TITLE OF DOCUMENT:
Resolution approving the Columbia Valley Water District Water Comp. Plan Update
ATTACHMENTS:
SEPA review required? ( ) Yes ( ) NO Should Clerk schedule a hearing? ( ) Yes ( X ) NO
SEPA review completed? ( ) Yes ( ) NO Requested Date:
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE: (If this item is an ordinance or requires a public
hearing,you must provide the language for use in the required public notice. Be specific and cite RCW or WCC as appropriate.
Be clear in explaining the intent of the action.)
Resolution approving the Columbia Valley Water District's 2013 Water System Comprehensive Plan Update
COMMITTEE ACTION: COUNCIL ACTION:
10/22/2013: Forwarded to Council for approval 10/22/2013: Council Approved 7-0
Res. 2013-035
Related County Contract#: Related File Numbers: Ordinance or Resolution
Number: Res. 2013-035
Please Note: Once adopted and signed, ordinances and resolutions are available for viewing and printing
on the County's website at: www.co.whatcom.wa.us/council.
Columbia Valley Water System Plan Update
PROPOSED BY: Consent
SPONSORED BY: Consent
INTRODUCED: October 22, 2013
RESOLUTION NO. 2013-035
APPROVING THE COLUMBIA VALLEY WATER DISTRICT'S
2013 WATER SYSTEM COMPREHENSIVE PLAN UPDATE
WHEREAS, the Columbia Valley Water District has submitted a proposed update to its
Comprehensive Water System Plan to Whatcom County for review and approval; and
WHEREAS, the District's proposed update complies with the criteria set forth in RCW
57.16.010; and
WHEREAS, RCW 57.16.010 requires that all comprehensive water and sewer system
plans and plan amendment be either approved, conditionally approved, or rejected by the
legislative authority of the county in which the district is located; and
WHEREAS, as required by RCW 57.16.010, the Whatcom County Health Department has
reviewed the proposed plan update and submitted a letter of approval to the County Council; and
WHEREAS, as required by RCW 57.16.010, the Whatcom County Public Works
Engineering Division has submitted a letter of approval to the County Council, with the following
notations:
APPROVAL CONDITIONS:
1. In the event of any conflict between Plan Update Appendix F Drawing Nos
W-01 & W-03 and the 2012.09.25 versions of Whatcom County Standard
Drawings Nos 512.F-1 & 512.F-2 that pertain, respectively, to trench
repairs and pavement overlays on County maintained public (i.e., not
private) roads, the County drawings shall apply; and
2. The 2012.09.25 version of Whatcom County Standard Drawing No 512.D-1
that pertains to standard utility locations within County maintained public
road prisms shall apply.
APPROVAL CLARIFICAITONS:
1. The District will coordinate its planned water system facilities construction
program with the County's planned road construction program.
2. All work that the District performs in a County right-of-way requires a
Revocable Encroachment Permit as a prerequisite.
3. Depending on the scope of work on any given District planned water
system facilities project, the County might also require:
a. Other permits (e.g., building, conditional use, land
disturbance, shoreline) as a prerequisite to project execution.
b. Stormwater management related documentation, with possible
consequent engineered stormwater management system design.
1
NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Council that the
Columbia Valley Water District's 2013 Water System Comprehensive Plan Update, dated
Mar h',‘Z,‘12.013, i s,h,er�eby approved as presented.
o '
.P EI't s.,22 day of October , 2013.
Q ' OUNTYO �' WHATCOM COUNTY COUNCIL
A "M' ST: WHATCOM COUNTY, WASHINGTON
D-ena $ v -De ii§; Gl'erk 44 the Council Katy Kershner, Council Chair
HIN•
•... ..•
APPR ►Qrrrr *ro: r
ivi Deputy Prosecutor
2
11
�.s J
w
cn > c2
.P ID,
ca
0
CD 3
4.11 C
a
E
z
>+
• L
0 w
w
• iu
E o
/MEMO
u, N
® ›-
Dtn
FULL PLAN ON FILE AND AVAILABLE FOR REVIEW
IN THE COUNCIL OFFICE
3+ (APPROXIMATELY 500 PAGES, INCLUDING NUMEROUS COLORED MAPS)