA Department of
Fish and Wildlife, WA Department of Archaeology and Historic Preservation, WA
Department of Natural Resources, Lummi Nation (Natural and Cultural Resources
Departments), Nooksack Indian Tribe (Natural and Cultural Resources Departments),
Applicant Carl Weimer, Williams Pipeline, Trans Mountain Pipeline, Olympic Pipeline,
Kinder-Morgan Pipeline, City of Blaine, City of Ferndale, City of Sumas, City of
Everson, City of Nooksack, Whatcom County Emergency Management, Whatcom
County Fire Districts ( 1 , 4, 5 , 7, 8, 11 , 14, 16, 17, 18, 19, and 21 ), South Whatcom Fire
Authority, Building Industry Association of Whatcom County, Federal Energy
Regulation Commission, State Utility and Transportation Commission.
5 . Public notification generated the following written responses : A letter of support from
Williams Northwest Pipeline dated March 4, 2010, a letter of support from the Olympic
Pipe Line Company, dated March 22, 2010, a letter of concern regarding the potential
impacts to forest practices from the Washington State Department of Natural Resources
dated March 22, 2010, a letter of support from the State of Washington Utilities and
Transportation Commission dated March 23 , 2010, a letter of support from BP
Corporation dated March 23 , 2010, a letter of concern regarding the potential impacts to
forest practices from the Great Western Lumber Company dated March 24, 2010, a letter
of support from the Washington State Citizens Committee on Pipeline Safety dated
March 25 , 2010, an email of concerns from Mr. Tim Surratt dated March 25 , 2010, a
letter of concern from the Building Industry Association of Whatcom County dated
March 25 , 2010, a letter of concern from Mr. Richard Gilda dated March 25, 2010, a
letter of concern from Mr. Jerry and Mrs. Lurline Hammer dated March 25 , 2010, a letter
of support from Kinder Morgan Canada Inc. dated March 25 , 2010, an email of concern
from Mr. Greg Brown dated March 25, 2010, an email of concern from Mr. Chris Hatch
through Mr. Jeff Rainey dated March 26, 2010, a letter from Trygve Construction, Inc.
dated March 26, 2010, and a letter of support from the Puget Sound Energy dated May
12, 2010.
6. The Whatcom County Comprehensive Plan Goal 5M and Policy 5M-3 support
developing information/education and notification programs to alert the public of pipeline
locations and safety when making land development decisions adjacent to transmission
pipelines.
7. The Whatcom County Comprehensive Plan Goal 5N and Policy 5N-7 discourages new
pipelines from certain more intense levels of development. This proposed amendment
provides a process for consultation with pipeline companies when new development is
proposed that moves closer to pipelines.
8 . The Whatcom County Planning Commission voted unanimously on May 13 , 2010, to
recommend a draft ordinance to the Whatcom County Council, as presented in Exhibit A.
CONCLUSION
The proposal meets all of the legal requirements as noted within the Findings of
Fact and Reasons for Action. The proposed amendment is compatible with the Growth
Management Act, Whatcom County Comprehensive Plan Goals and Policies, along with
policies within Whatcom County' s County Wide Planning Policies. Approval of this
amendment is in the public interest.
NOW, THEREFORE, BE IT ORDAINED by the Whatcom County Council that:
Section 1 . The Official Whatcom County Zoning Ordinance (Title 20) is hereby amended as
shown in Exhibit A.
ADOPTED this 2 7th day of July , 2010.
``����tuurrrrrn,i WHATCOM COUNTY COUNCIL
ATTE * N y C O 0 WHATCOM COUNTY, WASHINGTON
. • H • .
o: . • `" A ''0 *.?
•
• N -
1 tna $• Davit%o}mcil �'lerk S . Crawford, Cha ' serson
• •h'II •
''./ • N I
• • • • \\
APPROVED as „t�o form: - ( Approved ( ) Denied
/���%/ �r
Civil Deputy Prosecutor Pete Kremen, Executive
Date:
EXHIBIT A
Pipeline Safety Ordinance
Section 1 : Purpose
The purpose of this chapter is to help minimize unnecessary risk to the public from hazardous
liquid and natural gas transmission pipelines by :
( 1 ) Minimizing the likelihood of accidental damage to pipelines by ensuring early
communication between those developing property and pipeline operators .
(2) Limiting exposure of land uses with high on-site populations that are difficult to evacuate
and land uses that serve emergency functions to the risk of injury or damage in the event
of a pipeline failure.
(3 ) Ensuring that there is adequate protection of existing pipelines from inadvertent damage
during nearby construction.
Section 2 : Definitions
2 . 1 . Transmission Pipeline means a pipeline carrying hazardous liquids, and all natural gas
pipelines equal to or larger than 12 inches in diameter that operate at over 500 psi.
2.2 . Hazardous liquid means petroleum, petroleum products, or anhydrous ammonia.
2 . 3 . High Consequence Land Use means a land use that if located in the vicinity of a
hazardous liquid or gas transmission pipeline represents an unusually high risk in the
event of a pipeline failure due to characteristics of the inhabitants or functions of the use .
High consequence land uses include :
2 . 3 . 1 . Land uses that involve a high-density on-site population that is more difficult to
evacuate. These uses include schools, hospitals, multi-family housing or other
facilities exclusively for the elderly or handicapped housing or facilities,
stadiums, and day care centers. Day care centers do not extend to family day care
or adult family homes.
2 . 3 .2. Land uses that serve critical "lifeline" or emergency functions, such as fire and
police facilities.
2 .4. Pipeline Corridor means the pipeline pathway defined by rights-of-way and easements
in which the pipelines and facilities of a hazardous liquid or gas transmission pipeline
operator are located, including rights-of-way and easements over and through public or
private property.
2. 5 . Essential public facilities are those facilities "typically difficult to site, such as airports,
state education facilities and state or regional transportation facilities as defined in RCW
47 .06 . 140, state and local correctional facilities, solid waste handling facilities, and in-
patient facilities including substance abuse facilities, mental health facilities group
homes, and secure community transition facilities as defined in RCW 71 . 09 . 020 " (RCW
36 . 70A.200, Siting of essential public facilities). The county has also designated
telecommunication towers, water treatment plants, sewer treatment plants, and water
storage facilities as essential public facilities ; however, telecommunication towers are
exempt from the provisions of this ordinance.
Section 3 : Development notice when adjacent to transmission pipeline
The purpose of this section is to improve communication between property owners and
transmission pipeline owners to minimize the risk of inadvertent damage to transmission
pipelines and to provide guidance to property owners about minimizing further risk through site
design or construction.
3 . 1 . Land divisions, high consequence land uses and essential public facilities
3 . 1 . 1 . Applicants for divisions of land creating new lots, high consequence land uses
and essential public facilities shall show hazardous liquid and gas transmission
pipeline corridors and other required construction limits on applications when
proposed development is located within 500 feet of the centerline of the
pipeline corridor. Minor modifications to existing structures that do not involve
significant land disturbance on-site or changes to off-site improvements are
exempt from this requirement.
3 . 1 .2 . Whatcom County should notify the transmission pipeline owner at the earliest
possible stage of application review. Whatcom County shall provide the
transmission operator fifteen ( 15) days to provide comments to Whatcom
County on the development application prior to approval. Any comments
provided by the pipeline operators will be passed on to the applicant.
3 .2 . Other development
3 .2 . 1 . Development applications not addressed by Section 3 . 1 above are not required,
but encouraged to show transmission pipeline corridors that are on or abuts to
the proposed development property.
3 .2 .2. Whatcom County should notify the pipeline transmission pipeline operator at
the earliest possible stage of application review. Whatcom County may issue
development permits without written response from the transmission pipeline
owner. Any comments provided by the pipeline operator will be passed on to
the applicant.
Section 4 : Ensuring land use compatibility with pipelines
The purpose of this section is to limit exposure of land uses with high on-site populations that are
difficult to evacuate and land uses or essential public facilities from the risk of injury or damage
in the event of a pipeline failure.
4 . 1 . High Consequence Land Uses and Essential Public Facilities
4 . 1 . 1 . New structures for high consequence land uses and essential public facilities
proposed for within 500 feet of a hazardous liquid or natural gas transmission
pipeline corridor are prohibited.
4 . 1 .2 . Proposed expansions to existing high consequence land uses or essential public
facilities located within 500 feet of a hazardous liquid or natural gas
transmission pipeline corridor will be designed to avoid a significant increase
in the level of risk in the event of a pipeline failure, and where feasible, reduce
the risk compared to the existing development. Potential techniques to minimize
or reduce risk include but are not limited to :
(a) Site design features, such as maintaining or increasing the distance
between occupied structures, or structures that provide critical lifeline
functions, and the hazardous liquid or natural gas transmission pipeline.
(b) Building features, such as building design to avoid a significant increase
in risk to on-site populations or to expedite evacuation.
(c) , Technological features, such as accelerated notice of a pipeline failure to
the high consequence land use to facilitate evacuation or features that
help to avoid damage in the event of a pipeline failure.
(d) Operational features, such as emergency plans and education programs
for occupants and employees concerning pipeline safety.
Modifications to existing buildings that do not increase the onsite population or
hinder evacuation, or change evacuation routes are exempt from this
requirement.
Section 5 : Pipeline Corridor Protection Requirements.
The purpose of this section is to ensure that the pipeline pathway defined by rights-of-way and
easements are protected during construction in the manner set forth below.
5 . 1 . No significant land disturbance or construction or expansion of structures is allowed
within defined right-of-way or easements of transmission pipelines corridors without the
express written consent of the pipeline operator.
5 .2 . Pipeline corridors shall be identified and protected during construction by placement of
a temporary barricade and on-site notices . Barricades and on-site notices are subject to
review by the Code Administrator.
5 . 3 . On sites that directly abut or are located within the pipeline corridor, the County shall
verify that applicants and designees have notified utilities through the one call locator
service by checking the website www.managetickets.com before issuing development
permits for land disturbance or other significant work.