HomeMy WebLinkAboutres2014-040 WHATCOM COUNTY COUNCIL AGENDA BILL NO. 2014-299
—
CLEARANCES Initial Date Date Received in Council Office Agenda Date Assigned to:
Originator.• GSS 9/2/14 9/16/14 Council/Introduction
Division Head: `l' 3 R L C IE WED E D 9/30/14 Hearing
Dept.Head: jr f/'//A41 SEP 0 9 2014
Prosecutor: 4j� o9Aoy /ILI WHATCOM COUNTY
Purchasing/Budget: COUNCIL
Executive: G)/$/��
TITLE OF DOt'UIt1CNT:
Resolution adopting the Six-Year Water Resources Improvement Program(WRIP), 2015-2020
ATTACHMENTS:
• Memorandum
• Resolution
• Six-Year WRIP, 2015-2020
• Project Narratives
SEPA review required? ( ) Yes (X) NO Should Clerk schedule a hearing? (X) Yes ( ) NO
SEPA review completed? ( ) Yes ( ) NO Requested Date:September 30,2014(public hearing required under
RCW 86.15.120)
SUMMARY STATEMENT OR LEGAL NOTICE LANGUAGE:
Resolution by the Whatcom County Flood Control Zone District Board of Supervisors adopting the Six-
Year Water Resources Improvement Program (WRIP) for 2015-2020. The adoption by resolution is
pursuant to the Revised Code of Washington (RCW 86.15.110).
COMMITTEE ACTION: COUNCIL ACTION:
9/16/2014: Introduced 7-0, Council acting as FCZDBS,
Proposed Public Hearing for 9/30/14
9/30/2014: Council approved 7-0, Council acting as the
FCZDBS, Res. 2014-040
Related County Contract#: Related File Numbers: Ordinance or Resolution Number:
Res. 2014-040
Please Note: Once adopted and signed, ordinances and resolutions are available for viewing and printing on
the County's website at: www.co.whatcom.wa.us/council.
PROPOSED BY:
SPONSORED BY:.PutliciN rrks
INTRODUCED: 9/16/2014
RESOLUTION NO. 2014-040
(A Resolution of the Whatcom County Flood Control Zone District Board of
Supervisors)
WHATCOM COUNTY FLOOD CONTROL ZONE DISTRICT
SIX-YEAR WATER RESOURCES IMPROVEMENT PROGRAM
FOR THE YEARS 2015 THROUGH 2020
WHEREAS, pursuant to RCW 86.15.110, flood control or storm water control
improvements may be extended, enlarged, acquired, or constructed by a zone pursuant to a
resolution adopted by the Board of Supervisors; and
WHEREAS, Whatcom County Public Works Department on behalf of the Flood
Control Zone District has prepared a Six-Year Water Resources Improvement Program for
adoption; and
WHEREAS, pursuant to RCW 86.15.120, the supervisors shall hold a public hearing
prior to adopting the resolution; and
WHEREAS, the Six-Year Water Resources Improvement Program attached hereto as
Exhibit "A" has been reviewed and determined to be consistent with the County's
comprehensive plan and is consistent with the following plans:
• Lower Nooksack River Comprehensive Flood Hazard Management Plan,
October 1999
• Canyon Creek Alluvial Fan Risk Assessment, September 2003
• Jones Creek Debris Flow Study, March 2004
• WRIA 1 Salmon Recovery Plan, October 2005
• Lake Whatcom Comprehensive Stormwater Plan, March 2008
• Birch Bay Comprehensive Stormwater Plan, July 2006
• Swift Creek Sediment Management Action Plan, July 2013; and
Page 1
WHEREAS, pursuant to RCW 86.15.110, for constructed improvements the
preliminary engineering studies are on file with the Whatcom County Public Works
Department; and
WHEREAS, pursuant to RCW 86.15.110, the estimated cost of the acquisition or
construction of the improvement, together with supporting data is included in the Six-Year
Water Resources Improvement Program; and
WHEREAS, the improvements will benefit one or more zones, subzones and the
county as a whole;
NOW, THEREFORE, BE IT RESOLVED by the Whatcom County Flood Control Zone
District Board of Supervisors as follows:
1. That the Whatcom County Flood Control Zone District Six-Year Water Resources
Improvement Program for the years 2015 through 2020, which is attached hereto as
Exhibit "A", is hereby adopted.
APPROVED this 30th day of September , 2014.
' •• t�•t• • , C'� �,y Flood Control Zone District Board of
r �' ':+� .� Supervisors
ATtE . • WHATCOM COUNTY, WASHINGTON
-
•
ft-
Dane Brown-Davis, Clerk of the Council Carl Weimer, Chair
APPROVBD.14S TO FORM:
1111111111.
Pana 441,4).-TLF
Daniel L. Gibson, Chief Civil Deputy Prosecutor
Page 2
WHATCOM COUNTY PUBUC WORKS 2015-2020 SIX-YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A Updated 9/3/2014,992 AM
Fenn x1 UaOkase MYlehe�aMWa 7015 Wl6 7017 ` ___ 1t/� IDID TWI
I . 1 Plelect OePV�elan IDNe. • 06 Phase Amount Sauce jPhase Amount Source IPrgsr Ammtnt /maw Pllgl AIIIRaS8 PhHR Amwld }Airs Armed Phase AmeuM
LACE'rYIM:60)IM1sS[/ IYAIE$ I r---•••-.•-• kEE'r MEET PEET
AwGmy Rad/lo6R with COB(LW CIP-051: PE 5 _90,000 DOE PE 5 50,000 DOE 'PE PE le. RE —...rPE_
RW RW EW RW RW
Fr. S SBiRDO gB•[anG ana Row Mg _ ....r.-.. ... ...__. —.....— _ _ _ -
PDrtreaomrrt,media filter drain,sorlkl mob !HET EN CPO -�y EH $ 1,735,000•
1 07-097 fi05 jEN $ 175,100:FRD 91 ................ CN CN W EN
filter,high flow bypass,and vegetated buffer along
lakefront COB �1CN at CN EN FN
•
•
• FE $ 75.07' 0190 APE $ .MA313. P{' S .ShR70 f® PE RE PE
. R . .. _. Pf 5 516 Fab .PE - ...PE.. PE PE P
Ceder Wgs/E did(LW CSPU CIP-09,aP-10):Install
x 07-066 63.9 RW .S ...00.2 AEET.... RsV ---__ - 1tW ... .. ..... ow.................. RW $ 725,000
rain gardens,filter vaults,and,wales --- -"" - '-" "'- --Dl
CN Q1 ❑Y $....—_MAO) REEF............ CN 01 DI CN
_ CH 01 CH Of CN OS ON
PE PE S 315,030 EEO PE ■$ 20,000:REET PE YE Pf RE
Ape Heights Esbb/Bay lane(LW CSPM CIP-11,CIP• P[ _ Pe $ 5,000 OD PE $ 5,000 FCZD PE PE ................__.-...-_._PE...
3 12):System upgrades to improve water Quality 07-102 605 RW .........-.- RW $ 15,000.REEr RW _-- - —...SW .......... ....RW-...-_ 1651 —..-.... NW $ 610,000
IOiuinRlil-apon nwRls;redJCe dH�enaswnl CN i W CN CN .-_$ 500.!%17 LN _... .�— � -
CN CN CN CH CH Rtfi pi
PE PF _ 3370.'!QP PE 5 85000 REST PE S 29,900._PS— RE- PE
Beaver Chwk(LW apt'CIP-13):Restore and repair PE S 5.000 929 PE pE -FE PE
_ ---_ --
4 13003 563 ftW _ HW i RW S -1-0.g RE. CU RW NW OW $ 575,000
eroded sections of Beaver Creek CM dl Lk .-1,s CN 5 e50AP] CN..._......_._-..... .................-
. ...._. _
CH Cl et _CN CN at CN
PE #9 ....—. BE _._ 5 100.0.7 PE $• 259W!re PE
5 Sudden Valley(LW CPN CIP-16,CIP-17):Drainage 3 RW RW YI ■y }. .....}'m0Rt iAW RW
$ 640,000
systems upgrades and outfall retrofits 01 CN .... EN .--_ -- ... 311_ _ CN_ _ __�CN 3._°b0,d1?CN •
a �CN CH CU CN _99 _01
Uwe Beech Creek(LW 6PN OP-04,CI P-06):Maine � ..— —._ 7E P[ $ E—5 50_16'
,Rat RW RW RW RW 5 SOtq'RW BW.
6 channel restoration below Hillsdale using natural 07-095 60.5 t • �_..-.-.....----..-.- - —•— $ 750,000
vegetation !IX CN CN IX CN ai CN S 520.000-
.En CN _ —-_ CN ad IX CN ircm S 301 -
-- --arpuhon on..E Pier&Saeet:Desgn 2019, PE PR 19 p5 -PE ?E $ PF_S
construction 2021 System upgrades to improve RW 1739 RW SW RW RW S _96 6 RW
7 14-002 62 2 -• ._.. ... - _ _ _ $ 200.000
water quality(biufiltration swags,reduce ditch ON at 01 Chi -... CR Pi F?1
0.. IX al CN
erosion) CN q CN al CN CN
Lowell Drlw and Cedarbrouk Court Design 2020, PE PE ............. PE PE PE PE -Pt•8 RW Hit RW RW RW ANi• S 9
construction 2022.End of pipe media filtration and 14-003 62.2 - - ---- --- - CN — -- — $ 150,0110
01 09901 drraege S10pnY.prmemwltl CN __ ....._. .—__OS - - Oa - CH v1 p1 W- .
• •
Notes:
1.Expenditures shown are planning-level cost estimates The Six-Year WHIP does not
authorize expenditures
2.PE x Preliminary Engineering;6W=Property ACRuistion;CN=Construction
WHATCOM COUNTY PUBLIC WORKS 2015-2020 SIX-YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A Updated 9/3/2014,9:02 AM
limiest DeevSrtlm IFS Previa.EA:medlar. 2915 201/ 7017 1 __ MY M/u TDaI
N. DNo. Phase Amount Source Pltasa Amour= 06010 z Arnnel 3ouror Mee Amend Phan Arendt Phe• Amount Phase Amount
I mgt lay WNAM OBWARa6 •�•• BBWARM ••••• 06WARRS a6WAM NBWAtist 00WAR0
PE 1 WEDS PE PL PE PE re PE
Herborvf.w Reed Culvert Replacement(HL-1): RW RW •RW BIN RW $ • RW RW I
9 Upsize six culverts along Harborview Road to reduce 07-217 52.0 CN CN ICN 00 CN $ 133.000 C+1 CN [$ 315,000•
flooding over roadway and adjacent properties QF CN I00 IX 'CH 5 .TA?0 ge CM
CPI Cii .1CN CN IEN laSEh CN CN
• .. PE $ 127,0 PE +:PE iN S 39,000 IT P( PE
Cottonwood Drive Drainage Improvement)HL-2& RW RW IRW RW S. 20.000 Rw Rw RW_
10 HL-3):Conveyance improvement for reduced 13-006 52.2 CN CN -- - ICN - - CO } 71540 CN . -CIt -CN.. .-.. $ 967,000
flooding and water quality treatment improvements CW .-_ C _ H [N' ! r9.0 IX CO
_
0 CN 1
CO 1100)CN 60 CN
RE F'. 30,000 )PE PE PE PE P6
5wsiew111MfWrw1LIreOlsaetbYad.:609000 RW DE -RW RW ....RW .. .RW — — RW $ 115.000•11 drainage conveyance and reduce flooding 13-006 52.2 CN - OR S SSP00 {00 ..Dl.... Ca- CH CN
r..- .._ .._..CO CN -_ {CN :ON CN 072 d
Collaborative Drainage System Ibp•Ir-drxlr Point PE ✓'E 5 JAM) PE H 1RAPP:0rt�.Rwt PE PE r'E PE Total project
12 )60-03):New marine outfalland drainage system 07-241 37.8 KW RW S Rs.a awn rresrs ORW_5 E..rrmtivr RW AV RW R1N -_ — — 5620,000
from Semiahmoo Dr to Semiahmoo Bay �' • CN CN $ 20P,000 CH —4M CI! _ LN e1wMMiowc•
IX ail 120 3 2m,ox..Nw oevru000 01 'CM C1f ON .. 10W WO
Richmond Park(SH-3,SH-2,SH-1):Upsize outfall and
PE PE PE _REE.—. _ -- _ 5_219,000 K. .............. PE_S W.= .
13 install new drainage diversion down Shintaffer Road 07-271 62.1 O• - IX 3 250 CO S 1 $ 1,275,000
to reduceftaed:ng Ind FAN ercabn .... ...-___...... __ ___....... __...-. — _. _ .... .... .... - - - .....--- __ _- A�FO]
1 CN Cr LN pi CN CN CN
• PE PE PE PE PE ,$... 3QO+U PE PE
WaddrMge Drive Drainage Improvements(CC-03): I{
14 Improve drainage system to reduce local flooding 13-007 52.2 - - - - � - — RAW--• $ 90,000 aq• CN
and maarporate avatar yvalR,'watnwat
CN EN cN CN ...-._..CN.....-. OE W
PB PE TO 66 PE S 2S.=PE $ 3.As.:59 PE
15 Smel world pro}ctc Cen[ml North,Cottonwood, va. RW RW RW _
Point Whitehom, venous--— ----- 5,000
Terre!Creek ;011 CO CO CN C1z Lq f _�'�.cam $..—�� CN....-._---- ---- --- -----
I pi CN try ECM 61 CN d
Mal IAY DENE4PW PEDESEaPAN TAm717 1 1 1 I•7'E B f11Ao0 3TP.axd PE s ...sees 3-0-Row PE PiE PE YE PE Top1 Praia=
'6 .._ ssi.g..-_._-. ...- .-. ... _-...-- .. .- ._... -.....i ..-...._...._..-....--' -- .—... ..-
PE s ]x1-000 n� PE ,S 2n.946 e1Er-rig CH i L00.000:STEa.ed IIY11 0.W —.... RW RSV __......517,420,070
16 Berth Bay Drive&Pedestrian Pmlee:Stommeater 07-030 72-1 Pf PE a s '11sSP00 Mdfemt Lk S 1-3rRL000 CO i eN,o00 ILN CO
....t•
improvements PW 5 :snow aF1T RW 3 imam TELL-tag CO S 1,aeRn'm CN IX Jck 03'1
RW QY ON .$ 250zp6?_■.,7gD. fOC. - CN. ICN CO Nwpoo K20
.......__- ;CN CO CN S 2.5_�90Q.*NOM CO[ 0 1109 CR t 8DWto1NMu
•
T SWYTOBEH I ) I I
Sete 0..11 Plum 1 PAplry•xstimnnt Tr ps, :' PE $ 873,000 DOE Grant TPE -._s..............f t'766. ?arWT._.:-!!!M...........----PE......- .—..—IPf...— PE 'PE DE
17 Upper Goodwin Reach Setback Levee,and Sediment 13-031 69.6 PE $ 442,000 FQD Rio S 7DOp6 F520 RW RIY RW _ 1191f _....... ...—RW .._
Basins 01 CN .T 1.100,900.MS..wit as 5 69,000 CN S 30,OmpOP CN -- .. 01 _ �$ 14,209,000
_ EDl Cl ...CO Foil� DOfI CN CT
RE PE PE jPE PE PE PE
18
swift GeeY hMlmewno.-Dredging and levee repair; 0&023 602 RW RW NW i0W RW OW iry2• .. —.. .. - $ 1,475,000
and maintenance ; Cl. 5 141,000 Fop CN CN _ icN $ 150.D00 CN $ 150900 Cii S 13406 tai S 35D,Oln
.. --.. _. ........-..--_ _-_---- _—__.._ y
,STi to i z2s.P-A ooF�l.q CN ;CN CH SN 'CN
Notes:
1 Expenditures shown are planning-level cost estimates.The Six-Year WRIP does not
authorize expenditures.
2 PE=Preliminary Engineering;OW=Property Acquistion;CN=Construction
WHATCOM COUNTY PUBLIC WORKS 2015-2020 SIX-YEAR WATER RESOURCES IMPROVEMENT PROGRAM EXHIBIT A Updated 9/3/2014,002 AM
•
TW5 I i Diftlime Preview Enpendlarm 2015 200 71217 2019 2070 Tolol
1 Prognet DantrIgnion WS
No. I
WOW. On.. Amount ioirer Ppa-.0 Arni.,•,.. ic....:• 000e Al....,11. :PUNE. Phase Amount Phase MeAmount Phase Amount Phase Amount
. RIVER AND FLOOD :
• •
PE PE F: PE tE PE PE
-.. .. .
Total through 3035t
Nw ...5 7$.0-49 =r.lm' 'NW S. .0E00 ECU •
•
RW 6 250013 PkMA3-14/51.10 rant V? $ zso..om FEMA Fnd/State gra•.; P.V... 5120.0013 NW 5/20.00.!7 TO $laugravg •$120,000 NW ... $170;01 51590560
19 Marietta Asquisition-Acquire properties in 07-002 73 3 ,6„., 3,3...2
repetitive flood loN area
Dl 5 130,0:0 Pr20 CH S 50E03 FC7D IcN 530.000: D4 tinift EN $30,000 01. $39.90N. $30,000 .1730121:
EN S 70.,E03 EEMA ii4/53.0lit tm, EN $ a'-ra'.F+=01 Frq,..!Ilr! : •
.. 5650.300 -
. col S W246 EWP Ernst LH IN EN EN DI .4
PE $ 1CO,COS 0DED PE .113E _PE 'PE PE FE
I
----- Pt PE . ... -
PE irE _
:
I 4 S zizockt P=17. 4"..- 4.^,.. Fl PE . .
OR 5 90,000 DOE:rant I Project Total,
I '0
i f4W. S 110000 PC733. ' .. NW - _ RW RW NW I 55,640,003
NW .$ 703*PENA fmi/State pint _OW .... IOW OW NW A* . Ri. . .1
0nyon Creek Restorstion-Levee setback and • ' '" •
20 07-133 74.7 1119 5 303*-1.1-00 avant thriltrLT 0TW kW RW NW RW RW
construction of 23 engineered log jams •.. ••••
•RW 1 60.0130 REDPery9Orte grants NW NW kW RW . RW NW 1.2E7.1,
01 $ 20* DOE/front CH CN CH ,CN 5130,030.
:C6 .I 51/000 FEDilAF.05,01F-4.T. -
EN $ 7.,S50503 19th Fed/3Line oast. C21 EN _1_0,
CH 00. 01 - •
!EH 5 1510000 DOE grant CO EN 01 EN CO CN
i FE S Asopoo.an-7 PC S. Ri60.4!),REEr iE _ PU PC . FE EE Ponlekl Tot&
Owning Levee rownwament-Realign and improve 07-203 72 2 .NW S 60000 FCZD NW. .. .NW RW, _. kW RW RW 5.4.1$1.E711
21 -- • ...71..__•
upstream portion of levee to protect Deming '01 CR PI 5. J'aqfflUe•::REET CO . Co CN CO notoviro.
... .... _
EN Of _.
Dl g Ino0.2130 010Egatent :=N ul CN ,CN 560trio
FE 5 2%000.E217 Pi $ $P0Mq:*21E PE 3 31:0503 PCZO r. PE IN c'Plina.""b'0.1-•
liW $ %LOCO FCZD foie .5 MC05 I icth RW S 900030•0.411 kW liw 121A1 01.534.000
22 '''''''C ''D.hd.R."'P"'`th"-Cc'n'trud 07-105 70.6 kW 0 -W.A9,,•HaIAgilstsiEFX
draronon INFRI and Eldon:1.1 mons
Cid EN .. 01 WI 5 354.00 EN 5 1500,000 CN at FC7_18 Total:
09 01 • EN EN ON EN EN 01.500.000
- ,
PE $ nap,MID PE .5 $.74c.C...IPiceP PE .A .•11;RO,:otilY. PE $ glko;19 K PE , n_ .
EE $ E;Yrt.°3'''..5fErlim 1 PE ..5 19E0E0:PS?VW, 1 Planning Total: .
Lwow Hoak:rad Plwnirw SWIF and CINNIP Maim.r ., ...- .- --
PE 3 7.?0,12?2.PEP irMit ! $1.650000
23 -Planning projects will result in list a capita wrists 56 76
FM RW NW SW SW RW SW
Improvements and programmatic actions 01,._ • 01 501 EX '5 0015c.O.Co 5 059,009 Coo .3 MORalf,CO 5 tOoleTE p10125.k
Cot CM 1°' EN EN OE CM
pE ..$ .5$40$0.PPP. P$ ..$. $34a$0'PIP PT PU PE PE kl ft9147.1!t-
High Creek-
24 Recommended projects to address 07-125 574 " kW RW NW RW 1160 14.
•
ongoing sedimentation EN ..$ 00*.f00 EN .04 5 500505 CN EN EN CN FaIreol:
Ri EN EN CS EN 01 VI : SWOOP
PE 6 150.000•HUD PE PE PE ... PE PE PE P195030 160W
, S.IIMINTI Management Pilot-Small-scale sediment 07_265 .... iii . NW OW RW . _kW ._. _.,kW RW 5150,000
'... mrnavai re fuPP.,,LPP'PP"P‘...1....,.PLTPUIV: ". ON .
ni c.I4 ON c, 61 chi KM):
CM • 61. _ CPI .CH CH CM EN SIWW1
PE , PE FE r PE PE PE SE FIA.5,.,S,,14.__
Oty of Bellingtom Swallow Berm-Flood Huard - - - Mr/ RW I RW NW NW RW 52,400.000
26 13-009 61.4 'LIT •
Reduction 61 . Di S SOO.= l 01 00 at CS 05 NanTatir
cm CM EN br cm lcri EN .
1.00030 si -
• PF . iE . PE n. PE . PE PE 1.1.1/6546 _
27 Emergency/New P/OPICIS-Typically repair projects 00-003 v.,. NW .-RW
FLW il';'' . -- NW kw RW 5300.000
•
Mal roant Man ww dninairs..G resitLed. 0!. . .
. ... .... ..Dl .5 70,503 fq7'. . CH ..5 n0,600.110 ;Eh 0 154100 CH 5 254000 Cl! 5 210, EN $ 250P00
CI at 3 soxcn La,o,Fm.... EN .5 SECOD total too., i EH 0 10.000 CH 5 sbiiri cr' S se..me 00 S 95s.502,_
! . . . . _.. .... ... .. ..
NOTE Niatrows Iniaalb my isinenheldmaire
_ .arowns stgUardnnowroared-
•
• '
NOM PREP1Wol!wool to Rho Moo* . _lam I .
po4oct ors lio,oho Hood toodibabsoo- .... . . . -- ... - ' . • • • • • t
..
•
Notes:
1.Expenditures shown are planning-level cost estimates The Six-Year WRIP does not
authorize expenditures.
2.PE=Preliminary Engineering;NW=Property Acquistion;Dl=Construction.